This document proposes a new scheduling technique to improve upon the limitations of traditional Critical Path Method (CPM) and Gantt chart scheduling. The new technique, called Critical Path Division (CPD), divides activity durations and work quantities into daily time divisions to allow for more granular project tracking, monitoring, and control. CPM and Gantt charts only consider activity durations and cannot adequately represent schedule changes or recover delays. CPD addresses this by showing progress at a daily level based on both duration and work completed. The objectives are to develop an improved scheduling model that overcomes the weaknesses of traditional methods and better supports construction project management.