SlideShare a Scribd company logo
IMPROVE PRODUCTIVITY IN APPAREL INDUSTRY BY LEAN B.Anitha,B.Tech,(M.B.A) ANGEL COLLEGE OF ENGG &TECHNOLOGY, TIRUPUR.
CONTENT INTRODUCTION LITERATURE REVIEW METHODOLOGY RESULT & DISCUSSION CONCLUSION BIBILIOGRAPHY
1.INTRODUCTION To survive in the market, the goal of any manufacturing industry is to produce goods at the lowest time possible and at the lowest cost. Thus we decided to implement lean to improve productivity. Lean means manufacturing without waste.
2.LITERATURE REVIEW Indian apparel industry The fundamentals of productivity improvement  Efficiency towards productivity in garment industry  Lean manufacturing
PRODUCTIVITY Productivity = Value / Time (productivity equals value divided by time) By this definition there are two primary ways of increasing productivity: 1) Increase the value created 2) Decrease the time required to create that value.
LEAN MANUFACTURING What is lean ?  History of lean.  Objective of lean.  Lean concepts. Principle of lean.  Lean tools. Steps to achieve lean system.  Lean construction.  Benefits of lean.  Barriers for lean implementation.
LEAN Lean means manufacturing without waste. Lean makes use of many tools and techniques  Lean manufacturing systems are aimed towards attaining the shortest cycle time by eliminating waste.
HISTORY OF LEAN
OBJECTIVE OF LEAN   The basic objective of lean is to minimize the waste, and continuous improvement in every stage of product by utilizing minimum time and cost.  Lean manufacturing focuses on reduction of all kind of waste to make continuous flow of the work .
LEAN MANUFACTURING CONCEPT   Lean is a team based approach to identify and eliminate waste through continuous improvement. Any activity that adds cost or time without value to the service we offer to our customers is called waste . There are seven kinds of deadly waste.
THE SEVEN WASTES Transportation  (moving products that is not actually required to perform the processing)  Inventory  (all components, work-in-progress and finished product not being processed)  Motion  (people or equipment moving or walking more than is required to perform the processing)  Waiting  (waiting for the next production step)  Overproduction  (production ahead of demand)  Over Processing  (due to poor tool or product design creating activity)  Defects  (the effort involved in inspecting for and fixing defects)
PRINCIPLES OF LEAN MANUFACTURING
LEAN TOOLS 5s house keeping. Poka-yoke.  JIT. Kaizen. Kanban. Takt time. TPM. TPS. VSM. Work cell. PDCA. SMED. Six sigma.
LEAN ENTERPRISE
Steps to achieve lean systems The following steps should be implemented in order to create the ideal  lean manufacturing  system:  Design a simple manufacturing system  Recognize there is always room for improvements . Continuously improve the lean manufacturing system design.
LEAN PROCESS
BENEFITS OF LEAN Utilization of Space  Inventory Reduction  Waste reduction On time delivery Quality products Customer satisfaction Productivity improvement
BARRIERS FOR LEAN IMPLEMENTATION   Lack of awareness Lack of interest. Shortage of basic infrastructure Wasteful movement due to a larger distance between supporting departments like personnel, payrolls, canteen, etc. No regular and proper training to workmen and officers. While implementing lean in initial stage, some production will be distributed. More work in progress waiting for availability of next facility to carry out next operation. Time wasting during drifting tools from one place to another. Wrong concept about lean among employees
3.METHODOLOGY We divided the project into three phases: Study phase Implementation phase Result analysis phase
3.1.STUDY PHASE We have studied the company’s day to day activities at the different departments. We keenly watched about the style and how the process flow, the cut parts to packing are proceeded. It is the basic T-shirt, which is the running style.  First when we interacted with the merchandiser, we noted down the shipment trend of the company.
SHIPMENT DELAY   When we analyzed the shipment details for the past six months in JUPITER GARMENT UNIT, we found that there were seven delayed shipments out of sixty total shipments
DELAY DUE TO VARIOUS PROBLEMS   DELAY DUE TO VARIOUS PROBLEMS 84.35% 10.35% 4.69% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% LOSS P E R C E N T A G E SEWING PRINTING SOURCING
IDENTIFICATION OF THE PROBLEM The overall analysis of the shipment shows that delay is mostly due to sewing problems. The loss due to air shipment alone costs 7%  and other costs incurred in terms of overtime and extra wages are not included.
3.2.IMPLEMENTATION PHASE We identified from shipment details that sewing is the reason for delays. So we decided to concentrate on sewing floor. Out of different lean methods and tools, we decided to go for waste reduction and 5s housekeeping implementation.  There are seven deadly wastes.  Among the seven wastes we concentrated on Over production Defects Un necessary movements Waiting time
3.2.1.OVER PRODUCTION   It is production waste which cannot be completely eliminated, but it can be reduced by lean manufacturing technique. Here at this company we noticed that for every order, they cut extra 5% to meet the complete order . Hence we decided to  reduce the over production percentage by implementing lean manufacturing technique from 5% to 3% in next order for the same style.
PRODUCTION QUANTITY The total order quantity is 6000 pieces. And with 3% over production 6180 pieces are cut ,instead of  6300 pieces with 5% over production. So this reduced the total number of  pieces to be sewn.
3.2.2.PROCESS WASTE   Production defects and service errors waste resources in four ways.  First, materials are consumed. Second, the labor used to produce the part (or provide the service) the first time cannot be recovered. Third, labor is required to rework the product (or redo the service). Fourth, labor is required to address any forthcoming customer complaints.
Instead of checking the defects at final stage, it is essential that while sewing itself operator has to be taught and trained to stitch properly. We implemented traffic light system to control repairs and defects inside the sewing floor.
WHAT IS TRAFFFIC LIGHT SYSTEM? This is the visual technique used to control the  repairs while sewing the product. three cards like the traffic signal light (Red, yellow, Green) are  given to the operator according to their performance . The red card is given for those, who are identified by the quality control supervisors to produce one or more defective items out of  ten pieces inspected. The yellow card is given to those who are identified by the quality control supervisors to produce two or more minor defects out of ten inspected.  The green card is given if no reworks are found. There by we can motivate the workers to produce good quality products.
TRAFFIC LIGHT SYSTEM This card is given by the quality controller when he comes for every round for inline inspection.
3.3.3.  WAITING TIME   This includes waiting for bundle, accessories like label, thread, information, equipment, tools, etc. lean demands that for different reasons.  The reasons vary with respect to operation and the style.  But the most common reason, the most of the operators are waiting due to machine break down and needle breakages.
Productivity loss due to waiting time. Total minutes waited  =225min Time wasted by the individual for a day  =3 min Time wasted by 18 persons for a day  =54 min Time wasted by 18 persons for a week  =324 min Total minutes wasted in a week  =549 min Total working minutes in a week  =3240 min Total quantity that should be produced  in a week  = 9300pieces Pieces reduced due to waiting time  =1487pieces Productivity loss due to waiting time  =15.9%
RED FLAG SYSTEM It is also noted that when needle is broken, the workers have to go to the ground floor to get the new one. Most of the time is wasted due to this.  So we suggested a red flag system. A red colored flag is made and placed in the sewing floor.  If the operator has machine problem, he has to place the red flag on the top of  the machine. So that it is visible, when seen on any corner of the sewing floor.  The workers are waiting for the machine repair and so the time is wasted. So we suggested red flag system for the easy identification by the mechanic and thus the waiting time is saved
IMPLEMENTATION OF RED FLAG SYSTEM .
3.3.4. UNNECESSARY MOVEMENTS UNNECESSARY MOVEMENT IN MATERIAL HANDLING  . UNNECESSARY MOVEMENT IN INSPECTION  . UN NECESSARY MOVEMENT AT PACKING
UNNECESSARY MOVEMENT IN MATERIAL HANDLING   In this factory, usually, the cut parts are transferred from ground floor to second and third floor. Sometimes the worker takes the bundle from the cutting floor to the second floor or third floor instead of taking to the first floor. Thus most of the time is wasted and leads to confusion. So we implemented again a  color card system. Here for every floor there is a color and we stick this color card in the bundles to avoid confusions. For example red color for first floor, green color for second floor and so on.
The worker inserting the color card in the bundle. So, the helper will deliver the cut parts as per color code and hence no more ‘back and forth’ movement of bundle.
UNNECESSARY MOVEMENT IN INSPECTION   We found that in the inspection table, the rework and finished goods are placed in the baskets without identification.  So there is a chance that some of the rework pieces are put in to the good pieces basket. This sometimes leads for the rework pieces enter the packing section without any rework.  So, we made them to put the rework pieces and the good pieces in separate places to avoid Confusion with the clearly marked baskets.
UN NECESSARY MOVEMENT AT PACKING   In packing department , all the packers are standing around the same table and put all the sizes in the same crates,thus the different size ranges are mixed up and it takes lot of time to arrange it while putting into the final carton boxes.  So we suggested them to put the finished goods in the basket according to the size ranges. It helped them to pack easily as per the size wise and to have clear account of the size wise and color wise breakup ratios.
3.3.5.5s HOUSE KEEPING   The 5s practice is a house keeping technique used to establish and maintain a  and  productive quality environment in an organization. A well-organized work place results in a safer, more efficient and more productive  operation. Its boots the morale of the workers, promoting a sense of pride in their work and ownership of their responsibilities. 5s was invented in Japan. It stands for five Japanese words that start with the letter ′S′ SEIRI, SEITON, SEISO, and SEIKETSU. And SJITSUKE.
IMPLEMENTATION OF 5S
4.RESULTS AND DISCUSSIONS The findings and analysis after the implementation and above methods to reduce different wastes are discussed in this chapter. 4.1.OVERPRODUCTION:   In this order no AH806, It is only 3% of order quantity is  cut. Order quantity  =2000 packs(6000pieces) Additional cuts  = 3% ( 60 packs) Total pieces cut  =6000+180 =6180 pieces.
At the end, the defects found during final inspection are given below. FINAL INSPECTION REPORT: Placket up& down  = 31 pieces Print breakable  =27 pieces Non removal stains  =7pieces  Seam opening  =13 pieces  Un even join set  =7pieces Other defects  =2 pieces Total defects  = 87pieces Defect %  =87/6180= 1.4% Good pieces  =93pieces.  It shows that out of 180 pieces 87 pieces are  with different defects and 93 pieces are good pieces.
COST ANALYSIS 1 piece cost  =( 135 + 5 + 13)/3+ profit = Rs 61 Manufacturing cost for 6180 pcs in  after lean = Rs 3,76,98  Loss = Rs 10,980  When the over production rate is 5% for this order (6300pcs)  loss =Rs 18,300 Direct profit for single order;  Profit = Rs 7320  The cost of the single T-shirt made in this order is Rs.61. since the cut quantity is reduced by 2%, the net cost saved is Rs. 7320 without any inventories.
4.2.PROCESS WASTE: The  result of traffic light system implementation is analyzed using the defects level, recorded during inline inspection for individual operator for four days and they are compared.
REWORKS- COMPARSION CHART It showed that at each operator, the defect level is gradually reducing. Hence, the rework time is reduced and so, their productivity is improved, as their repairing time is used to sew extra pieces.
4.3.WAITING TIME   Total minutes waited=76min Time wasted by the individual for a day=3min Time wasted by 18 persons for a day=54min Time wasted by 18 persons approximately  for a week=324min Total minutes wasted in a week=400min Total working minutes in a week=3240 min Total quantity that should be produced in a week= 9300pcs Pieces reduced due to waiting time=1084pcs Productivity loss due to waiting time=11.66%
PRODUCTIVITY IMPROVED DUE TO REDUCTION IN WAITING TIME The graph shows that productivity loss is reduced from 15.9% to 11.66% by the elimination of simply the waiting time.
5. CONCLUSION   Out of seven deadly wastes we concentrated only on the four deadly wastes and with that itself it is proved that there is a remarkable improvement in quality and productivity and hence the profit. It is also emphasized that this is made without any extra investments on the machine or materials and it is merely an implementation of lean methods. We suggest that the factory should continue to follow the traffic light system and 5s house keeping system throughout the year, whatever may be the style and whatever may be the target.
In simple, for the repeat orders if they can control the defects, the extra pieces cut can be still reduced to 1%. We also suggested few methods to control other deadly wastes to the production department.  Awareness must be created among the workers and supervisors to control the other deadly wastes such as over processing, more inventories, etc.
6.REFERENCES Beau Keite and Drew, Locher (2004), the complete lean enterprise; value stream mapping for administrative and office processes, productivity press Newyork. Charles J.Corbett (2003), environmental aspects of lean operations environmental management and operations management: introduction to the third special issue. Dennis P.Hobbs (2003), lean manufacturing implementation APICS, the association of operations management, Santa Clara. Jeffrey P.Wincel (2003), lean supply chain management, Avnet advantage magazine December.
Krishna Murari and KS Gupta (2008), Lean manufacturing hurdles and solutions, productivity Jan- mar 2008. Paul Man fold (2005), lean for all- lean applications for SMEs S.William,M.Feld (2001), lean manufacturing; the St Lucie press. ‘ Implementation of lean manufacturing: waste and time’ project work done by 2005 batch
www.managementsupport.com/lean.htm www.mpcee.co.uk/LMFSpresentation.pdf www.5saudit.com/5slean.htm www.superfactory.com
THANK YOU

More Related Content

PDF
7 Wastes
PPTX
8 Wastes of Lean
PPTX
Muda mura muri
PPTX
QCO presentation
PPTX
Muda,Mura & Muri
PDF
Improving Productivity
PPT
Lean Manufacturing Training
PPTX
Lean ppt
7 Wastes
8 Wastes of Lean
Muda mura muri
QCO presentation
Muda,Mura & Muri
Improving Productivity
Lean Manufacturing Training
Lean ppt

What's hot (20)

PPTX
7 waste in the production
PDF
5 Steps to implementing Lean
PPTX
Seven wastes of lean operations management
PPTX
Lean six sigma - Waste elimination (Yellow Belt)
PPT
PPTX
How to Improve Productivity
PPTX
Value Stream Mapping
PPT
16 lean manufacturing
PPT
Productivity improvement slide share
PPT
Identify 7 Wastes
PPT
Lean Manufacturing - An Overview
PPT
Lean manufacturing overview
PPT
Muri-Mura-Muda
PPT
Lean manufacturing
PPTX
Lean basics
PPTX
Lean Manufacturing PowerPoint Presentation Sample
PDF
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
PPTX
Line balancing
PPTX
Principle 4 heijunka
7 waste in the production
5 Steps to implementing Lean
Seven wastes of lean operations management
Lean six sigma - Waste elimination (Yellow Belt)
How to Improve Productivity
Value Stream Mapping
16 lean manufacturing
Productivity improvement slide share
Identify 7 Wastes
Lean Manufacturing - An Overview
Lean manufacturing overview
Muri-Mura-Muda
Lean manufacturing
Lean basics
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Line balancing
Principle 4 heijunka
Ad

Viewers also liked (20)

PPTX
different techniques to productivity improvement
DOCX
MRP, MRP2 and ERP system in supply chain
PPTX
DOC
Internship report dawlance
PPTX
Management Functions in Dawlance
PPT
Dawlance lcd
PDF
Dawlance internship report
PPTX
Dawlance presentation
PPTX
Forecasting strategies for food companies
PPTX
Dawlance
PPTX
segmentation & indian automobile industry
DOCX
just in time and lean manufacturing
PDF
Lean Process Improvement In Outpatient Clinics
PPTX
Business Process Management in IT company
PPTX
Lean manufacturing
PPTX
Lean manufacturing in apparel industries
PPT
Lean manufacturing concepts and tools and quality management1
PPTX
Productivity
PPTX
LEAN MANUFACTURING IN APPAREL INDUSTRY
PPT
Lean Manufacturing
different techniques to productivity improvement
MRP, MRP2 and ERP system in supply chain
Internship report dawlance
Management Functions in Dawlance
Dawlance lcd
Dawlance internship report
Dawlance presentation
Forecasting strategies for food companies
Dawlance
segmentation & indian automobile industry
just in time and lean manufacturing
Lean Process Improvement In Outpatient Clinics
Business Process Management in IT company
Lean manufacturing
Lean manufacturing in apparel industries
Lean manufacturing concepts and tools and quality management1
Productivity
LEAN MANUFACTURING IN APPAREL INDUSTRY
Lean Manufacturing
Ad

Similar to Improving Productivity by Lean (20)

PPT
Lean Manufacturing and Principles
DOC
Lean System
PDF
Increase_the_Efficiency_and_Productivity.pdf
PPT
Study on Lean Manufacturing Process in Garments Production
PDF
LEAN SYSTEM ENGINEERING
PPTX
Training on development of supervisor
PDF
synopsis
PDF
Knitwear industry sri lanka
PDF
Lean manufacturing tools for garment industry
PDF
1729664598765_LEAN SYSTEM SUISTANABLE - WASTES OF LEAN
PPTX
5 s and lean manufacturing
PPTX
Lean-Dennis-summary-notes.ppt LEAN MANUFACTURINGx
PPT
Generic Lean Overview For Future Employer Of Alan S Desrocher
PDF
Lean innovation - Basic principles of Lean
PDF
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PDF
Lean manufacturing english
PDF
Lean manufacturing english
PPTX
Industrial Training Presentation
PDF
Project Report on Textile Industrial Engineering
PPT
Lean Manufacturing and Principles
Lean System
Increase_the_Efficiency_and_Productivity.pdf
Study on Lean Manufacturing Process in Garments Production
LEAN SYSTEM ENGINEERING
Training on development of supervisor
synopsis
Knitwear industry sri lanka
Lean manufacturing tools for garment industry
1729664598765_LEAN SYSTEM SUISTANABLE - WASTES OF LEAN
5 s and lean manufacturing
Lean-Dennis-summary-notes.ppt LEAN MANUFACTURINGx
Generic Lean Overview For Future Employer Of Alan S Desrocher
Lean innovation - Basic principles of Lean
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
Lean manufacturing english
Lean manufacturing english
Industrial Training Presentation
Project Report on Textile Industrial Engineering

Recently uploaded (20)

PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
RMMM.pdf make it easy to upload and study
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
TR - Agricultural Crops Production NC III.pdf
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PPTX
Pharma ospi slides which help in ospi learning
PDF
Insiders guide to clinical Medicine.pdf
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Supply Chain Operations Speaking Notes -ICLT Program
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Microbial disease of the cardiovascular and lymphatic systems
2.FourierTransform-ShortQuestionswithAnswers.pdf
RMMM.pdf make it easy to upload and study
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Renaissance Architecture: A Journey from Faith to Humanism
Microbial diseases, their pathogenesis and prophylaxis
Module 4: Burden of Disease Tutorial Slides S2 2025
TR - Agricultural Crops Production NC III.pdf
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
Pharma ospi slides which help in ospi learning
Insiders guide to clinical Medicine.pdf
FourierSeries-QuestionsWithAnswers(Part-A).pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
school management -TNTEU- B.Ed., Semester II Unit 1.pptx

Improving Productivity by Lean

  • 1. IMPROVE PRODUCTIVITY IN APPAREL INDUSTRY BY LEAN B.Anitha,B.Tech,(M.B.A) ANGEL COLLEGE OF ENGG &TECHNOLOGY, TIRUPUR.
  • 2. CONTENT INTRODUCTION LITERATURE REVIEW METHODOLOGY RESULT & DISCUSSION CONCLUSION BIBILIOGRAPHY
  • 3. 1.INTRODUCTION To survive in the market, the goal of any manufacturing industry is to produce goods at the lowest time possible and at the lowest cost. Thus we decided to implement lean to improve productivity. Lean means manufacturing without waste.
  • 4. 2.LITERATURE REVIEW Indian apparel industry The fundamentals of productivity improvement Efficiency towards productivity in garment industry Lean manufacturing
  • 5. PRODUCTIVITY Productivity = Value / Time (productivity equals value divided by time) By this definition there are two primary ways of increasing productivity: 1) Increase the value created 2) Decrease the time required to create that value.
  • 6. LEAN MANUFACTURING What is lean ? History of lean. Objective of lean. Lean concepts. Principle of lean. Lean tools. Steps to achieve lean system. Lean construction. Benefits of lean. Barriers for lean implementation.
  • 7. LEAN Lean means manufacturing without waste. Lean makes use of many tools and techniques Lean manufacturing systems are aimed towards attaining the shortest cycle time by eliminating waste.
  • 9. OBJECTIVE OF LEAN The basic objective of lean is to minimize the waste, and continuous improvement in every stage of product by utilizing minimum time and cost. Lean manufacturing focuses on reduction of all kind of waste to make continuous flow of the work .
  • 10. LEAN MANUFACTURING CONCEPT Lean is a team based approach to identify and eliminate waste through continuous improvement. Any activity that adds cost or time without value to the service we offer to our customers is called waste . There are seven kinds of deadly waste.
  • 11. THE SEVEN WASTES Transportation (moving products that is not actually required to perform the processing) Inventory (all components, work-in-progress and finished product not being processed) Motion (people or equipment moving or walking more than is required to perform the processing) Waiting (waiting for the next production step) Overproduction (production ahead of demand) Over Processing (due to poor tool or product design creating activity) Defects (the effort involved in inspecting for and fixing defects)
  • 12. PRINCIPLES OF LEAN MANUFACTURING
  • 13. LEAN TOOLS 5s house keeping. Poka-yoke. JIT. Kaizen. Kanban. Takt time. TPM. TPS. VSM. Work cell. PDCA. SMED. Six sigma.
  • 15. Steps to achieve lean systems The following steps should be implemented in order to create the ideal lean manufacturing system: Design a simple manufacturing system Recognize there is always room for improvements . Continuously improve the lean manufacturing system design.
  • 17. BENEFITS OF LEAN Utilization of Space Inventory Reduction Waste reduction On time delivery Quality products Customer satisfaction Productivity improvement
  • 18. BARRIERS FOR LEAN IMPLEMENTATION Lack of awareness Lack of interest. Shortage of basic infrastructure Wasteful movement due to a larger distance between supporting departments like personnel, payrolls, canteen, etc. No regular and proper training to workmen and officers. While implementing lean in initial stage, some production will be distributed. More work in progress waiting for availability of next facility to carry out next operation. Time wasting during drifting tools from one place to another. Wrong concept about lean among employees
  • 19. 3.METHODOLOGY We divided the project into three phases: Study phase Implementation phase Result analysis phase
  • 20. 3.1.STUDY PHASE We have studied the company’s day to day activities at the different departments. We keenly watched about the style and how the process flow, the cut parts to packing are proceeded. It is the basic T-shirt, which is the running style. First when we interacted with the merchandiser, we noted down the shipment trend of the company.
  • 21. SHIPMENT DELAY When we analyzed the shipment details for the past six months in JUPITER GARMENT UNIT, we found that there were seven delayed shipments out of sixty total shipments
  • 22. DELAY DUE TO VARIOUS PROBLEMS DELAY DUE TO VARIOUS PROBLEMS 84.35% 10.35% 4.69% 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% LOSS P E R C E N T A G E SEWING PRINTING SOURCING
  • 23. IDENTIFICATION OF THE PROBLEM The overall analysis of the shipment shows that delay is mostly due to sewing problems. The loss due to air shipment alone costs 7% and other costs incurred in terms of overtime and extra wages are not included.
  • 24. 3.2.IMPLEMENTATION PHASE We identified from shipment details that sewing is the reason for delays. So we decided to concentrate on sewing floor. Out of different lean methods and tools, we decided to go for waste reduction and 5s housekeeping implementation. There are seven deadly wastes. Among the seven wastes we concentrated on Over production Defects Un necessary movements Waiting time
  • 25. 3.2.1.OVER PRODUCTION It is production waste which cannot be completely eliminated, but it can be reduced by lean manufacturing technique. Here at this company we noticed that for every order, they cut extra 5% to meet the complete order . Hence we decided to reduce the over production percentage by implementing lean manufacturing technique from 5% to 3% in next order for the same style.
  • 26. PRODUCTION QUANTITY The total order quantity is 6000 pieces. And with 3% over production 6180 pieces are cut ,instead of 6300 pieces with 5% over production. So this reduced the total number of pieces to be sewn.
  • 27. 3.2.2.PROCESS WASTE Production defects and service errors waste resources in four ways. First, materials are consumed. Second, the labor used to produce the part (or provide the service) the first time cannot be recovered. Third, labor is required to rework the product (or redo the service). Fourth, labor is required to address any forthcoming customer complaints.
  • 28. Instead of checking the defects at final stage, it is essential that while sewing itself operator has to be taught and trained to stitch properly. We implemented traffic light system to control repairs and defects inside the sewing floor.
  • 29. WHAT IS TRAFFFIC LIGHT SYSTEM? This is the visual technique used to control the repairs while sewing the product. three cards like the traffic signal light (Red, yellow, Green) are given to the operator according to their performance . The red card is given for those, who are identified by the quality control supervisors to produce one or more defective items out of ten pieces inspected. The yellow card is given to those who are identified by the quality control supervisors to produce two or more minor defects out of ten inspected. The green card is given if no reworks are found. There by we can motivate the workers to produce good quality products.
  • 30. TRAFFIC LIGHT SYSTEM This card is given by the quality controller when he comes for every round for inline inspection.
  • 31. 3.3.3. WAITING TIME This includes waiting for bundle, accessories like label, thread, information, equipment, tools, etc. lean demands that for different reasons. The reasons vary with respect to operation and the style. But the most common reason, the most of the operators are waiting due to machine break down and needle breakages.
  • 32. Productivity loss due to waiting time. Total minutes waited =225min Time wasted by the individual for a day =3 min Time wasted by 18 persons for a day =54 min Time wasted by 18 persons for a week =324 min Total minutes wasted in a week =549 min Total working minutes in a week =3240 min Total quantity that should be produced in a week = 9300pieces Pieces reduced due to waiting time =1487pieces Productivity loss due to waiting time =15.9%
  • 33. RED FLAG SYSTEM It is also noted that when needle is broken, the workers have to go to the ground floor to get the new one. Most of the time is wasted due to this. So we suggested a red flag system. A red colored flag is made and placed in the sewing floor. If the operator has machine problem, he has to place the red flag on the top of the machine. So that it is visible, when seen on any corner of the sewing floor. The workers are waiting for the machine repair and so the time is wasted. So we suggested red flag system for the easy identification by the mechanic and thus the waiting time is saved
  • 34. IMPLEMENTATION OF RED FLAG SYSTEM .
  • 35. 3.3.4. UNNECESSARY MOVEMENTS UNNECESSARY MOVEMENT IN MATERIAL HANDLING . UNNECESSARY MOVEMENT IN INSPECTION . UN NECESSARY MOVEMENT AT PACKING
  • 36. UNNECESSARY MOVEMENT IN MATERIAL HANDLING In this factory, usually, the cut parts are transferred from ground floor to second and third floor. Sometimes the worker takes the bundle from the cutting floor to the second floor or third floor instead of taking to the first floor. Thus most of the time is wasted and leads to confusion. So we implemented again a color card system. Here for every floor there is a color and we stick this color card in the bundles to avoid confusions. For example red color for first floor, green color for second floor and so on.
  • 37. The worker inserting the color card in the bundle. So, the helper will deliver the cut parts as per color code and hence no more ‘back and forth’ movement of bundle.
  • 38. UNNECESSARY MOVEMENT IN INSPECTION We found that in the inspection table, the rework and finished goods are placed in the baskets without identification. So there is a chance that some of the rework pieces are put in to the good pieces basket. This sometimes leads for the rework pieces enter the packing section without any rework. So, we made them to put the rework pieces and the good pieces in separate places to avoid Confusion with the clearly marked baskets.
  • 39. UN NECESSARY MOVEMENT AT PACKING In packing department , all the packers are standing around the same table and put all the sizes in the same crates,thus the different size ranges are mixed up and it takes lot of time to arrange it while putting into the final carton boxes. So we suggested them to put the finished goods in the basket according to the size ranges. It helped them to pack easily as per the size wise and to have clear account of the size wise and color wise breakup ratios.
  • 40. 3.3.5.5s HOUSE KEEPING The 5s practice is a house keeping technique used to establish and maintain a and productive quality environment in an organization. A well-organized work place results in a safer, more efficient and more productive operation. Its boots the morale of the workers, promoting a sense of pride in their work and ownership of their responsibilities. 5s was invented in Japan. It stands for five Japanese words that start with the letter ′S′ SEIRI, SEITON, SEISO, and SEIKETSU. And SJITSUKE.
  • 42. 4.RESULTS AND DISCUSSIONS The findings and analysis after the implementation and above methods to reduce different wastes are discussed in this chapter. 4.1.OVERPRODUCTION: In this order no AH806, It is only 3% of order quantity is cut. Order quantity =2000 packs(6000pieces) Additional cuts = 3% ( 60 packs) Total pieces cut =6000+180 =6180 pieces.
  • 43. At the end, the defects found during final inspection are given below. FINAL INSPECTION REPORT: Placket up& down = 31 pieces Print breakable =27 pieces Non removal stains =7pieces Seam opening =13 pieces Un even join set =7pieces Other defects =2 pieces Total defects = 87pieces Defect % =87/6180= 1.4% Good pieces =93pieces. It shows that out of 180 pieces 87 pieces are with different defects and 93 pieces are good pieces.
  • 44. COST ANALYSIS 1 piece cost =( 135 + 5 + 13)/3+ profit = Rs 61 Manufacturing cost for 6180 pcs in after lean = Rs 3,76,98 Loss = Rs 10,980 When the over production rate is 5% for this order (6300pcs) loss =Rs 18,300 Direct profit for single order; Profit = Rs 7320 The cost of the single T-shirt made in this order is Rs.61. since the cut quantity is reduced by 2%, the net cost saved is Rs. 7320 without any inventories.
  • 45. 4.2.PROCESS WASTE: The result of traffic light system implementation is analyzed using the defects level, recorded during inline inspection for individual operator for four days and they are compared.
  • 46. REWORKS- COMPARSION CHART It showed that at each operator, the defect level is gradually reducing. Hence, the rework time is reduced and so, their productivity is improved, as their repairing time is used to sew extra pieces.
  • 47. 4.3.WAITING TIME Total minutes waited=76min Time wasted by the individual for a day=3min Time wasted by 18 persons for a day=54min Time wasted by 18 persons approximately for a week=324min Total minutes wasted in a week=400min Total working minutes in a week=3240 min Total quantity that should be produced in a week= 9300pcs Pieces reduced due to waiting time=1084pcs Productivity loss due to waiting time=11.66%
  • 48. PRODUCTIVITY IMPROVED DUE TO REDUCTION IN WAITING TIME The graph shows that productivity loss is reduced from 15.9% to 11.66% by the elimination of simply the waiting time.
  • 49. 5. CONCLUSION Out of seven deadly wastes we concentrated only on the four deadly wastes and with that itself it is proved that there is a remarkable improvement in quality and productivity and hence the profit. It is also emphasized that this is made without any extra investments on the machine or materials and it is merely an implementation of lean methods. We suggest that the factory should continue to follow the traffic light system and 5s house keeping system throughout the year, whatever may be the style and whatever may be the target.
  • 50. In simple, for the repeat orders if they can control the defects, the extra pieces cut can be still reduced to 1%. We also suggested few methods to control other deadly wastes to the production department. Awareness must be created among the workers and supervisors to control the other deadly wastes such as over processing, more inventories, etc.
  • 51. 6.REFERENCES Beau Keite and Drew, Locher (2004), the complete lean enterprise; value stream mapping for administrative and office processes, productivity press Newyork. Charles J.Corbett (2003), environmental aspects of lean operations environmental management and operations management: introduction to the third special issue. Dennis P.Hobbs (2003), lean manufacturing implementation APICS, the association of operations management, Santa Clara. Jeffrey P.Wincel (2003), lean supply chain management, Avnet advantage magazine December.
  • 52. Krishna Murari and KS Gupta (2008), Lean manufacturing hurdles and solutions, productivity Jan- mar 2008. Paul Man fold (2005), lean for all- lean applications for SMEs S.William,M.Feld (2001), lean manufacturing; the St Lucie press. ‘ Implementation of lean manufacturing: waste and time’ project work done by 2005 batch