Smart Cabling Infrastructure Solutions for Data Centers Constantin Ciuperca Project Manager Genesys Systems
Agenda Data Center Infrastructure requirements Smart Cabling Solutions for  Data Center Infrastructures
Tyco Electronics –  AMP NETCONNECT Strategic Division for  Complete Communication Infrastructures
Data Center Infrastructure Requirements
Data Center –  Overview / Subsystems Cabling Infrastructure IT Security Control system Raised floor Air Conditioning & Ventilation Systems Early fire Warning system Fire detection Fire extinguishing Water warning systems Access control Monitoring & Infrastructure Management Systems Power Supply, UPS & Generator Systems
Main issues & concerns of Data Center Owners & Operators   Data Center –  What is important ? (Source: Datacenter Dynamics)
Power supply and air conditioning have become the limiting factor for implementation of Data Centers. Data Center  - Limiting Factors Picture: Knürr
Data Center –  Power Consumption Sources:  EYP Mission Critical Facilities, Cisco IT, Network World, Customer Interviews, APC Reducing  Data Center Power Consumption  is a multi-faceted challenge.  All areas need to be addressed to maximize data center compute capacity and minimize power costs.
Cold air pumped into plenum space beneath floor tiles and vented into cold aisles and returns through a ceiling plenum. Data Center –  Airflow Efficiency
Airflow is blocked by a fully loaded raised floor  For new buildings, cabling in the ceiling shall be considered for better management and improved airflow. Data Center –  Airflow & Cable Placement Cable trays Cable trays Cable trays Cable trays Cable trays Cable trays Power cables Power cables Power cables
millions server units Data Center –  Server Trends (1G, 10G, 40G and 100G) Source: Intel & Broadcom 10 year transition for 1G Ethernet 6 years for 10GBE 5 years for 40GBE
Comparison:  Office Cabling <> Data Center Cabling Office Cabling: Static after installation Technology cycle: 5-10 years Lower density acceptable Downtimes less critical Physical environment less important Data Center Cabling: Dynamic Technology cycle: 3-5 years Highest density required Downtimes very critical Physical environment very important
Data Center –  Infrastructure Requirements Highest Reliability  and  Availabilit y  (= Quality ). High Infrastructure Performance to support various kinds of services. Shortest Deployment Time  for  Moves, Adds & Changes (MAC’s). Highest Density  of all equipment. Redundancy Support to  save Power Best possible control via  Network and Infrastructure Management (including reliable documentation).
Smart Cabling Solutions for Data Center Infrastructures
Data Center  –  Relevant Standards EN 50173-5 Data Center Cabling   ISO/IEC 24764 (created according EN 50173-5) EIA/TIA 942   “Telecommunications Infrastructure Standards for Data Centers”
Ad-hoc growth and cabling Point to point cabling Pathway confusion Documentation errors Data Center  –  Why standards ? Network Cabinets Server Cabinets Server Cabinets Server Cabinets Server Cabinets More an evolution than a real planning from the beginning Finally leading to a difficult to handle chaos !
Data Center  –  Structure acc. Standards MDA HDA EDA Telecommunication Room
Data Center  –  Structure & Cabling Requirements Main Distribution Area (MDA) Horizontal Distribution Area (HDA) Equipment Distribution Area (EDA) Optional: Zone Distribution Area (ZDA) HDA EDA ZDA HC HC HC MC Primary Entrance Room HC Scondary Entrance Room Access Providers Access Providers Access Providers Offices, Operations Center Support Rooms Telecom Room Interconnect Active Equip. Storage Area Devices etc. Interconnect Active Equipment Interconnect Active Equipment Active Equipment Interconnect Backbone Cabling Backbone Cabling Backbone Cabling Horizontal Cabling Horizontal Cabling Horizontal Cabling MDA Highest Performance Cat. 6 A  / 7 A  or Fiber Optic Density & Flexibility MRJ 21 MPO  “Plug & Go”
Complete Data Center Solutions AMP NETCONNECT provide the complete Cabling Infrastructure:  Classical High Performance Cabling Systems Data Center Optimized Plug&Go Solutions “Smart Cabling for Data Centers” Cable Management Systems ready to be integrated into Intelligent Infrastructure Management System (IIMS)
Data Center Optimized Solutions “Smart Cabling for Data Centers” MRJ21,  Σ-Link  & MPO Cabling Systems Shortest deployment time Fastest Moves, Adds & Changes 100% factory pre-tested Highest Density Easy to plan & design Re-useable AMP TRAC  Ready
Data Center Optimized – Pre-Terminated Solutions “AMP Σ-Link System” Pre-Terminated Solutions based on Bundled Cables & Cassettes . Class F A  (Cat.7 A ),  Class E A  (Cat.6 A ) Shielded Solutions Class E (Cat.6) UTP Solution
Data Center Optimized – Pre-Terminated Solutions MRJ21 System Special designed High Density Systems: Easy to install (just Plug & Go) Easy to change without interference of other channels 6 x 1000Base-T in one compact cable & interface Space saving Compact Pre-Terminated Trunk Cables allow efficient airflow Re-useable Example: MRJ21 Plug&Go System http://www.cisco.com/pcgi-bin/ctdp/displayProfile.pl?PARTNER_ID=59368
Data Center Optimized - Pre-Terminated Solutions   MRJ21 Plug & Go System MRJ21 Panel to Panel configuration:
MRJ21 System -  Applications Compact, Flexible & Easy to manage Consistent Quality & Performance
Data Center Optimized – Pre-Terminated Solutions MPO Fiber Optic System Fiber Optic Plug&Go System: Based on the industry standard MT-Ferrule 12 Fibers OM2, OM3, OM4 or Singlemode Cassettes for all important Interfaces (LC, SC, MT-RJ) Compact & Consistent Quality (100% Factory tested!) No installation errors AMP TRAC  Ready! Standard MT 2.45mm 6.4mm
MPO Next Generation Low Loss MPOptimate System Insertion Loss:   0,35 dB/Cassette  maximum  ! = Best performing MPO System in the world market
Data Center Optimized Solutions “Smart Cabling for Data Centers” Benefits: Fast Setup Time and MAC’s All Performance requirement (1/10/40/100 GBit) Pre-Tested Improved Cable Management Efficient Airflow Management
Unmanaged  and unstructured connections No documentation 30-40% abandoned patch cords after 1 year of operation Dead ports  in switches and cable  runs  30-40% unused capacity MAC time > 1h per port Adds up to 150% of operational cost Adds up to 200% of floorspace needed  Heat sinks creation ( blocking of air flow ) Poor Cable Management -  Consequences
Hi-D –  Cable Management Platform Very high density Side Cable Management saves space for horizontal management Requires 800mm Rack Compatible with all Copper & Fiber Panels Controlled Bend Radius = Easy access to each Patchcord in case of changes!
 
System Benefits: Integrates all AMP NETCONNECT High Density Data Center Solutions (MPO, MRJ21 & Classical Cabling) Visualizes & Documents complete Data Center Network (Updates all changes automatically) Notifies all changes  = Increasing control over complex Data Center Infrastructures = Reduction of Downtimes!
System  – Process overview
Infrastructure Manager
AMP NETCONNECT –  Total Solution
Data Center –  Green IT The AMP NETCONNECT Data Center Solutions support the  Green Initiative: Re-duce Energy consumption = cost saving = preserves natural resources Re-useable  solutions = cost saving = preserves natural resources Re-cycable  solutions Use only  environmental friendly  materials (RoHS compliant)
One Solution for Your Datacenter ! It is worthwhile to invest into  guaranteed  Performance & Quality!
AMP NETCONNECT  Data Center Solutions Your Benefits Unique Solution – optimized exactly for the special needs in a Data Center (we do not just try to implement office infrastructures into a   data center – as many others do) All changes in a data center (which happens often!) can be done in very short time – without interruption of other services. = maximized uptime! = highest flexibility Space & Energy saving solution = $$$$ savings on operational costs = fast return on investment Complete Management & Documentation Solution (AMPTRAC) = comes up with IT SM requirements from ITIL
Thank You ! -  Questions ? A Solid Foundation for Your Communication Infrastructure

More Related Content

PDF
Types of Prefabricated Modular Data Centers
PPTX
How Schneider Electric sees Ethernet in the Industrial Environment - Part 1
PDF
Field Data Gathering Services — A Cloud-Based Approach
PPTX
Energy in Factory Automation and the Role of Industrial Networks
PPT
Ppt Dc 09
PPTX
Industrial Ethernet, Part 2: Case Studies
PDF
Data center power infrastructure
PPTX
Energy efficiency data center overview
Types of Prefabricated Modular Data Centers
How Schneider Electric sees Ethernet in the Industrial Environment - Part 1
Field Data Gathering Services — A Cloud-Based Approach
Energy in Factory Automation and the Role of Industrial Networks
Ppt Dc 09
Industrial Ethernet, Part 2: Case Studies
Data center power infrastructure
Energy efficiency data center overview

What's hot (20)

PDF
[FAQs] Best Practices for IT/OT Convergence
PPS
Company profile miguns Group
PDF
Power Protection for Digital Medical Imaging and Diagnostic Equipment
PDF
Underground Self-Healing Solution
PPTX
Data center presentation toi -28022013
PDF
Advantages of a modern DCS in coal handling
PDF
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
PDF
Data center power availability provisioning
ZIP
New Approach for Intelligent Motor Control Centers
PDF
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
PDF
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
PPT
Tia 942 Data Center Standards
PDF
Delta-Data Center Solutions (1)
PDF
Datacenter Strategy, Design, and Build
PDF
A New Language for Specifying Modular Data Centers
PDF
Implementing energy efficient data centers
PDF
The Network Modernization Imperative
PDF
[Case study] DONG Energy: Improving the bottom line and getting better data q...
PDF
What is data center availability modes slide
PDF
An improved architecture for high efficiency, high-density data centers
[FAQs] Best Practices for IT/OT Convergence
Company profile miguns Group
Power Protection for Digital Medical Imaging and Diagnostic Equipment
Underground Self-Healing Solution
Data center presentation toi -28022013
Advantages of a modern DCS in coal handling
Virtualization and Cloud Computing: Optimized Power, Cooling, and Management ...
Data center power availability provisioning
New Approach for Intelligent Motor Control Centers
Effect on Substation Engineering Costs of IEC61850 & System Configuration Tools
[Case study] Dakota Electric Association: Solutions to streamline GIS, design...
Tia 942 Data Center Standards
Delta-Data Center Solutions (1)
Datacenter Strategy, Design, and Build
A New Language for Specifying Modular Data Centers
Implementing energy efficient data centers
The Network Modernization Imperative
[Case study] DONG Energy: Improving the bottom line and getting better data q...
What is data center availability modes slide
An improved architecture for high efficiency, high-density data centers
Ad

Viewers also liked (9)

PDF
Murphy Data Center Services Infographic
PDF
Data Center Network Topologies
PPT
Connectivity lcl carrier_neutral_datacenter
PPTX
Structure cabling technologies for networking
PPTX
IDC DCIM Webinar - How to Take Control of Chaos in a Lights-Out Data Center
PPT
Managing a virtual datacenter with System Center
PDF
EMAG: Lights Out Manufacturing Presentation
PPT
Digital data transmission
Murphy Data Center Services Infographic
Data Center Network Topologies
Connectivity lcl carrier_neutral_datacenter
Structure cabling technologies for networking
IDC DCIM Webinar - How to Take Control of Chaos in a Lights-Out Data Center
Managing a virtual datacenter with System Center
EMAG: Lights Out Manufacturing Presentation
Digital data transmission
Ad

Similar to Genesys System - 8dec2010 (20)

PDF
commscope_2023_Data_Center_Trends_eBook_LR.pdf
PDF
Datacenter guide
PPTX
Athens Datacentres And 10 G
PDF
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
PDF
Fanout technology in 40G data center
PDF
The right technologies for your strategy
PPTX
Webinar: Faster, Smarter, Simpler – The New Requirements in Storage Networking
PDF
Michigan Collaboration Summit - Washtenaw Community College
PPT
Fundamentals and Basics
PDF
4 Structure Cabling System Design
PPTX
Internet of Things - structured approach to the physical plant network - Rock...
PDF
The Building Blocks of the Industrial Network
PPTX
Jeff Green April 2011 May V1
PDF
Avb pov 2017 v2
PDF
Converged Data Center: FCoE, iSCSI, and the Future of Storage Networking ( EM...
 
PDF
Tomorrow’s Data Centre, Today
PPT
Chapter10
PDF
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
PPTX
Siemon Carrie Higbie
commscope_2023_Data_Center_Trends_eBook_LR.pdf
Datacenter guide
Athens Datacentres And 10 G
Commercial Overview DC Session 1 Introduction To Cabling Standards And Th...
Fanout technology in 40G data center
The right technologies for your strategy
Webinar: Faster, Smarter, Simpler – The New Requirements in Storage Networking
Michigan Collaboration Summit - Washtenaw Community College
Fundamentals and Basics
4 Structure Cabling System Design
Internet of Things - structured approach to the physical plant network - Rock...
The Building Blocks of the Industrial Network
Jeff Green April 2011 May V1
Avb pov 2017 v2
Converged Data Center: FCoE, iSCSI, and the Future of Storage Networking ( EM...
 
Tomorrow’s Data Centre, Today
Chapter10
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
Siemon Carrie Higbie

More from Agora Group (20)

PDF
How to Digitally Transform and Stay Competitive with a Zero-code Digital Busi...
PDF
Microservicii reutilizabile in arhitecturi bazate pe procese
PDF
The role of BPM in Paradigms Shift
PDF
Prezentare Ensight_BPM-20171004
PDF
Curs OSINT
PDF
Curs Digital Forensics
PDF
The next generation of Companies management: state of the art in BPM
PDF
Speed Dialing the Enterprise
PDF
ABPMP Romania
PDF
Arhitectura proceselor în Sistemul Informațional de Sănătate
PDF
IBM’s Smarter Process Reinvent Business
PDF
eHealth 2014_Radu Dop
PDF
Importanța registrelor pentru pacienți
PDF
CYBERCRIME AND THE HEALTHCARE INDUSTRY: Sistemul de sănătate, noua țintă a at...
PDF
Perspective naționale și internaționale ale informaticii și standardelor medi...
PDF
UTI_Dosarul electronic de sanatate
PPTX
Class IT - Enemy inside the wire
PPTX
Infologica - auditarea aplicatiilor mobile
PPTX
Agora Securitate yugo neumorni
PPT
Security threats in the LAN
How to Digitally Transform and Stay Competitive with a Zero-code Digital Busi...
Microservicii reutilizabile in arhitecturi bazate pe procese
The role of BPM in Paradigms Shift
Prezentare Ensight_BPM-20171004
Curs OSINT
Curs Digital Forensics
The next generation of Companies management: state of the art in BPM
Speed Dialing the Enterprise
ABPMP Romania
Arhitectura proceselor în Sistemul Informațional de Sănătate
IBM’s Smarter Process Reinvent Business
eHealth 2014_Radu Dop
Importanța registrelor pentru pacienți
CYBERCRIME AND THE HEALTHCARE INDUSTRY: Sistemul de sănătate, noua țintă a at...
Perspective naționale și internaționale ale informaticii și standardelor medi...
UTI_Dosarul electronic de sanatate
Class IT - Enemy inside the wire
Infologica - auditarea aplicatiilor mobile
Agora Securitate yugo neumorni
Security threats in the LAN

Genesys System - 8dec2010

  • 1. Smart Cabling Infrastructure Solutions for Data Centers Constantin Ciuperca Project Manager Genesys Systems
  • 2. Agenda Data Center Infrastructure requirements Smart Cabling Solutions for Data Center Infrastructures
  • 3. Tyco Electronics – AMP NETCONNECT Strategic Division for Complete Communication Infrastructures
  • 5. Data Center – Overview / Subsystems Cabling Infrastructure IT Security Control system Raised floor Air Conditioning & Ventilation Systems Early fire Warning system Fire detection Fire extinguishing Water warning systems Access control Monitoring & Infrastructure Management Systems Power Supply, UPS & Generator Systems
  • 6. Main issues & concerns of Data Center Owners & Operators Data Center – What is important ? (Source: Datacenter Dynamics)
  • 7. Power supply and air conditioning have become the limiting factor for implementation of Data Centers. Data Center - Limiting Factors Picture: Knürr
  • 8. Data Center – Power Consumption Sources: EYP Mission Critical Facilities, Cisco IT, Network World, Customer Interviews, APC Reducing Data Center Power Consumption is a multi-faceted challenge. All areas need to be addressed to maximize data center compute capacity and minimize power costs.
  • 9. Cold air pumped into plenum space beneath floor tiles and vented into cold aisles and returns through a ceiling plenum. Data Center – Airflow Efficiency
  • 10. Airflow is blocked by a fully loaded raised floor For new buildings, cabling in the ceiling shall be considered for better management and improved airflow. Data Center – Airflow & Cable Placement Cable trays Cable trays Cable trays Cable trays Cable trays Cable trays Power cables Power cables Power cables
  • 11. millions server units Data Center – Server Trends (1G, 10G, 40G and 100G) Source: Intel & Broadcom 10 year transition for 1G Ethernet 6 years for 10GBE 5 years for 40GBE
  • 12. Comparison: Office Cabling <> Data Center Cabling Office Cabling: Static after installation Technology cycle: 5-10 years Lower density acceptable Downtimes less critical Physical environment less important Data Center Cabling: Dynamic Technology cycle: 3-5 years Highest density required Downtimes very critical Physical environment very important
  • 13. Data Center – Infrastructure Requirements Highest Reliability and Availabilit y (= Quality ). High Infrastructure Performance to support various kinds of services. Shortest Deployment Time for Moves, Adds & Changes (MAC’s). Highest Density of all equipment. Redundancy Support to save Power Best possible control via Network and Infrastructure Management (including reliable documentation).
  • 14. Smart Cabling Solutions for Data Center Infrastructures
  • 15. Data Center – Relevant Standards EN 50173-5 Data Center Cabling ISO/IEC 24764 (created according EN 50173-5) EIA/TIA 942 “Telecommunications Infrastructure Standards for Data Centers”
  • 16. Ad-hoc growth and cabling Point to point cabling Pathway confusion Documentation errors Data Center – Why standards ? Network Cabinets Server Cabinets Server Cabinets Server Cabinets Server Cabinets More an evolution than a real planning from the beginning Finally leading to a difficult to handle chaos !
  • 17. Data Center – Structure acc. Standards MDA HDA EDA Telecommunication Room
  • 18. Data Center – Structure & Cabling Requirements Main Distribution Area (MDA) Horizontal Distribution Area (HDA) Equipment Distribution Area (EDA) Optional: Zone Distribution Area (ZDA) HDA EDA ZDA HC HC HC MC Primary Entrance Room HC Scondary Entrance Room Access Providers Access Providers Access Providers Offices, Operations Center Support Rooms Telecom Room Interconnect Active Equip. Storage Area Devices etc. Interconnect Active Equipment Interconnect Active Equipment Active Equipment Interconnect Backbone Cabling Backbone Cabling Backbone Cabling Horizontal Cabling Horizontal Cabling Horizontal Cabling MDA Highest Performance Cat. 6 A / 7 A or Fiber Optic Density & Flexibility MRJ 21 MPO “Plug & Go”
  • 19. Complete Data Center Solutions AMP NETCONNECT provide the complete Cabling Infrastructure: Classical High Performance Cabling Systems Data Center Optimized Plug&Go Solutions “Smart Cabling for Data Centers” Cable Management Systems ready to be integrated into Intelligent Infrastructure Management System (IIMS)
  • 20. Data Center Optimized Solutions “Smart Cabling for Data Centers” MRJ21, Σ-Link & MPO Cabling Systems Shortest deployment time Fastest Moves, Adds & Changes 100% factory pre-tested Highest Density Easy to plan & design Re-useable AMP TRAC Ready
  • 21. Data Center Optimized – Pre-Terminated Solutions “AMP Σ-Link System” Pre-Terminated Solutions based on Bundled Cables & Cassettes . Class F A (Cat.7 A ), Class E A (Cat.6 A ) Shielded Solutions Class E (Cat.6) UTP Solution
  • 22. Data Center Optimized – Pre-Terminated Solutions MRJ21 System Special designed High Density Systems: Easy to install (just Plug & Go) Easy to change without interference of other channels 6 x 1000Base-T in one compact cable & interface Space saving Compact Pre-Terminated Trunk Cables allow efficient airflow Re-useable Example: MRJ21 Plug&Go System http://www.cisco.com/pcgi-bin/ctdp/displayProfile.pl?PARTNER_ID=59368
  • 23. Data Center Optimized - Pre-Terminated Solutions MRJ21 Plug & Go System MRJ21 Panel to Panel configuration:
  • 24. MRJ21 System - Applications Compact, Flexible & Easy to manage Consistent Quality & Performance
  • 25. Data Center Optimized – Pre-Terminated Solutions MPO Fiber Optic System Fiber Optic Plug&Go System: Based on the industry standard MT-Ferrule 12 Fibers OM2, OM3, OM4 or Singlemode Cassettes for all important Interfaces (LC, SC, MT-RJ) Compact & Consistent Quality (100% Factory tested!) No installation errors AMP TRAC Ready! Standard MT 2.45mm 6.4mm
  • 26. MPO Next Generation Low Loss MPOptimate System Insertion Loss: 0,35 dB/Cassette maximum ! = Best performing MPO System in the world market
  • 27. Data Center Optimized Solutions “Smart Cabling for Data Centers” Benefits: Fast Setup Time and MAC’s All Performance requirement (1/10/40/100 GBit) Pre-Tested Improved Cable Management Efficient Airflow Management
  • 28. Unmanaged and unstructured connections No documentation 30-40% abandoned patch cords after 1 year of operation Dead ports in switches and cable runs 30-40% unused capacity MAC time > 1h per port Adds up to 150% of operational cost Adds up to 200% of floorspace needed Heat sinks creation ( blocking of air flow ) Poor Cable Management - Consequences
  • 29. Hi-D – Cable Management Platform Very high density Side Cable Management saves space for horizontal management Requires 800mm Rack Compatible with all Copper & Fiber Panels Controlled Bend Radius = Easy access to each Patchcord in case of changes!
  • 30.  
  • 31. System Benefits: Integrates all AMP NETCONNECT High Density Data Center Solutions (MPO, MRJ21 & Classical Cabling) Visualizes & Documents complete Data Center Network (Updates all changes automatically) Notifies all changes = Increasing control over complex Data Center Infrastructures = Reduction of Downtimes!
  • 32. System – Process overview
  • 34. AMP NETCONNECT – Total Solution
  • 35. Data Center – Green IT The AMP NETCONNECT Data Center Solutions support the Green Initiative: Re-duce Energy consumption = cost saving = preserves natural resources Re-useable solutions = cost saving = preserves natural resources Re-cycable solutions Use only environmental friendly materials (RoHS compliant)
  • 36. One Solution for Your Datacenter ! It is worthwhile to invest into guaranteed Performance & Quality!
  • 37. AMP NETCONNECT Data Center Solutions Your Benefits Unique Solution – optimized exactly for the special needs in a Data Center (we do not just try to implement office infrastructures into a data center – as many others do) All changes in a data center (which happens often!) can be done in very short time – without interruption of other services. = maximized uptime! = highest flexibility Space & Energy saving solution = $$$$ savings on operational costs = fast return on investment Complete Management & Documentation Solution (AMPTRAC) = comes up with IT SM requirements from ITIL
  • 38. Thank You ! - Questions ? A Solid Foundation for Your Communication Infrastructure

Editor's Notes

  • #9: Power including the power to remove the heat created in the data center has many root causes. If a customer wants to reduce their operational costs associated with power and cooling as well as increasing the useful life of their data center facility, they will need to address data center power in a more holistic fashion, and address issues such as cooling which have historically been less important
  • #29: All these concerns and the market trends brings us with the consequences of shown chaos… It is obvious that in this case it is a nightmare to handle yout cords. How are you going to document this. After 1 year at east 30-40% of the patchcordds are just hanging there and will not been used anymore. Drawback of this is that the switches will loose capacity due to the unused capacity. Think about how time consuming it is for the technician to do a job when he’s in front of such a mess. Funny thing about this picture is that explicitly is asked to DO NOT TOUCH ANY OF THESE WIRES. Offcourse if we look ninto the operational cost it is going skyhigh. Not only the additional floorspace is needed but this curtain of cords is blocking the airflow of the electronic components, again this influences the power and cooling requirements.