1
Issues and Strategies
for
Integrated Model Calibration
IAH Waterloo 2015
Dirk Kassenaar, E.J. Wexler
P.J. Thompson, M.G.S. Takeda
Earthfx Inc.
2
Integrated Modeling
► Integrated modelling can provide
significant insights into the overall
system behavior and response to
complex stresses
► Integrated Modelling: Modelling
with dynamic feedback between
the SW and GW systems
► NOT integrated: Conjunctive or
loosely coupled models that are
manually coupled or explicitly
solved
After USGS
3
Presentation Objectives
► Is integrated modelling different?
 Technical Issues:
► Complex non-linear processes, compensating errors, long run times…
 Non-Technical Issues:
► Knowledge limitations, different conceptual models, biases, terminology…
► Strategies for addressing these issues:
 We present a general strategy and flow chart for model development
4
7dps (2 years in 1.7 minutes)
Click for Animation
5
Integrated Hydrostratigraphic Modelling
► We are already doing integrated modelling…
► Integrated Stratigraphic/Groundwater modelling
 Some GW modellers have only a limited background in geology
► Geology is a “knowledge boundary”
► Desire to independently and completely develop the stratigraphic model
 Re-conceptualization of the stratigraphic model is rarely undertaken once
the GW model calibration process has begun.
► Geologic refinements often addressed with K zones or parameter estimation
(compensating errors)
► Integrated SW/GW modelling
 Similar “knowledge boundaries”, but integration is essential
 Greater chance that “compensating errors” enter into the process
6
Presentation Outline
► Technical Issues and Challenges
 Discussion of issues, with examples of soil zone response and dynamic
GW feedback to illustrate challenges
► Strategies for integrated SW/GW model calibration
 Presentation of an integrated model development “flow chart”
 Other guidelines and recommendations
► Non-technical issues
 Data management, blind spots, “Renaissance Hydrogeology”
7
Customs, Conventions and Blind Spots
► Historic simplifications
 GW: Too many constant heads, assumption of stasis (steady state)
 SW: Lumped parameter models, groundwater as a “decay reservoir”,
separation of hydrology and hydraulics, empirical baseflow separation
► Different in calibration approach and emphasis
 GW: Emphasis on matching heads and spatial patterns (head, xy)
► Less emphasis on regional flux calibration; poor recharge guesstimates
 SW: Emphasis on matching streamflow peaks (flux, time)
► Limited emphasis on spatial and low-flow calibration
► Both SW and GW modellers have “blind spots”
 Conventions and simplifications must be addressed during the integrated
model development process (Watch out for a defensive response!)
8
Integrated Model Development Flowchart
8
1. DATA
COMPILATION
AND SYNTHESIS
2.DEVELOPMENT
OF CONCEPTUAL
MODELS
-STRATIGRAPHY
-HYDROSTRAT
-SOIL ZONE
-WETLANDS
-RIVER SYSTEMS
3. SUB-MODEL
CONSTRUCTION,
PRE-CALIBRATION
AND PRE-PEST
4.INTEGRATION
APPLICATION
AND
INSIGHT
5.
CALIBRATION
PRECIPITATION
RUNOFF
SUB-MODEL
GROUNDWATER
FLOW
SUB-MODEL
ONGOING DATA EVALUATION
9
Model Construction Flowchart
► Model construction includes iterative data evaluation,
conceptualization, sub-model pre-calibration and integration
 Sub-models cannot be independently calibrated, but some components of
the sub-model (e.g. snow pack sub-model) can be more or less developed
► Stages 1-5 are not actually “completed” in a linear manner
 The most important conceptual insights are usually only identified once the
model integration and final calibration is complete.
10
1. DATA
COMPILATION
AND SYNTHESIS
Stage 1: Data Compilation and Synthesis
► Data availability, quality and gaps
 Unevenly distributed, but shallow subsurface data is common
 Watch for an unbalanced calibration: Too much focus on the data
at hand, and not the overall problem
► Integrated relational database
 Reduce barriers to integrated understanding and cross-system
response and calibration assessment
 Integrated data analysis and modelling tools (xyzt)
► Data collection and synthesis end when the report is done!
11
Stage 2: Preliminary Conceptualization
► Multiple conceptual models need to be generally formulated
 Stratigraphy, hydrostratigraphy, soil zone, land cover, vegetation, snow
pack, land use (pervious-impervious), climate
► Pre-identify areas of strong transient SW/GW interaction
 Shallow depth to water – Dunnian rejected recharge
► Enhanced ET in areas with shallow depth to water table
 Dynamic wetlands – storage
 Riparian zones and “contributing areas”
 Reaches with significant river pickup and loss
► Headwaters, springs, intermittent streams, seepage areas
 Identify, but avoid, these areas during initial model construction!
12
GW Feedback Zones
► Dunnian rejected recharge may likely occurs in areas with:
 Depth to water table less than 2 m
 Areas with flowing wells, springs and headwater seeps
13
Stage 3: Sub-Model Development
► Focus on:
 SW and GW model construction and parameter preparation
 Data review, assessment and pattern identification
 Understanding of general sensitivity (Pre-PEST)
► GW: Focus on the deeper GW flow system (steady state)
► SW: Pre-calibrate to a gauged sub-catchment with modest GW/SW
interaction
 Assume parsimony (consistency) when later extrapolating parameters from
the test or “donor” catchment to adjacent catchments.
14
Compensating Errors
► Compensating errors arise when the parameters of one sub-model are
adjusted incorrectly to offset processes and feedback from another
sub-model
► Examples:
 GW feedback (Dunnian rejected recharge) can be incorrectly represented
as low permeability soil
 Wetlands storage (and release) can mask GW discharge
 Cross-watershed GW inflows can be missed as stream gauge underflow
 Excessive hydraulic conductivity variation and PEST can mask structural
and stratigraphic errors.
 Over-parameterization and excessive local sub-catchment calibration
adjustment versus “parsimony”
►
15
GSFLOW: Dunnian Runoff
► Model representation of GW discharge areas, wetlands and shallow aquifers
► Runoff can occur off fully saturated soils (rejected recharge)
 Occurs when the water table is at or near surface
 Not sensitive to surficial material K
► Can create runoff from saturated gravels
 Spatially controlled: Tends to occur in stream valley areas
 Seasonally controlled: Tends to occur in spring when
water table is high
15
Unsaturated
zone
StreamStream
Gravity drainage
Recharge
Ground-water flow
16
Time-varying GW Feedback
► The “contributing area” that
generates true runoff
depends on the time-varying
position of the water table
► Example: Dunnian process
area varies seasonally
between 5 and 25% of the
study area
► Runoff occurs, but it is a
groundwater dependent
process!
17
GW Discharge to the Soil Zone (Daily)
Click for Animation
Daily GW discharge to soil zone
18
Step 4: Integration
► Re-assess the shallow conceptual model
 Review soil zone properties, thickness, storage, drainage, interflow
 Develop compatible groundwater layer 1 geometry and properties
► GW modellers must avoid over-simplifying the shallow system.
 Resist “old habits” previously used to avoid dry GW cells
► MODFLOW NWT – stable representation of shallow complexity
► Watch the terminology
 Infiltration – percolation - recharge
19
SW vs GW Conceptualization
► SW Conceptual Model
 Macropores
 Preferential flow
 Throughflow
 Interflow
 Subsurface stormflow
 Infiltration/percolation/
drainage/recharge
 Event mobilized GW
 Soil/rock contact zone
interface flow
 Seepage faces
► GW Conceptual Model
 1-D or 3-D Richard’s
equation
from Lin, 2010
20
Technical Issues
► The shallow subsurface, where the integration happens, is highly
transient and complex
 Significant fluctuation in system feedback
► GW Feedback is highly variable – wet year/dry year, seasonal
► Empirical baseflow separation is only a first guess
► Strong seasonality means the average conditions never exist
 Steady state calibration can be very limited in the upper system
► In summary, dynamic feedback is reality – get on with it
 Recognizing the dynamic nature is essential to the calibration process
21
Storage and 3D movement of water in the Soil Zone
► Soil zone moisture content
Beach Deposits
Till Upland
- Till uplands drain both vertically and downslope
- Lateral drainage to the beach deposits from the till uplands enhances recharge
- Soil zone storage helps supply rate limited GW recharge to the lower layers
Click for Animation
22
Soil Zone Drainage (GW Recharge)
► When moisture is available (winter months) there is a near constant, but rate
limited, drainage from the soil zone
Click for Animation
Beach DepositsTill Upland
23
Step 5: Integrated Calibration
► Get the models and the team working together
► Continue to re-conceptualize, as necessary
► Write a draft report to formulate your understanding (and impress your
boss/client with your progress)
24
Integrated Model Development Flowchart
24
1. DATA
COMPILATION
AND SYNTHESIS
2.DEVELOPMENT
OF CONCEPTUAL
MODELS
-STRATIGRAPHY
-HYDROSTRAT
-SOIL ZONE
-WETLANDS
-RIVER SYSTEMS
3. SUB-MODEL
CONSTRUCTION,
PRE-CALIBRATION
AND PRE-PEST
4.INTEGRATION
APPLICATION
AND
INSIGHT
5.
CALIBRATION
PRECIPITATION
RUNOFF
SUB-MODEL
GROUNDWATER
FLOW
SUB-MODEL
ONGOING DATA EVALUATION
25
Integration
Time Step
► The timing of the SW
and GW processes is
very different, and
can be a source of
contention
► Daily integration time
step:
 Too fine for GW modelers
 Too coarse for SW
modelers
 No one is happy, so it must
be right!
Click for Animation
26
Iterate: Sub-model Refinement
► After the first fully integrated simulations, it is likely that the uncoupled
models could use another round of refinement
 Update the conceptual model as necessary
 Refine model parameters
 Focus on the timing of the interaction
► GW: Focus on transient shallow system response
 Ensure that surface discharge and groundwater discharge to streams
matches observed wetland patterns and surface stream flows
► SW: Focus on the split between interflow and recharge
 In this final uncoupled refinement phase, the modellers must recognize
that model response will not reflect interaction
27
Step 5x: Final Integrated Calibration
► Lots of re-thinking and even re-conceptualization
 System response timing and lag is sensitive
► Two key benefits of the final integrated calibration process:
 Model Input: Measured total precipitation
 Calibrate to: Measured total streamflow
► Baseflow separation is only good for the preliminary stages
► Focus on matching low flows, and not just the peaks
 Balanced calibration to heads (GW) and flux (streamflow)
2828
Aquifer Head vs. Stream Stage
• GW/SW discharge
reverses during
each storm event
• Baseflow
separation does
not account for
reversals
• GSFLOW Simulated Hydrograph at Oro-Hawkstone stream gauge
Storm Event Reversal:
Stream level higher than aquifer
Dry period:
Aquifer level higher than
stream = GW discharge
29
GW Recharge
► GSFLOW provides
ground water
recharge estimates
on a daily basis
Click for Animation
30
Non-Technical Issues and Strategies
► Expect to do a lot of education: clients and peer reviewers
 Include plenty of simplified details about model integration in your reports
(no one wants to read the manuals!)
► Don’t get too attached to preliminary results
 Integrated conceptual models frequently require change
 Watch for “blind spots”
► Management: Identify someone who knows a little about everything to
oversee integration
 A polymath or renaissance hydrogeologist is needed for mediation, and
“compromise”
31
Conclusions
► Integrated Modelling is different; It requires:
 Integrated calibration strategies
► Don’t become attached to your initial uncoupled calibration estimates!
► Consider re-conceptualization, even late in the integrated process
 Integrated data management
► Data silos and barriers will only hide the relationships and response lag between
the systems
► Integrated modelling and calibration tools
 An integrated and balanced modelling team
► The skill, multi-disciplinary knowledge, and ability of the SW and GW experts to
address their “blind spots” is very important
► Our experience after a number of fully-integrated models:
 It’s hard, but it’s worth it.
1. DATA
COMPILATION
AND SYNTHESIS
2.DEVELOPMENT
OF CONCEPTUAL
MODELS
-STRATIGRAPHY
-HYDROSTRATIGRAPHY
-SOIL ZONE
-WETLANDS
-RIVER SYSTEMS
3. SUB-MODEL
CONSTRUCTION,
PRE-CALIBRATION
4.INTEGRATION
APPLICATION
AND
INSIGHT
5.
CALIBRATION
VALIDATION
PRECIPITATION
RUNOFF
SUB-MODEL
GROUNDWATER
FLOW
SUB-MODEL
ONGOING DATA EVALUATION

More Related Content

PDF
Data Management and Calibration Strategies for Integrated Modelling
PDF
Re-thinking recharge
PDF
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
PDF
Thermal Impact Assessment of Below-Water-Table Aggregate Extraction
PDF
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
PDF
Issues and Strategies for Integrated Model Calibration
PDF
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
PDF
Assessing Cumulative Effects with Integrated Modelling
Data Management and Calibration Strategies for Integrated Modelling
Re-thinking recharge
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Thermal Impact Assessment of Below-Water-Table Aggregate Extraction
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
Issues and Strategies for Integrated Model Calibration
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Assessing Cumulative Effects with Integrated Modelling

What's hot (20)

PDF
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
PDF
Topography and the Spatial Distribution of Groundwater Recharge and Evapotran...
PDF
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOW
PDF
Integrated Modelling: Insights and Blind Spots
PDF
Simulating hydrologic response to climate change and drought with an integrat...
PDF
Integrated Modelling of Groundwater Interaction with Channels, Wetlands and L...
PDF
Dusting Off the Source Water Protection Models: Adaptation and Application of...
PDF
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
PDF
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
PDF
Integrated surface water/groundwater modelling to simulate drought and climat...
PDF
Assessment of Low Impact Design (LID)
PDF
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
PDF
Dirk Kassenaar EarthFX Watertech 2016
PDF
Watertech Booth Slide 2013
PDF
Integrated Modelling with GSFLOW in a Complex Watershed on the Niagara Escarp...
PDF
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
PDF
Assessing Sensitivity to Drought and Climate Change with an Integrated Surfac...
DOCX
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
PDF
Estimation of Groundwater Potential
PDF
Modelling of a Coastal Aquifer using FEFLOW
Incorporating a Dynamic Irrigation Demand Module into an Integrated Surface ...
Topography and the Spatial Distribution of Groundwater Recharge and Evapotran...
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOW
Integrated Modelling: Insights and Blind Spots
Simulating hydrologic response to climate change and drought with an integrat...
Integrated Modelling of Groundwater Interaction with Channels, Wetlands and L...
Dusting Off the Source Water Protection Models: Adaptation and Application of...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Integrated surface water/groundwater modelling to simulate drought and climat...
Assessment of Low Impact Design (LID)
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
Dirk Kassenaar EarthFX Watertech 2016
Watertech Booth Slide 2013
Integrated Modelling with GSFLOW in a Complex Watershed on the Niagara Escarp...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Assessing Sensitivity to Drought and Climate Change with an Integrated Surfac...
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
Estimation of Groundwater Potential
Modelling of a Coastal Aquifer using FEFLOW
Ad

Viewers also liked (20)

PDF
Investment Opportunities in FinTech - Techsauce Summit Bangkok
PDF
Using IFRI data: Two examples
DOCX
To Win the Peace by Richard Hawkins
PDF
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
DOCX
Meta consolidado de educacion artistica efrain ichpas paquiyauri
DOC
Kalamazoo coffee shops
PPTX
Контролируемый сегмент BTC на базе публичной сети BTC (ver.2.1)
DOC
Europian Commission’s Humanitarian Aid Department sebagai Komisi Bantuan Uni...
PDF
Linking Household to other data
DOCX
Priyanka Mahajan resume for ECE 1.5.6.8
PDF
Using IFRI data: Two examples
PDF
10 Articles 20.3.16
PDF
Climate Smart Territories in Central America: Nicacentral and Trifinio (MAPNo...
PDF
Identifying climate stressors – A matter of scale
PDF
Oil palm: Landscapes, market chains and investment flows
PPTX
Stream 2: Tackling Climate Change Challenges and Opportunities
PPTX
Dynamic growth
PDF
Sentinel Landscape Nicaragua-Honduras advances to 2014
PDF
DOCX
Web excerpts-md-navcrs-v5-aug14
Investment Opportunities in FinTech - Techsauce Summit Bangkok
Using IFRI data: Two examples
To Win the Peace by Richard Hawkins
CWRA 2016 Assessing Cumulative Effects of SAGD Operations in the Mackay Water...
Meta consolidado de educacion artistica efrain ichpas paquiyauri
Kalamazoo coffee shops
Контролируемый сегмент BTC на базе публичной сети BTC (ver.2.1)
Europian Commission’s Humanitarian Aid Department sebagai Komisi Bantuan Uni...
Linking Household to other data
Priyanka Mahajan resume for ECE 1.5.6.8
Using IFRI data: Two examples
10 Articles 20.3.16
Climate Smart Territories in Central America: Nicacentral and Trifinio (MAPNo...
Identifying climate stressors – A matter of scale
Oil palm: Landscapes, market chains and investment flows
Stream 2: Tackling Climate Change Challenges and Opportunities
Dynamic growth
Sentinel Landscape Nicaragua-Honduras advances to 2014
Web excerpts-md-navcrs-v5-aug14
Ad

Similar to Issues and Strategies for Integrated Model Calibration (17)

PPT
Water and Productivity Impacts for the NBDC
PDF
18 - DSS_NIH_Presentation-Sep-17
PPTX
Water resource model modflow
PPTX
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
PDF
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
PPTX
Swat & modflow
PDF
Analyses of Low Impact Development Strategies using Continuous Fully-Distribu...
PDF
A2 Poster_Sotirios Moustakas and Patrick Willems.pdf
PPTX
ARandolph_wstc_presentation_dep_rev
PPTX
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
PPTX
UNIT.2.pptx
PPTX
Midterm presentation (1)
PDF
WATER QUALITY MODELING DR. YANTI
PPTX
Dirk Kassenaar Earthfx watertech 2016 presentation v1
PDF
Assessing Cumulative Effects of SAGD Operations in the Mackay Watershed
PPTX
Swat model
Water and Productivity Impacts for the NBDC
18 - DSS_NIH_Presentation-Sep-17
Water resource model modflow
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
Swat & modflow
Analyses of Low Impact Development Strategies using Continuous Fully-Distribu...
A2 Poster_Sotirios Moustakas and Patrick Willems.pdf
ARandolph_wstc_presentation_dep_rev
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
UNIT.2.pptx
Midterm presentation (1)
WATER QUALITY MODELING DR. YANTI
Dirk Kassenaar Earthfx watertech 2016 presentation v1
Assessing Cumulative Effects of SAGD Operations in the Mackay Watershed
Swat model

Recently uploaded (20)

PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
"Array and Linked List in Data Structures with Types, Operations, Implementat...
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
III.4.1.2_The_Space_Environment.p pdffdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Management Information system : MIS-e-Business Systems.pptx
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
distributed database system" (DDBS) is often used to refer to both the distri...
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Amdahl’s law is explained in the above power point presentations
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf

Issues and Strategies for Integrated Model Calibration

  • 1. 1 Issues and Strategies for Integrated Model Calibration IAH Waterloo 2015 Dirk Kassenaar, E.J. Wexler P.J. Thompson, M.G.S. Takeda Earthfx Inc.
  • 2. 2 Integrated Modeling ► Integrated modelling can provide significant insights into the overall system behavior and response to complex stresses ► Integrated Modelling: Modelling with dynamic feedback between the SW and GW systems ► NOT integrated: Conjunctive or loosely coupled models that are manually coupled or explicitly solved After USGS
  • 3. 3 Presentation Objectives ► Is integrated modelling different?  Technical Issues: ► Complex non-linear processes, compensating errors, long run times…  Non-Technical Issues: ► Knowledge limitations, different conceptual models, biases, terminology… ► Strategies for addressing these issues:  We present a general strategy and flow chart for model development
  • 4. 4 7dps (2 years in 1.7 minutes) Click for Animation
  • 5. 5 Integrated Hydrostratigraphic Modelling ► We are already doing integrated modelling… ► Integrated Stratigraphic/Groundwater modelling  Some GW modellers have only a limited background in geology ► Geology is a “knowledge boundary” ► Desire to independently and completely develop the stratigraphic model  Re-conceptualization of the stratigraphic model is rarely undertaken once the GW model calibration process has begun. ► Geologic refinements often addressed with K zones or parameter estimation (compensating errors) ► Integrated SW/GW modelling  Similar “knowledge boundaries”, but integration is essential  Greater chance that “compensating errors” enter into the process
  • 6. 6 Presentation Outline ► Technical Issues and Challenges  Discussion of issues, with examples of soil zone response and dynamic GW feedback to illustrate challenges ► Strategies for integrated SW/GW model calibration  Presentation of an integrated model development “flow chart”  Other guidelines and recommendations ► Non-technical issues  Data management, blind spots, “Renaissance Hydrogeology”
  • 7. 7 Customs, Conventions and Blind Spots ► Historic simplifications  GW: Too many constant heads, assumption of stasis (steady state)  SW: Lumped parameter models, groundwater as a “decay reservoir”, separation of hydrology and hydraulics, empirical baseflow separation ► Different in calibration approach and emphasis  GW: Emphasis on matching heads and spatial patterns (head, xy) ► Less emphasis on regional flux calibration; poor recharge guesstimates  SW: Emphasis on matching streamflow peaks (flux, time) ► Limited emphasis on spatial and low-flow calibration ► Both SW and GW modellers have “blind spots”  Conventions and simplifications must be addressed during the integrated model development process (Watch out for a defensive response!)
  • 8. 8 Integrated Model Development Flowchart 8 1. DATA COMPILATION AND SYNTHESIS 2.DEVELOPMENT OF CONCEPTUAL MODELS -STRATIGRAPHY -HYDROSTRAT -SOIL ZONE -WETLANDS -RIVER SYSTEMS 3. SUB-MODEL CONSTRUCTION, PRE-CALIBRATION AND PRE-PEST 4.INTEGRATION APPLICATION AND INSIGHT 5. CALIBRATION PRECIPITATION RUNOFF SUB-MODEL GROUNDWATER FLOW SUB-MODEL ONGOING DATA EVALUATION
  • 9. 9 Model Construction Flowchart ► Model construction includes iterative data evaluation, conceptualization, sub-model pre-calibration and integration  Sub-models cannot be independently calibrated, but some components of the sub-model (e.g. snow pack sub-model) can be more or less developed ► Stages 1-5 are not actually “completed” in a linear manner  The most important conceptual insights are usually only identified once the model integration and final calibration is complete.
  • 10. 10 1. DATA COMPILATION AND SYNTHESIS Stage 1: Data Compilation and Synthesis ► Data availability, quality and gaps  Unevenly distributed, but shallow subsurface data is common  Watch for an unbalanced calibration: Too much focus on the data at hand, and not the overall problem ► Integrated relational database  Reduce barriers to integrated understanding and cross-system response and calibration assessment  Integrated data analysis and modelling tools (xyzt) ► Data collection and synthesis end when the report is done!
  • 11. 11 Stage 2: Preliminary Conceptualization ► Multiple conceptual models need to be generally formulated  Stratigraphy, hydrostratigraphy, soil zone, land cover, vegetation, snow pack, land use (pervious-impervious), climate ► Pre-identify areas of strong transient SW/GW interaction  Shallow depth to water – Dunnian rejected recharge ► Enhanced ET in areas with shallow depth to water table  Dynamic wetlands – storage  Riparian zones and “contributing areas”  Reaches with significant river pickup and loss ► Headwaters, springs, intermittent streams, seepage areas  Identify, but avoid, these areas during initial model construction!
  • 12. 12 GW Feedback Zones ► Dunnian rejected recharge may likely occurs in areas with:  Depth to water table less than 2 m  Areas with flowing wells, springs and headwater seeps
  • 13. 13 Stage 3: Sub-Model Development ► Focus on:  SW and GW model construction and parameter preparation  Data review, assessment and pattern identification  Understanding of general sensitivity (Pre-PEST) ► GW: Focus on the deeper GW flow system (steady state) ► SW: Pre-calibrate to a gauged sub-catchment with modest GW/SW interaction  Assume parsimony (consistency) when later extrapolating parameters from the test or “donor” catchment to adjacent catchments.
  • 14. 14 Compensating Errors ► Compensating errors arise when the parameters of one sub-model are adjusted incorrectly to offset processes and feedback from another sub-model ► Examples:  GW feedback (Dunnian rejected recharge) can be incorrectly represented as low permeability soil  Wetlands storage (and release) can mask GW discharge  Cross-watershed GW inflows can be missed as stream gauge underflow  Excessive hydraulic conductivity variation and PEST can mask structural and stratigraphic errors.  Over-parameterization and excessive local sub-catchment calibration adjustment versus “parsimony” ►
  • 15. 15 GSFLOW: Dunnian Runoff ► Model representation of GW discharge areas, wetlands and shallow aquifers ► Runoff can occur off fully saturated soils (rejected recharge)  Occurs when the water table is at or near surface  Not sensitive to surficial material K ► Can create runoff from saturated gravels  Spatially controlled: Tends to occur in stream valley areas  Seasonally controlled: Tends to occur in spring when water table is high 15 Unsaturated zone StreamStream Gravity drainage Recharge Ground-water flow
  • 16. 16 Time-varying GW Feedback ► The “contributing area” that generates true runoff depends on the time-varying position of the water table ► Example: Dunnian process area varies seasonally between 5 and 25% of the study area ► Runoff occurs, but it is a groundwater dependent process!
  • 17. 17 GW Discharge to the Soil Zone (Daily) Click for Animation Daily GW discharge to soil zone
  • 18. 18 Step 4: Integration ► Re-assess the shallow conceptual model  Review soil zone properties, thickness, storage, drainage, interflow  Develop compatible groundwater layer 1 geometry and properties ► GW modellers must avoid over-simplifying the shallow system.  Resist “old habits” previously used to avoid dry GW cells ► MODFLOW NWT – stable representation of shallow complexity ► Watch the terminology  Infiltration – percolation - recharge
  • 19. 19 SW vs GW Conceptualization ► SW Conceptual Model  Macropores  Preferential flow  Throughflow  Interflow  Subsurface stormflow  Infiltration/percolation/ drainage/recharge  Event mobilized GW  Soil/rock contact zone interface flow  Seepage faces ► GW Conceptual Model  1-D or 3-D Richard’s equation from Lin, 2010
  • 20. 20 Technical Issues ► The shallow subsurface, where the integration happens, is highly transient and complex  Significant fluctuation in system feedback ► GW Feedback is highly variable – wet year/dry year, seasonal ► Empirical baseflow separation is only a first guess ► Strong seasonality means the average conditions never exist  Steady state calibration can be very limited in the upper system ► In summary, dynamic feedback is reality – get on with it  Recognizing the dynamic nature is essential to the calibration process
  • 21. 21 Storage and 3D movement of water in the Soil Zone ► Soil zone moisture content Beach Deposits Till Upland - Till uplands drain both vertically and downslope - Lateral drainage to the beach deposits from the till uplands enhances recharge - Soil zone storage helps supply rate limited GW recharge to the lower layers Click for Animation
  • 22. 22 Soil Zone Drainage (GW Recharge) ► When moisture is available (winter months) there is a near constant, but rate limited, drainage from the soil zone Click for Animation Beach DepositsTill Upland
  • 23. 23 Step 5: Integrated Calibration ► Get the models and the team working together ► Continue to re-conceptualize, as necessary ► Write a draft report to formulate your understanding (and impress your boss/client with your progress)
  • 24. 24 Integrated Model Development Flowchart 24 1. DATA COMPILATION AND SYNTHESIS 2.DEVELOPMENT OF CONCEPTUAL MODELS -STRATIGRAPHY -HYDROSTRAT -SOIL ZONE -WETLANDS -RIVER SYSTEMS 3. SUB-MODEL CONSTRUCTION, PRE-CALIBRATION AND PRE-PEST 4.INTEGRATION APPLICATION AND INSIGHT 5. CALIBRATION PRECIPITATION RUNOFF SUB-MODEL GROUNDWATER FLOW SUB-MODEL ONGOING DATA EVALUATION
  • 25. 25 Integration Time Step ► The timing of the SW and GW processes is very different, and can be a source of contention ► Daily integration time step:  Too fine for GW modelers  Too coarse for SW modelers  No one is happy, so it must be right! Click for Animation
  • 26. 26 Iterate: Sub-model Refinement ► After the first fully integrated simulations, it is likely that the uncoupled models could use another round of refinement  Update the conceptual model as necessary  Refine model parameters  Focus on the timing of the interaction ► GW: Focus on transient shallow system response  Ensure that surface discharge and groundwater discharge to streams matches observed wetland patterns and surface stream flows ► SW: Focus on the split between interflow and recharge  In this final uncoupled refinement phase, the modellers must recognize that model response will not reflect interaction
  • 27. 27 Step 5x: Final Integrated Calibration ► Lots of re-thinking and even re-conceptualization  System response timing and lag is sensitive ► Two key benefits of the final integrated calibration process:  Model Input: Measured total precipitation  Calibrate to: Measured total streamflow ► Baseflow separation is only good for the preliminary stages ► Focus on matching low flows, and not just the peaks  Balanced calibration to heads (GW) and flux (streamflow)
  • 28. 2828 Aquifer Head vs. Stream Stage • GW/SW discharge reverses during each storm event • Baseflow separation does not account for reversals • GSFLOW Simulated Hydrograph at Oro-Hawkstone stream gauge Storm Event Reversal: Stream level higher than aquifer Dry period: Aquifer level higher than stream = GW discharge
  • 29. 29 GW Recharge ► GSFLOW provides ground water recharge estimates on a daily basis Click for Animation
  • 30. 30 Non-Technical Issues and Strategies ► Expect to do a lot of education: clients and peer reviewers  Include plenty of simplified details about model integration in your reports (no one wants to read the manuals!) ► Don’t get too attached to preliminary results  Integrated conceptual models frequently require change  Watch for “blind spots” ► Management: Identify someone who knows a little about everything to oversee integration  A polymath or renaissance hydrogeologist is needed for mediation, and “compromise”
  • 31. 31 Conclusions ► Integrated Modelling is different; It requires:  Integrated calibration strategies ► Don’t become attached to your initial uncoupled calibration estimates! ► Consider re-conceptualization, even late in the integrated process  Integrated data management ► Data silos and barriers will only hide the relationships and response lag between the systems ► Integrated modelling and calibration tools  An integrated and balanced modelling team ► The skill, multi-disciplinary knowledge, and ability of the SW and GW experts to address their “blind spots” is very important ► Our experience after a number of fully-integrated models:  It’s hard, but it’s worth it.
  • 32. 1. DATA COMPILATION AND SYNTHESIS 2.DEVELOPMENT OF CONCEPTUAL MODELS -STRATIGRAPHY -HYDROSTRATIGRAPHY -SOIL ZONE -WETLANDS -RIVER SYSTEMS 3. SUB-MODEL CONSTRUCTION, PRE-CALIBRATION 4.INTEGRATION APPLICATION AND INSIGHT 5. CALIBRATION VALIDATION PRECIPITATION RUNOFF SUB-MODEL GROUNDWATER FLOW SUB-MODEL ONGOING DATA EVALUATION