Advance Project & Production
Management (AAPM)-OM3
Introduction to Project Management & Planning
What is a project?
• A project requires an organized set of work efforts.
• Projects require a level of detail that is progressively
elaborated upon as more information is discovered.
• Projects are subject to limitations of time and
resources such as money and people.
• Projects have a defined beginning and ending.
2
Project – “a temporary endeavor undertaken to
create a unique product, service, or result.”
What is a project?
• A project has a unique combination of stakeholders
3
stakeholders – “persons or organizations … that are
actively involved in the project, or whose interests may
be positively or negatively affected by execution or
completion of the project.”
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part. 4
Project
Characteristics
A definite start and end point
A definite start and end point
Once the end point is reached
project is over
It is attempting to achieve
something new
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part. 5
Project
constraints
Time
Cost
Scope
Resources
Risk
Quality
Project Management (PM)
• PM includes work processes to plan, execute, and
controlling of project activities
• Work processes require tradeoffs among the scope,
quality, cost, and schedule of the project
• PM includes leadership tasks for visioning, motivating,
and promoting work associates.
• PM knowledge, skills, and methods apply for most
projects 6
Project management – “the application of knowledge,
skills, tools and techniques to project activities to meet
project requirements.” PMBOK® Guide
History of Project Management
• 3300 BC Indus Valley Civilization (well constructed
houses and city)
• 2570 BC Giza Pyramid
• 208 BC Great Wall of China
• 1917 Henry Gantt introduced Gantt chart
• PM emerged as a formal discipline in the 1950s
• 1957 Critical Path Method technique (CPM)
developed by DuPont Corporation
• 1958 Program Evaluation and Review
Techniques(PERT) developed by US Navy
7
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
History of Project Management
• 1962 Work Breakdown Structure (WBS) was
introduced by US department od Defense
• 1965 IPMA, International Project Management
Association was formed
• 1969 PMI ( Project Management Institute)US based
non profit professional organization was
established to promote project management
professionals
• 1987 PMI published PMBOK Guide (after that
updated editions kept on coming. 7th edition came
2021)
8
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
History of Project Management
• 1997 critical chain project management technique
was invented
• 2012 ISO 21500:2012 guidance on Project
Management
• Manufacturing, research and development,
government, and construction projects used and
refined management techniques
9
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
The Project Management Institute
• The largest professional organization
• Publishes and regularly updates A Guide to the
Project Management Body of Knowledge (PMBOK®
Guide)
• Established a professional certification - Project
Management Professional (PMP®)
• Established a second certification—Certified
Associate in Project Management (CAPM)
10
Highlights of Projects
• Projects are temporary and unique; operations are
more continuous.
• Project managers need “soft skills” and “hard skills”
to be effective.
• Project managers frequently have more
responsibility than authority.
• Projects go through predictable stages called a life
cycle.
11
Projects Versus Operations
• Projects are temporary
• Projects have both routine and unique
characteristics
• Operations consist of the ongoing work needed to
ensure that an organization continues to function
effectively
12
Soft Skills and Hard Skills
• Soft skills include communication and leadership
activities.
• Hard skills include risk analysis, quality control,
scheduling, and budgeting work
• A successful project manager needs both soft and
hard skills along with the judgment of when each is
more necessary.
• Training, experience, and mentoring are
instrumental in developing necessary skills.
13
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Project Life Cycle
• All projects go through predictable stages called a
project life cycle.
• Life cycle allows for control to assure that the
project is proceeding in a satisfactory manner and
that the results are likely to serve its customer’s
intended purpose
14
Project life cycle – “a collection of generally sequential
project phases whose name and number are determined
by the control needs of the organization or organizations
involved in the project.” PMBOK® Guide
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Project Life Cycle Stages
• Selecting and initiating— a project is proposed, planned at a
high level, and key participants commit to it in broad terms
• Planning—starts after the initial commitment, includes
detailed planning, and ends when all stakeholders accept the
entire detailed plan.
• Executing—includes authorizing, executing, monitoring, and
controlling work until the customer accepts the project
deliverables.
• Closing and realizing—all activities after customer acceptance
to ensure project is completed, lessons are learned, resources
are reassigned, contributions are recognized, and benefits are
realized.
15
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Project Life Cycle Stages
• Most companies insist that a project must pass an
approval of some kind to move from one stage to
the next
• The project life cycle is highly formalized and very
specific
• Projects are measured at selection, progress
reporting, and benefits realization points
16
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Project Life Cycle Stages
17
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Defining Project Success and Failure
• Project success is creating deliverables that include
all of the agreed upon features
• Outputs please the project’s customers.
• Customers use the outputs effectively as they meet
quality goals
• The project should be completed on schedule and
on budget (meet time and cost constraints).
18
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Defining Project Success and Failure
• Successful projects are completed without heroics
• People who work on the project should learn new skills
and/or refine existing skills.
• Organizational learning should take place and be
captured for future projects.
• Reap business-level benefits such as development of
new products, increased market share, increased
profitability, decreased cost, etc.
19
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Project Success
•Meeting Agreements
•Cost, schedule, and specifications met
•Customer’ Success
•Needs met, deliverables used, customer satisfied
•Performing Organization’s Success
•Market share, new products, new technology
•Project Team’s Success
•Loyalty, development, satisfaction
20
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Why Projects Fail
• Not enough resources are available for project
completion.
• Not enough time has been given to the project.
• Project expectations are unclear.
• Changes in the scope are not understood or agreed
upon by all parties involved.
• Stakeholders disagree regarding expectations for
the project.
• Adequate project planning is not used.
21
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Levels of Decision making
22
Operating
decision
Administrative
decision
Strategic decision
Taken by
management
level
Lower level
management
Middle level
management
Top level
management
Structure of the
decision
Routine Semi-structured unstructured
Level of resource
commitment
Minor resource
commitment
Moderate
resource
commitment
Major resource
commitment
Time horizon Short-term Medium-term Long-term
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Facets of Project Analysis
23
Market
Analysis
Technical
Analysis
Financial
Analysis
Economic
Analysis
Ecological
Analysis
• Potential
Market
• Market
Share
• Technical
viability
• Sensible
choices
• Risk
• Return
• Benefit,
costs,
shadow
prices
• Other
impacts
• Environme
ntal
damage
• Restoration
measures
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Strategy
The determination of the basic long-term goals and
objectives of an enterprise, and the adoption of courses of
action and the allocation of resources necessary for
carrying out these goals.
-Chandler A.D.
24
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Formulation of strategies
25
Environmental Analysis
Customers, competitors,
suppliers, regulations,
infrastructure, political and
social environment
Internal Analysis
Technical analysis, production
capacity, logistics capacity,
financial resources, skilled
resource
Opportunity and Threats
Identify opportunities
Strengths and Weaknesses
Determine Core capabilities
Find the fit between core
capabilities and external
opportunities
Firms Strategies
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Grand Strategy
26
Contraction
Stability
Growth
Concentration Diversification
Vertical
Integration
Liquidation Divestiture
Conglomerate
Concentric
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part. 27
Strategy Principal Motivations Likely Outcomes
Profitability Growth Risk
Concentration Ability to serve a growing
market, familiarity with
technology and market, cost
leadership
High Moderate Moderate
Vertical
integration
Greater stability for existing
and proposed operations,
greater market power
High Moderate Moderate
Concentric
diversification
Improved utilization of
resources
High Moderate Moderate
Conglomerate
diversification
Limited scope in present
business
Moderate High Low
Stability Satisfaction with status quo High Low Low
Divestment Inadequate profit, poor
strategy
High Low Low
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
Portfolio Strategy
1. BCG Matrix
Developed by Boston Consulting Group
2. GE Stoplight Matrix
Developed by General electric Company
3. McKinsey Matrix
28
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
BCG Matrix
Market
Growth
Rate
Market Share
High Low
High Stars Question Mark
Low Cash Cows Dogs
29
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
General Electric’s Stoplight Matrix
Industry
Attractiveness
Business Strength
Strong Average Weak
High
Invest Invest Hold
Medium
Invest Hold Divest
Low
Hold Divest Divest
30
© 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted
to a publicly accessible website, in whole or in part.
The McKinsey Matrix
Industry
Attractiveness
Competitive Position
Good Medium Poor
High
Winner Winner
Question
Mark
Medium
Winner
Average
Business
Loser
Low
Profit
Producer
Loser Loser
31

More Related Content

PPT
Introduction to Project Management
PPTX
Project Management
PPTX
Project Management
PPTX
Project Planning, Design and Management
PPTX
What are the Basic Principles of Project Management | AIMS, UK
PPTX
Project management
PPTX
Lec 03 project life cycle
PPT
Project planning and planning process
Introduction to Project Management
Project Management
Project Management
Project Planning, Design and Management
What are the Basic Principles of Project Management | AIMS, UK
Project management
Lec 03 project life cycle
Project planning and planning process

What's hot (20)

PPT
Project organisation structure
DOC
Roles and-responsibilities-project manager
PPT
Project life cycle
PPTX
Project stakeholder management
PDF
Introduction to Project Management
PPT
Introduction-to-project-management
PPT
Project Management
PPTX
Project management
PPTX
Project characteristics
PPTX
project management concepts
PDF
The role and responsibilities of the project manager
PPTX
Elements of Project Management
PDF
Project Life Cycle and Phases
PPTX
Project management
PDF
Introduction to Project Management.pdf
PPTX
Project Risk Management
PPTX
Project management process and Project Management Knowledge areas
PDF
Fundamentals of project management
PPT
Lecture 01: Advanced Project Management-Introduction
PDF
SPM NOTES cc.pdf unit-2.......................
Project organisation structure
Roles and-responsibilities-project manager
Project life cycle
Project stakeholder management
Introduction to Project Management
Introduction-to-project-management
Project Management
Project management
Project characteristics
project management concepts
The role and responsibilities of the project manager
Elements of Project Management
Project Life Cycle and Phases
Project management
Introduction to Project Management.pdf
Project Risk Management
Project management process and Project Management Knowledge areas
Fundamentals of project management
Lecture 01: Advanced Project Management-Introduction
SPM NOTES cc.pdf unit-2.......................
Ad

Similar to Introduction to Project Management and Planning.ppt (20)

DOCX
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
DOCX
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit
PDF
Topic 1 - Introduction of Project Management.pdf
PPT
PM ppt unit 1.ppt
PPTX
PPT1-PROJECT-_-Project-Management.pptx
PPTX
Lecture 27 Projects (03-11-20).pptx
PPTX
PM & PM LC.pptx
PPT
introduction to project management
PPTX
Project Management online sample (1) (1).pptx
PPT
Ibm projectmgmt-1
PDF
01 02&03 introduction to pmp-mao
PPT
Introduction to Project Management
PPTX
PM UNIT 1_2.pptx
PPT
Projects management student notes. .ppt
PPT
01-Introduction to Project Management.ppt
PPTX
PROJECT MANAGEMENT intro - Lecture 01.pptx
PPT
Project_management_Amit_dubey
PPTX
Project management [module 1]
PDF
Successful Project Management 7th Jack Gido James P Clements
PPTX
1. Introduction to Project Management and the Project Management Framework
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit
Topic 1 - Introduction of Project Management.pdf
PM ppt unit 1.ppt
PPT1-PROJECT-_-Project-Management.pptx
Lecture 27 Projects (03-11-20).pptx
PM & PM LC.pptx
introduction to project management
Project Management online sample (1) (1).pptx
Ibm projectmgmt-1
01 02&03 introduction to pmp-mao
Introduction to Project Management
PM UNIT 1_2.pptx
Projects management student notes. .ppt
01-Introduction to Project Management.ppt
PROJECT MANAGEMENT intro - Lecture 01.pptx
Project_management_Amit_dubey
Project management [module 1]
Successful Project Management 7th Jack Gido James P Clements
1. Introduction to Project Management and the Project Management Framework
Ad

Recently uploaded (20)

PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Construction Project Organization Group 2.pptx
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
additive manufacturing of ss316l using mig welding
DOCX
573137875-Attendance-Management-System-original
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Construction Project Organization Group 2.pptx
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
bas. eng. economics group 4 presentation 1.pptx
R24 SURVEYING LAB MANUAL for civil enggi
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
UNIT 4 Total Quality Management .pptx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Lecture Notes Electrical Wiring System Components
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
additive manufacturing of ss316l using mig welding
573137875-Attendance-Management-System-original
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
UNIT-1 - COAL BASED THERMAL POWER PLANTS
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...

Introduction to Project Management and Planning.ppt

  • 1. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Advance Project & Production Management (AAPM)-OM3 Introduction to Project Management & Planning
  • 2. What is a project? • A project requires an organized set of work efforts. • Projects require a level of detail that is progressively elaborated upon as more information is discovered. • Projects are subject to limitations of time and resources such as money and people. • Projects have a defined beginning and ending. 2 Project – “a temporary endeavor undertaken to create a unique product, service, or result.”
  • 3. What is a project? • A project has a unique combination of stakeholders 3 stakeholders – “persons or organizations … that are actively involved in the project, or whose interests may be positively or negatively affected by execution or completion of the project.”
  • 4. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. 4 Project Characteristics A definite start and end point A definite start and end point Once the end point is reached project is over It is attempting to achieve something new
  • 5. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. 5 Project constraints Time Cost Scope Resources Risk Quality
  • 6. Project Management (PM) • PM includes work processes to plan, execute, and controlling of project activities • Work processes require tradeoffs among the scope, quality, cost, and schedule of the project • PM includes leadership tasks for visioning, motivating, and promoting work associates. • PM knowledge, skills, and methods apply for most projects 6 Project management – “the application of knowledge, skills, tools and techniques to project activities to meet project requirements.” PMBOK® Guide
  • 7. History of Project Management • 3300 BC Indus Valley Civilization (well constructed houses and city) • 2570 BC Giza Pyramid • 208 BC Great Wall of China • 1917 Henry Gantt introduced Gantt chart • PM emerged as a formal discipline in the 1950s • 1957 Critical Path Method technique (CPM) developed by DuPont Corporation • 1958 Program Evaluation and Review Techniques(PERT) developed by US Navy 7
  • 8. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. History of Project Management • 1962 Work Breakdown Structure (WBS) was introduced by US department od Defense • 1965 IPMA, International Project Management Association was formed • 1969 PMI ( Project Management Institute)US based non profit professional organization was established to promote project management professionals • 1987 PMI published PMBOK Guide (after that updated editions kept on coming. 7th edition came 2021) 8
  • 9. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. History of Project Management • 1997 critical chain project management technique was invented • 2012 ISO 21500:2012 guidance on Project Management • Manufacturing, research and development, government, and construction projects used and refined management techniques 9
  • 10. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. The Project Management Institute • The largest professional organization • Publishes and regularly updates A Guide to the Project Management Body of Knowledge (PMBOK® Guide) • Established a professional certification - Project Management Professional (PMP®) • Established a second certification—Certified Associate in Project Management (CAPM) 10
  • 11. Highlights of Projects • Projects are temporary and unique; operations are more continuous. • Project managers need “soft skills” and “hard skills” to be effective. • Project managers frequently have more responsibility than authority. • Projects go through predictable stages called a life cycle. 11
  • 12. Projects Versus Operations • Projects are temporary • Projects have both routine and unique characteristics • Operations consist of the ongoing work needed to ensure that an organization continues to function effectively 12
  • 13. Soft Skills and Hard Skills • Soft skills include communication and leadership activities. • Hard skills include risk analysis, quality control, scheduling, and budgeting work • A successful project manager needs both soft and hard skills along with the judgment of when each is more necessary. • Training, experience, and mentoring are instrumental in developing necessary skills. 13
  • 14. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Life Cycle • All projects go through predictable stages called a project life cycle. • Life cycle allows for control to assure that the project is proceeding in a satisfactory manner and that the results are likely to serve its customer’s intended purpose 14 Project life cycle – “a collection of generally sequential project phases whose name and number are determined by the control needs of the organization or organizations involved in the project.” PMBOK® Guide
  • 15. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Life Cycle Stages • Selecting and initiating— a project is proposed, planned at a high level, and key participants commit to it in broad terms • Planning—starts after the initial commitment, includes detailed planning, and ends when all stakeholders accept the entire detailed plan. • Executing—includes authorizing, executing, monitoring, and controlling work until the customer accepts the project deliverables. • Closing and realizing—all activities after customer acceptance to ensure project is completed, lessons are learned, resources are reassigned, contributions are recognized, and benefits are realized. 15
  • 16. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Life Cycle Stages • Most companies insist that a project must pass an approval of some kind to move from one stage to the next • The project life cycle is highly formalized and very specific • Projects are measured at selection, progress reporting, and benefits realization points 16
  • 17. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Life Cycle Stages 17
  • 18. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Defining Project Success and Failure • Project success is creating deliverables that include all of the agreed upon features • Outputs please the project’s customers. • Customers use the outputs effectively as they meet quality goals • The project should be completed on schedule and on budget (meet time and cost constraints). 18
  • 19. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Defining Project Success and Failure • Successful projects are completed without heroics • People who work on the project should learn new skills and/or refine existing skills. • Organizational learning should take place and be captured for future projects. • Reap business-level benefits such as development of new products, increased market share, increased profitability, decreased cost, etc. 19
  • 20. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Project Success •Meeting Agreements •Cost, schedule, and specifications met •Customer’ Success •Needs met, deliverables used, customer satisfied •Performing Organization’s Success •Market share, new products, new technology •Project Team’s Success •Loyalty, development, satisfaction 20
  • 21. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Why Projects Fail • Not enough resources are available for project completion. • Not enough time has been given to the project. • Project expectations are unclear. • Changes in the scope are not understood or agreed upon by all parties involved. • Stakeholders disagree regarding expectations for the project. • Adequate project planning is not used. 21
  • 22. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Levels of Decision making 22 Operating decision Administrative decision Strategic decision Taken by management level Lower level management Middle level management Top level management Structure of the decision Routine Semi-structured unstructured Level of resource commitment Minor resource commitment Moderate resource commitment Major resource commitment Time horizon Short-term Medium-term Long-term
  • 23. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Facets of Project Analysis 23 Market Analysis Technical Analysis Financial Analysis Economic Analysis Ecological Analysis • Potential Market • Market Share • Technical viability • Sensible choices • Risk • Return • Benefit, costs, shadow prices • Other impacts • Environme ntal damage • Restoration measures
  • 24. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Strategy The determination of the basic long-term goals and objectives of an enterprise, and the adoption of courses of action and the allocation of resources necessary for carrying out these goals. -Chandler A.D. 24
  • 25. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Formulation of strategies 25 Environmental Analysis Customers, competitors, suppliers, regulations, infrastructure, political and social environment Internal Analysis Technical analysis, production capacity, logistics capacity, financial resources, skilled resource Opportunity and Threats Identify opportunities Strengths and Weaknesses Determine Core capabilities Find the fit between core capabilities and external opportunities Firms Strategies
  • 26. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Grand Strategy 26 Contraction Stability Growth Concentration Diversification Vertical Integration Liquidation Divestiture Conglomerate Concentric
  • 27. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. 27 Strategy Principal Motivations Likely Outcomes Profitability Growth Risk Concentration Ability to serve a growing market, familiarity with technology and market, cost leadership High Moderate Moderate Vertical integration Greater stability for existing and proposed operations, greater market power High Moderate Moderate Concentric diversification Improved utilization of resources High Moderate Moderate Conglomerate diversification Limited scope in present business Moderate High Low Stability Satisfaction with status quo High Low Low Divestment Inadequate profit, poor strategy High Low Low
  • 28. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. Portfolio Strategy 1. BCG Matrix Developed by Boston Consulting Group 2. GE Stoplight Matrix Developed by General electric Company 3. McKinsey Matrix 28
  • 29. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. BCG Matrix Market Growth Rate Market Share High Low High Stars Question Mark Low Cash Cows Dogs 29
  • 30. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. General Electric’s Stoplight Matrix Industry Attractiveness Business Strength Strong Average Weak High Invest Invest Hold Medium Invest Hold Divest Low Hold Divest Divest 30
  • 31. © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. The McKinsey Matrix Industry Attractiveness Competitive Position Good Medium Poor High Winner Winner Question Mark Medium Winner Average Business Loser Low Profit Producer Loser Loser 31