IndII Support to DGH on National Roads –
- Road sector achievements and future program



  DGH, 9 July 2012
IndII Support under Phase 1 - summary

• MTEF, budgeting and sector performance:
  – Budgeting process, strategy linkage to long-term plan, KPI, action plan
• Road network development and planning (Bipran-AECOM):
  – NR Masterplan, road corridor plans for E Sumatra & N Java
  – BPJT capacity, institutional options and toll road program
• Road program delivery (Bintek-Cardno):
  – Extending design life, life-cycle costs, axle load limits, performance-based
    contracts, project management, routine maintenance delivery
• Road sector policy issues:
  – South Africa visit: SANRAL MTEF, road management, business model
• Sub-national roads:
  – Pilot on road management surveys, programming and routine maintenance
• Road safety:
  – Blackspot program prepared, design manual produced

                                                                                   2
Challenges for the road sector - MTEF
• Infrastructure is a critical constraint to growth
  – low competitiveness ranking for road infrastructure provision
• Poor connectivity
  – Main corridor times 60-100 percent longer than neighbours
• Low cost effectiveness of road asset management
  – while condition is fairly good, deterioration is rapid
  – high annual costs, equivalent to new road every 5 years
  – fragmented contracts; weak construction industry.
• Changed resource environment
  – 6-fold increase in funding in 6 years, 95+% budget execution
  – Value for money?? - average cost up, but output flat
• Weak linkages to national development plan
  – lacks targets on connectivity, efficiency and effectiveness

                                                                    3
Phase 1 – Road Program implementation

• Strong direction & interaction with Bintek and Balai
• Revision to Pavement Design Guide:
      • Long-life designs (low maintenance)
      • Catalog approach for greater reliability
        (based on detailed analysis and life-cycle costs)
      • Strong foundation and drainage for long life
      • Overloading incorporated in design
      • Flexible, rigid, reconstructed and recycled pavements
• Larger package size improves cost and quality
• Balai want automated road surveys for better data
• Options for management of routine maintenance
• Economic justification for raising legal axle load limit
                                                                4
Phase 1 – Road Network Development
  Connectivity:
  • low connectivity compared to regional neighbours, but no target
  • how do we measure performance and set targets?
  • need to measure, report and forecast travel times
  • link RENSTRA workplan to connectivity target and
  national long-term plan          Normalized Trip Times on Economic Corridor Arterial
                                                                             Roads – 2011 Estimates

                                                                                    Trip time hr/100 km*
High land transport costs – low                                       0.0     1.0         2.0       3.0        4.0        5.0        6.0

connectivity of economic centres                      Trans-Sumatra




                                                  1
                                                                                                          Target Service level
                                                         Trans-Java                                       1-1.5 hr/100 km
                                                  2
                                      Vietnam
                                      Indonesia         Kalimantan
                                                  3


                                      China
                                                           Sulawesi
                                                  4




                                      Thailand
                                      Malaysia             Bali-NTT
                                                  5




                                                      Papua-Maluku
                                                  6




0.00      1.00        2.00     3.00
       Trip time (hr/100 km)                                                                               * Corridor distance shorter
                                                                  Road Trip Time        Nautical Add-on    than Arterial road distance
                                                  Source: IndII estimates from bus schedules and DGH data, April 2012


                                                                                                                                         5
DGH Masterplan for Road Infrastructure 2010-14
                                                                Road Length, km
                                                     -     2,000 4,000 6,000 8,000 10,000
Road development program -
                                           Sumatra
  Incremental widening to                                        3,690
  minimum width standard                      Java       1,430
• Budget IDR 7 trillion/yr              Kalimantan         2,780
• Covers 47% of network in 5 yr
                                          Sulawesi             3,160
                                                                                        Total Length
• Increments to 4.5, 6 or 7 m width
                                              NTT        987                            Improved
But comes at high cost:                                                                 length
                                      Maluku-Papua       1,905
• No distance saving, little speed
                                                  Width standard of national arterial roads,
  improvement                                  after DGH road development program 2010-14

• Investment repeated in 5-10 yrs
                                                                   7m
• High cost = 30-40% of full                                      width
                                                                  14%
  construction for 20-yr life
                                                          6 m width       4.5 m width
• Defers achieving modern asset                              33%              53%


• Compounds land issues
                                                                                                       6
Corridor planning approach for long-term
             development
                                                                                                                 Nunukan



                                                                                               Malinau
 Corridor plan evaluates options when
 generating project pipeline and                                                                     Tj. Selor

 investment profile for Economic
                              Aruk
 Corridor:
                                                       Ng Badau
 staged over 5, 10,                        Enttikong
                                                                  Putusibau


 15 & 20 year periods
                               Pontianak   Tayan
                                                                                                                 Samarinda



                                                                                                          Balikpapan
                                                                              Palangkaraya



Strategic Options
(1) Widen existing road                                     Banjarmasin
(2) Realign & rebuild – “road renewal”; digambarkan dengan garis putus-putus
                          Jalan yang belum terbangun
                                                                                             Road standard
(3) Highway on future expressway                                                                   Expressway
    location                                                                                       >= 7 m
                                                                                                   6m
(4) Expressway in new location                                                                     4.5 – 6 m
                                                                                                   Not Connected
                                                                                                   Sea Port
                                                                                                                             7
Corridor plan (trans-Sumatra example):
  detailed multi-year program & standard




                                           8
Corridor plan – strip map presentation:
       Trans-Sumatra - Corridor Plan for Staged Development of
                 Capacity in Parallel Facilities over long-term 20-yr period

ARTERIAL NATIONAL ROAD WIDTH
Width m 14                                                                                                 2019
   Road Width

                 10               2024
                                                                                                                                                        2014
                  7
                  6
                  5                                                                                                                                           2010
                      101       102        103      104     105          106         107     108    109             110         111          112        113

                B Aceh
                   B Aceh                        Medan
                                                   Medan                                     Pekanbaru
                                                                                                Pekanba                                            Lampung
                                                                                                                                             Palembg Lampung

Length km      644                                  694                                             754                                      443                        0
Total distance 2536                                 1892                                            1198                                     443



                   EXPRESSWAY
                   Dual C'way


                                                                                                                                                              Renstra period color code
                                                                                                                                                              Baseline
                                                                                                                                                              2010-2014
                                                                                                                                                              2015-2019
                                                                                                                                                              2020-2024
                                                                                                                                                              2025-2029
                                  101      102     103     104     105         106     107    108   109       110         111         112      113
                                  B Aceh                   Medan                                    Pekanba                           Palembg Lampung

                                           2029                                2019                           2024                          2019
                   Length km   460                         564                                      610                               380               0
                   Distance km 2014                        1554                                     990                               380


                                                                                                                                                                                  9
Corridor Plan Output - Trans-Sumatra Example:
                               Linkage of Development Outcomes and Financing Plan
                                              – Long-term 20-yr Period



                          Connectivity:                                                        80          Financing Plan




                                                            5-Year Spending estimate (IDR T)
                   Travel Time from South to                                                   70
                                                                                                                                          1,5
                             North                                                             60
                                                                                                                             7
                                                                                               50
                   70
                   60                                                                          40
                                                                                                                                   58,6
TRAVEL TIME (hr)




                   50                                                                          30                     47,9
                                                                                                                                                           0
                   40                                                                          20
                                                                                                                                                    20,2
                   30                              B Aceh                                      10
                                                                                                          2,6              1,7 3          3,6
                                                                                                                3 3                             3          0
                   20                              Medan                                       0    1,8
                                                   Pekanb
                   10                                                                                     R1          R2           R3               R4
                                                   Palem                                                              RENSTRA PERIOD
                    0                              Boukh
                        2010 2015 2020 2025 2030                                       Rd Presv           Rd Widening        Exwy GOI     Exwy PrivSec




                                                                                                                                                               10
Forecast of Forward Funding Requirements
  (demonstration only, from study data)
• Public funding of IDR 42-56 trillion/yr required 2015-29
• Only IDR 4 trillion/yr (16%) attractive to private sector
• Road development requires IDR 19 trillion/yr – in renewal
• Road preservation 20-30% less due to stronger roads
                                  70
                                                  Forecast Funding Requirements
                                  60
   Annual Funding Requirement,
     IDR trillion (2011 prices)




                                  50

                                  40
                                                                                         Expressway - private funding
                                  30
                                                                                         Expressway - public funding
                                  20                                                     Arterial road development

                                  10                                                     Road preservation
                                                                                         Road management
                                  0
                                       2005-09   2010-14   2015-19   2020-24   2025-29
                                                                                                                        11
Priorities for Phase 2 support
Based on DGH priorities and Phase 1 findings, key areas include:
• Preparation of long-term national road master-plan:
  – Connectivity in main economic corridors
  – Expressway development, project pipeline and financing
  – Modernisation of arterial road network
• Better road performance and lower annual costs
  – extend life of road assets – expected and actual
• Better budget allocation and accountability
  – Improved asset management and systems
• Strategic priorities for RENSTRA and funding requirement
• Staff performance, capability and accountability

                                                              12
Proposed activities for Phase 2 National roads



Policy

Planning

Program delivery

                                            13
1. Advisory support on road sector policy
   - DG, Directors
Aims
• Improving sector and institutional performance
• Effective legal, regulatory & financing provisions
• Effectiveness of IndII support to DGH & road sector
Sub-activities:
• Dialog with GOI – MPW, MOF, Bappenas, CMEA, MoT
• Revisions to Road Law
• Expressway financing and issues
• Institutional structure and organizational performance
• Management and financing
• Sub-national road role, road preservation fund
• IndII road program effectiveness
                                                           14
2. Support on Planning Road Development
- Bipran, BPJT
Aims:
• Plan road development to meet connectivity goals
• Strategy for modernising arterial road network
• Improve delivery & financing of expressway network
Main outputs:
• Long-term development strategy for road infrastructure
• 20-yr pipeline of investment projects in economic corridors
• Expressway masterplan and PPP-VGF demonstration
• Road renewal policy to modernise arterial road network
Performance measures:
• Connectivity (travel time) in main corridors
• Accessibility in eastern region (km/km2)
                                                           15
2. Support on Planning Road Development:
Sub-activities
• Procedures for planning development of road network
  – Advisory support in Bipran: long-term planning of connectivity &
    capacity in corridors, road renewal policy, medium-term pipeline, KPI
    for network, staff competencies and training
• Planning & capacity for developing expressway network
  – Update expressway master-plan, include staging
  – BPJT advisory support, VGF financing mechanisms, capacity-building,
    review of packages, institutional options
• Preparation of corridor plans for Java and Sumatra
  – Refine corridor plans & extend to arterial corridors, prepare 2015-19
    project pipeline, guidance on expressway packages
• Preparation of corridor plans & pipeline for east region
  – Survey, analyse and prepare plans for 4 main corridors in Kal, Sul,
    Bali-NTT, M-Papua; 2015-19 pipeline; review needs for other NAR
• Preparation of medium- and long-term plans
  – Assist preparation of 2015-19 RENSTRA and 2015-24 long-term plan
                                                                          16
3. Improving performance of national road
   program implementation (Bintek, balai)
Aims:
• To extend asset life through improved design
• To build capacity for asset management in balai
  implementation offices
• To improve delivery and quality of construction and
  maintenance
Performance measures:
• Expected life and actual life of major works
• Contract package length
• Average preservation costs/km/yr
• Road and bridge condition
• Percentage of arterial road renewed
                                                        17
3. Improving the performance of national
   road program implementation (cont)
• Implementation of new design code
  – Longer life, better foundation & drainage, concrete
• Application of road renewal policy
  – Programming, design & implementation of road renewal along
    arterial corridors coordinated with long-term network plan
• Development of improved asset management tools
  – Automated surveys, practical life-cycle programming tool with
    strip-map report to replace IRMS, performance indicator reports
• Improved project management, skills & performance
  – Satker and PPK strengthened in contract packaging, procurement
    and supervision
  – Further use of performance-based and maintenance contracts
• Piloting of asset management & project management
  – 2 balai in 2013, then progressively to other balai 2014-15.
                                                                  18
3. Improving the performance of national
   road program implementation (cont)

• Improved public participation
  – Use of program reports in local consultation, public disclosure of
    program and project information (perhaps through CoST)
• Improved performance and incentives for contractors
  – Support for action plan of Bp Konstruksi to improve certification
    and performance evaluation, strengthen LPJK and accountability




                                                                    19
Interim activities – July-December 2012
• Bintek support:
  – Training of balai on new pavement design manual, calibration of
    structural tests, preparation of drainage design manual, baseline
    survey of KPI
• DG, Bipran support:
  – Preparing & convening national symposium on road network
    development and financing, with GOI & international participants
• Bipran support:
  – Baseline surveys of connectivity in main trunk routes; review
    status of new toll road packages; preparation for main activity
• Detailed preparation and procurement of IndII DGH
  activities



                                                                      20
IndII-2 in DGH:
Key concepts to note
• Expressway as class of public road, not toll road
• New public financing model (VGF) in PPP
  – Availability- or performance-based, quarterly payment, toll optional
• Long-term corridor plan selects road standard and timing
  of renewal
• Road renewal policy
  – Defers betterment until full realignment & construction planned
  – Gains long life, safe, modern highway
• Asset management and programming function for
  preservation transferred to balai, with graphical tool
• Costs reduced by extending expected and actual life
• Independence between supervision and contractor
• Monitor outcomes – KPI on travel time, age, costs
                                                                    21
Timeline for Phase 2 on national roads

      Month                  Activity
    Jan-12    DGH workshop on future direction,
              Ongoing IndII-DGH discussions
    Apr-12    IndII consultation on strategy with
              AusAID
    Jul-12    - Activity proposals drafted
              - Activities discussed with DGH
              - Policy adviser (John Lee) arrives
    Aug-12    - Activity designs finalised,
                procurement starts;
              - Interim activities start
    Oct-12    Symposium on road development
              planning and financing
    Jan-13    Expected start of main Planning
              and Implementation activities
    Jan-14    Mid-term review
    Dec-14    Main activities end
                                                    22
Conclusion
• The activities are designed to support DGH in delivering
  its program
• Core support will be provided through individual advisers
  working as partner to Directorate staff in DGH offices
• Consultant teams will be coordinated by the advisers and
  work closely with DGH staff in central and balai offices
• The teams will be most effective if working space can be
  made available in DGH offices
• Your input to the activity design is important – especially
  in the next two months Jul-Aug
                        Terima kasih
                                                           23
4. Sub-national roads:
   Incentivising road management
        Objectives                         Implementation and Outcomes
    Strengthening central    Component 1: Preparation of Grant Design and Interim
     and provincial           Support for Critical Elements to expedite program,
     agencies on asset        (implemented second half of 2012)
     management for sub-      Component 2: Consultants for project management and
     national roads (SNR)     implementation of grant program over 5 years, 2014-2018;

    Improving participation     Creation of SNR project management unit in DGH
     by private sector and
                                 Establishment of transport forums
     the public – to improve
     communication and           TA and training in planning and implementation of
     agency performance           maintenance & rehabilitation, and PBC
    Implementation of pilot     Incentives for increased budget allocation, for
     output-based road            contracting out works and performance-based contracts
     maintenance and
     rehabilitation program      Staged pilot, starting with one province (NTT) increasing
                                  to up to other jurisdictions, based on demonstrated
    Effective delivery of        capability and commitment.
     IndII support for sub-
     national roads


                                                                                          24
5. Improving Road Safety Blackspots and
   Program Management
      Objectives                        Implementation and Outcomes
   Building capability of   Component 1: Interim support: international road safety
    central and regional     specialist supporting RSEU 3 p-months to Jul-12;
    offices for managing     Component 2. Implementation support by Consultant firm for
                             24 months to Jun-14 (2-stage);
    blackspot improvement
                             Component 3. Program management support by International
    programs                 specialist (50% of 30 months).
   Implementation of        Strategic Plan for Road Safety in DGH
    blackspot
    improvements to meet        RSEU, DGH balai and local police trained in managing
    RENSTRA targets              road safety programs,

   Developing and              Support to achieve 150 blackspot improvements to
    monitoring road safety       achieve RENSTRA objectives
    programs in national        Three fact-finding missions provide overseas training and
    police and sub-national      experience to 60 officials
    road agencies
                                Performance and results publicised and build GOI donor
   Effective delivery of        & public support for road safety programs
    IndII support for road
    safety•                     Further road safety programs ready in DGH, INTP and
                                 sub-national DGLT agencies.

                                                                                          25

More Related Content

PDF
Presentation on dgh program to ind ii board 2012 04
PPT
Trb09 ped strategy-zvaniga
DOC
Yogesh_Resume
DOC
MANISH KUMAR GUPTA.docx
PPTX
COTA NE AA Public Meeting Presentation
PDF
Space Systems Loral
PDF
Enhanced and Integrated Ant Colony-Artificial Bee Colony-Based QOS Constraine...
PDF
Gosford city centre TMAP
Presentation on dgh program to ind ii board 2012 04
Trb09 ped strategy-zvaniga
Yogesh_Resume
MANISH KUMAR GUPTA.docx
COTA NE AA Public Meeting Presentation
Space Systems Loral
Enhanced and Integrated Ant Colony-Artificial Bee Colony-Based QOS Constraine...
Gosford city centre TMAP

What's hot (11)

PDF
Smith - Review of Energy Infrastructure
PPTX
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
PDF
I021201059064
PPTX
Planning and Design of Feeder Services and Short Routes - RR Deshpande
PDF
Freight and public transport planning initiatives conference 24 november 2011
PDF
DRAFT Central Coast Regional Transport Strategy
DOC
Optimal Contro To Save Fuel I Hha09 Rev4
PDF
Peering equilibrium multi path routing
PDF
19 9255 nautical ad hoc network application edit septian
PDF
L046066577
PDF
Nov 2010 mha report
Smith - Review of Energy Infrastructure
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
I021201059064
Planning and Design of Feeder Services and Short Routes - RR Deshpande
Freight and public transport planning initiatives conference 24 november 2011
DRAFT Central Coast Regional Transport Strategy
Optimal Contro To Save Fuel I Hha09 Rev4
Peering equilibrium multi path routing
19 9255 nautical ad hoc network application edit septian
L046066577
Nov 2010 mha report
Ad

Viewers also liked (6)

PPT
8 ind ii role rli final id r1
DOCX
1Resume
PPTX
расписание дня
PDF
News letter janeiro de 2009 ESEB CONSULTORIA
PPTX
Ghandi p bill paterson ppt v 3
PPT
1 issues and priorities rli final id.pptx r1
8 ind ii role rli final id r1
1Resume
расписание дня
News letter janeiro de 2009 ESEB CONSULTORIA
Ghandi p bill paterson ppt v 3
1 issues and priorities rli final id.pptx r1
Ad

Similar to Ind ii2 national roads program proposal to dgh 09jul12 plus concepts (15)

PPTX
Final transisi pakgandhi_newyear
PPTX
Life lines and economy
PPT
Application of tracking and gis in solid waste management
PPT
P4 ken shirley tauranga transport and logistics forum 2012
PDF
INDONESIA TRANSPORTATION SECTOR OVERVIEW
PDF
Indonesia Transportation Overview
PPTX
Solution To Pune Traffic Final (3)
PPTX
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
PPTX
Kathmandu – Hetauda Fast Track Highway
PPTX
Eea energy - development
PDF
Transportation and Quality of Life
PPTX
life lines of notional economy
PPTX
Llone!! maha,krishna
PDF
BubbleMotion automated rickshaws (Apr 2013)
PPT
Mighty mekong presentation muic 2012
Final transisi pakgandhi_newyear
Life lines and economy
Application of tracking and gis in solid waste management
P4 ken shirley tauranga transport and logistics forum 2012
INDONESIA TRANSPORTATION SECTOR OVERVIEW
Indonesia Transportation Overview
Solution To Pune Traffic Final (3)
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
Kathmandu – Hetauda Fast Track Highway
Eea energy - development
Transportation and Quality of Life
life lines of notional economy
Llone!! maha,krishna
BubbleMotion automated rickshaws (Apr 2013)
Mighty mekong presentation muic 2012

More from Indonesia Infrastructure Initiative (20)

PPTX
Presentasi Sanitasi INDII
PPTX
Balikpapan Public Diplomacy 25 May 2015
PPT
World experience-in-railway-restructuring
PPT
Indonesian railways revitalisation bambang susantono, vice minister for tra...
PPTX
WS2 Infrastructure Issues
PPTX
Development of multimodal transport in north java corridor
PPTX
Railway function in developing multimodal transportation in java
PDF
The role of ipc in developing multimodal transportation in java
PDF
Government strategy in developing multimodal transportation
PDF
The role of ferry in developing multimodal transportation
PDF
Development of multimodal transportation and inter regional connectivitiy
PPTX
Ws3 safe system approach (bahasa version)
PPTX
Ws3 safe system supporting vru (english version)
PPTX
Ws3 safe system supporting vru (bahasa version)
PPTX
Ws3 infrastructure related to pedestrian safety
PPTX
Ws3 gender and disability presentation
PPT
Workshop #2 safe system approach
Presentasi Sanitasi INDII
Balikpapan Public Diplomacy 25 May 2015
World experience-in-railway-restructuring
Indonesian railways revitalisation bambang susantono, vice minister for tra...
WS2 Infrastructure Issues
Development of multimodal transport in north java corridor
Railway function in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
Government strategy in developing multimodal transportation
The role of ferry in developing multimodal transportation
Development of multimodal transportation and inter regional connectivitiy
Ws3 safe system approach (bahasa version)
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (bahasa version)
Ws3 infrastructure related to pedestrian safety
Ws3 gender and disability presentation
Workshop #2 safe system approach

Recently uploaded (20)

PPTX
Chapter 5: Probability Theory and Statistics
PPTX
The various Industrial Revolutions .pptx
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
Getting started with AI Agents and Multi-Agent Systems
PDF
CloudStack 4.21: First Look Webinar slides
PDF
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
PDF
Credit Without Borders: AI and Financial Inclusion in Bangladesh
PDF
Consumable AI The What, Why & How for Small Teams.pdf
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
PDF
STKI Israel Market Study 2025 version august
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PDF
Convolutional neural network based encoder-decoder for efficient real-time ob...
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
Flame analysis and combustion estimation using large language and vision assi...
PDF
sbt 2.0: go big (Scala Days 2025 edition)
PPT
Geologic Time for studying geology for geologist
PPTX
Microsoft Excel 365/2024 Beginner's training
PDF
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
PPTX
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
Chapter 5: Probability Theory and Statistics
The various Industrial Revolutions .pptx
Zenith AI: Advanced Artificial Intelligence
Getting started with AI Agents and Multi-Agent Systems
CloudStack 4.21: First Look Webinar slides
Hybrid horned lizard optimization algorithm-aquila optimizer for DC motor
Credit Without Borders: AI and Financial Inclusion in Bangladesh
Consumable AI The What, Why & How for Small Teams.pdf
Developing a website for English-speaking practice to English as a foreign la...
From MVP to Full-Scale Product A Startup’s Software Journey.pdf
STKI Israel Market Study 2025 version august
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
Convolutional neural network based encoder-decoder for efficient real-time ob...
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
Flame analysis and combustion estimation using large language and vision assi...
sbt 2.0: go big (Scala Days 2025 edition)
Geologic Time for studying geology for geologist
Microsoft Excel 365/2024 Beginner's training
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx

Ind ii2 national roads program proposal to dgh 09jul12 plus concepts

  • 1. IndII Support to DGH on National Roads – - Road sector achievements and future program DGH, 9 July 2012
  • 2. IndII Support under Phase 1 - summary • MTEF, budgeting and sector performance: – Budgeting process, strategy linkage to long-term plan, KPI, action plan • Road network development and planning (Bipran-AECOM): – NR Masterplan, road corridor plans for E Sumatra & N Java – BPJT capacity, institutional options and toll road program • Road program delivery (Bintek-Cardno): – Extending design life, life-cycle costs, axle load limits, performance-based contracts, project management, routine maintenance delivery • Road sector policy issues: – South Africa visit: SANRAL MTEF, road management, business model • Sub-national roads: – Pilot on road management surveys, programming and routine maintenance • Road safety: – Blackspot program prepared, design manual produced 2
  • 3. Challenges for the road sector - MTEF • Infrastructure is a critical constraint to growth – low competitiveness ranking for road infrastructure provision • Poor connectivity – Main corridor times 60-100 percent longer than neighbours • Low cost effectiveness of road asset management – while condition is fairly good, deterioration is rapid – high annual costs, equivalent to new road every 5 years – fragmented contracts; weak construction industry. • Changed resource environment – 6-fold increase in funding in 6 years, 95+% budget execution – Value for money?? - average cost up, but output flat • Weak linkages to national development plan – lacks targets on connectivity, efficiency and effectiveness 3
  • 4. Phase 1 – Road Program implementation • Strong direction & interaction with Bintek and Balai • Revision to Pavement Design Guide: • Long-life designs (low maintenance) • Catalog approach for greater reliability (based on detailed analysis and life-cycle costs) • Strong foundation and drainage for long life • Overloading incorporated in design • Flexible, rigid, reconstructed and recycled pavements • Larger package size improves cost and quality • Balai want automated road surveys for better data • Options for management of routine maintenance • Economic justification for raising legal axle load limit 4
  • 5. Phase 1 – Road Network Development Connectivity: • low connectivity compared to regional neighbours, but no target • how do we measure performance and set targets? • need to measure, report and forecast travel times • link RENSTRA workplan to connectivity target and national long-term plan Normalized Trip Times on Economic Corridor Arterial Roads – 2011 Estimates Trip time hr/100 km* High land transport costs – low 0.0 1.0 2.0 3.0 4.0 5.0 6.0 connectivity of economic centres Trans-Sumatra 1 Target Service level Trans-Java 1-1.5 hr/100 km 2 Vietnam Indonesia Kalimantan 3 China Sulawesi 4 Thailand Malaysia Bali-NTT 5 Papua-Maluku 6 0.00 1.00 2.00 3.00 Trip time (hr/100 km) * Corridor distance shorter Road Trip Time Nautical Add-on than Arterial road distance Source: IndII estimates from bus schedules and DGH data, April 2012 5
  • 6. DGH Masterplan for Road Infrastructure 2010-14 Road Length, km - 2,000 4,000 6,000 8,000 10,000 Road development program - Sumatra Incremental widening to 3,690 minimum width standard Java 1,430 • Budget IDR 7 trillion/yr Kalimantan 2,780 • Covers 47% of network in 5 yr Sulawesi 3,160 Total Length • Increments to 4.5, 6 or 7 m width NTT 987 Improved But comes at high cost: length Maluku-Papua 1,905 • No distance saving, little speed Width standard of national arterial roads, improvement after DGH road development program 2010-14 • Investment repeated in 5-10 yrs 7m • High cost = 30-40% of full width 14% construction for 20-yr life 6 m width 4.5 m width • Defers achieving modern asset 33% 53% • Compounds land issues 6
  • 7. Corridor planning approach for long-term development Nunukan Malinau Corridor plan evaluates options when generating project pipeline and Tj. Selor investment profile for Economic Aruk Corridor: Ng Badau staged over 5, 10, Enttikong Putusibau 15 & 20 year periods Pontianak Tayan Samarinda Balikpapan Palangkaraya Strategic Options (1) Widen existing road Banjarmasin (2) Realign & rebuild – “road renewal”; digambarkan dengan garis putus-putus Jalan yang belum terbangun Road standard (3) Highway on future expressway Expressway location >= 7 m 6m (4) Expressway in new location 4.5 – 6 m Not Connected Sea Port 7
  • 8. Corridor plan (trans-Sumatra example): detailed multi-year program & standard 8
  • 9. Corridor plan – strip map presentation: Trans-Sumatra - Corridor Plan for Staged Development of Capacity in Parallel Facilities over long-term 20-yr period ARTERIAL NATIONAL ROAD WIDTH Width m 14 2019 Road Width 10 2024 2014 7 6 5 2010 101 102 103 104 105 106 107 108 109 110 111 112 113 B Aceh B Aceh Medan Medan Pekanbaru Pekanba Lampung Palembg Lampung Length km 644 694 754 443 0 Total distance 2536 1892 1198 443 EXPRESSWAY Dual C'way Renstra period color code Baseline 2010-2014 2015-2019 2020-2024 2025-2029 101 102 103 104 105 106 107 108 109 110 111 112 113 B Aceh Medan Pekanba Palembg Lampung 2029 2019 2024 2019 Length km 460 564 610 380 0 Distance km 2014 1554 990 380 9
  • 10. Corridor Plan Output - Trans-Sumatra Example: Linkage of Development Outcomes and Financing Plan – Long-term 20-yr Period Connectivity: 80 Financing Plan 5-Year Spending estimate (IDR T) Travel Time from South to 70 1,5 North 60 7 50 70 60 40 58,6 TRAVEL TIME (hr) 50 30 47,9 0 40 20 20,2 30 B Aceh 10 2,6 1,7 3 3,6 3 3 3 0 20 Medan 0 1,8 Pekanb 10 R1 R2 R3 R4 Palem RENSTRA PERIOD 0 Boukh 2010 2015 2020 2025 2030 Rd Presv Rd Widening Exwy GOI Exwy PrivSec 10
  • 11. Forecast of Forward Funding Requirements (demonstration only, from study data) • Public funding of IDR 42-56 trillion/yr required 2015-29 • Only IDR 4 trillion/yr (16%) attractive to private sector • Road development requires IDR 19 trillion/yr – in renewal • Road preservation 20-30% less due to stronger roads 70 Forecast Funding Requirements 60 Annual Funding Requirement, IDR trillion (2011 prices) 50 40 Expressway - private funding 30 Expressway - public funding 20 Arterial road development 10 Road preservation Road management 0 2005-09 2010-14 2015-19 2020-24 2025-29 11
  • 12. Priorities for Phase 2 support Based on DGH priorities and Phase 1 findings, key areas include: • Preparation of long-term national road master-plan: – Connectivity in main economic corridors – Expressway development, project pipeline and financing – Modernisation of arterial road network • Better road performance and lower annual costs – extend life of road assets – expected and actual • Better budget allocation and accountability – Improved asset management and systems • Strategic priorities for RENSTRA and funding requirement • Staff performance, capability and accountability 12
  • 13. Proposed activities for Phase 2 National roads Policy Planning Program delivery 13
  • 14. 1. Advisory support on road sector policy - DG, Directors Aims • Improving sector and institutional performance • Effective legal, regulatory & financing provisions • Effectiveness of IndII support to DGH & road sector Sub-activities: • Dialog with GOI – MPW, MOF, Bappenas, CMEA, MoT • Revisions to Road Law • Expressway financing and issues • Institutional structure and organizational performance • Management and financing • Sub-national road role, road preservation fund • IndII road program effectiveness 14
  • 15. 2. Support on Planning Road Development - Bipran, BPJT Aims: • Plan road development to meet connectivity goals • Strategy for modernising arterial road network • Improve delivery & financing of expressway network Main outputs: • Long-term development strategy for road infrastructure • 20-yr pipeline of investment projects in economic corridors • Expressway masterplan and PPP-VGF demonstration • Road renewal policy to modernise arterial road network Performance measures: • Connectivity (travel time) in main corridors • Accessibility in eastern region (km/km2) 15
  • 16. 2. Support on Planning Road Development: Sub-activities • Procedures for planning development of road network – Advisory support in Bipran: long-term planning of connectivity & capacity in corridors, road renewal policy, medium-term pipeline, KPI for network, staff competencies and training • Planning & capacity for developing expressway network – Update expressway master-plan, include staging – BPJT advisory support, VGF financing mechanisms, capacity-building, review of packages, institutional options • Preparation of corridor plans for Java and Sumatra – Refine corridor plans & extend to arterial corridors, prepare 2015-19 project pipeline, guidance on expressway packages • Preparation of corridor plans & pipeline for east region – Survey, analyse and prepare plans for 4 main corridors in Kal, Sul, Bali-NTT, M-Papua; 2015-19 pipeline; review needs for other NAR • Preparation of medium- and long-term plans – Assist preparation of 2015-19 RENSTRA and 2015-24 long-term plan 16
  • 17. 3. Improving performance of national road program implementation (Bintek, balai) Aims: • To extend asset life through improved design • To build capacity for asset management in balai implementation offices • To improve delivery and quality of construction and maintenance Performance measures: • Expected life and actual life of major works • Contract package length • Average preservation costs/km/yr • Road and bridge condition • Percentage of arterial road renewed 17
  • 18. 3. Improving the performance of national road program implementation (cont) • Implementation of new design code – Longer life, better foundation & drainage, concrete • Application of road renewal policy – Programming, design & implementation of road renewal along arterial corridors coordinated with long-term network plan • Development of improved asset management tools – Automated surveys, practical life-cycle programming tool with strip-map report to replace IRMS, performance indicator reports • Improved project management, skills & performance – Satker and PPK strengthened in contract packaging, procurement and supervision – Further use of performance-based and maintenance contracts • Piloting of asset management & project management – 2 balai in 2013, then progressively to other balai 2014-15. 18
  • 19. 3. Improving the performance of national road program implementation (cont) • Improved public participation – Use of program reports in local consultation, public disclosure of program and project information (perhaps through CoST) • Improved performance and incentives for contractors – Support for action plan of Bp Konstruksi to improve certification and performance evaluation, strengthen LPJK and accountability 19
  • 20. Interim activities – July-December 2012 • Bintek support: – Training of balai on new pavement design manual, calibration of structural tests, preparation of drainage design manual, baseline survey of KPI • DG, Bipran support: – Preparing & convening national symposium on road network development and financing, with GOI & international participants • Bipran support: – Baseline surveys of connectivity in main trunk routes; review status of new toll road packages; preparation for main activity • Detailed preparation and procurement of IndII DGH activities 20
  • 21. IndII-2 in DGH: Key concepts to note • Expressway as class of public road, not toll road • New public financing model (VGF) in PPP – Availability- or performance-based, quarterly payment, toll optional • Long-term corridor plan selects road standard and timing of renewal • Road renewal policy – Defers betterment until full realignment & construction planned – Gains long life, safe, modern highway • Asset management and programming function for preservation transferred to balai, with graphical tool • Costs reduced by extending expected and actual life • Independence between supervision and contractor • Monitor outcomes – KPI on travel time, age, costs 21
  • 22. Timeline for Phase 2 on national roads Month Activity Jan-12 DGH workshop on future direction, Ongoing IndII-DGH discussions Apr-12 IndII consultation on strategy with AusAID Jul-12 - Activity proposals drafted - Activities discussed with DGH - Policy adviser (John Lee) arrives Aug-12 - Activity designs finalised, procurement starts; - Interim activities start Oct-12 Symposium on road development planning and financing Jan-13 Expected start of main Planning and Implementation activities Jan-14 Mid-term review Dec-14 Main activities end 22
  • 23. Conclusion • The activities are designed to support DGH in delivering its program • Core support will be provided through individual advisers working as partner to Directorate staff in DGH offices • Consultant teams will be coordinated by the advisers and work closely with DGH staff in central and balai offices • The teams will be most effective if working space can be made available in DGH offices • Your input to the activity design is important – especially in the next two months Jul-Aug Terima kasih 23
  • 24. 4. Sub-national roads: Incentivising road management Objectives Implementation and Outcomes  Strengthening central Component 1: Preparation of Grant Design and Interim and provincial Support for Critical Elements to expedite program, agencies on asset (implemented second half of 2012) management for sub- Component 2: Consultants for project management and national roads (SNR) implementation of grant program over 5 years, 2014-2018;  Improving participation  Creation of SNR project management unit in DGH by private sector and  Establishment of transport forums the public – to improve communication and  TA and training in planning and implementation of agency performance maintenance & rehabilitation, and PBC  Implementation of pilot  Incentives for increased budget allocation, for output-based road contracting out works and performance-based contracts maintenance and rehabilitation program  Staged pilot, starting with one province (NTT) increasing to up to other jurisdictions, based on demonstrated  Effective delivery of capability and commitment. IndII support for sub- national roads 24
  • 25. 5. Improving Road Safety Blackspots and Program Management Objectives Implementation and Outcomes  Building capability of Component 1: Interim support: international road safety central and regional specialist supporting RSEU 3 p-months to Jul-12; offices for managing Component 2. Implementation support by Consultant firm for 24 months to Jun-14 (2-stage); blackspot improvement Component 3. Program management support by International programs specialist (50% of 30 months).  Implementation of Strategic Plan for Road Safety in DGH blackspot improvements to meet  RSEU, DGH balai and local police trained in managing RENSTRA targets road safety programs,  Developing and  Support to achieve 150 blackspot improvements to monitoring road safety achieve RENSTRA objectives programs in national  Three fact-finding missions provide overseas training and police and sub-national experience to 60 officials road agencies  Performance and results publicised and build GOI donor  Effective delivery of & public support for road safety programs IndII support for road safety•  Further road safety programs ready in DGH, INTP and sub-national DGLT agencies. 25