Msc. Edilson Giffhorn - Speaker PhD. Leonardo Ensslin Msc. Rogério Lacerda PhD. Sandra Rolim Ensslin Msc. William Barbosa Vianna Improving the Alignment of Strategic Objectives in the Outsourced Projects Management 23rd European Conference on Operational Research 5. – 8.7.2009, Bonn - Germany
Santa Catarina Federal University - Brazil Production Engineering Pos-graduation Program Multicriteria Decision Aid Laboratory - LabMCDA
Summary 1. Introduction 1.1 Social Issue 1.2 Bibliographical Support 2. Theoretical Construct 3. Construction of the Performance Evaluation Model 3.1. Model Structuring 3.2. Evaluation 3.3. Recommendations 4. Final Considerations
1. Introduction 1.1 Social Issue: The economic growth of Brazil demands increased infra-structural improvements in the country. One of the areas that has been most affected by this growth is telecommunications. The fall of market reserve laws and the state monopolies in 1998 were the cornerstone of rapid changes and demands of the telecommunications consumer market. The new challenges faced by system operators resulted in the need for new Project Management practices and partial service Outsourcing.
This led to an integration of both techniques, namely outsourcing of project execution. The role of project managers became essentially that of managing contracts of outsourced project providers. To a certain extent, the Project Manager no longer had direct control over activity resources but was held accountable for results.
In this scenario, outsourced companies charter to their own needs causing conflict of interests and priorities, drops in productivity, delays, rework, and endangerment of the company image. This situation comprises multiple undefined criteria: The decision-maker is unsure about which considerations to take into account during evaluation of outsourced project providers; Pressure due to compression of goal attainment timelines forces the decision-maker to adopt intuitive management procedures; Misalignment between the strategic objectives of the contracting company and the outsourced providers.
1.2 Bibliographical Support: A structured process was adopted for the selection of articles that contribute to the provision of theoretical rationale for research. A study of the reference material revealed a gap in methods adopted to identify, organize, measure and integrate KPIs in order to improve the alignment of strategic objectives.
2. Theoretical Construct 2.1. Project Outsourcing and Performance Evaluation In Brazil, outsourcing in telecommunications was definitively incorporated with the privatization of state-owned companies at the end of the 90s. In this context, the final result of a project depends on the joint action of different companies. This calls for the use of tools that allow a broader understanding regarding which  KPIs  will improve the alignment of the strategic objectives between the companies involved. Multicriteria Decision Aid – Constructivist (MCDA-C) approach was employed as the intervention instrument.
2.2. MCDA-C and traditional MCDA methodologies MCDA-C consolidation as a management instrument occurred in the 80s with the works of: Roy (1996) and Landry (1995) – limits of objectivity for decision aid processes; Skinner (1986) and Keeney (1992) – attributes (objectives, criteria) are specific to the decision-maker in each context; Bana and Costa (1993, 1999) – MCDA convictions. MCDA-C is a ramification of traditional MCDA to aid decision-makers in the contexts in which they have a partial understanding of this context, and wish to broaden this knowledge to better comprehend the consequences of their values and preferences.
Source: Ensslin, Dutra, Ensslin (2000) MCDA-C phases
3.1 Structuring 3.1.1 Contextualization The Case Study was developed in the branch of a telecommunications operator in southern Brazil. This operator has around 6000 workers, 10 million customers and yearly gross revenue of approximately 8 billion US dollars. Up until the 90s: state monopoly. In 1995: start of privatizations. Supplier contracts are drafted in the researched parent company and in the branches the projects are conducted by outsourced companies.
Subsystem of Actors
3.1.2 Primary Assessment Elements  Open interviews were conducted in which the decision-maker was asked to discourse on this issue. Statements were analyzed to identify Primary Assessment Elements (PAE): characteristics or properties that the decision-maker considers may impact his/her values.
Direction of preference for each PAE is identified, together with the psychological opposite, to understand the consequences that the decision-maker wishes to avoid  (Eden, Ackermann, 1992) . 3.1.3 Concepts
3.1.4 Means-Ends Maps Broadening of understanding through identification of hierarchical relations and relations of influence between concepts. “ How can the end concept be obtained?”  “Why is the end concept important?”
Means-Ends Map for Professional Qualification and Testing Clusters
The relations of influence structure is converted to a Hierarchical Values Structure by incorporating the understanding of preferential judgement of the decision-maker  (Keeney, 1992) . 3.1.5 Clusters
3.1.6 Hierarchical Value Structure: Label Areas of Concern Fundamental Points of View: Strategic Objectives Technical Quality Objectives Alignment Communication Evaluate Performance of Outsourced Providers FPV 6 –  Technique FPV 7 -Organizational FPV 3 –  Testing FPV 4 - Priorities FPV 5 –  Routes FPV 1 – Standards Compliance FPV 2 – Professional Qualification
3.1.7 Descriptors - KPIs The construction of ordinal scales to measure Fundamental Points of View result in Descriptors or KPIs. Jeopardize Excellence Good Level Neutral Level Market KPI
ordinal measurement Hierarchical Value Structure for FPV 2: KPIs
3.2 Evaluation KPIs are ordinal scales that do not allow mathematical operations. Information on differences of attractiveness should be added between levels to transform them into (numerical) interval scales. The Macbeth method was adopted to transform ordinal scales into cardinal scales  (Bana and Costa, 2008).
3.2.1 Value Functions Cardinal scales are built using information of difference of attractiveness between descriptor levels (ordinal) and M-Macbeth software, resulting in cardinal scales that meet preference judgments of the decision-maker.
Cardinal scales for FPV Professional Qualification: cardinal measurement
3.2.2 Substitution Rates Information that allows the integration of cardinal scales should be incorporated to display measurement of aspects that are considered strategic and tactical.
Potential actions that represent a contribution to the transition from Neutral to Good level are created in each criteria in which an establishment of rates is desired.
3.2.3  Global Evaluation and Impact Profile of the  Status Quo The global model is provided using the sum of models of each FPV. The model was used to aid the management process. The decision-maker selected three real companies.
Status quo  Impact Profile of the three companies: strategic objectives
3.3 Recommendations This stage is a support to identify ways of improving evaluated performance, and to understand the consequences of actions within the strategic objectives implemented using KPIs. For this: are identified strategic objectives, in which performance enhancement is desired; the corresponding  status quo  of the evaluated company impact level are displayed; actors involved are used to seek alternatives to improve.
KPI performance alteration – Revenue Loss with application of Alpha Actions: 0 2 3 4 5 Good Level Neutral Level KPI – Revenue Loss Number of fines due to work stoppage with loss of revenue Alpha Actions Portfolio: In initial meeting, convey norms for active system intervention; Adapt use of cable ducts to prevent extension works from interfering with active systems; Convey communication channels with the Management and Faults Centre; Convey, in initial meetings, mandatory communication with the Management and Faults Centre before and after scheduled intervention to certify system standardization; In works timeline planning, observe the need for prior scheduling for active system intervention.
FPV2 Profile of Impact on status quo and with application of Alpha Actions:
The Recommendations stage provided means for the decision-maker to identify: where it is convenient to act; actions to promote enhancement; the consequences of implementing actions at local, tactical and strategic level.
4. Final Considerations The decision-maker specified  strategic objectives  and identified objective properties of the accountable context. These properties were measured using KPIs. The following study contributions can be highlighted: the use of a transparent and structured process to identify strategic objectives and the KPIs that operacionalize them; a demonstration of the MCDA-C approach used to identify, organize, measure and integrate KPIs; a demonstration of the management process used to promote actions that enhance  status quo  performance.
References: Bana e Costa, C. A. (1993). Três convicções fundamentais na prática do apoio à decisão.  Pesquisa Operacional, 13, 1-12. Bana e Costa, C. A.; Ensslin, L.; Corrêa, E. C.; Vansnick, J. C. (1999). Decision Support Systems in action: integrated application in a multicriteria decision aid process. European Journal of Operational Research, 113, p. 315-335. Bana e Costa, C. A.; De Corte, J.M. & Vansnick, J.C. (2005). On the mathematical foundations of macbeth. In: Multicriteria Decision Analysis: state of the art survey [edited by Greco, J. F. & Ehrgott, S. M.], Springer Verlag, Boston, Dordrecht, London, 409-442. Bana e Costa, C. A, Lorrenço João C. ,Chabas, Mamuel P. , Bana e Costa, João C. “Development of Reusable Bid Evaluation Models for the Portuguese Electric Transmissin Company”. Decision Analysis , Vol. 5, No. 1, March , 2008, pp. 22–42. Eden, C. & Ackermann, F. (1992). The analysis of cause maps. Journal of Management Studies, 29, 309-324. Ensslin, L.; Dutra, A. & Ensslin, S. R. (2000). MCDA: a constructivist approach to the management of human resources at a governmental agency. International Transactions in Operational Research, 7, 79-100. Keeney, R. L. (1992). Value-focused thinking: a path to creative decision making. Harvard University Press, London. Landry, M. (1995). A note on the concept of problem. Organization Studies, 16, 315-343.
Roy, B. (1996). Multicriteria Methodology for Decision Aiding. Kluwer Academic Publishers, Dordrecht. Roy, B. (2005). Paradigms and Challenges, Multiple Criteria Decision Analysis – State of the Art Survey. In: Multicriteria Decision Analysis: state of the art survey [edited by Greco, J. F. & Ehrgott, S. M.], Springer Verlag, Boston, Dordrecht, London, 03-24. Skinner, W. (1986). The productivity paradox. Management Review, 75, 41-45.
Questions? Thank You Msc. Edilson Giffhorn - edilson.giffhorn@gmail.com PhD. Leonardo Ensslin - ensslin@deps.ufsc.br Msc. Rogério Lacerda - rogerlacerda@gmail.com PhD. Sandra Rolim Ensslin - sensslin@gmail.com Msc. William Barbosa Vianna - wpwilliam@hotmail.com

More Related Content

PPT
Multicriteria methodology for kpi identification in outsourced projects
PDF
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
PDF
GEMS M&E Handbook
PDF
Bryan.moser
PPT
Tm(Ii)060908 Periheral Knowledge Rongwei(Final)
PDF
Decision making
PDF
A Multicriteria Model for Strategic Implementation of Business Process Manage...
PPT
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah
Multicriteria methodology for kpi identification in outsourced projects
Proven Paradigm for Creating Enterprise Project and Portfolio Management Adop...
 
GEMS M&E Handbook
Bryan.moser
Tm(Ii)060908 Periheral Knowledge Rongwei(Final)
Decision making
A Multicriteria Model for Strategic Implementation of Business Process Manage...
Reevaluasi Metode Penentuan Prioritas Layanan Pemerintah

What's hot (10)

DOC
Str 581 final exam set 3
PDF
M&e learning paper (24 october 2019)
PDF
Project and Portfolio Management in a Federated Governance Model
 
PPTX
Gbpca ncqa pcmh overview 02 22 13 v1
PDF
Ga article
PDF
Targeting Results: Lessons Learned from UAE National ID Program
DOC
Lightweight Processes: A Definition
PPTX
2.30 3.00pm Understanding Vocab Of Perf Mgmt (Jim Brumby)
PPTX
Building the baseline
Str 581 final exam set 3
M&e learning paper (24 october 2019)
Project and Portfolio Management in a Federated Governance Model
 
Gbpca ncqa pcmh overview 02 22 13 v1
Ga article
Targeting Results: Lessons Learned from UAE National ID Program
Lightweight Processes: A Definition
2.30 3.00pm Understanding Vocab Of Perf Mgmt (Jim Brumby)
Building the baseline
Ad

Viewers also liked (7)

PPT
Ch10
PDF
Kroger Store Simulation Using Arena
DOCX
Simulation with ARENA - SM Paints
PDF
Simulation Modeling on Campus Starbucks Coffee Center
PDF
Simulation for kfc order counter at rajiv gandhi international airport, hyder...
PPTX
Simulation Modelling: Costa Coffee (London, UK)
PPTX
Simulation with Arena (Dental Clinic project)
Ch10
Kroger Store Simulation Using Arena
Simulation with ARENA - SM Paints
Simulation Modeling on Campus Starbucks Coffee Center
Simulation for kfc order counter at rajiv gandhi international airport, hyder...
Simulation Modelling: Costa Coffee (London, UK)
Simulation with Arena (Dental Clinic project)
Ad

Similar to Improving the alignment of strategic objectives in the outsourced projects management (20)

PDF
Kpi methodology
PDF
Depository Trust & Clearing Corporation Shared Assessments Case Study
PPTX
Software Productivity Framework
PDF
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
PPTX
Components of a monitoring and evaluation system
PDF
A STRATEGIC ANALYTICS METHODOLOGY v1
PDF
Identifying knowledge value measurement in a company - june 2006
PPT
Ea As A Strategy M Veeraragaloo Approach
PPT
Chapter IV of project planning and (5).ppt
PPT
Protocall One Benchmarking Approach
PPT
Pc 1 Benchmarking Approach
PPT
Pc 1 Benchmarking Approach
PDF
Clint Britt _ Six Sigma Project _ MFP_ June2016
PPT
K6201 presentation v3
PDF
Manuscript dss
PDF
Cima syllabus is in the context of look : E3 strategic case study 2015 march
DOCX
CV - Gunjan Sharma
PDF
PDF
Ejkm volume1-issue1-article8
PDF
Data Audit – Global Logistics Company
Kpi methodology
Depository Trust & Clearing Corporation Shared Assessments Case Study
Software Productivity Framework
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
Components of a monitoring and evaluation system
A STRATEGIC ANALYTICS METHODOLOGY v1
Identifying knowledge value measurement in a company - june 2006
Ea As A Strategy M Veeraragaloo Approach
Chapter IV of project planning and (5).ppt
Protocall One Benchmarking Approach
Pc 1 Benchmarking Approach
Pc 1 Benchmarking Approach
Clint Britt _ Six Sigma Project _ MFP_ June2016
K6201 presentation v3
Manuscript dss
Cima syllabus is in the context of look : E3 strategic case study 2015 march
CV - Gunjan Sharma
Ejkm volume1-issue1-article8
Data Audit – Global Logistics Company

Recently uploaded (20)

PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
DOCX
Business Management - unit 1 and 2
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
IFRS Notes in your pocket for study all the time
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
Amazon (Business Studies) management studies
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Unit 1 Cost Accounting - Cost sheet
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Business Management - unit 1 and 2
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Probability Distribution, binomial distribution, poisson distribution
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
HR Introduction Slide (1).pptx on hr intro
Roadmap Map-digital Banking feature MB,IB,AB
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
IFRS Notes in your pocket for study all the time
Nidhal Samdaie CV - International Business Consultant
Amazon (Business Studies) management studies
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
unit 1 COST ACCOUNTING AND COST SHEET
Lecture (1)-Introduction.pptx business communication
Tata consultancy services case study shri Sharda college, basrur
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Unit 1 Cost Accounting - Cost sheet

Improving the alignment of strategic objectives in the outsourced projects management

  • 1. Msc. Edilson Giffhorn - Speaker PhD. Leonardo Ensslin Msc. Rogério Lacerda PhD. Sandra Rolim Ensslin Msc. William Barbosa Vianna Improving the Alignment of Strategic Objectives in the Outsourced Projects Management 23rd European Conference on Operational Research 5. – 8.7.2009, Bonn - Germany
  • 2. Santa Catarina Federal University - Brazil Production Engineering Pos-graduation Program Multicriteria Decision Aid Laboratory - LabMCDA
  • 3. Summary 1. Introduction 1.1 Social Issue 1.2 Bibliographical Support 2. Theoretical Construct 3. Construction of the Performance Evaluation Model 3.1. Model Structuring 3.2. Evaluation 3.3. Recommendations 4. Final Considerations
  • 4. 1. Introduction 1.1 Social Issue: The economic growth of Brazil demands increased infra-structural improvements in the country. One of the areas that has been most affected by this growth is telecommunications. The fall of market reserve laws and the state monopolies in 1998 were the cornerstone of rapid changes and demands of the telecommunications consumer market. The new challenges faced by system operators resulted in the need for new Project Management practices and partial service Outsourcing.
  • 5. This led to an integration of both techniques, namely outsourcing of project execution. The role of project managers became essentially that of managing contracts of outsourced project providers. To a certain extent, the Project Manager no longer had direct control over activity resources but was held accountable for results.
  • 6. In this scenario, outsourced companies charter to their own needs causing conflict of interests and priorities, drops in productivity, delays, rework, and endangerment of the company image. This situation comprises multiple undefined criteria: The decision-maker is unsure about which considerations to take into account during evaluation of outsourced project providers; Pressure due to compression of goal attainment timelines forces the decision-maker to adopt intuitive management procedures; Misalignment between the strategic objectives of the contracting company and the outsourced providers.
  • 7. 1.2 Bibliographical Support: A structured process was adopted for the selection of articles that contribute to the provision of theoretical rationale for research. A study of the reference material revealed a gap in methods adopted to identify, organize, measure and integrate KPIs in order to improve the alignment of strategic objectives.
  • 8. 2. Theoretical Construct 2.1. Project Outsourcing and Performance Evaluation In Brazil, outsourcing in telecommunications was definitively incorporated with the privatization of state-owned companies at the end of the 90s. In this context, the final result of a project depends on the joint action of different companies. This calls for the use of tools that allow a broader understanding regarding which KPIs will improve the alignment of the strategic objectives between the companies involved. Multicriteria Decision Aid – Constructivist (MCDA-C) approach was employed as the intervention instrument.
  • 9. 2.2. MCDA-C and traditional MCDA methodologies MCDA-C consolidation as a management instrument occurred in the 80s with the works of: Roy (1996) and Landry (1995) – limits of objectivity for decision aid processes; Skinner (1986) and Keeney (1992) – attributes (objectives, criteria) are specific to the decision-maker in each context; Bana and Costa (1993, 1999) – MCDA convictions. MCDA-C is a ramification of traditional MCDA to aid decision-makers in the contexts in which they have a partial understanding of this context, and wish to broaden this knowledge to better comprehend the consequences of their values and preferences.
  • 10. Source: Ensslin, Dutra, Ensslin (2000) MCDA-C phases
  • 11. 3.1 Structuring 3.1.1 Contextualization The Case Study was developed in the branch of a telecommunications operator in southern Brazil. This operator has around 6000 workers, 10 million customers and yearly gross revenue of approximately 8 billion US dollars. Up until the 90s: state monopoly. In 1995: start of privatizations. Supplier contracts are drafted in the researched parent company and in the branches the projects are conducted by outsourced companies.
  • 13. 3.1.2 Primary Assessment Elements Open interviews were conducted in which the decision-maker was asked to discourse on this issue. Statements were analyzed to identify Primary Assessment Elements (PAE): characteristics or properties that the decision-maker considers may impact his/her values.
  • 14. Direction of preference for each PAE is identified, together with the psychological opposite, to understand the consequences that the decision-maker wishes to avoid (Eden, Ackermann, 1992) . 3.1.3 Concepts
  • 15. 3.1.4 Means-Ends Maps Broadening of understanding through identification of hierarchical relations and relations of influence between concepts. “ How can the end concept be obtained?” “Why is the end concept important?”
  • 16. Means-Ends Map for Professional Qualification and Testing Clusters
  • 17. The relations of influence structure is converted to a Hierarchical Values Structure by incorporating the understanding of preferential judgement of the decision-maker (Keeney, 1992) . 3.1.5 Clusters
  • 18. 3.1.6 Hierarchical Value Structure: Label Areas of Concern Fundamental Points of View: Strategic Objectives Technical Quality Objectives Alignment Communication Evaluate Performance of Outsourced Providers FPV 6 – Technique FPV 7 -Organizational FPV 3 – Testing FPV 4 - Priorities FPV 5 – Routes FPV 1 – Standards Compliance FPV 2 – Professional Qualification
  • 19. 3.1.7 Descriptors - KPIs The construction of ordinal scales to measure Fundamental Points of View result in Descriptors or KPIs. Jeopardize Excellence Good Level Neutral Level Market KPI
  • 20. ordinal measurement Hierarchical Value Structure for FPV 2: KPIs
  • 21. 3.2 Evaluation KPIs are ordinal scales that do not allow mathematical operations. Information on differences of attractiveness should be added between levels to transform them into (numerical) interval scales. The Macbeth method was adopted to transform ordinal scales into cardinal scales (Bana and Costa, 2008).
  • 22. 3.2.1 Value Functions Cardinal scales are built using information of difference of attractiveness between descriptor levels (ordinal) and M-Macbeth software, resulting in cardinal scales that meet preference judgments of the decision-maker.
  • 23. Cardinal scales for FPV Professional Qualification: cardinal measurement
  • 24. 3.2.2 Substitution Rates Information that allows the integration of cardinal scales should be incorporated to display measurement of aspects that are considered strategic and tactical.
  • 25. Potential actions that represent a contribution to the transition from Neutral to Good level are created in each criteria in which an establishment of rates is desired.
  • 26. 3.2.3 Global Evaluation and Impact Profile of the Status Quo The global model is provided using the sum of models of each FPV. The model was used to aid the management process. The decision-maker selected three real companies.
  • 27. Status quo Impact Profile of the three companies: strategic objectives
  • 28. 3.3 Recommendations This stage is a support to identify ways of improving evaluated performance, and to understand the consequences of actions within the strategic objectives implemented using KPIs. For this: are identified strategic objectives, in which performance enhancement is desired; the corresponding status quo of the evaluated company impact level are displayed; actors involved are used to seek alternatives to improve.
  • 29. KPI performance alteration – Revenue Loss with application of Alpha Actions: 0 2 3 4 5 Good Level Neutral Level KPI – Revenue Loss Number of fines due to work stoppage with loss of revenue Alpha Actions Portfolio: In initial meeting, convey norms for active system intervention; Adapt use of cable ducts to prevent extension works from interfering with active systems; Convey communication channels with the Management and Faults Centre; Convey, in initial meetings, mandatory communication with the Management and Faults Centre before and after scheduled intervention to certify system standardization; In works timeline planning, observe the need for prior scheduling for active system intervention.
  • 30. FPV2 Profile of Impact on status quo and with application of Alpha Actions:
  • 31. The Recommendations stage provided means for the decision-maker to identify: where it is convenient to act; actions to promote enhancement; the consequences of implementing actions at local, tactical and strategic level.
  • 32. 4. Final Considerations The decision-maker specified strategic objectives and identified objective properties of the accountable context. These properties were measured using KPIs. The following study contributions can be highlighted: the use of a transparent and structured process to identify strategic objectives and the KPIs that operacionalize them; a demonstration of the MCDA-C approach used to identify, organize, measure and integrate KPIs; a demonstration of the management process used to promote actions that enhance status quo performance.
  • 33. References: Bana e Costa, C. A. (1993). Três convicções fundamentais na prática do apoio à decisão. Pesquisa Operacional, 13, 1-12. Bana e Costa, C. A.; Ensslin, L.; Corrêa, E. C.; Vansnick, J. C. (1999). Decision Support Systems in action: integrated application in a multicriteria decision aid process. European Journal of Operational Research, 113, p. 315-335. Bana e Costa, C. A.; De Corte, J.M. & Vansnick, J.C. (2005). On the mathematical foundations of macbeth. In: Multicriteria Decision Analysis: state of the art survey [edited by Greco, J. F. & Ehrgott, S. M.], Springer Verlag, Boston, Dordrecht, London, 409-442. Bana e Costa, C. A, Lorrenço João C. ,Chabas, Mamuel P. , Bana e Costa, João C. “Development of Reusable Bid Evaluation Models for the Portuguese Electric Transmissin Company”. Decision Analysis , Vol. 5, No. 1, March , 2008, pp. 22–42. Eden, C. & Ackermann, F. (1992). The analysis of cause maps. Journal of Management Studies, 29, 309-324. Ensslin, L.; Dutra, A. & Ensslin, S. R. (2000). MCDA: a constructivist approach to the management of human resources at a governmental agency. International Transactions in Operational Research, 7, 79-100. Keeney, R. L. (1992). Value-focused thinking: a path to creative decision making. Harvard University Press, London. Landry, M. (1995). A note on the concept of problem. Organization Studies, 16, 315-343.
  • 34. Roy, B. (1996). Multicriteria Methodology for Decision Aiding. Kluwer Academic Publishers, Dordrecht. Roy, B. (2005). Paradigms and Challenges, Multiple Criteria Decision Analysis – State of the Art Survey. In: Multicriteria Decision Analysis: state of the art survey [edited by Greco, J. F. & Ehrgott, S. M.], Springer Verlag, Boston, Dordrecht, London, 03-24. Skinner, W. (1986). The productivity paradox. Management Review, 75, 41-45.
  • 35. Questions? Thank You Msc. Edilson Giffhorn - edilson.giffhorn@gmail.com PhD. Leonardo Ensslin - ensslin@deps.ufsc.br Msc. Rogério Lacerda - rogerlacerda@gmail.com PhD. Sandra Rolim Ensslin - sensslin@gmail.com Msc. William Barbosa Vianna - wpwilliam@hotmail.com