Bridge Working Group
2012 Work Plan Accomplishments
• Conducted a survey on commonly used deck
patching products used by state and contract forces.
• Sponsored and supporting research initiatives
• Working on a process for identifying and promoting
innovative bridge preservation products, materials,
and techniques for use by bridge preservation
practitioners
• Worked with the ETG, TSP-2, T-9, in getting the
definition of bridge preservation approved by the
Standing Committee on Highways
2012 Work Plan Accomplishments
• Supporting FHWA’s Long Term Bridge Performance
Program (Bridge Preservation & Durability ETG)
• Supporting FHWA’s Bridge Preservation ETG’s efforts
• Identified bridge maintenance related training
materials that will be disseminated to users
• Conducting regular quarterly teleconferences with
the Bridge TWG members.
Proposed Performance Measures per AASHTO
Standing Committee on Performance Management
(SCPM) Discussion
• Use of AASHTO Bridge Element Condition States
– Update the AASHTO Bridge Health Index to be
Condition-based driven (remove the cost
dependency from the current calculation)
– Classifying Bridge Condition under Good, Fair, Poor
or a similar grading system
• Focus Areas - Research
• NCHRP 14-23 – “Practical Bridge Preservation Actions
and Investment Strategies”
• NCHRP 14-24 – “Guidance for Communicating the Value
of Highway System Maintenance and Preservation”
• NCHRP 14-30 – “Extending the Life of Highway Bridge
Coating Systems Through the Use of Spot Painting with
Minimal Surface Preparation”
• NCHRP 14-28 – “Condition assessment of bridge post
tensioning and stayed cable systems using NDE”
• Task 330 Maintenance Investigating the Use of
Pavement Preservation Products as Low Cost
Waterproofing Treatments for Bridge Decks
2013 Work Plan
• Focus Areas - Workforce Development
• Survey the State DOTs
– Identify and collect available bridge maintenance training
materials
• Collaborate with FHWA, States, and Industry partners
to host the training materials and make available to
users
2013 Work Plan
2013 Work Plan
• Focus Areas - Performance Measures
• Work with other AASHTO Subcommittees and FHWA to
promote:
1. The use of bridge element condition assessment
2. Transition a way from the use of structurally deficient
measurement
3. Use of a condition-based bridge health index (remove the
cost dependency from the current HI calculation)
4. Use of a Good, Fair, Poor measurements or similar grading
system
5. Survey the State DOTs to identify current measures used in
bridge maintenance, i.e. work backlog; flag systems, etc.
2013 Work Plan
• Focus Areas - Environment
• Proposing two research statements:
1. Quantify the environmental benefits of bridge
preservation
2. Identify environmental requirements for bridge
washing
3. Promote the use of recycled glass as an abrasive
blasting medium material in bridge maintenance.
Research
• Proposed Topics for Environmental Excellence
Work plan
– Identify strategies and practices that promote
environmental sustainable bridge maintenance
practices.
Research
• Research Implementation Recommendations
– 2005 14-15 Developing a National Database System
for Maintenance Actions on Highway Bridges
– 2007 234 Guidelines for Selection of Bridge Deck
Overlays, Sealers, and Treatments
– 2013 14-29 Developing a Consistent Coding and
Training System for Emergency Structure Inspections (F-02)
– 2013 14-30 Extending the Life of Highway Bridge
Coating Systems Through the Use of Spot Painting with
Minimal Surface Preparation (F-03) New Research Problem
Statements and Proposed Resolutions (see next slide)
Research
• New Research Problem Statements
1. Quantifying environmental benefits of bridge
preservation
2. Investigation of the Use of Reduced Residual
Compressive Stresses for Arresting Steel Girder
Cracks Induced by Out-of-Plane Bending
3. Detection and Remediation of Chloride
Contamination Prior to Coating Structural Steel
4. Structural Rehabilitation of Corrugated Metal
Pipe through the Application of a Centrifugally
Cast Cementitious Material
Research
• New Research Problem Statements
(Continued)
5. Identifying and addressing the failures of small
movement bridge expansion joints.
6. Current practices, benefits, and environmental
requirements for bridge cleaning and washing
7. Reducing traffic impacts by using innovative
bridge maintenance and preservation
techniques
Proposed Resolutions
• Resolution on the Promotion of Highway
Bridge Measurement Criteria that Promotes
Bridge Preservation
Equipment Working Group
2012 Work Plan Accomplishments
• Research
NCHRP Project 20-7 –Task 309:
Challenges and Opportunities: A Strategic Plan for
Equipment Management Research
–9 topics, approximately 5 research problem statements
could result
–Final report of the workshop deliberations and findings
completed and posted on EMTSP Website
–Topics prioritized by attendees of 2012 National Equipment
Management Conference (more later)
2012 Work Plan Accomplishments
• Research (Continued)
NCHRP Problem Statement 2013-F-04, “Guidelines for the
Development of Highway Operations Equipment
Replacement Lifecycle Criteria”
– Based on preliminary information from meeting in
Irvine last year
– Developed at TWG meeting last year
– Submitted to Subcommittee last August
– SCOM submitted to NCHRP as priority #3 of 4
– Favorable review by NCHRP
– Was not recommended by the Standing Committee on
Research
2012 Work Plan Accomplishments
• Research (Continued)
Initiated NCHRP 20-05 Task 43-14 Fleet Funding Management
and Charge-Back Systems to Develop Optimum Fleet
Sustainability
2012 Work Plan Accomplishments
• Workforce Development
Developing a model training and certification
curriculum appropriate for state equipment
managers by revising the skills matrix developed
by the TCCC
2012 Work Plan Accomplishments
• Performance Measures
Developed resolution for adopting applicable
Performance Measures developed through the
EMTSP regional partnerships:
– Evolved from the 2012 National Equipment
Fleet Management Conference in Mobile,
Alabama
– Michigan DOT spearheaded effort with
volunteers from other regions assisting in
refining and additional measures
2012 Work Plan Accomplishments
• Environment
– Monitoring and disseminating information regarding
environmental issues that have potential impact upon
highway equipment fleets by utilizing the equipment
industry to identify national regulatory changes and
communicate to the equipment management
professionals.
– Information will be posted on EMTSP website and
communicated at partnership meetings
2012 Work Plan Accomplishments
• Reports
– AASHTO Equipment Reference Book for 2012
– AASHTO guide, Decision Making for Outsourcing
and Privatization of Vehicle and Equipment Fleet
Maintenance
– NCHRP Project 20-7 –Task 309 - Challenges and
Opportunities: A Strategic Plan for Equipment
Management Research
2012 Work Plan Accomplishments
• Task Forces
– EMTSP Oversight Panel
– EMTSP Regional Partnerships
Proposed Performance Measures per
AASHTO Standing Committee on
Performance Management (SCPM)
Discussion
• Equipment fleet performance measures
– Utilization
– Preventive maintenance
– Retention
– Availability/ Downtime
Rank Challenges
#2 Fleet Performance Measurement
#5 Equipment Cost and Financial Management
– Cost of Service Analysis
– Charge-Back System
#3 Equipment Utilization Measurement
#1 Equipment Replacement Management
– Replacement Cycle Guideline Development
– Repair/Rebuild vs Replace Decision Making
– Equipment Replacement Planning
– Equipment Replacement Financing
#4 Equipment Disposal and Remarketing
2013 Work Plan
Focus Area – Research
Continue working on NCHRP 20-07/309 Research topics as
prioritized by attendees of 2012 National Equipment
Management Conference:
2013 Work Plan
Focus Area – Research
Continue working on NCHRP 20-05 Task 43-14 Fleet
Funding Management and Charge-Back Systems to
Develop Optimum Fleet Sustainability
• Draft Interim Report being reviewed by Project
Panel
• Focus Area - Workforce Development
– Continue work on developing the model training
and certification curriculum appropriate for state
equipment managers by revising the skills matrix
developed by the TCCC
2013 Work Plan
• Focus Area - Performance Measure
–Continue work of EMTSP Partnerships of
identifying additional applicable
Performance
–Review and refine existing performance
measures if needed
2013 Work Plan
• Focus Area – Environment
– Continue monitoring and disseminating
information regarding environmental issues that
have potential impact upon highway equipment
fleets by utilizing the equipment industry to
identify national regulatory changes and
communicate to the equipment management
professionals.
– Continue posting Information on EMTSP website
and communicating at partnership meetings
2013 Work Plan
• Reports
– Produce and distribute next year’s AASHTO
Equipment Reference Book
2013 Work Plan
• Task Forces
– Continue overseeing the EMTSP
 Coordinate and schedule 2013 Northeast &
Midwestern Equipment Management Joint
Partnership Meeting (TBD)
 Coordinate and schedule 2013 Western
States Highway Equipment Managers
Association (WSHEMA) Partnership Meeting
, (TBD)
 Coordinate and schedule 2013 Southeastern
States Equipment Managers Conference
Partnership Meeting (TBD)
2013 Work Plan
Research and Proposed Resolutions
• Proposed Topics for Environmental Excellence
Workplan
– None at this time
Research
• Research Implementation Recommendations
– AASHTO Guide - Decision Making for Outsourcing
and Privatization of Vehicle and Equipment Fleet
Maintenance
 Result of NCHRP Project 13-03A
 Based on NCHRP Report 692
– AASHTO Guidelines for Selection and Application
of Warning Lights
Result of NCHRP Project 13-02
Based on NCHRP Report 624
Research
• New Research Problem Statements
“Guidelines for the Development of Highway
Operations Equipment Replacement Lifecycle
Criteria”
Proposed Resolutions
• Proposed Resolutions
–12-03 Equipment TWG Performance
Measures Resolution
–12-04 Equipment TWG RESOLUTION -
EMTSP PARTNERSHIP MEETINGS
Pavements Working Group
2012 Work Plan Accomplishments
General Accomplishments by the PTWG and SCOM
• Sustained a high level of maintenance interest and
involvement in the area of System Preservation.
• Promoted the Transportation System Preservation
Technical Services Program (TSP2) and the Regional
Pavement Preservation Partnerships.
• Promote the utilization of the National Center for
Pavement Preservation for research management.
2012 Work Plan Accomplishments
• Focus Areas
– Research
• Assisted in the implementation of the Pavement
Preservation Roadmap.
• Reviewed TRB/NCHRP Completed Research for possible
publication as AASHTO Manuals
– Workforce Development
• Supported NHI Class Development
• Supported Web-Based Training Efforts
2012 Work Plan Accomplishments
• Focus Areas
– Performance Measures
• Conducted a Survey on RSL = 0
– Environment
• Supported the development of life cycle assessment
methodologies that demonstrate the environmental-
friendliness and sustainability benefits of pavement
preservation techniques and strategies.
• Reports
– None were Produced
• Task Forces
– No Separate Task Forces by the PTWG.
Proposed Performance Measures per AASHTO
Standing Committee on Performance Management
(SCPM) Discussion
• International Roughness Index
• Structural Adequacy
• Remaining Service Life (RSL)
• Damage Claims
• Public Satisfaction Surveys
2013 Work Plan
1. Sustain high level of maintenance interest and involvement
in the area of System Preservation.
2. Promote the Transportation System Preservation Technical
Services Program (TSP2) and the Regional Pavement
Preservation Partnerships.
3. Enhance the Internal Communications of the PTWG by:
expanding the membership list; improving the e-mail address
list; and conducting quarterly telephone conference calls
and/or webinars.
4. Development and promotion of common performance
measures for pavement preservation activities.
5. Work to confirm and enhance the linkage of pavement
preservation activities to overall crash reductions.
2013 Work Plan
6. Development and promotion of certification programs for
pavement preservation contractors and/or personnel.
7. Support the development and implementation of
performance management with asset management tools.
8. Work to develop a guideline that will uniformly define the
Remaining Service Life (RSL) of zero for use by our member
agencies.
9. Assist in the Implementation of SHRP2 R-26: Pavement
Preservation for High Volume Roads.
Research Problem Statements
1. Development of Non-Destructive Test Methods to Determine
Oxidation, Raveling, Flushing, and other Environmental and
Functional Distresses of Asphalt Pavements.
2. Performance Measures that Consider the Contributions of
Preservation to Pavement Performance and Service Life.
3. Project to Support the a Task Force of the AASHTO Joint
Technical Committee on Pavements and the Subcommittee
on Maintenance Pavement Technical Working Group in the
Development of Performance Measures for Pavements
Proposed Resolution
A Resolution Expressing the AASHTO
Subcommittee on Maintenance’s Support for
the FHWA Pavement Preservation Expert Task
Group and Requesting Biannual Meetings for
the Group.
Roadway/Roadside Working Group
2012 Work Plan Accomplishments
• Focus Areas
– Research
• Stormwater Best Management Practices – NCHRP 25-40
• Low-cost Roadway Environmental Practices Survey and
Discussion (generating further ideas for research and
synthesis)
• Roundtable discussion for brainstorming potential
research topics
2012 Work Plan Accomplishments
• Focus Areas
–Workforce Development
• Presentation of NHI Maintenance Leadership
Academy in Chattanooga, TN
– October 1-10 and November 6-11
– Blended Learning approach
– Strong focus on preservation and performance
management, along with workzones, environmental
considerations
– $3500 per participant (plus travel and lodging
expenses)
2012 Work Plan Accomplishments
• Focus Areas
– Environment
• LEED Rest Areas (North Carolina)
• Facilities Energy and Environment Best Practices
(Colorado)
– Performance Measures
• Peer Exchange – Best Practices in Privatization of
Maintenance Functions (August 2012 in Anaheim, CA)
• MQA/ MMS Implementation: Alabama/ Mississippi
Partnership
• WSDOT MMS presentation
Proposed Performance Measures per AASHTO
Standing Committee on Performance Management
(SCPM) Discussion
• Accidents: Potential for maintenance activities to have
an impact on injury accidents and/ or PDO
– Safety hardware - pavement markings, wet visibility,
condition of signs
– Collisions with animals (mowing for safety vs. reducing
mowing for funding and habitat)
Proposed Performance Measures per AASHTO
Standing Committee on Performance Management
(SCPM) Discussion
• Environment/ Sustainability performance
measures may not be consistent or reflective
of with goals and activities of maintenance
– Action: Propose to work with AASHTO
Subcommittee on Environment to align
performance measures
• Host two telecommunication technical events to
regularly share information on TWG activities,
develop ideas and plans for additional activities such
as surveys and problem statements that can further
the TWG mission
• Build a contact list from TWG meeting attendees for
ongoing communication
• Develop performance measures and input that relate
to Roadway and Roadsides area
• Second Vice Chair
2013 Work Plan
Research and Proposed Resolutions
• New Research Problem Statements
– Development of “Generic” Impact Attenuator and
Cable Barrier Systems
– Synthesis: Identification and prioritization of
energy-saving measures for transportation
facilities
• No resolutions
Highway Safety & Reliability Working Group
2012 Work Plan Accomplishments
• Focus Areas
–Research
• Problem Statement status
• Completed other projects
• Promoted the results of the 2011 Winter Maintenance
Peer Exchange
–Workforce Development
• Promoted the results of NCHRP 685, “Implementing
Strategies to Attract and Retain a Capable
Transportation Workforce”
2012 Work Plan Accomplishments
• Focus Areas - continued
– Performance Measures
• Polled the members, “Do you have them?”
• Raised awareness of the “1201 Rule” (Real-Time System Management)
– Environment
• TWG states involved with evaluation of the FHWA INVEST prototype
• Overview of INVEST program at TWG breakout session
• Reports
– Surveyed the States on their awareness and use of technical
reports
– Serves as a critical input into outreach efforts
• Task Forces – N/A
Proposed Performance Measures per AASHTO
Standing Committee on Performance Management
(SCPM) Discussion
• Strong progress made in snow & ice control
– Good work to date lays the foundation (e.g.,
NCHRP 6-17 (implemented via CBT), NCHRP #708,
Aurora efforts)
• Opportunity - we need to work with other AASHTO
groups since Maintenance plays more of a supportive
role to others (especially with respect to Safety &
Reliability)
• Focus Areas
–Research
• Well-structured needs process
• Support the 2013 Winter Maintenance Peer
Exchange
• Maintain the Peer Exchange website
2013 Work Plan
• Focus Areas
–Workforce Development
• Work with TCCC to develop new training
material
• Finish web-based CBT
• Promote findings of NCHRP 685 on
Transportation Workforce
• Support SHRP2 implementation of L12 –
Training Traffic Incident Responders
2013 Work Plan
• Focus Areas
–Performance Measures – Support
T2/implementation of NCHRP studies
– Build upon survey results
2013 Work Plan
Research and Proposed Resolutions
• Proposed Topics for Environmental Excellence Workplan
– Support the Climate Change Adaptation Conference
– As part of CEE Tasks 3.0 or 6.0 – Document use of
MDSS/MODSS to address environmental aspects of
maintenance (e.g., tracking salt use in winter, herbicide
applications, seal coating, etc.)
• Research Implementation Recommendations
– “Synthesis of Vehicle Based Winter Maintenance Technologies”
– state of practice
– “Update AASHTO Guide for Snow & Ice Control” – next phase
pending
– “Roadmap for Winter Maintenance Research” – integrated into
key groups
• New Research Problem Statements
– Sustainable Snow Removal System
• Objective: to compile all the various sundry modules of
removing snow and ice from pavements, ascertain
where the gaps or improvement prospects are, map out
what needs to be developed, linked or adapted and
create a sustainable systematic approach
• Proposed Resolutions
– None
Research and Proposed Resolutions
Summary: Research Completed
NCHRP
Year
Project Number Project Title Status
Estimated
Completion
Date or Report
#
TWG
Recommended
Implementation
Action
Duluth
(‘03)
2005 9-40 Optimization of Tack Coat for HMA Placement Complete Report 712 P
As is – report is
available
2005 9-41 Performance and Maintenance of Permeable Friction Courses Complete
Report 640,
web-only 138
P
As is – report is
available
2005 6-17 Performance Measures for Snow and Ice Control Operations Complete
Results digest
335, web-only
136
H
Became CBT
module
2005 10-68 Guidelines for the Use of Highway Pavement Warranties Complete
Publication
decision
pending
P
Waiting on report
publication
2005 14-15
Developing a National Database System for Maintenance Actions
on Highway Bridges
Complete Report 668 B
On hold – need
SCOBS but rec.
AASHTO pub.
Bismarck
(’04)
2006 14-16 Guidelines for Vegetation Management Complete R
AASHTO
Publication GVM-
1 (2011)
2006 14-17 Manual for Emulsion-Based Chip Seals for Pavements Complete Report 680 P
Passed balloting
– waiting on P
TWG, need SOM
Lincol
n
(’05)
2007 13-03/ 13-03A
Decision Making for Outsourcing and Privatization of Vehicle and
Equipment Fleet Maintenance
Complete Report 692 E
AASHTO
Publication
EFM-1
Charleston
(’06)
2008 14-18
Determining Actual Cost of Performing Routine and Preventive
Maintenance Operations on Highway Systems
Complete Report 688 P, H
H rec. AASHTO
pub.
P okay with that
2008 14-19
Culvert Rehabilitation to Maximize Service Life While Minimizing
Direct Costs and Traffic Disruption
Interim report in
review
June 2011
2008 20-74A
Development of National Level of Service Criteria for the Interstate
Highway System
Complete Report 677 P, R
R rec. peer
exchange
P as is – report
available
Madison
(’07)
2009 08-71
Methodology for Estimated Life Expectancies of Highway Assets [2
projects combined]
Complete Report 713 P, B, R
R rec. discussion
with Subcom on
Asset Mgmt
2009 20-81
Challenges and Successes in Attracting and Retaining a Skilled
Transportation Workforce
Complete
Being prepared
for publication
P, B, R, H, E
B, H rec. for
adoption
B: TCCC & TSP2
Monterey
(’08)
2010 10-82
Performance-Related Specifications for Pavement Preservation
Treatments
Decision regarding
further work is
pending after review
of availability of
current data and
research team’s
methodology.
Jan 2013
2010 14-20 Consequences of Delayed Maintenance
Phase I complete and
supplementary
information provided
– in review by panel
and decision on
further work is
pending.
June 2013
2010 14-21
Resource Allocation Framework to Meet Highway Asset Preservation
Needs
Research in progress July 2012
2010 14-22 Effective Removal of Pavement Markings Draft report pending Dec 2011
2010 20-85 Renewable Energy Guide for Highway Maintenance Facilities Research in progress Dec 2012
Annapolis
(’09)
2011 14-23
Practical Bridge Preservation Actions and Investment Strategies (F-
01/F-02/F-03)
Research in progress Mar 2015
2011 14-24
Guidance for Communicating the Value of Highway System
Maintenance and Preservation (F-05)
Research in progress Sept 2012
2011 14-25
Guide for Selecting Level-of-Service Targets for Maintaining and
Operating Highway Assets (F-04)
Research in progress Aug 2013
Savann
ah
(’10)
2012 14-28
Improved Corrosion Inspection Techniques for Ducted Strands for
Cable Stayed and Post-Tensioned Concrete Bridges (F-09)
Research agency
selected, award not
yet made
?
Louisville
(’11)
2013 14-29
Developing a Consistent Coding and Training System for Emergency
Structure Inspections (F-02)
Not on web yet, in
process of forming
panel
?
2013 14-30
Extending the Life of Highway Bridge Coating Systems Through the
Use of Spot Painting with Minimal Surface Preparation (F-03)
Not on web yet, in
process of forming
panel
?
Summary: Research Completed
NCHRP
Year
Project
Number
Project Title Status
Estimated
Completion
Date or Report
#
TWG
Recommended
Implementation
Action
Summary: Proposed Research
Potential Problem Statement TWG
(Importance
to you)
1 =Low
5=high
1 Development of “Generic” Impact Attenuator and Cable Barrier Systems
Highway
Safety and
Reliability
2 Sustainable Snow Removal System
Roadway/Ro
adside
3
Guidelines for the Development of Highway Operations Equipment Replacement
Lifecycle Criteria
Equipment
4 Quantifying Environmental Benefits of Bridge Preservation Bridge
5
Investigation of the Use of Reduced Residual Compressive Stresses for Arresting Steel
Girder Cracks Induced by Out-of-Plane Bending
Bridge
6 Detection and Remediation of Chloride Contamination Prior to Coating Structural Steel Bridge
7
Structural Rehabilitation of Corrugated Metal Pipe through the Application of a
Centrifugally Cast Cementitious Material
Bridge
Summary: Proposed Research
Potential Problem Statement TWG
(Importanc
e to you)
1=low
5=high
8
Identifying and Addressing Failures of Small Movement Bridge Expansion
Joints
Bridge
9
Current Practices, Benefits, and Environmental Requirements for Bridge
Cleaning and Washing
Bridge
10
Reducing Traffic Impacts by Using Innovative Bridge Maintenance and
Preservation Techniques
Bridge
11
Development of NDT Methods to Determine Oxidation, Raveling, Flushing,
and other Environmental and Functional Distresses of Asphalt Pavements
Pavement
12
Performance Measures that Consider the Contributions of Preservation to
Pavement Performance and Service Life
Pavement
13
Project to Support a Task Force of AASHTO JTC on Pavements and SCOM
Pavement TWG in the Development of Performance Measures for
Pavements
Pavement
Summary: Resolutions
Number Title TWG Sponsorship Action: Pass or Fail
12-1 Washington State Department
of Transportation THANK YOU
SCOM Pass
12-2 Resolution on the Promotion of
Highway Bridge Measurement
Criteria that Promotes Bridge
Preservation
SCOM
12-3 Equipment Fleet Management
Performance Measures
SCOM
12-4 Establish a Schedule for
Alternating Biennial Regional
and National AASHTO EMTSP
Partnership Meetings
SCOM
12-5 Support FHWA Pavement
Preservation ETG
Pavement
Future AASHTO SCOM Meetings
• 2013 NASHTO – Burlington, Vermont
• 2014 SASHTO – Charleston, West Virginia
• 2015 MASHTO – Iowa (Tentative)
• 2016 WASHTO - Nebraska (Tentative)

More Related Content

PPTX
Oarc slides c02 assessment workshop
PPTX
PPTX
NASA Tech Integration Georgia Tech Grand Challenge
PPT
Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...
PDF
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
PPT
AITPM Risk and Governance
PDF
2010 Sustainability Summit Presentation
PPT
Ta 7844 project introduction ppt annual road managers' forum 23 march 2012 eng
Oarc slides c02 assessment workshop
NASA Tech Integration Georgia Tech Grand Challenge
Jason Russell, The opportunity for efficiency savings: Highways Maintenance E...
RV 2015: Sustainable Corridors: Broad and Specific Looks by Robert Hastings
AITPM Risk and Governance
2010 Sustainability Summit Presentation
Ta 7844 project introduction ppt annual road managers' forum 23 march 2012 eng

Similar to frfefeferfefqfeferc2012 Report Out Slides Final.ppt (20)

PPT
Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...
PPT
2014 03-04 maintenance devon way
PDF
2017 iii 2_robert_tomas_inspire_miwp
PPTX
Prescriptive Maintenance of Railway Infrastructure
PPTX
AMP Training Presentation v2 24.01.03 (1).pptx
PPT
Air Quality and the DMRB
PDF
A REVIEW PAPER -STUDY OF GREEN HIGHWAY RATING SYSTEME
PPTX
Mechanical EPC procedure for power plants Rev.02.pptx
PDF
Overview of LACMTA Green Construction Policy
PPTX
Benjamin Pool
DOC
Reliability Engineer
PPTX
Projects Summary
DOC
Resume David Young
PPTX
APM North East Network: How to lead a project responsibly, 2 April 2025
PDF
cv_Junhong Lin(5_26)
PPTX
Construction Management in Developing Countries, Lecture 8
PDF
DOC
dapski042116
PDF
2022 GATF Annual Meeting - Item 7.5 - Sustainable Infrastructure Programme in...
Matthew Lugg, Never waste a good crisis: the opportunity to make efficiencies...
2014 03-04 maintenance devon way
2017 iii 2_robert_tomas_inspire_miwp
Prescriptive Maintenance of Railway Infrastructure
AMP Training Presentation v2 24.01.03 (1).pptx
Air Quality and the DMRB
A REVIEW PAPER -STUDY OF GREEN HIGHWAY RATING SYSTEME
Mechanical EPC procedure for power plants Rev.02.pptx
Overview of LACMTA Green Construction Policy
Benjamin Pool
Reliability Engineer
Projects Summary
Resume David Young
APM North East Network: How to lead a project responsibly, 2 April 2025
cv_Junhong Lin(5_26)
Construction Management in Developing Countries, Lecture 8
dapski042116
2022 GATF Annual Meeting - Item 7.5 - Sustainable Infrastructure Programme in...
Ad

Recently uploaded (20)

PPTX
Cerebral_Palsy_Detailed_Presentation.pptx
PPTX
Your Guide to a Winning Interview Aug 2025.
PPTX
FINAL PPT.pptx cfyufuyfuyuy8ioyoiuvy ituyc utdfm v
PPTX
microtomy kkk. presenting to cryst in gl
PPTX
AREAS OF SPECIALIZATION AND CAREER OPPORTUNITIES FOR COMMUNICATORS AND JOURNA...
PDF
Biography of Mohammad Anamul Haque Nayan
PDF
APNCET2025RESULT Result Result 2025 2025
PDF
esg-supply-chain-webinar-nov2018hkhkkh.pdf
PPTX
Nervous_System_Drugs_PPT.pptxXXXXXXXXXXXXXXXXX
PPTX
OnePlus 13R – ⚡ All-Rounder King Performance: Snapdragon 8 Gen 3 – same as iQ...
PPTX
cse couse aefrfrqewrbqwrgbqgvq2w3vqbvq23rbgw3rnw345
PPTX
Principles of Inheritance and variation class 12.pptx
PPTX
The Stock at arrangement the stock and product.pptx
PDF
Prostaglandin E2.pdf orthoodontics op kharbanda
PPT
Gsisgdkddkvdgjsjdvdbdbdbdghjkhgcvvkkfcxxfg
PDF
Why Today’s Brands Need ORM & SEO Specialists More Than Ever.pdf
PPTX
Surgical thesis protocol formation ppt.pptx
PDF
L-0018048598visual cloud book for PCa-pdf.pdf
PPTX
1751884730-Visual Basic -Unitj CS B.pptx
PDF
Sales and Distribution Managemnjnfijient.pdf
Cerebral_Palsy_Detailed_Presentation.pptx
Your Guide to a Winning Interview Aug 2025.
FINAL PPT.pptx cfyufuyfuyuy8ioyoiuvy ituyc utdfm v
microtomy kkk. presenting to cryst in gl
AREAS OF SPECIALIZATION AND CAREER OPPORTUNITIES FOR COMMUNICATORS AND JOURNA...
Biography of Mohammad Anamul Haque Nayan
APNCET2025RESULT Result Result 2025 2025
esg-supply-chain-webinar-nov2018hkhkkh.pdf
Nervous_System_Drugs_PPT.pptxXXXXXXXXXXXXXXXXX
OnePlus 13R – ⚡ All-Rounder King Performance: Snapdragon 8 Gen 3 – same as iQ...
cse couse aefrfrqewrbqwrgbqgvq2w3vqbvq23rbgw3rnw345
Principles of Inheritance and variation class 12.pptx
The Stock at arrangement the stock and product.pptx
Prostaglandin E2.pdf orthoodontics op kharbanda
Gsisgdkddkvdgjsjdvdbdbdbdghjkhgcvvkkfcxxfg
Why Today’s Brands Need ORM & SEO Specialists More Than Ever.pdf
Surgical thesis protocol formation ppt.pptx
L-0018048598visual cloud book for PCa-pdf.pdf
1751884730-Visual Basic -Unitj CS B.pptx
Sales and Distribution Managemnjnfijient.pdf
Ad

frfefeferfefqfeferc2012 Report Out Slides Final.ppt

  • 1. Technical Working Group Reports • Bridge • Equipment • Pavement • Roadway and Roadside • Highway Safety and Reliability
  • 3. 2012 Work Plan Accomplishments • Conducted a survey on commonly used deck patching products used by state and contract forces. • Sponsored and supporting research initiatives • Working on a process for identifying and promoting innovative bridge preservation products, materials, and techniques for use by bridge preservation practitioners • Worked with the ETG, TSP-2, T-9, in getting the definition of bridge preservation approved by the Standing Committee on Highways
  • 4. 2012 Work Plan Accomplishments • Supporting FHWA’s Long Term Bridge Performance Program (Bridge Preservation & Durability ETG) • Supporting FHWA’s Bridge Preservation ETG’s efforts • Identified bridge maintenance related training materials that will be disseminated to users • Conducting regular quarterly teleconferences with the Bridge TWG members.
  • 5. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Use of AASHTO Bridge Element Condition States – Update the AASHTO Bridge Health Index to be Condition-based driven (remove the cost dependency from the current calculation) – Classifying Bridge Condition under Good, Fair, Poor or a similar grading system
  • 6. • Focus Areas - Research • NCHRP 14-23 – “Practical Bridge Preservation Actions and Investment Strategies” • NCHRP 14-24 – “Guidance for Communicating the Value of Highway System Maintenance and Preservation” • NCHRP 14-30 – “Extending the Life of Highway Bridge Coating Systems Through the Use of Spot Painting with Minimal Surface Preparation” • NCHRP 14-28 – “Condition assessment of bridge post tensioning and stayed cable systems using NDE” • Task 330 Maintenance Investigating the Use of Pavement Preservation Products as Low Cost Waterproofing Treatments for Bridge Decks 2013 Work Plan
  • 7. • Focus Areas - Workforce Development • Survey the State DOTs – Identify and collect available bridge maintenance training materials • Collaborate with FHWA, States, and Industry partners to host the training materials and make available to users 2013 Work Plan
  • 8. 2013 Work Plan • Focus Areas - Performance Measures • Work with other AASHTO Subcommittees and FHWA to promote: 1. The use of bridge element condition assessment 2. Transition a way from the use of structurally deficient measurement 3. Use of a condition-based bridge health index (remove the cost dependency from the current HI calculation) 4. Use of a Good, Fair, Poor measurements or similar grading system 5. Survey the State DOTs to identify current measures used in bridge maintenance, i.e. work backlog; flag systems, etc.
  • 9. 2013 Work Plan • Focus Areas - Environment • Proposing two research statements: 1. Quantify the environmental benefits of bridge preservation 2. Identify environmental requirements for bridge washing 3. Promote the use of recycled glass as an abrasive blasting medium material in bridge maintenance.
  • 10. Research • Proposed Topics for Environmental Excellence Work plan – Identify strategies and practices that promote environmental sustainable bridge maintenance practices.
  • 11. Research • Research Implementation Recommendations – 2005 14-15 Developing a National Database System for Maintenance Actions on Highway Bridges – 2007 234 Guidelines for Selection of Bridge Deck Overlays, Sealers, and Treatments – 2013 14-29 Developing a Consistent Coding and Training System for Emergency Structure Inspections (F-02) – 2013 14-30 Extending the Life of Highway Bridge Coating Systems Through the Use of Spot Painting with Minimal Surface Preparation (F-03) New Research Problem Statements and Proposed Resolutions (see next slide)
  • 12. Research • New Research Problem Statements 1. Quantifying environmental benefits of bridge preservation 2. Investigation of the Use of Reduced Residual Compressive Stresses for Arresting Steel Girder Cracks Induced by Out-of-Plane Bending 3. Detection and Remediation of Chloride Contamination Prior to Coating Structural Steel 4. Structural Rehabilitation of Corrugated Metal Pipe through the Application of a Centrifugally Cast Cementitious Material
  • 13. Research • New Research Problem Statements (Continued) 5. Identifying and addressing the failures of small movement bridge expansion joints. 6. Current practices, benefits, and environmental requirements for bridge cleaning and washing 7. Reducing traffic impacts by using innovative bridge maintenance and preservation techniques
  • 14. Proposed Resolutions • Resolution on the Promotion of Highway Bridge Measurement Criteria that Promotes Bridge Preservation
  • 16. 2012 Work Plan Accomplishments • Research NCHRP Project 20-7 –Task 309: Challenges and Opportunities: A Strategic Plan for Equipment Management Research –9 topics, approximately 5 research problem statements could result –Final report of the workshop deliberations and findings completed and posted on EMTSP Website –Topics prioritized by attendees of 2012 National Equipment Management Conference (more later)
  • 17. 2012 Work Plan Accomplishments • Research (Continued) NCHRP Problem Statement 2013-F-04, “Guidelines for the Development of Highway Operations Equipment Replacement Lifecycle Criteria” – Based on preliminary information from meeting in Irvine last year – Developed at TWG meeting last year – Submitted to Subcommittee last August – SCOM submitted to NCHRP as priority #3 of 4 – Favorable review by NCHRP – Was not recommended by the Standing Committee on Research
  • 18. 2012 Work Plan Accomplishments • Research (Continued) Initiated NCHRP 20-05 Task 43-14 Fleet Funding Management and Charge-Back Systems to Develop Optimum Fleet Sustainability
  • 19. 2012 Work Plan Accomplishments • Workforce Development Developing a model training and certification curriculum appropriate for state equipment managers by revising the skills matrix developed by the TCCC
  • 20. 2012 Work Plan Accomplishments • Performance Measures Developed resolution for adopting applicable Performance Measures developed through the EMTSP regional partnerships: – Evolved from the 2012 National Equipment Fleet Management Conference in Mobile, Alabama – Michigan DOT spearheaded effort with volunteers from other regions assisting in refining and additional measures
  • 21. 2012 Work Plan Accomplishments • Environment – Monitoring and disseminating information regarding environmental issues that have potential impact upon highway equipment fleets by utilizing the equipment industry to identify national regulatory changes and communicate to the equipment management professionals. – Information will be posted on EMTSP website and communicated at partnership meetings
  • 22. 2012 Work Plan Accomplishments • Reports – AASHTO Equipment Reference Book for 2012 – AASHTO guide, Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance – NCHRP Project 20-7 –Task 309 - Challenges and Opportunities: A Strategic Plan for Equipment Management Research
  • 23. 2012 Work Plan Accomplishments • Task Forces – EMTSP Oversight Panel – EMTSP Regional Partnerships
  • 24. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Equipment fleet performance measures – Utilization – Preventive maintenance – Retention – Availability/ Downtime
  • 25. Rank Challenges #2 Fleet Performance Measurement #5 Equipment Cost and Financial Management – Cost of Service Analysis – Charge-Back System #3 Equipment Utilization Measurement #1 Equipment Replacement Management – Replacement Cycle Guideline Development – Repair/Rebuild vs Replace Decision Making – Equipment Replacement Planning – Equipment Replacement Financing #4 Equipment Disposal and Remarketing 2013 Work Plan Focus Area – Research Continue working on NCHRP 20-07/309 Research topics as prioritized by attendees of 2012 National Equipment Management Conference:
  • 26. 2013 Work Plan Focus Area – Research Continue working on NCHRP 20-05 Task 43-14 Fleet Funding Management and Charge-Back Systems to Develop Optimum Fleet Sustainability • Draft Interim Report being reviewed by Project Panel
  • 27. • Focus Area - Workforce Development – Continue work on developing the model training and certification curriculum appropriate for state equipment managers by revising the skills matrix developed by the TCCC 2013 Work Plan
  • 28. • Focus Area - Performance Measure –Continue work of EMTSP Partnerships of identifying additional applicable Performance –Review and refine existing performance measures if needed 2013 Work Plan
  • 29. • Focus Area – Environment – Continue monitoring and disseminating information regarding environmental issues that have potential impact upon highway equipment fleets by utilizing the equipment industry to identify national regulatory changes and communicate to the equipment management professionals. – Continue posting Information on EMTSP website and communicating at partnership meetings 2013 Work Plan
  • 30. • Reports – Produce and distribute next year’s AASHTO Equipment Reference Book 2013 Work Plan
  • 31. • Task Forces – Continue overseeing the EMTSP  Coordinate and schedule 2013 Northeast & Midwestern Equipment Management Joint Partnership Meeting (TBD)  Coordinate and schedule 2013 Western States Highway Equipment Managers Association (WSHEMA) Partnership Meeting , (TBD)  Coordinate and schedule 2013 Southeastern States Equipment Managers Conference Partnership Meeting (TBD) 2013 Work Plan
  • 32. Research and Proposed Resolutions • Proposed Topics for Environmental Excellence Workplan – None at this time
  • 33. Research • Research Implementation Recommendations – AASHTO Guide - Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance  Result of NCHRP Project 13-03A  Based on NCHRP Report 692 – AASHTO Guidelines for Selection and Application of Warning Lights Result of NCHRP Project 13-02 Based on NCHRP Report 624
  • 34. Research • New Research Problem Statements “Guidelines for the Development of Highway Operations Equipment Replacement Lifecycle Criteria”
  • 35. Proposed Resolutions • Proposed Resolutions –12-03 Equipment TWG Performance Measures Resolution –12-04 Equipment TWG RESOLUTION - EMTSP PARTNERSHIP MEETINGS
  • 37. 2012 Work Plan Accomplishments General Accomplishments by the PTWG and SCOM • Sustained a high level of maintenance interest and involvement in the area of System Preservation. • Promoted the Transportation System Preservation Technical Services Program (TSP2) and the Regional Pavement Preservation Partnerships. • Promote the utilization of the National Center for Pavement Preservation for research management.
  • 38. 2012 Work Plan Accomplishments • Focus Areas – Research • Assisted in the implementation of the Pavement Preservation Roadmap. • Reviewed TRB/NCHRP Completed Research for possible publication as AASHTO Manuals – Workforce Development • Supported NHI Class Development • Supported Web-Based Training Efforts
  • 39. 2012 Work Plan Accomplishments • Focus Areas – Performance Measures • Conducted a Survey on RSL = 0 – Environment • Supported the development of life cycle assessment methodologies that demonstrate the environmental- friendliness and sustainability benefits of pavement preservation techniques and strategies. • Reports – None were Produced • Task Forces – No Separate Task Forces by the PTWG.
  • 40. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • International Roughness Index • Structural Adequacy • Remaining Service Life (RSL) • Damage Claims • Public Satisfaction Surveys
  • 41. 2013 Work Plan 1. Sustain high level of maintenance interest and involvement in the area of System Preservation. 2. Promote the Transportation System Preservation Technical Services Program (TSP2) and the Regional Pavement Preservation Partnerships. 3. Enhance the Internal Communications of the PTWG by: expanding the membership list; improving the e-mail address list; and conducting quarterly telephone conference calls and/or webinars. 4. Development and promotion of common performance measures for pavement preservation activities. 5. Work to confirm and enhance the linkage of pavement preservation activities to overall crash reductions.
  • 42. 2013 Work Plan 6. Development and promotion of certification programs for pavement preservation contractors and/or personnel. 7. Support the development and implementation of performance management with asset management tools. 8. Work to develop a guideline that will uniformly define the Remaining Service Life (RSL) of zero for use by our member agencies. 9. Assist in the Implementation of SHRP2 R-26: Pavement Preservation for High Volume Roads.
  • 43. Research Problem Statements 1. Development of Non-Destructive Test Methods to Determine Oxidation, Raveling, Flushing, and other Environmental and Functional Distresses of Asphalt Pavements. 2. Performance Measures that Consider the Contributions of Preservation to Pavement Performance and Service Life. 3. Project to Support the a Task Force of the AASHTO Joint Technical Committee on Pavements and the Subcommittee on Maintenance Pavement Technical Working Group in the Development of Performance Measures for Pavements
  • 44. Proposed Resolution A Resolution Expressing the AASHTO Subcommittee on Maintenance’s Support for the FHWA Pavement Preservation Expert Task Group and Requesting Biannual Meetings for the Group.
  • 46. 2012 Work Plan Accomplishments • Focus Areas – Research • Stormwater Best Management Practices – NCHRP 25-40 • Low-cost Roadway Environmental Practices Survey and Discussion (generating further ideas for research and synthesis) • Roundtable discussion for brainstorming potential research topics
  • 47. 2012 Work Plan Accomplishments • Focus Areas –Workforce Development • Presentation of NHI Maintenance Leadership Academy in Chattanooga, TN – October 1-10 and November 6-11 – Blended Learning approach – Strong focus on preservation and performance management, along with workzones, environmental considerations – $3500 per participant (plus travel and lodging expenses)
  • 48. 2012 Work Plan Accomplishments • Focus Areas – Environment • LEED Rest Areas (North Carolina) • Facilities Energy and Environment Best Practices (Colorado) – Performance Measures • Peer Exchange – Best Practices in Privatization of Maintenance Functions (August 2012 in Anaheim, CA) • MQA/ MMS Implementation: Alabama/ Mississippi Partnership • WSDOT MMS presentation
  • 49. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Accidents: Potential for maintenance activities to have an impact on injury accidents and/ or PDO – Safety hardware - pavement markings, wet visibility, condition of signs – Collisions with animals (mowing for safety vs. reducing mowing for funding and habitat)
  • 50. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Environment/ Sustainability performance measures may not be consistent or reflective of with goals and activities of maintenance – Action: Propose to work with AASHTO Subcommittee on Environment to align performance measures
  • 51. • Host two telecommunication technical events to regularly share information on TWG activities, develop ideas and plans for additional activities such as surveys and problem statements that can further the TWG mission • Build a contact list from TWG meeting attendees for ongoing communication • Develop performance measures and input that relate to Roadway and Roadsides area • Second Vice Chair 2013 Work Plan
  • 52. Research and Proposed Resolutions • New Research Problem Statements – Development of “Generic” Impact Attenuator and Cable Barrier Systems – Synthesis: Identification and prioritization of energy-saving measures for transportation facilities • No resolutions
  • 53. Highway Safety & Reliability Working Group
  • 54. 2012 Work Plan Accomplishments • Focus Areas –Research • Problem Statement status • Completed other projects • Promoted the results of the 2011 Winter Maintenance Peer Exchange –Workforce Development • Promoted the results of NCHRP 685, “Implementing Strategies to Attract and Retain a Capable Transportation Workforce”
  • 55. 2012 Work Plan Accomplishments • Focus Areas - continued – Performance Measures • Polled the members, “Do you have them?” • Raised awareness of the “1201 Rule” (Real-Time System Management) – Environment • TWG states involved with evaluation of the FHWA INVEST prototype • Overview of INVEST program at TWG breakout session • Reports – Surveyed the States on their awareness and use of technical reports – Serves as a critical input into outreach efforts • Task Forces – N/A
  • 56. Proposed Performance Measures per AASHTO Standing Committee on Performance Management (SCPM) Discussion • Strong progress made in snow & ice control – Good work to date lays the foundation (e.g., NCHRP 6-17 (implemented via CBT), NCHRP #708, Aurora efforts) • Opportunity - we need to work with other AASHTO groups since Maintenance plays more of a supportive role to others (especially with respect to Safety & Reliability)
  • 57. • Focus Areas –Research • Well-structured needs process • Support the 2013 Winter Maintenance Peer Exchange • Maintain the Peer Exchange website 2013 Work Plan
  • 58. • Focus Areas –Workforce Development • Work with TCCC to develop new training material • Finish web-based CBT • Promote findings of NCHRP 685 on Transportation Workforce • Support SHRP2 implementation of L12 – Training Traffic Incident Responders 2013 Work Plan
  • 59. • Focus Areas –Performance Measures – Support T2/implementation of NCHRP studies – Build upon survey results 2013 Work Plan
  • 60. Research and Proposed Resolutions • Proposed Topics for Environmental Excellence Workplan – Support the Climate Change Adaptation Conference – As part of CEE Tasks 3.0 or 6.0 – Document use of MDSS/MODSS to address environmental aspects of maintenance (e.g., tracking salt use in winter, herbicide applications, seal coating, etc.) • Research Implementation Recommendations – “Synthesis of Vehicle Based Winter Maintenance Technologies” – state of practice – “Update AASHTO Guide for Snow & Ice Control” – next phase pending – “Roadmap for Winter Maintenance Research” – integrated into key groups
  • 61. • New Research Problem Statements – Sustainable Snow Removal System • Objective: to compile all the various sundry modules of removing snow and ice from pavements, ascertain where the gaps or improvement prospects are, map out what needs to be developed, linked or adapted and create a sustainable systematic approach • Proposed Resolutions – None Research and Proposed Resolutions
  • 62. Summary: Research Completed NCHRP Year Project Number Project Title Status Estimated Completion Date or Report # TWG Recommended Implementation Action Duluth (‘03) 2005 9-40 Optimization of Tack Coat for HMA Placement Complete Report 712 P As is – report is available 2005 9-41 Performance and Maintenance of Permeable Friction Courses Complete Report 640, web-only 138 P As is – report is available 2005 6-17 Performance Measures for Snow and Ice Control Operations Complete Results digest 335, web-only 136 H Became CBT module 2005 10-68 Guidelines for the Use of Highway Pavement Warranties Complete Publication decision pending P Waiting on report publication 2005 14-15 Developing a National Database System for Maintenance Actions on Highway Bridges Complete Report 668 B On hold – need SCOBS but rec. AASHTO pub. Bismarck (’04) 2006 14-16 Guidelines for Vegetation Management Complete R AASHTO Publication GVM- 1 (2011) 2006 14-17 Manual for Emulsion-Based Chip Seals for Pavements Complete Report 680 P Passed balloting – waiting on P TWG, need SOM Lincol n (’05) 2007 13-03/ 13-03A Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance Complete Report 692 E AASHTO Publication EFM-1 Charleston (’06) 2008 14-18 Determining Actual Cost of Performing Routine and Preventive Maintenance Operations on Highway Systems Complete Report 688 P, H H rec. AASHTO pub. P okay with that 2008 14-19 Culvert Rehabilitation to Maximize Service Life While Minimizing Direct Costs and Traffic Disruption Interim report in review June 2011 2008 20-74A Development of National Level of Service Criteria for the Interstate Highway System Complete Report 677 P, R R rec. peer exchange P as is – report available Madison (’07) 2009 08-71 Methodology for Estimated Life Expectancies of Highway Assets [2 projects combined] Complete Report 713 P, B, R R rec. discussion with Subcom on Asset Mgmt 2009 20-81 Challenges and Successes in Attracting and Retaining a Skilled Transportation Workforce Complete Being prepared for publication P, B, R, H, E B, H rec. for adoption B: TCCC & TSP2
  • 63. Monterey (’08) 2010 10-82 Performance-Related Specifications for Pavement Preservation Treatments Decision regarding further work is pending after review of availability of current data and research team’s methodology. Jan 2013 2010 14-20 Consequences of Delayed Maintenance Phase I complete and supplementary information provided – in review by panel and decision on further work is pending. June 2013 2010 14-21 Resource Allocation Framework to Meet Highway Asset Preservation Needs Research in progress July 2012 2010 14-22 Effective Removal of Pavement Markings Draft report pending Dec 2011 2010 20-85 Renewable Energy Guide for Highway Maintenance Facilities Research in progress Dec 2012 Annapolis (’09) 2011 14-23 Practical Bridge Preservation Actions and Investment Strategies (F- 01/F-02/F-03) Research in progress Mar 2015 2011 14-24 Guidance for Communicating the Value of Highway System Maintenance and Preservation (F-05) Research in progress Sept 2012 2011 14-25 Guide for Selecting Level-of-Service Targets for Maintaining and Operating Highway Assets (F-04) Research in progress Aug 2013 Savann ah (’10) 2012 14-28 Improved Corrosion Inspection Techniques for Ducted Strands for Cable Stayed and Post-Tensioned Concrete Bridges (F-09) Research agency selected, award not yet made ? Louisville (’11) 2013 14-29 Developing a Consistent Coding and Training System for Emergency Structure Inspections (F-02) Not on web yet, in process of forming panel ? 2013 14-30 Extending the Life of Highway Bridge Coating Systems Through the Use of Spot Painting with Minimal Surface Preparation (F-03) Not on web yet, in process of forming panel ? Summary: Research Completed NCHRP Year Project Number Project Title Status Estimated Completion Date or Report # TWG Recommended Implementation Action
  • 64. Summary: Proposed Research Potential Problem Statement TWG (Importance to you) 1 =Low 5=high 1 Development of “Generic” Impact Attenuator and Cable Barrier Systems Highway Safety and Reliability 2 Sustainable Snow Removal System Roadway/Ro adside 3 Guidelines for the Development of Highway Operations Equipment Replacement Lifecycle Criteria Equipment 4 Quantifying Environmental Benefits of Bridge Preservation Bridge 5 Investigation of the Use of Reduced Residual Compressive Stresses for Arresting Steel Girder Cracks Induced by Out-of-Plane Bending Bridge 6 Detection and Remediation of Chloride Contamination Prior to Coating Structural Steel Bridge 7 Structural Rehabilitation of Corrugated Metal Pipe through the Application of a Centrifugally Cast Cementitious Material Bridge
  • 65. Summary: Proposed Research Potential Problem Statement TWG (Importanc e to you) 1=low 5=high 8 Identifying and Addressing Failures of Small Movement Bridge Expansion Joints Bridge 9 Current Practices, Benefits, and Environmental Requirements for Bridge Cleaning and Washing Bridge 10 Reducing Traffic Impacts by Using Innovative Bridge Maintenance and Preservation Techniques Bridge 11 Development of NDT Methods to Determine Oxidation, Raveling, Flushing, and other Environmental and Functional Distresses of Asphalt Pavements Pavement 12 Performance Measures that Consider the Contributions of Preservation to Pavement Performance and Service Life Pavement 13 Project to Support a Task Force of AASHTO JTC on Pavements and SCOM Pavement TWG in the Development of Performance Measures for Pavements Pavement
  • 66. Summary: Resolutions Number Title TWG Sponsorship Action: Pass or Fail 12-1 Washington State Department of Transportation THANK YOU SCOM Pass 12-2 Resolution on the Promotion of Highway Bridge Measurement Criteria that Promotes Bridge Preservation SCOM 12-3 Equipment Fleet Management Performance Measures SCOM 12-4 Establish a Schedule for Alternating Biennial Regional and National AASHTO EMTSP Partnership Meetings SCOM 12-5 Support FHWA Pavement Preservation ETG Pavement
  • 67. Future AASHTO SCOM Meetings • 2013 NASHTO – Burlington, Vermont • 2014 SASHTO – Charleston, West Virginia • 2015 MASHTO – Iowa (Tentative) • 2016 WASHTO - Nebraska (Tentative)

Editor's Notes

  • #7: 14-23 – research in progress 14-24 – research completed. Report is due in September, 2012 14-30 – is a newly approved research panel is being formed 330 - is a newly approved research status is unknown. Need to follow up with Amir Hana with TRB on this
  • #55: Focus Areas Research – Problem Statement status: “Revised Chapter 8 Winter Operations…” (under contract) “Assessing Alternative Delivery Methods for Winter Operations” (nearing award) “Sustainability in Maintenance Operations “(not funded) Co-sponsored “Coding and Training System” Problem Statement (in process) Completed other projects Methods for Estimating the Benefits for Winter Maintenance Operations – final repot in review by panel Promoted the results of the 2011 Winter Maintenance Peer Exchange. Workforce Development Promoted the results of NCHRP 685, “Implementing Strategies to Attract and Retain a Capable Transportation Workforce”
  • #56: Focus Areas - continued Performance Measures Polled the members, “Do you have them?” c.30% familiar with the studies; 40% were aware of the studies but hadn’t dug into them. Most have some performance measures/performance management system, and some should be promoted as best practices Raised awareness of the “1201 Rule” (Real-Time System Management) Environment – Some members helped evaluate the INVEST prototype Reports Surveyed the States on their awareness and use of technical reports. Serves as a critical input into our outreach efforts Task Forces – N/A
  • #58: Note to Steve – TWG leadership needs to assess scope of TWG. Are we the “Kitchen Sink” TWG? Should we scale back? For bullet on Performance Measures: Resources include NCHRP studies on Performance Measures: “Performance Measures for Snow and Ice Control Operations”, Synthesis 389 “Performance-based Contracting for Maintenance”, NCHRP 20-68A “US Domestic Scan Best Practices in Winter Maintenance”. Focus Areas Research – Well-structured process to identify research needs (W.M. Peer Exchange, Aurora, Clear Roads). Currently working across these efforts to develop Research Problem Statements Support the 2013 Winter Maintenance Peer Exchange Maintain Peer Exchange website (status of research projects) Workforce Development Work with TCCC to develop new training material Finish implementation of web-based applications of CBT Promote findings of NCHRP 685 on Transportation Workforce Support SHRP2 implementation of L12 – Training Traffic Incident Responders Performance Measures – Support T2/implementation of NCHRP studies Environment – strengthen relationship with Standing Committee on Environment Reports – Publish results of member survey. Build upon survey results and translate into targeted outreach (incl. SICOP listserv & Aurora wiki) Task Forces – None
  • #59: Note to Steve – TWG leadership needs to assess scope of TWG. Are we the “Kitchen Sink” TWG? Should we scale back? For bullet on Performance Measures: Resources include NCHRP studies on Performance Measures: “Performance Measures for Snow and Ice Control Operations”, Synthesis 389 “Performance-based Contracting for Maintenance”, NCHRP 20-68A “US Domestic Scan Best Practices in Winter Maintenance”. Focus Areas Research – Well-structured process to identify research needs (W.M. Peer Exchange, Aurora, Clear Roads). Currently working across these efforts to develop Research Problem Statements Support the 2013 Winter Maintenance Peer Exchange Maintain Peer Exchange website (status of research projects) Workforce Development Work with TCCC to develop new training material Finish implementation of web-based applications of CBT Promote findings of NCHRP 685 on Transportation Workforce Support SHRP2 implementation of L12 – Training Traffic Incident Responders Performance Measures – Support T2/implementation of NCHRP studies Environment – strengthen relationship with Standing Committee on Environment Reports – Publish results of member survey. Build upon survey results and translate into targeted outreach (incl. SICOP listserv & Aurora wiki) Task Forces – None
  • #60: Note to Steve – TWG leadership needs to assess scope of TWG. Are we the “Kitchen Sink” TWG? Should we scale back? For bullet on Performance Measures: Resources include NCHRP studies on Performance Measures: “Performance Measures for Snow and Ice Control Operations”, Synthesis 389 “Performance-based Contracting for Maintenance”, NCHRP 20-68A “US Domestic Scan Best Practices in Winter Maintenance”. Focus Areas Research – Well-structured process to identify research needs (W.M. Peer Exchange, Aurora, Clear Roads). Currently working across these efforts to develop Research Problem Statements Support the 2013 Winter Maintenance Peer Exchange Maintain Peer Exchange website (status of research projects) Workforce Development Work with TCCC to develop new training material Finish implementation of web-based applications of CBT Promote findings of NCHRP 685 on Transportation Workforce Support SHRP2 implementation of L12 – Training Traffic Incident Responders Performance Measures – Support T2/implementation of NCHRP studies Environment – strengthen relationship with Standing Committee on Environment Reports – Publish results of member survey. Build upon survey results and translate into targeted outreach (incl. SICOP listserv & Aurora wiki) Task Forces – None