Introduction of LVAC Auto Change Over Scheme in DEWA
Transmission System
Owen Raymond Glynn, Jayasingh Balakrishnan, Amod Madhukar Khirwadkar, Muthusamy
Veerabahu, Pownrajan Chinnadurai, Raghavendra Upadhya Heggodlu-
Transmission Protection Department, Dubai Electricity & Water Authority.
---------------------------------------------------------------------------***---------------------------------------------------------------------------
Abstract- Dubai’s transmission power system plays a vital
role in delivering optimum reliability and uninterrupted
power. We therefore need to maintain the highest levels of
technology, operational and best design practices for all
digital systems.
This paper aims to provide the conceptual design overview
and benefits of the innovative design of LVAC Auto
Changeover Scheme in DEWA Transmission Substations
(132kV).
The existing design of LVAC switchboards (400V AC supply
for substation equipment’s) used in 132/11 KV substations
under DEWA transmission network have three buses
powered through three earthing transformers and has two
bus sections. During normal operation, all three buses in
LVAC switchboard are independently supplied by each
earthing transformer (incomer) respectively and bus sections
are in open condition. To maintain uninterruptable LVAC
supply to substation equipment’s, a PLC is used and
programmed to execute automatic switching operation of
concerned bus section / incomer breakers in case of any of
the incomer supply fails. LVAC switchboard has an Auto/
Manual switch and PLC is operational if the switch is on Auto
mode. The existing scheme has mainly two issues as below:
A) In case of outage required on any of the IDT’s, operator
intervention is required to execute switching by shifting
Auto/ Manual switch in Manual mode. Manual switching
results in loss of LVAC supply as well as generation of
several alarms through SCMS.
B) In case of switching off any IDT during LVAC in Auto
mode, switching through PLC will affect only with a time
delay results in momentary interruptions to downstream
LV circuits which generates large number of undesired
alarms in SCMS.
With an objective to eliminate momentary supply
interruptions and unwanted alarms due to that, the team has
developed new logic diagrams to facilitate high speed
Automatic changeover of LVAC supplies with minimum
allowable paralleling time for the IDT’s after study on the
risks involved during momentary paralleling. In place of PLC,
Bay Control Units (BCU) from approved OEM’s are utilized
which are in use at higher voltage levels in DEWA system.
BCU’s are having major advantages over PLC in terms of ease
and flexibility in logic buildings, programming of the device
and speed of operation.
This paper aims to provide the conceptual overview and
benefits of LVAC High speed Auto Change Over scheme
developed in house by DEWA specialists in conjunction with
specialists from the original equipment manufacturers. The
new scheme involves use of Bay Control Units in place of
PLC’s in LVAC switchgear design. The BCU’s and overall
scheme is engineered, configured and extensively laboratory
tested to ensure perfect functionality of High-Speed Auto
Change Overs in LVAC board. Utilizing the capabilities of
modern IED’s to build large numbers of user defined logic
and implementing these in innovative new ways has
produced new unique LVAC changeover scheme that enhance
functionality and reliability by eliminating discreet
components and circuitry whilst maximizing overall
efficiency by reducing supply interruptions and unwarranted
alarms during supply changeover.
This innovative initiative will ensure that DEWA will have
arguably the most advanced LVAC switchboards in its
transmission systems both regionally and globally by
introducing the latest digital technologies, optimized designs
in line with the industry leading best practices.
I. INTRODUCTION
Dubai Electricity & Water Authority (DEWA) was
established in 1992 by His Excellency Sheikh Maktoum bin
Rashid Al Maktoum with the objective to provide reliable
power to residents of the Emirate of Dubai. Since its
inception, DEWA has continuously invested in maintaining
and upgrading the power delivery infrastructure to meet
the increasing demands of the growing Emirate of Dubai.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 968
Dubai Electricity & Water Authority (DEWA) Power System
includes Generation, Transmission and Distribution
networks. The transmission network operates at 400kV and
132kV voltage levels with over 350 transmission
substations consisting of 400/132kV, 132/33kV and
132/11kV sites. LVAC switchgears are installed in all types
of transmission substations and are used to supply station
loads (station auxiliaries, air conditioning, heating, and
lighting etc.). LVAC supplies to various equipment’s and
related systems are continuously monitored by connecting
the alarms through SCMS to DEWA control center. As per
existing design, during supply changeover in LVAC, many
unwanted alarms are received. Moreover, if the LVAC
operational switch is kept in manual mode, manual
intervention is required to execute supply changeovers.
In order to overcome the above-mentioned constraints,
DEWA team has developed a high speed LVAC auto
changeover scheme which allows momentary paralleling of
transformers without any side effect thus to avoid supply
interruption. The innovative LVAC scheme under
discussions is approved for implementation in DEWA’s all
future 132/11 KV substations.
The major concerns while finalizing the scheme were as
follows:
1) 1) During any one of the IDT Switching, paralleling of
secondary side may involve circulating currents. In
order to overcome the same it is ensured that the
primary of the concerned IDT’s are already parallel and
maximum paralleling time is set as 500 msec and to
eliminate any adverse effect such as IDT circulating
currents. Moreover the LVAC busbar fault levels are
within the limits for paralleling the two LVAC incomers
(LVAC fault levels are shown in figure 1).
Figure-1: LVAC Fault Levels
2) The complications of switching LVAC breakers from
control center would have been challenging with
existing PLC, however use of Bay Control Units having
IEC 61850 communication facility found as a suitable
solution to achieve remote switching.
3) High speed changeover in case of tripping of any one
IDT was considered as a risk to other healthy IDT’s for
momentary paralleling. Hence a hybrid solution was
adapted. High speed paralleling was configured for
planned switching and low speed LVAC changeover
with 10 sec time delay was maintained for IDT
protection tripping scenarios without paralleling the
IDT’s.
II.PROBLEMS WITH EXISTING LVAC SCHEME
Existing LVAC Single Line Diagram
The salient features specified for the existing LVAC scheme
related to supply changeover scheme are as below:
1) The substation shall be provided with three auxiliary
supplies derived from the three earthing transformers
2) Normally three sections (Bus 1, 2, 3) of the main LVAC
switchboard shall be supplied via the associated main
incoming circuit breakers with both the bus section
breakers in open condition.
3) Electrical interlock shall be provided such that it shall not
be possible to parallel any two transformers both on
Auto and Manual mode of operations.
4) Only one Auto/Manual switch common to all 5 ACBs
shall be provided, and operation logic shall be submitted
for DEWA approval.
5) If a fault occurs on a section of the busbars the relevant
circuit breaker shall open to isolate the faulty section and
any auto-changeover on to a faulty section shall be
inhibited.
6) When selected on manual mode no automatic
changeover shall occur.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 969
7) SCADA alarms are hardwired since the existing PLC
devices are not capable to send alarms directly to SCMS
system.
It is evident from the above-mentioned specification clauses
that paralleling of transformers was not permitted and
manual operations are required for supply changeover
during planned outages on any one of the IDT’s.
Moreover, momentary supply interruption will results in
several unwanted alarms from associated LVAC circuits to
SCMS.
III. High Speed Auto Changeover Scheme
The high-speed auto changeover (ACO) scheme is
implemented by redesigning the LVAC control system as
follows:
1. Auto Changeover (ACO) can be enabled or disabled
using the existing auto/ manual switch.
2. The ACO is completely autonomous requiring no action
from TCC or HMI.
3. Detection of IDT1 switching out: (the same is applicable
for IDT2 & IDT3)
a) Detect IDT1 132kV CB Open command (switching
out IDT1).
b) Initiate auto changeover of LVAC Bus 1.
c) Close BS1 and Open Incomer 1 (Aux contact of BS1
Opens IC1 to achieve coordinated high speed
switching).
4. Detection of IDT1 switching back into service:
a) 132kV CB Closed and LVAC supply healthy for 5
seconds.
b) Initiates restore of LVAC Bus 1 to normal supply.
c) Close Incomer 1 and then open BS1 (Aux contact of
IC1 opens BS1 to achieve coordinated high-speed
switching).
5. Duration of paralleling is kept to minimum
(milliseconds) therefore no overload concerns.
IDT1 Switching – ACO Scenario is shown in Figure-2.
Figure-2: IDT1 Switching
A. ACO Logic
Sample logic – LVAC Incomer CB close
Sample logic – LVAC Incomer CB Open
B. Methodology: The steps undertaken for
implementing the LVAC changeover scheme are as
explained below:
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 970
1) Existing LVAC logic and schematic diagrams are
thoroughly studied by the team and based on it,
new logics are prepared to incorporate hybrid
changeover scheme. One high speed logic for
routing switching of IDT’s and other slow logic
for IDT tripping cases.
2) PLC was proposed to be replaced with modern
and sophisticated BCU’s.
3) The proposal was presented to DEWA
Transmission Power Technical Committee and
approval was received.
4) BCU input /output requirements were finalized
and accordingly, Generic wiring diagrams were
prepared.
5) DEWA approved OEM’s (SEL, Hitachi, GE and
Siemens) were approached to finalize suitable
BCU device.
6) M/s Hitachi REC 670 and SEL451 BCU’s found
most suitable for this application.
7) Extensive laboratory testing was performed on
these BCU’s considering all network conditions
in presence of DEWA stakeholder departments
and BCU settings and configurations were
finalized.
8) Based on successful evaluation of the BCU’s,
tender documents were updated to include High
Speed Automatic changeover.
C. Advantages of the High-Speed Auto Changeover
Scheme
The new innovative LVAC design provides significant benefits
to DEWA as a utility. The new design for 132/11kV
substations includes the following advantages:
 Eliminate momentary interruption of LVAC supply
during IDT outage or switching
 The Scheme is completely autonomous.
 Fast switching avoids exposure to circulating
currents.
 It is a cost-effective design improvement due to less
number of components and wiring.
 Eliminate unwanted alarms during IDT outage.
 Increased digitization due to elimination of hard
wiring (BCU option). BCU is directly connected to
SCADA system and all LVAC related alarms are send
to SCADA via IEC61850 protocol.
 BCU’s are having major advantages over PLC in terms
of ease and flexibility in logic buildings, programming
of the device and speed of operation.
IV. CONCLUSION
Implementing a high-speed auto changeover (ACO) will
avoid interruption of LVAC supply in the event of switching
IDT’s in and out of service. This will in turn avoid
unnecessary supply interruption, associated alarms and
improve reliability of equipment.
The high speed ACO avoids the need for operator
intervention and avoids exposure to overload since
paralleling is extremely short in duration.
The proposed ACO scheme was configured and tested with
different OEM BCU. All the test scenario was simulated and
passed. Hence the same concept can be implemented
wherever applicable.
BCU is the preferred option rather than the PLC.
V. REFERENCES
[1] Aster A. Roy, Gesa F. Newton & Aondoakaa I. Solomon:
“Design and Implementation of a 3-Phase Automatic Power
Change-Over Switch” published in American Journal of
Engineering Research (AJER) Vol-3, Issue-9, pp-07-14
[2] Scott Manson and Saurabh Shah “Automated Power
Management Systems for Power Consumers with On-site
Generation” Available on SEL website, SEL Inc. Pullman
[3] Scott M. Manson, Ashish Upreti and Michael Thompson
Available on SEL website, SEL Inc. Pullman
[4] Stefan Meier, Thomas Werner, “Performance
considerations in digital substation applications” white
paper presented at PAC World UK 2015.
[5] Greg Rzepka, Scott Wenke, Sarah Walling, “Choose
Simplicity for a Better Digital Substation Design”, 70th
Annual Conference for Protective Relay Engineers, Texas,
April-2017.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072

More Related Content

PDF
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
PDF
Bochure
PDF
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
PDF
Abb b.g. controlled switching ed4
PDF
Tech7 Automation Systems India Pvt.Ltd.Tamil Nadu India
PDF
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
PPTX
locomotive_worksAlokumar12214100internPPT.pptx
PPTX
Low Voltage System GE Gas Turbine Simple
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
Bochure
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Abb b.g. controlled switching ed4
Tech7 Automation Systems India Pvt.Ltd.Tamil Nadu India
Power Factor Control at ABA Control 33/11kV Injection Substation Using Auto T...
locomotive_worksAlokumar12214100internPPT.pptx
Low Voltage System GE Gas Turbine Simple

Similar to Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System (20)

PDF
Development and Performance Evaluation of an Intelligent Electric Power Switc...
PDF
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
DOC
Abstract11
PPTX
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
PDF
IRJET- Automatic Load Sharing of Transformer
PPT
Dg synchronisation process
PDF
Analysis optimization and monitoring system
PPTX
Appraisal ppt ankur
PDF
A Survey on Quality Changes in Positive, Negative and Combined Switching Stra...
PPTX
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
PDF
PSOC UNIT 1.pdf for electric engineering in which we learnt how the Indian gr...
PDF
CS243I1410B1_low.pdf
PDF
Subtech profile
PDF
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
PPTX
Chapter 10 Introduction to Air Insulation Substation .pptx
PDF
Low frequency ac transmission for power systems by Aamir Saleem
PPTX
Power System Automation.pptx , ELECTRICAL ENGINEERING
PDF
IRJET- PLC Based Intelligent Control of Substation
PPTX
btech electrical Lecture_Module_2 (1).pptx
PPT
Hvdc dad
Development and Performance Evaluation of an Intelligent Electric Power Switc...
Massive Energy Saving Systems and Strategies at Equipment Level in the Highes...
Abstract11
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
IRJET- Automatic Load Sharing of Transformer
Dg synchronisation process
Analysis optimization and monitoring system
Appraisal ppt ankur
A Survey on Quality Changes in Positive, Negative and Combined Switching Stra...
AUTOMATIC THREE PHASE SUPPLY CHANGOVER
PSOC UNIT 1.pdf for electric engineering in which we learnt how the Indian gr...
CS243I1410B1_low.pdf
Subtech profile
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
Chapter 10 Introduction to Air Insulation Substation .pptx
Low frequency ac transmission for power systems by Aamir Saleem
Power System Automation.pptx , ELECTRICAL ENGINEERING
IRJET- PLC Based Intelligent Control of Substation
btech electrical Lecture_Module_2 (1).pptx
Hvdc dad
Ad

More from IRJET Journal (20)

PDF
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
PDF
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
PDF
Kiona – A Smart Society Automation Project
PDF
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
PDF
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
PDF
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
PDF
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
PDF
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
PDF
BRAIN TUMOUR DETECTION AND CLASSIFICATION
PDF
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
PDF
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
PDF
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
PDF
Breast Cancer Detection using Computer Vision
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
Kiona – A Smart Society Automation Project
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
BRAIN TUMOUR DETECTION AND CLASSIFICATION
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
Breast Cancer Detection using Computer Vision
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Ad

Recently uploaded (20)

PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
Current and future trends in Computer Vision.pptx
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
introduction to high performance computing
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPTX
communication and presentation skills 01
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
Feature types and data preprocessing steps
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Current and future trends in Computer Vision.pptx
distributed database system" (DDBS) is often used to refer to both the distri...
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Information Storage and Retrieval Techniques Unit III
Abrasive, erosive and cavitation wear.pdf
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
III.4.1.2_The_Space_Environment.p pdffdf
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Visual Aids for Exploratory Data Analysis.pdf
introduction to high performance computing
Nature of X-rays, X- Ray Equipment, Fluoroscopy
communication and presentation skills 01
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Feature types and data preprocessing steps

Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System

  • 1. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 967 Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System Owen Raymond Glynn, Jayasingh Balakrishnan, Amod Madhukar Khirwadkar, Muthusamy Veerabahu, Pownrajan Chinnadurai, Raghavendra Upadhya Heggodlu- Transmission Protection Department, Dubai Electricity & Water Authority. ---------------------------------------------------------------------------***--------------------------------------------------------------------------- Abstract- Dubai’s transmission power system plays a vital role in delivering optimum reliability and uninterrupted power. We therefore need to maintain the highest levels of technology, operational and best design practices for all digital systems. This paper aims to provide the conceptual design overview and benefits of the innovative design of LVAC Auto Changeover Scheme in DEWA Transmission Substations (132kV). The existing design of LVAC switchboards (400V AC supply for substation equipment’s) used in 132/11 KV substations under DEWA transmission network have three buses powered through three earthing transformers and has two bus sections. During normal operation, all three buses in LVAC switchboard are independently supplied by each earthing transformer (incomer) respectively and bus sections are in open condition. To maintain uninterruptable LVAC supply to substation equipment’s, a PLC is used and programmed to execute automatic switching operation of concerned bus section / incomer breakers in case of any of the incomer supply fails. LVAC switchboard has an Auto/ Manual switch and PLC is operational if the switch is on Auto mode. The existing scheme has mainly two issues as below: A) In case of outage required on any of the IDT’s, operator intervention is required to execute switching by shifting Auto/ Manual switch in Manual mode. Manual switching results in loss of LVAC supply as well as generation of several alarms through SCMS. B) In case of switching off any IDT during LVAC in Auto mode, switching through PLC will affect only with a time delay results in momentary interruptions to downstream LV circuits which generates large number of undesired alarms in SCMS. With an objective to eliminate momentary supply interruptions and unwanted alarms due to that, the team has developed new logic diagrams to facilitate high speed Automatic changeover of LVAC supplies with minimum allowable paralleling time for the IDT’s after study on the risks involved during momentary paralleling. In place of PLC, Bay Control Units (BCU) from approved OEM’s are utilized which are in use at higher voltage levels in DEWA system. BCU’s are having major advantages over PLC in terms of ease and flexibility in logic buildings, programming of the device and speed of operation. This paper aims to provide the conceptual overview and benefits of LVAC High speed Auto Change Over scheme developed in house by DEWA specialists in conjunction with specialists from the original equipment manufacturers. The new scheme involves use of Bay Control Units in place of PLC’s in LVAC switchgear design. The BCU’s and overall scheme is engineered, configured and extensively laboratory tested to ensure perfect functionality of High-Speed Auto Change Overs in LVAC board. Utilizing the capabilities of modern IED’s to build large numbers of user defined logic and implementing these in innovative new ways has produced new unique LVAC changeover scheme that enhance functionality and reliability by eliminating discreet components and circuitry whilst maximizing overall efficiency by reducing supply interruptions and unwarranted alarms during supply changeover. This innovative initiative will ensure that DEWA will have arguably the most advanced LVAC switchboards in its transmission systems both regionally and globally by introducing the latest digital technologies, optimized designs in line with the industry leading best practices. I. INTRODUCTION Dubai Electricity & Water Authority (DEWA) was established in 1992 by His Excellency Sheikh Maktoum bin Rashid Al Maktoum with the objective to provide reliable power to residents of the Emirate of Dubai. Since its inception, DEWA has continuously invested in maintaining and upgrading the power delivery infrastructure to meet the increasing demands of the growing Emirate of Dubai. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
  • 2. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 968 Dubai Electricity & Water Authority (DEWA) Power System includes Generation, Transmission and Distribution networks. The transmission network operates at 400kV and 132kV voltage levels with over 350 transmission substations consisting of 400/132kV, 132/33kV and 132/11kV sites. LVAC switchgears are installed in all types of transmission substations and are used to supply station loads (station auxiliaries, air conditioning, heating, and lighting etc.). LVAC supplies to various equipment’s and related systems are continuously monitored by connecting the alarms through SCMS to DEWA control center. As per existing design, during supply changeover in LVAC, many unwanted alarms are received. Moreover, if the LVAC operational switch is kept in manual mode, manual intervention is required to execute supply changeovers. In order to overcome the above-mentioned constraints, DEWA team has developed a high speed LVAC auto changeover scheme which allows momentary paralleling of transformers without any side effect thus to avoid supply interruption. The innovative LVAC scheme under discussions is approved for implementation in DEWA’s all future 132/11 KV substations. The major concerns while finalizing the scheme were as follows: 1) 1) During any one of the IDT Switching, paralleling of secondary side may involve circulating currents. In order to overcome the same it is ensured that the primary of the concerned IDT’s are already parallel and maximum paralleling time is set as 500 msec and to eliminate any adverse effect such as IDT circulating currents. Moreover the LVAC busbar fault levels are within the limits for paralleling the two LVAC incomers (LVAC fault levels are shown in figure 1). Figure-1: LVAC Fault Levels 2) The complications of switching LVAC breakers from control center would have been challenging with existing PLC, however use of Bay Control Units having IEC 61850 communication facility found as a suitable solution to achieve remote switching. 3) High speed changeover in case of tripping of any one IDT was considered as a risk to other healthy IDT’s for momentary paralleling. Hence a hybrid solution was adapted. High speed paralleling was configured for planned switching and low speed LVAC changeover with 10 sec time delay was maintained for IDT protection tripping scenarios without paralleling the IDT’s. II.PROBLEMS WITH EXISTING LVAC SCHEME Existing LVAC Single Line Diagram The salient features specified for the existing LVAC scheme related to supply changeover scheme are as below: 1) The substation shall be provided with three auxiliary supplies derived from the three earthing transformers 2) Normally three sections (Bus 1, 2, 3) of the main LVAC switchboard shall be supplied via the associated main incoming circuit breakers with both the bus section breakers in open condition. 3) Electrical interlock shall be provided such that it shall not be possible to parallel any two transformers both on Auto and Manual mode of operations. 4) Only one Auto/Manual switch common to all 5 ACBs shall be provided, and operation logic shall be submitted for DEWA approval. 5) If a fault occurs on a section of the busbars the relevant circuit breaker shall open to isolate the faulty section and any auto-changeover on to a faulty section shall be inhibited. 6) When selected on manual mode no automatic changeover shall occur. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
  • 3. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 969 7) SCADA alarms are hardwired since the existing PLC devices are not capable to send alarms directly to SCMS system. It is evident from the above-mentioned specification clauses that paralleling of transformers was not permitted and manual operations are required for supply changeover during planned outages on any one of the IDT’s. Moreover, momentary supply interruption will results in several unwanted alarms from associated LVAC circuits to SCMS. III. High Speed Auto Changeover Scheme The high-speed auto changeover (ACO) scheme is implemented by redesigning the LVAC control system as follows: 1. Auto Changeover (ACO) can be enabled or disabled using the existing auto/ manual switch. 2. The ACO is completely autonomous requiring no action from TCC or HMI. 3. Detection of IDT1 switching out: (the same is applicable for IDT2 & IDT3) a) Detect IDT1 132kV CB Open command (switching out IDT1). b) Initiate auto changeover of LVAC Bus 1. c) Close BS1 and Open Incomer 1 (Aux contact of BS1 Opens IC1 to achieve coordinated high speed switching). 4. Detection of IDT1 switching back into service: a) 132kV CB Closed and LVAC supply healthy for 5 seconds. b) Initiates restore of LVAC Bus 1 to normal supply. c) Close Incomer 1 and then open BS1 (Aux contact of IC1 opens BS1 to achieve coordinated high-speed switching). 5. Duration of paralleling is kept to minimum (milliseconds) therefore no overload concerns. IDT1 Switching – ACO Scenario is shown in Figure-2. Figure-2: IDT1 Switching A. ACO Logic Sample logic – LVAC Incomer CB close Sample logic – LVAC Incomer CB Open B. Methodology: The steps undertaken for implementing the LVAC changeover scheme are as explained below: International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072
  • 4. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 970 1) Existing LVAC logic and schematic diagrams are thoroughly studied by the team and based on it, new logics are prepared to incorporate hybrid changeover scheme. One high speed logic for routing switching of IDT’s and other slow logic for IDT tripping cases. 2) PLC was proposed to be replaced with modern and sophisticated BCU’s. 3) The proposal was presented to DEWA Transmission Power Technical Committee and approval was received. 4) BCU input /output requirements were finalized and accordingly, Generic wiring diagrams were prepared. 5) DEWA approved OEM’s (SEL, Hitachi, GE and Siemens) were approached to finalize suitable BCU device. 6) M/s Hitachi REC 670 and SEL451 BCU’s found most suitable for this application. 7) Extensive laboratory testing was performed on these BCU’s considering all network conditions in presence of DEWA stakeholder departments and BCU settings and configurations were finalized. 8) Based on successful evaluation of the BCU’s, tender documents were updated to include High Speed Automatic changeover. C. Advantages of the High-Speed Auto Changeover Scheme The new innovative LVAC design provides significant benefits to DEWA as a utility. The new design for 132/11kV substations includes the following advantages:  Eliminate momentary interruption of LVAC supply during IDT outage or switching  The Scheme is completely autonomous.  Fast switching avoids exposure to circulating currents.  It is a cost-effective design improvement due to less number of components and wiring.  Eliminate unwanted alarms during IDT outage.  Increased digitization due to elimination of hard wiring (BCU option). BCU is directly connected to SCADA system and all LVAC related alarms are send to SCADA via IEC61850 protocol.  BCU’s are having major advantages over PLC in terms of ease and flexibility in logic buildings, programming of the device and speed of operation. IV. CONCLUSION Implementing a high-speed auto changeover (ACO) will avoid interruption of LVAC supply in the event of switching IDT’s in and out of service. This will in turn avoid unnecessary supply interruption, associated alarms and improve reliability of equipment. The high speed ACO avoids the need for operator intervention and avoids exposure to overload since paralleling is extremely short in duration. The proposed ACO scheme was configured and tested with different OEM BCU. All the test scenario was simulated and passed. Hence the same concept can be implemented wherever applicable. BCU is the preferred option rather than the PLC. V. REFERENCES [1] Aster A. Roy, Gesa F. Newton & Aondoakaa I. Solomon: “Design and Implementation of a 3-Phase Automatic Power Change-Over Switch” published in American Journal of Engineering Research (AJER) Vol-3, Issue-9, pp-07-14 [2] Scott Manson and Saurabh Shah “Automated Power Management Systems for Power Consumers with On-site Generation” Available on SEL website, SEL Inc. Pullman [3] Scott M. Manson, Ashish Upreti and Michael Thompson Available on SEL website, SEL Inc. Pullman [4] Stefan Meier, Thomas Werner, “Performance considerations in digital substation applications” white paper presented at PAC World UK 2015. [5] Greg Rzepka, Scott Wenke, Sarah Walling, “Choose Simplicity for a Better Digital Substation Design”, 70th Annual Conference for Protective Relay Engineers, Texas, April-2017. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 12 | Dec 2023 www.irjet.net p-ISSN: 2395-0072