Incentive Schemes or Plans
Presented by
Dr. B. N. Shinde
Assistant Professor
Department of Commerce
Deogiri College, Aurangabad
Incentive Schemes or Plans
I) Taylor’s Differential Piece Rate System
Differential Piece Rate System was introduced by Taylor,
the father of scientific management. The underlying
principle of this system is to penalize a slow worker by
paying him a low piece rate for low production and to
reward an efficient worker by giving him a higher piece
rate for a higher production. Taylor was of the view that an
inefficient worker should have no place in the organization
and he should be compelled to leave the organization by
paying him a low piece rate for low production.
Continue…
• Taylor proceeded on the assumption that through
time and motion study it is possible to fix a
standard time for doing a particular task. To
encourage the workers to complete the work within
the standard time, Taylor advocated two piece
rates, so that if a worker performs the work within
or less than the standard time, he is paid a higher
piece rate, and if he does not complete the work
within the standard time, he is given a lower piece
rate.
Continue…
• Taylor decided to give a large reward to those
who would complete the work within or less
than the standard time and much less wages
to those who would not complete the job
within the standard time. The system is very
harsh to the inefficient workers because they
earn much less wages on account of lower
output and lower rate.
Continue…
• Moreover, minimum wages are not
guaranteed under this method. Another
drawback of the system is that if a worker just
fails to complete the work within the standard
time earns much less wages than a worker
who just completes the job within the
standard time. Therefore, the system is now
almost out of use.
Continue…
• Under this system two widely differing wage rates are fixed. The
lower rate is @83% of the normal piece rate and higher rate
@125% of the normal piece rate and sometimes 50% of the wage
rate is added in it. These percentages may vary concern to
concern as per their convenience.
• As there are two different piece rates are used the system is
called as differential piece rate system. For operating this system
the efficiency of worker is measured either by using the formula.
Standard Time Actual Output
100 Or 100
Actual Time Taken Standard Output
To Calculate the wages under this method following formula is used –
Wages = Units produced Applicable Higher or lower rate per unit
= U R
For Example: If piece rate is Rs. 2 per unit
Standard production is 100 units per day of 8 hours.
Worker x produced 75 units and worker Y produced 140 units.
Then, the worker’s wages under Taylors differential piece rate system can be
calculated as under:
Normal Rate – Rs. 2 per unit.
Lower Rate – 2 83% = 1.66 per unit for production less than 100 units.
Higher Rate – 2 125% = 2.50 per unit for production more than 100 units.
X’s Wages = 75 1.66 = Rs. 124.50
Y’s Wages = 140 2.50 = Rs. 350.00
II)Halsey Plan
• Under Halsey Plan, the standard time for the
completion of a job is fixed and the rate per
hour is then determined. If the time taken by a
worker is more than the standard time, then
he shall be paid according to the time rate, i.e.
time taken multiplied by the rate per hour. In
Halsey plan, the time wages are
guaranteed even if the output of a worker is
below the standard.
Continue…
• In case, the worker completes the works in
less than the standard time, then he/she will
be paid according to the actual time, i.e. time-
rate plus the bonus calculated at a specified
percentage of the saved time. Generally, the
bonus percentage varies from 30-70
percent. The usual bonus share paid to the
worker is 50% of the time saved multiplied
by the rate per hour (time-rate).
To Calculate the wages under this method following formula is used-
Wages = (Time Taken Rate per hour) + Standard Time – Time Taken Rate per hour
2
= TR + S – T Rate
2
For Example : If, the standard time is fixed - 8 hours
The time taken is - 6 hours
The time rate is - Rs. 10 per hour
The wages under Halsey plan would be –
Wages = TR + ( S – T ) Rate
2
= (6 10) + ( 8-6 ) 10
2
= 60 + 10
= 70
III) Rowan Plan
Under this method standard time is pre –fixed , like Halsey plan the day wages are
guaranteed and the bonus is paid for time saved. The bonus is paid in proportion of the time
wages as time saved bears to the standard time.
Under this method the wages are calculated by using following formula –
Wages = ( Time Taken Rate per hour ) + Standard time – Time taken
Standard time Time taken Rate
For example – If standard time is – 12 hours
Rate per hour is Rs. 14
Time taken is 8 hours.
Then, the wages under Rowan plan would be –
Wages = ( Time Taken Rate per hour ) + Standard time – Time taken
Standard time Time taken Rate
(8 14 ) + 12 – 8 8 14
12
= 112 + 37.33
On the basis of the following information calculate
the earning of Ganesh and Dinesh on the Straight
Piece rate basis and Taylor’s differential piece rate
system.
Standard Time Rate 8 units per hour
Normal Time Rate Rs. 4 per hour
Differential to be applied
80% of piece rate below standard
120 % of piece rate at or above standard
In a 9 hour day, Ganesh produces 54 units and
Dinesh produces 75 units.
Solution:
Workings:
Calculation of piece rate = 4 / 8 = 0.50
Standard production= 8 units per hour * 9 hours
(working day) = 72 units
Calculation of rate lower and higher rate:
Lower rate 0.50 * 80/100 = 0.40 per unit
Higher rate = 0. 50 * 120 /100 = 0.60 per unit
Calculations of earnings:
A) Under straight piece rate method:
i) Ganesh = 54 *0.50 =Rs. 27
ii)Dinesh = 75 units * 0.50 piece rate=
37.50
B) Under Taylor’s piece rate method:
i) Ganesh= 54 * 0.40 =Rs.21.60
ii) Dinesh = 75 * 0.60 = Rs. 45.00

More Related Content

PPTX
Chapter 04 Labour Costs
PPTX
Cost & management Accounting
PPTX
Methods of remuneration
PDF
methods of remuneration human resource management
PPT
COMPENSATION1.ppt
PPTX
cost accounting.UNIT 3.pptx
PPT
Remuneration method
PPTX
Incentive plans
Chapter 04 Labour Costs
Cost & management Accounting
Methods of remuneration
methods of remuneration human resource management
COMPENSATION1.ppt
cost accounting.UNIT 3.pptx
Remuneration method
Incentive plans

Similar to Incentive Schemes or Plans. ……. . (20)

PPTX
incentives and performance based pay
PPTX
HR Incentives
PPTX
New Labour Cost
PPT
Incentives
PPTX
Labour Cost Accounting.pptx
PPTX
Wages and Salary Industrial Management.pptx
PPTX
Labour cost
PPTX
Incentive plans
PPTX
Cost Accounting - Labour costing
PPT
Incentives plans
PPTX
Wage payments methods
PPTX
Individual Incentive System
PPTX
PPTX
labour cost control
PPTX
Labour cost control b.v.raghunandan
PPTX
Presentation of types_of_incentive_plan
PPTX
Methods of Wage Fixation - 2
PPT
wages system
PDF
Unit 2 (Part 1).pptx.pdf bba sem 2 timep
PPTX
premium bonus plans
incentives and performance based pay
HR Incentives
New Labour Cost
Incentives
Labour Cost Accounting.pptx
Wages and Salary Industrial Management.pptx
Labour cost
Incentive plans
Cost Accounting - Labour costing
Incentives plans
Wage payments methods
Individual Incentive System
labour cost control
Labour cost control b.v.raghunandan
Presentation of types_of_incentive_plan
Methods of Wage Fixation - 2
wages system
Unit 2 (Part 1).pptx.pdf bba sem 2 timep
premium bonus plans
Ad

Recently uploaded (20)

PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
TR - Agricultural Crops Production NC III.pdf
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Classroom Observation Tools for Teachers
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
Complications of Minimal Access Surgery at WLH
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Insiders guide to clinical Medicine.pdf
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PPTX
Pharma ospi slides which help in ospi learning
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PPTX
Cell Types and Its function , kingdom of life
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
RMMM.pdf make it easy to upload and study
Pharmacology of Heart Failure /Pharmacotherapy of CHF
TR - Agricultural Crops Production NC III.pdf
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
STATICS OF THE RIGID BODIES Hibbelers.pdf
Supply Chain Operations Speaking Notes -ICLT Program
Classroom Observation Tools for Teachers
Renaissance Architecture: A Journey from Faith to Humanism
Complications of Minimal Access Surgery at WLH
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Abdominal Access Techniques with Prof. Dr. R K Mishra
Insiders guide to clinical Medicine.pdf
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
Pharma ospi slides which help in ospi learning
Final Presentation General Medicine 03-08-2024.pptx
O7-L3 Supply Chain Operations - ICLT Program
102 student loan defaulters named and shamed – Is someone you know on the list?
Cell Types and Its function , kingdom of life
Module 4: Burden of Disease Tutorial Slides S2 2025
RMMM.pdf make it easy to upload and study
Ad

Incentive Schemes or Plans. ……. .

  • 1. Incentive Schemes or Plans Presented by Dr. B. N. Shinde Assistant Professor Department of Commerce Deogiri College, Aurangabad
  • 2. Incentive Schemes or Plans I) Taylor’s Differential Piece Rate System Differential Piece Rate System was introduced by Taylor, the father of scientific management. The underlying principle of this system is to penalize a slow worker by paying him a low piece rate for low production and to reward an efficient worker by giving him a higher piece rate for a higher production. Taylor was of the view that an inefficient worker should have no place in the organization and he should be compelled to leave the organization by paying him a low piece rate for low production.
  • 3. Continue… • Taylor proceeded on the assumption that through time and motion study it is possible to fix a standard time for doing a particular task. To encourage the workers to complete the work within the standard time, Taylor advocated two piece rates, so that if a worker performs the work within or less than the standard time, he is paid a higher piece rate, and if he does not complete the work within the standard time, he is given a lower piece rate.
  • 4. Continue… • Taylor decided to give a large reward to those who would complete the work within or less than the standard time and much less wages to those who would not complete the job within the standard time. The system is very harsh to the inefficient workers because they earn much less wages on account of lower output and lower rate.
  • 5. Continue… • Moreover, minimum wages are not guaranteed under this method. Another drawback of the system is that if a worker just fails to complete the work within the standard time earns much less wages than a worker who just completes the job within the standard time. Therefore, the system is now almost out of use.
  • 6. Continue… • Under this system two widely differing wage rates are fixed. The lower rate is @83% of the normal piece rate and higher rate @125% of the normal piece rate and sometimes 50% of the wage rate is added in it. These percentages may vary concern to concern as per their convenience. • As there are two different piece rates are used the system is called as differential piece rate system. For operating this system the efficiency of worker is measured either by using the formula. Standard Time Actual Output 100 Or 100 Actual Time Taken Standard Output
  • 7. To Calculate the wages under this method following formula is used – Wages = Units produced Applicable Higher or lower rate per unit = U R For Example: If piece rate is Rs. 2 per unit Standard production is 100 units per day of 8 hours. Worker x produced 75 units and worker Y produced 140 units. Then, the worker’s wages under Taylors differential piece rate system can be calculated as under: Normal Rate – Rs. 2 per unit. Lower Rate – 2 83% = 1.66 per unit for production less than 100 units. Higher Rate – 2 125% = 2.50 per unit for production more than 100 units. X’s Wages = 75 1.66 = Rs. 124.50 Y’s Wages = 140 2.50 = Rs. 350.00
  • 8. II)Halsey Plan • Under Halsey Plan, the standard time for the completion of a job is fixed and the rate per hour is then determined. If the time taken by a worker is more than the standard time, then he shall be paid according to the time rate, i.e. time taken multiplied by the rate per hour. In Halsey plan, the time wages are guaranteed even if the output of a worker is below the standard.
  • 9. Continue… • In case, the worker completes the works in less than the standard time, then he/she will be paid according to the actual time, i.e. time- rate plus the bonus calculated at a specified percentage of the saved time. Generally, the bonus percentage varies from 30-70 percent. The usual bonus share paid to the worker is 50% of the time saved multiplied by the rate per hour (time-rate).
  • 10. To Calculate the wages under this method following formula is used- Wages = (Time Taken Rate per hour) + Standard Time – Time Taken Rate per hour 2 = TR + S – T Rate 2 For Example : If, the standard time is fixed - 8 hours The time taken is - 6 hours The time rate is - Rs. 10 per hour The wages under Halsey plan would be – Wages = TR + ( S – T ) Rate 2 = (6 10) + ( 8-6 ) 10 2 = 60 + 10 = 70
  • 11. III) Rowan Plan Under this method standard time is pre –fixed , like Halsey plan the day wages are guaranteed and the bonus is paid for time saved. The bonus is paid in proportion of the time wages as time saved bears to the standard time. Under this method the wages are calculated by using following formula – Wages = ( Time Taken Rate per hour ) + Standard time – Time taken Standard time Time taken Rate For example – If standard time is – 12 hours Rate per hour is Rs. 14 Time taken is 8 hours. Then, the wages under Rowan plan would be – Wages = ( Time Taken Rate per hour ) + Standard time – Time taken Standard time Time taken Rate (8 14 ) + 12 – 8 8 14 12 = 112 + 37.33
  • 12. On the basis of the following information calculate the earning of Ganesh and Dinesh on the Straight Piece rate basis and Taylor’s differential piece rate system. Standard Time Rate 8 units per hour Normal Time Rate Rs. 4 per hour Differential to be applied 80% of piece rate below standard 120 % of piece rate at or above standard In a 9 hour day, Ganesh produces 54 units and Dinesh produces 75 units.
  • 13. Solution: Workings: Calculation of piece rate = 4 / 8 = 0.50 Standard production= 8 units per hour * 9 hours (working day) = 72 units Calculation of rate lower and higher rate: Lower rate 0.50 * 80/100 = 0.40 per unit Higher rate = 0. 50 * 120 /100 = 0.60 per unit
  • 14. Calculations of earnings: A) Under straight piece rate method: i) Ganesh = 54 *0.50 =Rs. 27 ii)Dinesh = 75 units * 0.50 piece rate= 37.50 B) Under Taylor’s piece rate method: i) Ganesh= 54 * 0.40 =Rs.21.60 ii) Dinesh = 75 * 0.60 = Rs. 45.00