HDPE PERFORATION GUIDE 
                                                                     PERFORATIONS PER AASHTO M252/M294 

PERFORATIONS – GENERAL 
Lane’s  perforated  pipe  offerings  follow  the  AASHTO  classification  system  and  conform  to  AASHTO 
requirements for size, spacing and placement of the perforations. It is not the intent of this guide to cite 
AASHTO  requirements  but  to  describe  Lane’s  perforated  pipe  offerings  with  the  added  note  that 
AASHTO specifications are met. 
 
CLASS 1 PERFORATIONS (PARTIALLY PERFORATED PIPE) 
Class 1 perforations are for pipe intended to be used for subsurface drainage or combination storm and 
underdrain.  As such,  the  pipe  maintains an unperforated segment above the invert to serve as a flow 
channel.  Perforations  are  circular  and  arranged  in  rows  parallel  to  the  axis  of  the  pipe  with  one 
perforation  in  each  row  for  each  corrugation.  Rows  of  perforations  are  arranged  in  two  equal  groups 
placed symmetrically on each side of a lower unperforated segment corresponding  to the  flow line of 
the pipe. 
 
CLASS 2 PERFORATIONS (STANDARD OR FULLY PERFORATED PIPE) 
Class 2 perforations are for pipe intended to be used for subsurface drainage only. Perforations may be 
circular or slotted and are uniformly spaced along the length and circumference of the pipe. Perforated 
pipe shall conform to the requirements for Class 2 unless noted otherwise. 
 
                                                                                                                   
 
 
AASHTO M252 CLASS 2 SLOTTED PERFORATIONS FOR SINGLE‐WALL (CP) AND DOUBLE‐WALL (SP) PIPE
 
 
         Type CP Class 2 Slotted Perforations                        Type SP Class 2 Slotted Perforations 
    D      P        n         l        w       WIA            D        P        n          l       w         WIA 
    4    0.645      4       0.783  0.069  4.02                 6     0.773      4       0.769  0.055         2.63 
    6    0.824      4       0.769  0.055  2.46                 8     0.975      4       0.759  0.050         1.87 
    8     1.02      4       0.759  0.050  1.79                10     1.525      4       0.779  0.054         1.32 
                                                           
D = Nominal pipe diameter (in) 
P = Period of Corrugations (in) 
n = number of slots per corrugation valley 
l = average length of slotted perforation (in) 
w = average width of slotted perforation (in) 
WIA = Water inlet area (in2/ft) 

Summary description 
Class  2  slotted  perforations  includes  a 
total of four equally spaced slots in each 
corrugation  valley  as  shown  by  the 
black centerlines at right. 




                                                Perforation Guide 
                                                      PG‐1 
 
HDPE PERFORATION GUIDE 
                                                                    PERFORATIONS PER AASHTO M252/M294 

 
 
        AASHTO M294 CLASS 2 SLOTTED PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
 
     
          Type SP Class 2 Perforations                                
                        
          D        d        L      WIA 
          12    0.3125  1.94       2.85 
          15    0.3125  2.62       2.11 
          18    0.3125  2.96       1.87 

        D = Nominal pipe diameter (in) 
        d = diameter of circular perforation (in) 
        L = Longitudinal spacing between holes (in) 
        WIA = Water inlet area (in2/ft) 

        Summary description 
        Class 2 perforations for 12", 15" and 18" 
        HDPE pipes include a total of six equally 
        spaced  5/16"  diameter  holes  in  each 
        corrugation valley as shown at right. 
     


     
          Type SP Class 2 Perforations 
          D        d        L      WIA 
          24    0.3750  3.95       2.68 
          30    0.3750  4.01       2.64 
          36    0.3750  4.06       2.61 
          42    0.3750  5.38       1.97 
          48    0.3750  5.37       1.97 

        D = Nominal pipe diameter (in) 
        d = diameter of circular perforation (in) 
        L = Longitudinal spacing between holes (in) 
        WIA = Water inlet area (in2/ft) 

        Summary description 
        Class  2  perforations  for  24",  30",  36", 
        42"  and  48"  HDPE  pipes  include  a  total 
        of  eight  equally  spaced  3/8"  diameter 
        holes  in  each  corrugation  valley  as 
        shown at right. 
     
                                               Perforation Guide 
                                                     PG‐2 
 
HDPE PERFORATION GUIDE 
                                                            PERFORATIONS PER AASHTO M252/M294 

    AASHTO M252 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 

       
                AASHTO M252 Type SP Class 1 Perforations (6" through 10")  
          D     1    2      L     Lmin  H      Hmax       s1/2       d      S  WIA 
          6     48    70    4.46    3.74 1.97    2.76       1.15    0.1875  0.75  1.77 
          8     48    70    5.95    5.12 2.63    3.70       1.54    0.1875  1.00  1.33 
          10    48    70    7.43    6.30 3.29    4.72       1.92    0.3125  1.75  2.10 

          D = Nominal diameter (in) 
          1 ≥ 37.5°, 2 ≤ 85° (AASHTO maximum and minimum angles) 
          s = arc length between holes (in) 
          d = diameter of circular perforation (in) 
          S = longitudinal spacing between perforations (in) 
          WIA = Water inlet area (in2/ft) 

          Summary description 
          Class 1 perforations for 6", 8" and 10" HDPE pipes include a total of four 
          holes in each corrugation valley as shown below. Perforations for the 6" 
          and 8" pipes shall be 3/16" diameter, while the perforations for the 10" 
          pipe shall be 5/16" diameter. 




                                       Perforation Guide 
                                             PG‐3 
 
HDPE PERFORATION GUIDE 
                                                               PERFORATIONS PER AASHTO M252/M294 


               AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
     
                    AASHTO M294 Type SP Class 1 Perforations (12" through 18")  
        D     1    2    3     L      Lmin    H      Hmax     s1/2     s2/3    d     S    WIA
        12    47    62    78  8.78  7.56  4.75         5.43     1.57 1.68 0.38  1.94  4.10
        15    47    62    78  10.97  9.45  5.94        6.77     1.96 2.09 0.38  2.62  3.04
        18    47    62    78  13.16  11.34 7.13        8.15     2.36 2.51 0.38  2.96  2.69

        D = Nominal diameter (in) 
        1 ≥ 40°, 3 ≤ 85° (AASHTO maximum and minimum angles) 
        s = arc length between holes (in), must be ≥ 1 inch 
        d = diameter of circular perforation (in) 
        S = longitudinal spacing between perforations (in) 
        WIA = Water inlet area (in2/ft) 

                                   Summary description 
        Class 1 perforations for 12 through 18‐in HDPE pipes include a total of six 
        ⅜" diameter holes in each corrugation valley as shown below. 




                                          Perforation Guide 
                                                PG‐4 
 
HDPE PERFORATION GUIDE 
                                                                           PERFORATIONS PER AASHTO M252/M294 


                        AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE 
     
                            AASHTO M294 Type SP Class 1 Perforations (24" through 48") 
        D     1     2    3  4    L     Lmin     H      Hmax  s1/2  s2/3  s3/4       d           S    WIA
        24    46     57    68  79  17.26  15.36 9.71  11.04 2.30 2.30 2.30  0.375                 3.95   2.68
        30    46     57    68  79  21.58  19.20 12.14 13.80 2.88 2.88 2.88  0.375                 4.01   2.64
        36    46     57    68  79  25.90  23.04 14.57 16.56 3.46 3.46 3.46  0.375                 4.06   2.61
        42    46     57    68  79  30.21  26.88 16.99 19.32 4.03 4.03 4.03  0.375                 5.38   1.97
        48    46     57    68  79  34.53  30.72 19.42 22.08 4.61 4.61 4.61  0.375                 5.37   1.97

        Summary description 
        Class  1  perforations  for  24  through  48‐in  HDPE  pipes  include  a  total  of 
        eight ⅜" diameter holes in each corrugation valley as shown below. 

        D = Nominal diameter (in) 
        1 ≥ 40°, 4 ≤ 85° (AASHTO maximum and minimum angles) 
        s = arc length between holes (in), must be ≥ 1 inch 
        d = diameter of circular perforation (in) 
        S = longitudinal spacing between perforations (in) 
        WIA = Water inlet area (in2/ft) 




                                                      Perforation Guide 
                                                            PG‐5 
 

More Related Content

PDF
AASHTO T283.pdf
PDF
Development Length Hook Splice Of Reinforcements
PPT
Reinforcement detailing
PDF
From work & shuttering
PDF
Acceptance criteria of cube
PDF
BT 1: Concrete Hollow Blocks
PPTX
Deduction of opening , Number of bars and Bar Bending Scheduling
PDF
Presentation1 integrity problems of concrete piles-emergency
AASHTO T283.pdf
Development Length Hook Splice Of Reinforcements
Reinforcement detailing
From work & shuttering
Acceptance criteria of cube
BT 1: Concrete Hollow Blocks
Deduction of opening , Number of bars and Bar Bending Scheduling
Presentation1 integrity problems of concrete piles-emergency

What's hot (20)

PDF
Cold-Formed-Steel Design And Construction ( Steel Structure )
PPTX
PDF
Bs 1881-part-116-83
DOCX
Bar bending schedule for neck column
PDF
2 pat e acidentes
PPTX
Materials for repair: Ferro-cement (part 2) (RR&S)
PDF
BBS Preparation
PPTX
Bar bending schedule(by akhil)
PDF
Plain and-reinforced-concrete(IS 456 2000)
PDF
SNF vs PCE: technical aspects and possibilities
PDF
Durability of Concrete structures by Dr.Vinay Kumar B M
PPTX
limit state method
PDF
Steel building design worked example
PDF
Csi recycling concrete-fullreport
PDF
Diaphragm walls
PDF
Estrutura de concreto armado imprimir
PDF
PLUMBING
PDF
Cement Test.pdf
PDF
Agregados 2012 2 janaína
PDF
1 produtos cg_2011
Cold-Formed-Steel Design And Construction ( Steel Structure )
Bs 1881-part-116-83
Bar bending schedule for neck column
2 pat e acidentes
Materials for repair: Ferro-cement (part 2) (RR&S)
BBS Preparation
Bar bending schedule(by akhil)
Plain and-reinforced-concrete(IS 456 2000)
SNF vs PCE: technical aspects and possibilities
Durability of Concrete structures by Dr.Vinay Kumar B M
limit state method
Steel building design worked example
Csi recycling concrete-fullreport
Diaphragm walls
Estrutura de concreto armado imprimir
PLUMBING
Cement Test.pdf
Agregados 2012 2 janaína
1 produtos cg_2011
Ad

Similar to Hdpe perforation guide (20)

PDF
Pump Hose Kit - Rental Series Linecard
PDF
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
PDF
Hawke 501 421
PDF
CATALOG BOOK-Baling Steel-DRILL PIPE.pdf
PPTX
Lecture Riveted Joints by molvie imran.pptx
PDF
Hawke 501/414 Hazardous Area Cable Glands
PDF
Crimping-Booklet-March-2020.pdf
PDF
Hydraulic Fittings to Din 2353
PDF
Jgb industrial cleaning catalog
PDF
Vacuum Switch MN Series
PPT
casing-design for drilling engineering-2005.ppt
PDF
09 mirror shine stainless steel
PPT
11-INTRODUCTION TO DRILLING BIT and eng.ppt
PPTX
604.pptx
PDF
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
PDF
Tangential entry hollow cone nozzles
PDF
Eg34799802
PDF
Hawke 501/423 Hazardous Area Cable Gland
PDF
Raccordi per alte pressioni - Fitok serie 20
Pump Hose Kit - Rental Series Linecard
Jyoti Industries, Mumbai, Pipes & Pipe Fittings
Hawke 501 421
CATALOG BOOK-Baling Steel-DRILL PIPE.pdf
Lecture Riveted Joints by molvie imran.pptx
Hawke 501/414 Hazardous Area Cable Glands
Crimping-Booklet-March-2020.pdf
Hydraulic Fittings to Din 2353
Jgb industrial cleaning catalog
Vacuum Switch MN Series
casing-design for drilling engineering-2005.ppt
09 mirror shine stainless steel
11-INTRODUCTION TO DRILLING BIT and eng.ppt
604.pptx
|AKBAR TRADING EST. SAUDI ARABIA|HAWKE 501 453 ATEX – IECEx Safety Exe / Dust...
Tangential entry hollow cone nozzles
Eg34799802
Hawke 501/423 Hazardous Area Cable Gland
Raccordi per alte pressioni - Fitok serie 20
Ad

More from TADSA1 (9)

PDF
CATÁLOGO DE PRODUCTOS TADSA
PDF
FICHA TÉCNICA LANE
PDF
GUÍA DE PERFORACIÓN
PDF
HDPE ROLLOS DE TUBERÍA
PDF
Manual de instalacion
PDF
Hdpe coil-pipe-brochure2
PDF
Hdpe installation practice
PDF
Hdpe installation practice
PDF
Ficha tecnica lane
CATÁLOGO DE PRODUCTOS TADSA
FICHA TÉCNICA LANE
GUÍA DE PERFORACIÓN
HDPE ROLLOS DE TUBERÍA
Manual de instalacion
Hdpe coil-pipe-brochure2
Hdpe installation practice
Hdpe installation practice
Ficha tecnica lane

Recently uploaded (20)

PDF
Unlock new opportunities with location data.pdf
PPTX
Chapter 5: Probability Theory and Statistics
PDF
sustainability-14-14877-v2.pddhzftheheeeee
PDF
A comparative study of natural language inference in Swahili using monolingua...
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PDF
A review of recent deep learning applications in wood surface defect identifi...
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PDF
Architecture types and enterprise applications.pdf
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
PDF
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PPTX
The various Industrial Revolutions .pptx
PDF
WOOl fibre morphology and structure.pdf for textiles
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
STKI Israel Market Study 2025 version august
PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PPT
What is a Computer? Input Devices /output devices
Unlock new opportunities with location data.pdf
Chapter 5: Probability Theory and Statistics
sustainability-14-14877-v2.pddhzftheheeeee
A comparative study of natural language inference in Swahili using monolingua...
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
A review of recent deep learning applications in wood surface defect identifi...
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
Architecture types and enterprise applications.pdf
Benefits of Physical activity for teenagers.pptx
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
Assigned Numbers - 2025 - Bluetooth® Document
Univ-Connecticut-ChatGPT-Presentaion.pdf
Group 1 Presentation -Planning and Decision Making .pptx
The various Industrial Revolutions .pptx
WOOl fibre morphology and structure.pdf for textiles
1 - Historical Antecedents, Social Consideration.pdf
STKI Israel Market Study 2025 version august
A contest of sentiment analysis: k-nearest neighbor versus neural network
What is a Computer? Input Devices /output devices

Hdpe perforation guide

  • 1. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  PERFORATIONS – GENERAL  Lane’s  perforated  pipe  offerings  follow  the  AASHTO  classification  system  and  conform  to  AASHTO  requirements for size, spacing and placement of the perforations. It is not the intent of this guide to cite  AASHTO  requirements  but  to  describe  Lane’s  perforated  pipe  offerings  with  the  added  note  that  AASHTO specifications are met.    CLASS 1 PERFORATIONS (PARTIALLY PERFORATED PIPE)  Class 1 perforations are for pipe intended to be used for subsurface drainage or combination storm and  underdrain.  As such,  the  pipe  maintains an unperforated segment above the invert to serve as a flow  channel.  Perforations  are  circular  and  arranged  in  rows  parallel  to  the  axis  of  the  pipe  with  one  perforation  in  each  row  for  each  corrugation.  Rows  of  perforations  are  arranged  in  two  equal  groups  placed symmetrically on each side of a lower unperforated segment corresponding  to the  flow line of  the pipe.    CLASS 2 PERFORATIONS (STANDARD OR FULLY PERFORATED PIPE)  Class 2 perforations are for pipe intended to be used for subsurface drainage only. Perforations may be  circular or slotted and are uniformly spaced along the length and circumference of the pipe. Perforated  pipe shall conform to the requirements for Class 2 unless noted otherwise.          AASHTO M252 CLASS 2 SLOTTED PERFORATIONS FOR SINGLE‐WALL (CP) AND DOUBLE‐WALL (SP) PIPE     Type CP Class 2 Slotted Perforations  Type SP Class 2 Slotted Perforations  D  P  n  l  w  WIA  D  P  n  l  w  WIA  4  0.645  4  0.783  0.069  4.02  6  0.773  4  0.769  0.055  2.63  6  0.824  4  0.769  0.055  2.46  8  0.975  4  0.759  0.050  1.87  8  1.02  4  0.759  0.050  1.79  10  1.525  4  0.779  0.054  1.32    D = Nominal pipe diameter (in)  P = Period of Corrugations (in)  n = number of slots per corrugation valley  l = average length of slotted perforation (in)  w = average width of slotted perforation (in)  WIA = Water inlet area (in2/ft)  Summary description  Class  2  slotted  perforations  includes  a  total of four equally spaced slots in each  corrugation  valley  as  shown  by  the  black centerlines at right.  Perforation Guide  PG‐1   
  • 2. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294        AASHTO M294 CLASS 2 SLOTTED PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE          Type SP Class 2 Perforations        D  d  L  WIA  12  0.3125  1.94  2.85  15  0.3125  2.62  2.11  18  0.3125  2.96  1.87  D = Nominal pipe diameter (in)  d = diameter of circular perforation (in)  L = Longitudinal spacing between holes (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 2 perforations for 12", 15" and 18"  HDPE pipes include a total of six equally  spaced  5/16"  diameter  holes  in  each  corrugation valley as shown at right.      Type SP Class 2 Perforations  D  d  L  WIA  24  0.3750  3.95  2.68  30  0.3750  4.01  2.64  36  0.3750  4.06  2.61  42  0.3750  5.38  1.97  48  0.3750  5.37  1.97  D = Nominal pipe diameter (in)  d = diameter of circular perforation (in)  L = Longitudinal spacing between holes (in)  WIA = Water inlet area (in2/ft)  Summary description  Class  2  perforations  for  24",  30",  36",  42"  and  48"  HDPE  pipes  include  a  total  of  eight  equally  spaced  3/8"  diameter  holes  in  each  corrugation  valley  as  shown at right.    Perforation Guide  PG‐2   
  • 3. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M252 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M252 Type SP Class 1 Perforations (6" through 10")   D  1  2  L  Lmin  H  Hmax  s1/2  d  S  WIA  6  48  70  4.46  3.74 1.97 2.76  1.15 0.1875  0.75  1.77  8  48  70  5.95  5.12 2.63 3.70  1.54 0.1875  1.00  1.33  10  48  70  7.43  6.30 3.29 4.72  1.92 0.3125  1.75  2.10  D = Nominal diameter (in)  1 ≥ 37.5°, 2 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in)  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 1 perforations for 6", 8" and 10" HDPE pipes include a total of four  holes in each corrugation valley as shown below. Perforations for the 6"  and 8" pipes shall be 3/16" diameter, while the perforations for the 10"  pipe shall be 5/16" diameter.  Perforation Guide  PG‐3   
  • 4. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M294 Type SP Class 1 Perforations (12" through 18")   D  1  2  3  L  Lmin  H  Hmax  s1/2  s2/3  d  S  WIA 12  47  62  78  8.78  7.56  4.75 5.43  1.57 1.68 0.38  1.94  4.10 15  47  62  78  10.97  9.45  5.94 6.77  1.96 2.09 0.38  2.62  3.04 18  47  62  78  13.16  11.34 7.13 8.15  2.36 2.51 0.38  2.96  2.69 D = Nominal diameter (in)  1 ≥ 40°, 3 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in), must be ≥ 1 inch  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Summary description  Class 1 perforations for 12 through 18‐in HDPE pipes include a total of six  ⅜" diameter holes in each corrugation valley as shown below.  Perforation Guide  PG‐4   
  • 5. HDPE PERFORATION GUIDE  PERFORATIONS PER AASHTO M252/M294  AASHTO M294 CLASS 1 PERFORATIONS FOR DOUBLE‐WALL (SP) PIPE    AASHTO M294 Type SP Class 1 Perforations (24" through 48")  D  1  2  3  4  L  Lmin  H  Hmax  s1/2  s2/3  s3/4  d  S  WIA 24  46  57  68  79  17.26  15.36 9.71  11.04 2.30 2.30 2.30  0.375  3.95 2.68 30  46  57  68  79  21.58  19.20 12.14 13.80 2.88 2.88 2.88  0.375  4.01 2.64 36  46  57  68  79  25.90  23.04 14.57 16.56 3.46 3.46 3.46  0.375  4.06 2.61 42  46  57  68  79  30.21  26.88 16.99 19.32 4.03 4.03 4.03  0.375  5.38 1.97 48  46  57  68  79  34.53  30.72 19.42 22.08 4.61 4.61 4.61  0.375  5.37 1.97 Summary description  Class  1  perforations  for  24  through  48‐in  HDPE  pipes  include  a  total  of  eight ⅜" diameter holes in each corrugation valley as shown below.  D = Nominal diameter (in)  1 ≥ 40°, 4 ≤ 85° (AASHTO maximum and minimum angles)  s = arc length between holes (in), must be ≥ 1 inch  d = diameter of circular perforation (in)  S = longitudinal spacing between perforations (in)  WIA = Water inlet area (in2/ft)  Perforation Guide  PG‐5