SlideShare a Scribd company logo
Implementation of
Construction Project with
Detailed Contract Documents
Soe Minn Sett
Myanmar Transitional Platform
1 March 2014
UMFCCI, Yangon
Key Team Player in following airport projects:-
Changi Airport (Singapore)
Sembawang Airbase (Singapore)
Seletar Airport (Singapore)
New Phu Quoc International Project (Vietnam)
Can Tho International Airport (Vietnam)
Buon Ma Thout Airport (Vietnam)
Benazir Bhutto International Airport (Islamabad, Pakistan)
Naypyitaw Airport (Myanmar)
Melbourne Airport (Australia)
Hambantota International Airport (Sri Lanka)
Soe Minn Sett
B.E (Civil),
M.Sc (Transportation Engineering)
1) LEGAL FRAME WORK
2) FORM OF CONTRACT
3) RESULT OF DETAILED CONTRACT DOCUMENTS
3
CONTENT
Myanmar Transitional Platform
4
Ref: Imperial Gazetteer of India, v. 9, p. 213.
LEGAL FRAME WORK
BRITISH BURMA MUNICIPAL ACT, 1874
BURMA MUNICIPAL ACT, 1884
Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885”
Myanmar Transitional Platform
5
LEGAL FRAME WORK
Rangoon City Municipal Act (1922)
Rangoon City Municipal Act (1956)
Myanmar Transitional Platform
6
Yangon City Development Committee
LEGAL FRAME WORK
Myanmar Transitional Platform
7
CURRENT PRACTICE
City Development Committee
Myanmar Transitional Platform
8
CURRENT PRACTICE
Ministry of Construction
Myanmar Transitional Platform
9
Contract Law
LEGAL FRAME WORK
-Myanmar Contract Act, 1872
(formerly known as “Indian Contract Act”)
- Sale of Goods Act, 1930
Same as Australian, English, Hong Kong and Singapore law.
three major differences:
(i) Consideration may be given by a person who is not a person to the contract;
(ii) Past consideration (that is, payment/performance prior to entering into the
contract) is valid consideration
(iii) Consideration is not presumed in the case of a contract under seal.
Myanmar Transitional Platform
LEGAL FRAME WORK
10
Typical Contract Agreement Document
(Private Sector Project)
- Contract agreements were
drafted on Stamp paper and
signed by both parties.
- May witness by Lawyers
- Mentioned payment term
- General description of project
deliverable (Eg. 8 stories R.C
building, 20’ x 50’ Warehouse Steel
Structure building etc)
Myanmar Transitional Platform
LEGAL FRAME WORK
11
Typical Contract Agreement Document
(Private Sector Project)
Myanmar Transitional Platform
LEGAL FRAME WORK
12
Typical Contract Agreement Document
(Government Sector Project)
Myanmar Transitional Platform
13
LEGAL FRAME WORK
Myanmar Transitional Platform
Photo Courtesy : Swe Oo’s Facebook PUBLIC share
FORM OF CONTRACT
14
PRINCIPAL STAGES OF CONSTRUCTION PROCESS
14
Project
Brief
Decision
to Build
Evaluation
& Award
Completion &
Maintenance
Design
Drawings
Tender Documentation
-Conditions of Contract
-Drawings
-BQs
-Specifications
Tender
Invitation
Construction
Works
Letter of
Intent/Award
Contract
Documents
Myanmar Transitional Platform
FORM OF CONTRACT
15
Standard form of Contract Documents
1. Articles of Agreement
2. Conditions of Contract
(regulate to practice)
3. Plans and Drawings
4. Bill of Quantities
5. Specification
(recommend to practice)
Myanmar Transitional Platform
16
Common Standard Form of Condition of Contract
 Joint Contracts Tribunal (JCT)
 International Federation of Consulting Engineers (FIDIC)
 NEC Engineering and Construction Contract (NEC)
 Singapore Institute of Architect (SIA)
 Association of Consultant Architects (ACA)
 Public Sector Standard Conditions of Contract for Construction Works
(PSSCOC)
 Master Format (Construction Specification Institute, CSI)
FORM OF CONTRACT
Myanmar Transitional Platform
17
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
18
Common Standard Form of Condition of Contract
FORM OF CONTRACT
19
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
20
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
21
Common Standard Form of Condition of Contract
FORM OF CONTRACT
Myanmar Transitional Platform
22
PSSCOC
Public Sector Standard Conditions of Contract for Construction Works
1. Definitions and Interpretation
2 . Superintending Officer and
Superintending Officer's Representative
3. Contract Documents
4. General Obligations of the Contractor
5. Sub-Surface and Ground Conditions
6. Permanent Works Designed by the
Contractor
7. Notices and Fees
8. Setting Out
9. Programme for the Works
10. Quality in Construction
11. Administration
12. Possession of Site And
Commencement Of Works
13. Suspension
14. Time for Completion
15. Expediting Progress of Works
16. Liquidated Damages
17. Substantial Completion
18. Defects
19. Variations to the Works
20. Valuation of Variations
21. Measurement
22. Claims for Loss and Expense
23. Procedure for Claims
24. Construction Equipment
Temporary Works Materials and
Goods
25. General Responsibilities
26. Indemnity Provisions
27. Insurance for Personal Injury, Work
Injury Compensation and Property
Damage
28. Insurance of the Works
29. Damage to Property of Employer or
Government
30. Assignment and Subcontracting
31. Termination by The Employer
32. Progress Payments and Final Account
33. Fluctuations
34. Final Completion Certificate
35. Settlement of Disputes
36. Recovery by the Employer
37. Governing Law & Notices
FORM OF CONTRACT
Myanmar Transitional Platform
23
Technical Specification
Specifications
FORM OF CONTRACT
Myanmar Transitional Platform
24
Technical Specification
Specifications
FORM OF CONTRACT
Myanmar Transitional Platform
25
Specifications
Specification Format
-National Building Specification Format
(UK Based System)
-Master Format (Construction Specification Institute, CSI)
(US Based System)
- PWD/CPG General Specification
FORM OF CONTRACT
Myanmar Transitional Platform
26
Specifications
Particular Requirement
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
27
Technical Specification
Specifications
FORM OF CONTRACT
NBS Master Format
Myanmar Transitional Platform
28
 Publish Standard Condition of Contract by relevant
Authorities
(for Public and Private Sectors)
 Regulate to practice the published Standard
Condition of Contract
 Practice to include Detailed Specification
(Consultants, License Engineers, Professional Engineers)
RECOMMENDATION
Myanmar Transitional Platform
29
 Clear understanding of respective responsible of each party
(Benefit to both Employer and Employee)
 Prevent ambiguity and un-necessary Arbitration at Court
(lost time and money)
 Property is “General Public Investment”
(Contribute GDP)
 Preparation for “Next Generation of Construction Industrial”
(Set up the industrial practice and standard to prevent
from Nasty International Contractor who want to take
advantages on lack of industrialise inexperience)
RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT
Myanmar Transitional Platform
Thank You
30
Soe Min Sett
Email : smsett@gmail.com
Myanmar Transitional Platform

More Related Content

PDF
Implementation of Construction Project with Detailed Contract Documents
DOC
Curriculum vitae
PPT
Mindscape Architects
DOCX
CV Iftikhar Hussain - 12-4-16
PDF
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
PPTX
Design a house contract document stage
PPT
Partnering and partnering contracts presentation
PPT
Drafting Construction Contracts
Implementation of Construction Project with Detailed Contract Documents
Curriculum vitae
Mindscape Architects
CV Iftikhar Hussain - 12-4-16
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
Design a house contract document stage
Partnering and partnering contracts presentation
Drafting Construction Contracts

Similar to Implementation of construction project with detailed contract documents r1 (8)

PPTX
4GOVEaasdfgggtkfwseyRNMENT CONTRACTS33.pptx
PDF
11.05 - 11.15 Asen Antov
PDF
Bids and contracts L7-L12 fundementals.pdf
PDF
Bids and contracts L7-L12 fundementals.pdf
PPT
Fidic 99 ppt by dr karim
DOCX
Project management
PPT
1449739458979-TENDERSANDCONTRACTS -FINAL.ppt
PPTX
Fidic conditions of contract presentation
4GOVEaasdfgggtkfwseyRNMENT CONTRACTS33.pptx
11.05 - 11.15 Asen Antov
Bids and contracts L7-L12 fundementals.pdf
Bids and contracts L7-L12 fundementals.pdf
Fidic 99 ppt by dr karim
Project management
1449739458979-TENDERSANDCONTRACTS -FINAL.ppt
Fidic conditions of contract presentation
Ad

More from thinthinaung2005 (17)

PPT
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
PPT
Ko win mg training slide 24122012
PPTX
Ko tza how to apply industrial safety standard in myanmar 241212
PPTX
Construction safety seminar
PPTX
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
PPTX
Setting up for emergency life saving in myanmar
PPTX
Mtp food safety slides_final
PPTX
Migration policy for domestic workers tmw rev a
PPTX
Developing networks and workgroups final
PPTX
Data and health policy final
PPTX
Anti corruption mission possible - u minn thu (final 30 apr2013)
PPTX
08 quality control system on building in myanmar
PPTX
05 msda presentation for pd
PPTX
Safe food for local and global consumption saint
PPTX
Presentation foia dr tt win
PPT
Myanmar transition platform (r1)
PPTX
Foreign manpower employment act aye nyein
ပညာသင္ၾကားရျခင္း၏ အဓိကရည္ရြယ္ခ်က္
Ko win mg training slide 24122012
Ko tza how to apply industrial safety standard in myanmar 241212
Construction safety seminar
လယ္ယာလုပ္ငန္းအႏၱရာယ္ကင္းေရး
Setting up for emergency life saving in myanmar
Mtp food safety slides_final
Migration policy for domestic workers tmw rev a
Developing networks and workgroups final
Data and health policy final
Anti corruption mission possible - u minn thu (final 30 apr2013)
08 quality control system on building in myanmar
05 msda presentation for pd
Safe food for local and global consumption saint
Presentation foia dr tt win
Myanmar transition platform (r1)
Foreign manpower employment act aye nyein
Ad

Recently uploaded (20)

PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
master seminar digital applications in india
PDF
Complications of Minimal Access Surgery at WLH
PDF
Classroom Observation Tools for Teachers
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
01-Introduction-to-Information-Management.pdf
PPTX
Cell Structure & Organelles in detailed.
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
GDM (1) (1).pptx small presentation for students
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Chinmaya Tiranga quiz Grand Finale.pdf
master seminar digital applications in india
Complications of Minimal Access Surgery at WLH
Classroom Observation Tools for Teachers
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Final Presentation General Medicine 03-08-2024.pptx
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
01-Introduction-to-Information-Management.pdf
Cell Structure & Organelles in detailed.
Module 4: Burden of Disease Tutorial Slides S2 2025
Pharmacology of Heart Failure /Pharmacotherapy of CHF
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Anesthesia in Laparoscopic Surgery in India
Computing-Curriculum for Schools in Ghana
Final Presentation General Medicine 03-08-2024.pptx
GDM (1) (1).pptx small presentation for students
human mycosis Human fungal infections are called human mycosis..pptx
Microbial diseases, their pathogenesis and prophylaxis
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx

Implementation of construction project with detailed contract documents r1

  • 1. Implementation of Construction Project with Detailed Contract Documents Soe Minn Sett Myanmar Transitional Platform 1 March 2014 UMFCCI, Yangon
  • 2. Key Team Player in following airport projects:- Changi Airport (Singapore) Sembawang Airbase (Singapore) Seletar Airport (Singapore) New Phu Quoc International Project (Vietnam) Can Tho International Airport (Vietnam) Buon Ma Thout Airport (Vietnam) Benazir Bhutto International Airport (Islamabad, Pakistan) Naypyitaw Airport (Myanmar) Melbourne Airport (Australia) Hambantota International Airport (Sri Lanka) Soe Minn Sett B.E (Civil), M.Sc (Transportation Engineering)
  • 3. 1) LEGAL FRAME WORK 2) FORM OF CONTRACT 3) RESULT OF DETAILED CONTRACT DOCUMENTS 3 CONTENT Myanmar Transitional Platform
  • 4. 4 Ref: Imperial Gazetteer of India, v. 9, p. 213. LEGAL FRAME WORK BRITISH BURMA MUNICIPAL ACT, 1874 BURMA MUNICIPAL ACT, 1884 Ref: “A Collection of The Acts published by the Governor General of India in Council in the year 1885” Myanmar Transitional Platform
  • 5. 5 LEGAL FRAME WORK Rangoon City Municipal Act (1922) Rangoon City Municipal Act (1956) Myanmar Transitional Platform
  • 6. 6 Yangon City Development Committee LEGAL FRAME WORK Myanmar Transitional Platform
  • 7. 7 CURRENT PRACTICE City Development Committee Myanmar Transitional Platform
  • 8. 8 CURRENT PRACTICE Ministry of Construction Myanmar Transitional Platform
  • 9. 9 Contract Law LEGAL FRAME WORK -Myanmar Contract Act, 1872 (formerly known as “Indian Contract Act”) - Sale of Goods Act, 1930 Same as Australian, English, Hong Kong and Singapore law. three major differences: (i) Consideration may be given by a person who is not a person to the contract; (ii) Past consideration (that is, payment/performance prior to entering into the contract) is valid consideration (iii) Consideration is not presumed in the case of a contract under seal. Myanmar Transitional Platform
  • 10. LEGAL FRAME WORK 10 Typical Contract Agreement Document (Private Sector Project) - Contract agreements were drafted on Stamp paper and signed by both parties. - May witness by Lawyers - Mentioned payment term - General description of project deliverable (Eg. 8 stories R.C building, 20’ x 50’ Warehouse Steel Structure building etc) Myanmar Transitional Platform
  • 11. LEGAL FRAME WORK 11 Typical Contract Agreement Document (Private Sector Project) Myanmar Transitional Platform
  • 12. LEGAL FRAME WORK 12 Typical Contract Agreement Document (Government Sector Project) Myanmar Transitional Platform
  • 13. 13 LEGAL FRAME WORK Myanmar Transitional Platform Photo Courtesy : Swe Oo’s Facebook PUBLIC share
  • 14. FORM OF CONTRACT 14 PRINCIPAL STAGES OF CONSTRUCTION PROCESS 14 Project Brief Decision to Build Evaluation & Award Completion & Maintenance Design Drawings Tender Documentation -Conditions of Contract -Drawings -BQs -Specifications Tender Invitation Construction Works Letter of Intent/Award Contract Documents Myanmar Transitional Platform
  • 15. FORM OF CONTRACT 15 Standard form of Contract Documents 1. Articles of Agreement 2. Conditions of Contract (regulate to practice) 3. Plans and Drawings 4. Bill of Quantities 5. Specification (recommend to practice) Myanmar Transitional Platform
  • 16. 16 Common Standard Form of Condition of Contract  Joint Contracts Tribunal (JCT)  International Federation of Consulting Engineers (FIDIC)  NEC Engineering and Construction Contract (NEC)  Singapore Institute of Architect (SIA)  Association of Consultant Architects (ACA)  Public Sector Standard Conditions of Contract for Construction Works (PSSCOC)  Master Format (Construction Specification Institute, CSI) FORM OF CONTRACT Myanmar Transitional Platform
  • 17. 17 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 18. 18 Common Standard Form of Condition of Contract FORM OF CONTRACT
  • 19. 19 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 20. 20 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 21. 21 Common Standard Form of Condition of Contract FORM OF CONTRACT Myanmar Transitional Platform
  • 22. 22 PSSCOC Public Sector Standard Conditions of Contract for Construction Works 1. Definitions and Interpretation 2 . Superintending Officer and Superintending Officer's Representative 3. Contract Documents 4. General Obligations of the Contractor 5. Sub-Surface and Ground Conditions 6. Permanent Works Designed by the Contractor 7. Notices and Fees 8. Setting Out 9. Programme for the Works 10. Quality in Construction 11. Administration 12. Possession of Site And Commencement Of Works 13. Suspension 14. Time for Completion 15. Expediting Progress of Works 16. Liquidated Damages 17. Substantial Completion 18. Defects 19. Variations to the Works 20. Valuation of Variations 21. Measurement 22. Claims for Loss and Expense 23. Procedure for Claims 24. Construction Equipment Temporary Works Materials and Goods 25. General Responsibilities 26. Indemnity Provisions 27. Insurance for Personal Injury, Work Injury Compensation and Property Damage 28. Insurance of the Works 29. Damage to Property of Employer or Government 30. Assignment and Subcontracting 31. Termination by The Employer 32. Progress Payments and Final Account 33. Fluctuations 34. Final Completion Certificate 35. Settlement of Disputes 36. Recovery by the Employer 37. Governing Law & Notices FORM OF CONTRACT Myanmar Transitional Platform
  • 23. 23 Technical Specification Specifications FORM OF CONTRACT Myanmar Transitional Platform
  • 24. 24 Technical Specification Specifications FORM OF CONTRACT Myanmar Transitional Platform
  • 25. 25 Specifications Specification Format -National Building Specification Format (UK Based System) -Master Format (Construction Specification Institute, CSI) (US Based System) - PWD/CPG General Specification FORM OF CONTRACT Myanmar Transitional Platform
  • 26. 26 Specifications Particular Requirement FORM OF CONTRACT NBS Master Format Myanmar Transitional Platform
  • 27. 27 Technical Specification Specifications FORM OF CONTRACT NBS Master Format Myanmar Transitional Platform
  • 28. 28  Publish Standard Condition of Contract by relevant Authorities (for Public and Private Sectors)  Regulate to practice the published Standard Condition of Contract  Practice to include Detailed Specification (Consultants, License Engineers, Professional Engineers) RECOMMENDATION Myanmar Transitional Platform
  • 29. 29  Clear understanding of respective responsible of each party (Benefit to both Employer and Employee)  Prevent ambiguity and un-necessary Arbitration at Court (lost time and money)  Property is “General Public Investment” (Contribute GDP)  Preparation for “Next Generation of Construction Industrial” (Set up the industrial practice and standard to prevent from Nasty International Contractor who want to take advantages on lack of industrialise inexperience) RESULT OF PRACTICING DETAILED CONTRACT DOCUMENT Myanmar Transitional Platform
  • 30. Thank You 30 Soe Min Sett Email : smsett@gmail.com Myanmar Transitional Platform