Informi GIS Handout
Following Presentation at Esri UC 2014
Informi GIS A/S Author: Jens Dalsgaard July 4th 2014
www.informi.dk http://www.linkedin.com/in/jensdalsgaard
Visualizing Knowledge
Optimizing Electric Utility
Grid Operations
through GIS and Powergrid
-
Integrating Asset Management
&
Extracting to CIM
Summary:
Previously siloed systems are broken down and data is increasingly shared across lines of
business. For an electric utility operator the most fundamental data is the network model.
With the right network model, grid documentation can be shared between applications,
thus ensuring consolidated data usage.
GIS is the logical center for electric utilities. Implementing the PowerGrid data model en-
sures that grid documentation can be shared across platforms like DMS and asset man-
agement. Besides this, in GIS itself offers great support for in-field crew and central dis-
patching teams.
Keywords:
Electric Utility; Transmission System Operator; Distribution; Grid Optimization; ArcGIS; Geographic Information
System; GIS; Asset Management; Field Crew; Dispatching; DMS; CIM extract; PSS(R)E; PSS(R)ODMS; PowerGrid;
Data Model; IBM; Maximo; Fingrid; Informi GIS
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 2 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Introduction
Typically, Electric utility companies have acquired or developed a large number of extremely specialized
software solutions to support specific challenges met in the business over the years. But often such systems
are custom developed and are referred to as point-solutions – they may each be useful in a specific context,
but there’s a lack of consistency and coherence in between the many systems. Each part-solution requires
specific data to operate so users must obtain separate skills for each application. Thus, upholding opera-
tions and services for the many diverse applications can take its toll on the IT-department.
As the electric utility companies continue into the digital age, former previously siloed systems are broken
down and data is increasingly shared across lines of business. For a grid operator the most fundamental
data is the network model. The advanced PowerGrid data model from Informi GIS allows focus on a single
network model shared between applications which support business needs in a much broader perspective.
Various Complex Tasks in Electric Utility Operations
Today an electric utility must be able to support a large number of complex tasks – a few examples are:
 Optimizing grid operation during highly fluctuating production and consumption
 Optimizing asset life cycle cost and operability
 Extracting asset data for benchmarking, valuations etc.
 Supporting the various planning phases
 Protecting buried assets from excavation damage
 Calculating overhead line sag
 Calculating induced voltage on nearby underground pipelines
 Pinpointing fault location, based on distance relay output
 Planning outages and switching operations
 Supporting field crew operation
 Keeping track of field crew position
 Ensuring management, overview of grid operation, planned service …
 …
It is fairly obvious that IT-solutions are needed – but which and how?
This paper aims at briefly describing an approach and a solution that ensures consolidated grid documenta-
tion using the ArcGIS solution from Esri. A solution built on 20+ years of experience in delivering solutions
to electric distribution and transmission utilities; a solution that proves useful in all of the above mentioned
tasks and many more.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 3 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
The Fingrid ‘ELVIS’ Project
In 2010 the Finnish Electricity Transmission System Operator (TSO), Fingrid, initiated 'ELVIS'1
- a replace-
ment of their entire grid planning, asset and work management IT system landscape. In order to maintain
its position among the most reliable and lean TSO’s, Fingrid needed a robust, flexible and fully integrated
grid, asset and work management system – data should be entered once and distributed as needed.
The winning solution had ArcGIS as a cornerstone component. The ELVIS project was a rare opportunity to
build a fully coherent solution, combining best in class products, industry standards and stringent architec-
tural principles. As intended, it serves as a “point-of-reference” system for any modern network utility.
The ELVIS solution delivers a consolidated grid design, asset and work management solution. Centered on
the electrical grid model the solution supports key planning areas such as project management as well as
grid and asset modelling though out the asset lifecycle.
In this project the Powergrid data model from Informi GIS is essential.
Besides providing a data foundation for DMS and asset management systems, the GIS solution in itself sup-
ports a large number of business processes related to data maintenance, grid planning, field crew support
etc.
The presentation by Informi GIS, IBM and Fingrid at Esri UC 2014 gave a glimpse into this solution - we’ll
readily elaborate on this upon request.
1
http://www.fingrid.fi/en/company/elvis/Pages/default.aspx
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 4 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Smart Grid – Definition and Ways of Optimizing Grid Operation
You have probably all seen several definitions on Smart Grid – but let us here add another definition here:
“Automating an optimized grid operation
despite significantly fluctuating production and consumption
– to largest possible extent even during faults.”
Power production depends more and more on how the wind blows and how the sun shines. Consumers are
expected to act more on market fluctuation – when energy is cheap, more will be used.
Metering and forecasting consumption is part of the picture, and many vendors offer solutions for this:
However, metering alone leaves out a crucial part of the equation: The grid itself.
In order to optimize grid operation (minimizing losses, avoiding overloading/damaging equipment etc.) we
must know
 how the grid is connected
 what types of cables/overhead lines transport the energy
 where the customers (loads) are connected in the grid
 …
In the following pages we’ll take a look at how GIS lets you document such data – in doing so we’ll be look-
ing at an example from one of our electric utility distribution customers.
Figure 1: Metering voltages and power flow in substations and at customers offers useful input when
optimizing grid operation
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 5 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Inherent network handling in GIS offers powerful standard tools for documenting and verifying the grid in a
consolidated way – the ‘One Version of The Truth’2
.
Also, the substation layout is registered revealing transformers, bus bars, bays, breakers etc. – obviously
including how everything’s connected (internally as well as to external cables/overhead lines) and with
property data.
The cables/overhead lines shown above colored by feeder also are shown connected to the bays in the
substation.
2
Besides allowing documenting projects using versioning.
Figure 2: Part of a typical low voltage cable and overhead line grid.
The coloring here reveals what is fed from which bay in the substation in question.
The yellow rings reveal relevant tie points that are useful in switching operations during faults.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 6 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Figure 4: Load points (customers) are connected to relevant service lines. Data on consumption, customer type etc. is
automatically updated based on regular extracts from a relevant third party system.
Here loads are symbolized with circles revealing annual consumption.
Figure 3: The same part of the grid this time symbolized by type of cable / overhead lines.
Although connectivity is a crucial part of the equation, there are many other important aspects. For in-
stance, the GIS data model holds information on types of cables, overhead lines etc. Crucial data on trans-
formers, circuit breakers, fuses etc. is also documented…
Combining this grid documentation with customer and load information extracted regularly from a billing /
AMR system GIS offers the consolidated picture of the grid allowing advanced analyses used in optimizing
grid operations.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 7 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Extracting Data Using the CIM Standard
At Fingrid, grid data is extracted from GIS and the PowerGrid data model to CIM XML by a tool developed
IBM which handles the complex task of aligning different models.
This CIM XML is subsequently imported into a market leading software package used for transmission plan-
ning and analysis (fault analysis, contingency analysis...).
The PowerGrid data model and Esri ArcGIS thus provide
the foundation for efficiently establishing and maintaining
the complete grid documentation needed in grid operation optimization.
Figure 5: This drawing illustrates how GIS entities (left hand side) are mapped into
CIM entities (right hand side).
ODMS
GIS
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 8 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Figure 6: A number of service tasks in the field are allocated here to six field crews, thus optimizing driving patterns,
taking into account possible service windows etc.
Asset Management and Field Crew Support
The same grid documentation in GIS is also used in asset management which further increases the high val-
ue of solutions and data.
It’s worth noting that a lot of asset management related tasks can be handled by using GIS alone.
Besides allowing reports needed in benchmarking, valuation etc. GIS offers the ability to visualize e.g. re-
cently completed as well as upcoming service tasks, perform automated route planning and assign tasks
and corresponding routes to individual field crews.
Central dispatching units may visualize in a map where specific service cars are and use this in e.g. assigning
ad-hoc tasks. Management and planning teams may easily follow progress using dashboards that reveal
KPIs using ArcGIS standard functionality. For the field crew, GIS offers flexible tools allowing easy access to
relevant data. Besides accessing data needed in the field, the field crew may in the field document tasks
performed etc. – even take photos and assign these to document certain issues.
Standard mobile devices may be used –laptops, tablets or smart phones – no expensive and hard to service
special equipment. Some companies prefer devices
that run Windows, others prefer Android or IOS (Ap-
ple OS) – all of these operating systems are supported.
When moving into areas with limited network cover-
age the user may go off-line and still access data –
once back in areas with network coverage, changes
can be synchronized.
In this way, GIS is used also in optimizing in-field ser-
vice planning and execution, which further optimizes
electric utility operations.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 9 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Integrating with IBM Maximo: Ensuring Advanced Work and Asset Management
At Fingrid a dedicated third party asset management system (Maximo) from IBM is being implemented.
The main functionality of the Maximo asset register is to hold information about the assets, their specifica-
tions, the costs for maintenance, and their condition. The Location and operating function of the assets is
maintained, enabling tracking of individual assets between locations and functions. This also includes ad-
vanced grid value calculations as well as loadability and hazardous voltages calculations.
For work/maintenance management Maximo is used as a way of automating and orchestrating business
processes with relation to managing work orders and the associated resources, service providers, schedules
and cost, while capturing the resulting changes to condition or cost figures at the location or asset level.
IBM has implemented a two-way integration between GIS and Maximo allowing needed data to flow from
GIS to the asset management system – and vice versa. When new grid is being documented in GIS, integra-
tion ensures the correct generation of corresponding entities in Maximo. nd when asset data is en-
tered/altered in Maximo, integration makes it available in GIS.
Such consolidated and integrated data management further increases the value of data and allows the cus-
tomer to optimize the system usage and value.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 10 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Establishing Requested Data Quality
Whenever requirements regarding data quality are high, separate attention should be put towards ensur-
ing data completeness. Initial migration from previous source systems allows good starting point but most
likely won’t get you all the way. Besides this, users may make mistakes when editing data.
ArcGIS holds efficient tools for analyzing and verifying that the data quality requirements are met. Where
requirements are not met, the user is guided to data needing further processing.
ArcGIS offers useful functionality to experts throughout the organization that work with the grid – be it the
central planning team, the field crews doing maintenance, the dispatching teams, the outage management
teams or management. And it’s a well-known fact that nothing works better in establishing and maintaining
a high data quality than offering useful functionality to the experts throughout the organization that actual-
ly work with the grid.
The ability to easily access GIS data through fully fledged desktop applications or through standard web
browsers and using standard mobile eases deployment, ensures return of investment and helps ensure da-
ta quality that makes the difference between actually being able to optimize grid operations or simply
dreaming of it.
The PowerGrid Data Model
The Powergrid solution is based on market leading standard software systems from Esri. Over the years
Informi GIS has not only gained a high level of expertise in the immense functionality palette of ArcGIS but
has also formed a close relationship with Esri, allowing us to be at the forefront for new and upcoming
functionality.
The Powergrid data model, developed by Informi GIS, is based on
20+ years of experience in the electric utility industry using GIS. The
data model is to a large extent inspired by the CIM standard.
The Powergrid data model and the GIS solution supports
consolidated documention of the entire grid - including:
 Towers, overhead lines, earth wires, spans, cables...
 Phase sequence and transpositioning, pi equivalent data,
mutual coupling…
 Grouping as transmission lines, line sections, branches…
 Substations, bus bars, bays, circuit breakers, disconnectors,
ground switches, capacitor banks, reactors, synchronous
machines, current and potential transformers, power trans-
formers, neutral network…
 Locational data as well as asset data
 Connectivity as WYSIWYG: 'what you see is what you get' Figure 7: The Fingrid power system
http://www.fingrid.fi/en/powersystem/
Pages/default.aspx
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 11 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Figure 8: The PowerGrid data model is thoroughly documented.
Screen shots below offer a quick glimpse into documentation of a substation using the Powergrid solution:
Being an advanced, CIM inspired data model, the
Powergrid data model combined with compre-
hensive ArcGIS functionality allows consolidated
registering of the grid.
Informi GIS presents a GIS solution allowing inte-
gration with DMS and asset management sys-
tems, so that data crucial to automation and op-
timization is maintained and utilized in an opti-
mal way.
Optimizing Electric Utility Grid Operations Using GIS
Informi GIS July 4
th
2014 Page 12 / 12
Jaegerborg Allé 4
DK - 2920 Charlottenlund
Phone: +45 3996 5900
Informi GIS has 20+ Years of Experience in Electric Utility Solutions
Informi GIS is based in Denmark and has more than 20 years of experience as a distributor for and as a
partner with a number of leading companies including Esri, Schneider Electric, Telcordia, ENVI and Mi-
crosoft.
Our involvement with this global network positions us in the forefront of technologic development and
trends, as well as up-to-date in new techniques in strategic counseling, project management, education,
and marketing.
Through implementation projects and subsequent partnership with a large number of distribution and
transmission companies, Informi GIS has gained valuable knowledge of crucial business processes and use
cases.
Thus, the Informi GIS solutions intuitively support a large number of processes throughout the electric utili-
ty organization.
 Planning new transmission lines and substations - including parts of the EIA processes
 Detailed design of new (or altered) transmission lines and / or substations
 Task centered on- and off-line tools empowering field crews
 Web maps, dash boards etc. used externally and / or internally
 Right of Way analyses
 Co-existence with third party asset management systems
 Extracts in CIM format
 …
Informi GIS has been a central part in a large number of projects for electric utility companies involving
leading processes regarding clarification, migration, customization, training, implementation or support.
Based on this, we hold not only the right software, functionality and data models but also skilled consult-
ants with proven experience and the ability to deliver in a complex field.
We continuously strive to maintain a positive work relationship with our customers, partners and employ-
ees.
Please feel free to contact us for further information or to speak to a representative directly.
Visit Informi GIS at: Or simply contact:
www.informi.dk Jens Dalsgaard
http://www.linkedin.com/in/jensdalsgaard
Solution Strategist and Smart Grid Specialist
JensD@informi.dk
Cell Phone: +45 23 31 78 89

More Related Content

PDF
GIS Telecom Ecosystem
PDF
The Advanced Distribution Management System (ADMS)
PDF
TechM GIS Telecom
PDF
ENERGY EFFICIENT COMPUTING FOR SMART PHONES IN CLOUD ASSISTED ENVIRONMENT
PDF
Gis in telecomm ppt
PDF
IBM Support for CIM and the Common Grid Model Exchange Standard
PDF
Gis in telecomm
PPTX
Advanced Power Distribution System Configuration for Smart Grid
GIS Telecom Ecosystem
The Advanced Distribution Management System (ADMS)
TechM GIS Telecom
ENERGY EFFICIENT COMPUTING FOR SMART PHONES IN CLOUD ASSISTED ENVIRONMENT
Gis in telecomm ppt
IBM Support for CIM and the Common Grid Model Exchange Standard
Gis in telecomm
Advanced Power Distribution System Configuration for Smart Grid

What's hot (20)

PDF
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
PDF
GIS for Small Utilities
PDF
[Case study] Jackson Energy Authority: Aligning solutions into one product suite
DOCX
Cloud computing for mobile users can offloading computation save energy
PDF
07_Delhi+airport+final
PDF
Life cycle assessment (LCA) for ICT
PDF
Green Cloud Computing :Emerging Technology
PDF
IRJET- Collaborative Task Execution for Application as a General Topology in ...
PPTX
Green cloud computing
PDF
Green cloud computing
PPTX
Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...
PPTX
Cloud computing for mobile users can offloading computation save energy
PPTX
Smart grid'
PPTX
GREEN CLOUD COMPUTING BY SAIKIRAN PANJALA
PDF
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
PDF
[Case study] DONG Energy: Improving the bottom line and getting better data q...
PPTX
Green cloud computing using heuristic algorithms
PDF
White Paper, Ericsson, TCO2
PDF
Review On Design Of Low Power Multiply And Accumulate Unit Using Baugh-Wooley...
PPT
Cloud computing for mobile users?Can Offloading computation save energy. . .
[Case study] City of Peoria Municipality: Getting the most impact for GIS tec...
GIS for Small Utilities
[Case study] Jackson Energy Authority: Aligning solutions into one product suite
Cloud computing for mobile users can offloading computation save energy
07_Delhi+airport+final
Life cycle assessment (LCA) for ICT
Green Cloud Computing :Emerging Technology
IRJET- Collaborative Task Execution for Application as a General Topology in ...
Green cloud computing
Green cloud computing
Patent Landscape Report on “Electric vehicles – Vehicle to Grid Technology” b...
Cloud computing for mobile users can offloading computation save energy
Smart grid'
GREEN CLOUD COMPUTING BY SAIKIRAN PANJALA
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
[Case study] DONG Energy: Improving the bottom line and getting better data q...
Green cloud computing using heuristic algorithms
White Paper, Ericsson, TCO2
Review On Design Of Low Power Multiply And Accumulate Unit Using Baugh-Wooley...
Cloud computing for mobile users?Can Offloading computation save energy. . .
Ad

Viewers also liked (7)

PDF
Pf bts-2014-final-print-version
PPTX
Kamis
PPSX
Joint Informi GIS / IBM presentation at Esri UC 2014
PPTX
Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Manag...
PDF
Pinnacle Foods Inc. Presentation to CAGNY
PDF
Pinnacle Foods Inc. Presentation to CAGNY
PPT
Chapter four2
Pf bts-2014-final-print-version
Kamis
Joint Informi GIS / IBM presentation at Esri UC 2014
Powel presenting the Fingrid ELVIS solution at IAM Infrastructure Asset Manag...
Pinnacle Foods Inc. Presentation to CAGNY
Pinnacle Foods Inc. Presentation to CAGNY
Chapter four2
Ad

Similar to Informi GIS hand-out used in connection with presentation at Esri UC 2014 (20)

PDF
Capgemini ses - the gis centric enterprise pov (gr)
PDF
Cv4301566568
PDF
Jens Dalsgaard resume (auto generated from LinkedIn profile)
PDF
GIS-Based Design for Effective Smart Grid Strategies
PPTX
Future of GIS, Moving to the Enterprise Platform
PPTX
Applications of GIS in Electrical Power System
DOC
Outage Management System - Report
DOC
Outage Management System - Report
PDF
Capgemini ses - smart grid operational services - where to start - five fou...
PDF
GIS for Smart Grid
PPTX
Grid calculations ELVIS event Antti Harjula
PDF
Electric gas-summer-2013
PDF
Smart Grid Operational Services Where To Start Five Foundational Elements POV
PDF
GIS For Smart Grid
PDF
Best Practices for Creating Your Smart Grid Network Model
PDF
Gis pov
PDF
Information SCADA Subsystem
PDF
Gis for Electric Distribution
PPTX
Tia summit anil kadam schneider_ smart energy solutions
PDF
[Case study] Green Mountain Power: Reducing the duration of outages
Capgemini ses - the gis centric enterprise pov (gr)
Cv4301566568
Jens Dalsgaard resume (auto generated from LinkedIn profile)
GIS-Based Design for Effective Smart Grid Strategies
Future of GIS, Moving to the Enterprise Platform
Applications of GIS in Electrical Power System
Outage Management System - Report
Outage Management System - Report
Capgemini ses - smart grid operational services - where to start - five fou...
GIS for Smart Grid
Grid calculations ELVIS event Antti Harjula
Electric gas-summer-2013
Smart Grid Operational Services Where To Start Five Foundational Elements POV
GIS For Smart Grid
Best Practices for Creating Your Smart Grid Network Model
Gis pov
Information SCADA Subsystem
Gis for Electric Distribution
Tia summit anil kadam schneider_ smart energy solutions
[Case study] Green Mountain Power: Reducing the duration of outages

Recently uploaded (20)

PPTX
Project and change Managment: short video sequences for IBA
PPTX
water for all cao bang - a charity project
PPTX
The spiral of silence is a theory in communication and political science that...
PPTX
Tour Presentation Educational Activity.pptx
PPTX
2025-08-10 Joseph 02 (shared slides).pptx
PPTX
Hydrogel Based delivery Cancer Treatment
PPTX
Non-Verbal-Communication .mh.pdf_110245_compressed.pptx
PPTX
English-9-Q1-3-.pptxjkshbxnnxgchchxgxhxhx
PPTX
Presentation for DGJV QMS (PQP)_12.03.2025.pptx
DOCX
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
PPTX
Self management and self evaluation presentation
PDF
Swiggy’s Playbook: UX, Logistics & Monetization
PPTX
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
PPTX
Impressionism_PostImpressionism_Presentation.pptx
DOCX
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
PPTX
An Unlikely Response 08 10 2025.pptx
PDF
oil_refinery_presentation_v1 sllfmfls.pdf
PPT
The Effect of Human Resource Management Practice on Organizational Performanc...
PPTX
Effective_Handling_Information_Presentation.pptx
PPTX
Tablets And Capsule Preformulation Of Paracetamol
Project and change Managment: short video sequences for IBA
water for all cao bang - a charity project
The spiral of silence is a theory in communication and political science that...
Tour Presentation Educational Activity.pptx
2025-08-10 Joseph 02 (shared slides).pptx
Hydrogel Based delivery Cancer Treatment
Non-Verbal-Communication .mh.pdf_110245_compressed.pptx
English-9-Q1-3-.pptxjkshbxnnxgchchxgxhxhx
Presentation for DGJV QMS (PQP)_12.03.2025.pptx
"Project Management: Ultimate Guide to Tools, Techniques, and Strategies (2025)"
Self management and self evaluation presentation
Swiggy’s Playbook: UX, Logistics & Monetization
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
Impressionism_PostImpressionism_Presentation.pptx
ENGLISH PROJECT FOR BINOD BIHARI MAHTO KOYLANCHAL UNIVERSITY
An Unlikely Response 08 10 2025.pptx
oil_refinery_presentation_v1 sllfmfls.pdf
The Effect of Human Resource Management Practice on Organizational Performanc...
Effective_Handling_Information_Presentation.pptx
Tablets And Capsule Preformulation Of Paracetamol

Informi GIS hand-out used in connection with presentation at Esri UC 2014

  • 1. Informi GIS Handout Following Presentation at Esri UC 2014 Informi GIS A/S Author: Jens Dalsgaard July 4th 2014 www.informi.dk http://www.linkedin.com/in/jensdalsgaard Visualizing Knowledge Optimizing Electric Utility Grid Operations through GIS and Powergrid - Integrating Asset Management & Extracting to CIM Summary: Previously siloed systems are broken down and data is increasingly shared across lines of business. For an electric utility operator the most fundamental data is the network model. With the right network model, grid documentation can be shared between applications, thus ensuring consolidated data usage. GIS is the logical center for electric utilities. Implementing the PowerGrid data model en- sures that grid documentation can be shared across platforms like DMS and asset man- agement. Besides this, in GIS itself offers great support for in-field crew and central dis- patching teams. Keywords: Electric Utility; Transmission System Operator; Distribution; Grid Optimization; ArcGIS; Geographic Information System; GIS; Asset Management; Field Crew; Dispatching; DMS; CIM extract; PSS(R)E; PSS(R)ODMS; PowerGrid; Data Model; IBM; Maximo; Fingrid; Informi GIS
  • 2. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 2 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Introduction Typically, Electric utility companies have acquired or developed a large number of extremely specialized software solutions to support specific challenges met in the business over the years. But often such systems are custom developed and are referred to as point-solutions – they may each be useful in a specific context, but there’s a lack of consistency and coherence in between the many systems. Each part-solution requires specific data to operate so users must obtain separate skills for each application. Thus, upholding opera- tions and services for the many diverse applications can take its toll on the IT-department. As the electric utility companies continue into the digital age, former previously siloed systems are broken down and data is increasingly shared across lines of business. For a grid operator the most fundamental data is the network model. The advanced PowerGrid data model from Informi GIS allows focus on a single network model shared between applications which support business needs in a much broader perspective. Various Complex Tasks in Electric Utility Operations Today an electric utility must be able to support a large number of complex tasks – a few examples are:  Optimizing grid operation during highly fluctuating production and consumption  Optimizing asset life cycle cost and operability  Extracting asset data for benchmarking, valuations etc.  Supporting the various planning phases  Protecting buried assets from excavation damage  Calculating overhead line sag  Calculating induced voltage on nearby underground pipelines  Pinpointing fault location, based on distance relay output  Planning outages and switching operations  Supporting field crew operation  Keeping track of field crew position  Ensuring management, overview of grid operation, planned service …  … It is fairly obvious that IT-solutions are needed – but which and how? This paper aims at briefly describing an approach and a solution that ensures consolidated grid documenta- tion using the ArcGIS solution from Esri. A solution built on 20+ years of experience in delivering solutions to electric distribution and transmission utilities; a solution that proves useful in all of the above mentioned tasks and many more.
  • 3. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 3 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 The Fingrid ‘ELVIS’ Project In 2010 the Finnish Electricity Transmission System Operator (TSO), Fingrid, initiated 'ELVIS'1 - a replace- ment of their entire grid planning, asset and work management IT system landscape. In order to maintain its position among the most reliable and lean TSO’s, Fingrid needed a robust, flexible and fully integrated grid, asset and work management system – data should be entered once and distributed as needed. The winning solution had ArcGIS as a cornerstone component. The ELVIS project was a rare opportunity to build a fully coherent solution, combining best in class products, industry standards and stringent architec- tural principles. As intended, it serves as a “point-of-reference” system for any modern network utility. The ELVIS solution delivers a consolidated grid design, asset and work management solution. Centered on the electrical grid model the solution supports key planning areas such as project management as well as grid and asset modelling though out the asset lifecycle. In this project the Powergrid data model from Informi GIS is essential. Besides providing a data foundation for DMS and asset management systems, the GIS solution in itself sup- ports a large number of business processes related to data maintenance, grid planning, field crew support etc. The presentation by Informi GIS, IBM and Fingrid at Esri UC 2014 gave a glimpse into this solution - we’ll readily elaborate on this upon request. 1 http://www.fingrid.fi/en/company/elvis/Pages/default.aspx
  • 4. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 4 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Smart Grid – Definition and Ways of Optimizing Grid Operation You have probably all seen several definitions on Smart Grid – but let us here add another definition here: “Automating an optimized grid operation despite significantly fluctuating production and consumption – to largest possible extent even during faults.” Power production depends more and more on how the wind blows and how the sun shines. Consumers are expected to act more on market fluctuation – when energy is cheap, more will be used. Metering and forecasting consumption is part of the picture, and many vendors offer solutions for this: However, metering alone leaves out a crucial part of the equation: The grid itself. In order to optimize grid operation (minimizing losses, avoiding overloading/damaging equipment etc.) we must know  how the grid is connected  what types of cables/overhead lines transport the energy  where the customers (loads) are connected in the grid  … In the following pages we’ll take a look at how GIS lets you document such data – in doing so we’ll be look- ing at an example from one of our electric utility distribution customers. Figure 1: Metering voltages and power flow in substations and at customers offers useful input when optimizing grid operation
  • 5. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 5 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Inherent network handling in GIS offers powerful standard tools for documenting and verifying the grid in a consolidated way – the ‘One Version of The Truth’2 . Also, the substation layout is registered revealing transformers, bus bars, bays, breakers etc. – obviously including how everything’s connected (internally as well as to external cables/overhead lines) and with property data. The cables/overhead lines shown above colored by feeder also are shown connected to the bays in the substation. 2 Besides allowing documenting projects using versioning. Figure 2: Part of a typical low voltage cable and overhead line grid. The coloring here reveals what is fed from which bay in the substation in question. The yellow rings reveal relevant tie points that are useful in switching operations during faults.
  • 6. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 6 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Figure 4: Load points (customers) are connected to relevant service lines. Data on consumption, customer type etc. is automatically updated based on regular extracts from a relevant third party system. Here loads are symbolized with circles revealing annual consumption. Figure 3: The same part of the grid this time symbolized by type of cable / overhead lines. Although connectivity is a crucial part of the equation, there are many other important aspects. For in- stance, the GIS data model holds information on types of cables, overhead lines etc. Crucial data on trans- formers, circuit breakers, fuses etc. is also documented… Combining this grid documentation with customer and load information extracted regularly from a billing / AMR system GIS offers the consolidated picture of the grid allowing advanced analyses used in optimizing grid operations.
  • 7. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 7 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Extracting Data Using the CIM Standard At Fingrid, grid data is extracted from GIS and the PowerGrid data model to CIM XML by a tool developed IBM which handles the complex task of aligning different models. This CIM XML is subsequently imported into a market leading software package used for transmission plan- ning and analysis (fault analysis, contingency analysis...). The PowerGrid data model and Esri ArcGIS thus provide the foundation for efficiently establishing and maintaining the complete grid documentation needed in grid operation optimization. Figure 5: This drawing illustrates how GIS entities (left hand side) are mapped into CIM entities (right hand side). ODMS GIS
  • 8. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 8 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Figure 6: A number of service tasks in the field are allocated here to six field crews, thus optimizing driving patterns, taking into account possible service windows etc. Asset Management and Field Crew Support The same grid documentation in GIS is also used in asset management which further increases the high val- ue of solutions and data. It’s worth noting that a lot of asset management related tasks can be handled by using GIS alone. Besides allowing reports needed in benchmarking, valuation etc. GIS offers the ability to visualize e.g. re- cently completed as well as upcoming service tasks, perform automated route planning and assign tasks and corresponding routes to individual field crews. Central dispatching units may visualize in a map where specific service cars are and use this in e.g. assigning ad-hoc tasks. Management and planning teams may easily follow progress using dashboards that reveal KPIs using ArcGIS standard functionality. For the field crew, GIS offers flexible tools allowing easy access to relevant data. Besides accessing data needed in the field, the field crew may in the field document tasks performed etc. – even take photos and assign these to document certain issues. Standard mobile devices may be used –laptops, tablets or smart phones – no expensive and hard to service special equipment. Some companies prefer devices that run Windows, others prefer Android or IOS (Ap- ple OS) – all of these operating systems are supported. When moving into areas with limited network cover- age the user may go off-line and still access data – once back in areas with network coverage, changes can be synchronized. In this way, GIS is used also in optimizing in-field ser- vice planning and execution, which further optimizes electric utility operations.
  • 9. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 9 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Integrating with IBM Maximo: Ensuring Advanced Work and Asset Management At Fingrid a dedicated third party asset management system (Maximo) from IBM is being implemented. The main functionality of the Maximo asset register is to hold information about the assets, their specifica- tions, the costs for maintenance, and their condition. The Location and operating function of the assets is maintained, enabling tracking of individual assets between locations and functions. This also includes ad- vanced grid value calculations as well as loadability and hazardous voltages calculations. For work/maintenance management Maximo is used as a way of automating and orchestrating business processes with relation to managing work orders and the associated resources, service providers, schedules and cost, while capturing the resulting changes to condition or cost figures at the location or asset level. IBM has implemented a two-way integration between GIS and Maximo allowing needed data to flow from GIS to the asset management system – and vice versa. When new grid is being documented in GIS, integra- tion ensures the correct generation of corresponding entities in Maximo. nd when asset data is en- tered/altered in Maximo, integration makes it available in GIS. Such consolidated and integrated data management further increases the value of data and allows the cus- tomer to optimize the system usage and value.
  • 10. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 10 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Establishing Requested Data Quality Whenever requirements regarding data quality are high, separate attention should be put towards ensur- ing data completeness. Initial migration from previous source systems allows good starting point but most likely won’t get you all the way. Besides this, users may make mistakes when editing data. ArcGIS holds efficient tools for analyzing and verifying that the data quality requirements are met. Where requirements are not met, the user is guided to data needing further processing. ArcGIS offers useful functionality to experts throughout the organization that work with the grid – be it the central planning team, the field crews doing maintenance, the dispatching teams, the outage management teams or management. And it’s a well-known fact that nothing works better in establishing and maintaining a high data quality than offering useful functionality to the experts throughout the organization that actual- ly work with the grid. The ability to easily access GIS data through fully fledged desktop applications or through standard web browsers and using standard mobile eases deployment, ensures return of investment and helps ensure da- ta quality that makes the difference between actually being able to optimize grid operations or simply dreaming of it. The PowerGrid Data Model The Powergrid solution is based on market leading standard software systems from Esri. Over the years Informi GIS has not only gained a high level of expertise in the immense functionality palette of ArcGIS but has also formed a close relationship with Esri, allowing us to be at the forefront for new and upcoming functionality. The Powergrid data model, developed by Informi GIS, is based on 20+ years of experience in the electric utility industry using GIS. The data model is to a large extent inspired by the CIM standard. The Powergrid data model and the GIS solution supports consolidated documention of the entire grid - including:  Towers, overhead lines, earth wires, spans, cables...  Phase sequence and transpositioning, pi equivalent data, mutual coupling…  Grouping as transmission lines, line sections, branches…  Substations, bus bars, bays, circuit breakers, disconnectors, ground switches, capacitor banks, reactors, synchronous machines, current and potential transformers, power trans- formers, neutral network…  Locational data as well as asset data  Connectivity as WYSIWYG: 'what you see is what you get' Figure 7: The Fingrid power system http://www.fingrid.fi/en/powersystem/ Pages/default.aspx
  • 11. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 11 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Figure 8: The PowerGrid data model is thoroughly documented. Screen shots below offer a quick glimpse into documentation of a substation using the Powergrid solution: Being an advanced, CIM inspired data model, the Powergrid data model combined with compre- hensive ArcGIS functionality allows consolidated registering of the grid. Informi GIS presents a GIS solution allowing inte- gration with DMS and asset management sys- tems, so that data crucial to automation and op- timization is maintained and utilized in an opti- mal way.
  • 12. Optimizing Electric Utility Grid Operations Using GIS Informi GIS July 4 th 2014 Page 12 / 12 Jaegerborg Allé 4 DK - 2920 Charlottenlund Phone: +45 3996 5900 Informi GIS has 20+ Years of Experience in Electric Utility Solutions Informi GIS is based in Denmark and has more than 20 years of experience as a distributor for and as a partner with a number of leading companies including Esri, Schneider Electric, Telcordia, ENVI and Mi- crosoft. Our involvement with this global network positions us in the forefront of technologic development and trends, as well as up-to-date in new techniques in strategic counseling, project management, education, and marketing. Through implementation projects and subsequent partnership with a large number of distribution and transmission companies, Informi GIS has gained valuable knowledge of crucial business processes and use cases. Thus, the Informi GIS solutions intuitively support a large number of processes throughout the electric utili- ty organization.  Planning new transmission lines and substations - including parts of the EIA processes  Detailed design of new (or altered) transmission lines and / or substations  Task centered on- and off-line tools empowering field crews  Web maps, dash boards etc. used externally and / or internally  Right of Way analyses  Co-existence with third party asset management systems  Extracts in CIM format  … Informi GIS has been a central part in a large number of projects for electric utility companies involving leading processes regarding clarification, migration, customization, training, implementation or support. Based on this, we hold not only the right software, functionality and data models but also skilled consult- ants with proven experience and the ability to deliver in a complex field. We continuously strive to maintain a positive work relationship with our customers, partners and employ- ees. Please feel free to contact us for further information or to speak to a representative directly. Visit Informi GIS at: Or simply contact: www.informi.dk Jens Dalsgaard http://www.linkedin.com/in/jensdalsgaard Solution Strategist and Smart Grid Specialist JensD@informi.dk Cell Phone: +45 23 31 78 89