Michael Krigsman
Asuret, Inc.
                                             IT waste:
617-905-5950
mkrigsman@asuret.com            A world-class problem
                       © Copyright 2009 Asuret Inc. All rights reserved.
Failure is common:
30-70% of projects are
 late, over-budget, or
   don’t meet plan.

        © Copyright 2009 Asuret Inc. All rights reserved.
Total failure worldwide:
maybe $6 trillion (SWAG*)


                                                 *silly wild-ass guess
http://blogs.zdnet.com/projectfailures/?p=6142

                                                 © Copyright 2009 Asuret Inc. All rights reserved.
Many of us
ignore the warning signs




        © Copyright 2009 Asuret Inc. All rights reserved.
So What?
“That’s the IT Department’s
    problem, not mine.”




         © Copyright 2009 Asuret Inc. All rights reserved.
Nightmare
           S c e na rio
Levis can’t fill orders
for one week = 98%
decline in quarterly
profits

http://blogs.zdnet.com/projectfailures/?p=917
http://blogs.zdnet.com/projectfailures/?p=935
 © Copyright 2009 Asuret Inc. All rights reserved. Image © LS&CO
Understanding failure




       © Copyright 2009 Asuret Inc. All rights reserved.
Business vulnerabilities, not technology,
cause the problems
                                              Project
                                            Management
                     Executive                                                          Change
                    Sponsorship                                                       Management



      Stakeholder                                                                                   Third-Party
      Involvement                                                                                  Relationships




                                             IT
   Business
    Case                                  Project                                                         Resource
                                                                                                         Availability
                                          Success



                                  © Copyright 2009 Asuret Inc. All rights reserved.
Managing pain was part of the plan.
    Adrian Sannier
    University Technology Officer, ASU
    (Wall Street Journal, 9/25/07)




                       © Copyright 2009 Asuret Inc. All rights reserved.
Guns at Arizona State University
   Expected: $70M; Plan: $30M
   Typical schedule: 4 yrs; Plan: 1.5 years
   Software vendor: Oracle
   Project goal: Replace payroll system
   Failure: Incorrect paychecks cause severe morale
    problems, including need for armed guards on payday
   Causes:
        Complexity of university payroll
        Primary project strategy: maintain schedule at all cost
        Accepting high error rate, with plan to fix over time




http://blogs.zdnet.com/projectfailures/?p=412
http://blogs.zdnet.com/projectfailures/?p=418
                                                © Copyright 2009 Asuret Inc. All rights reserved.
American LaFrance:
Custom emergency equipment




             © Copyright 2009 Asuret Inc. All rights reserved.
ALF blames IBM for bankruptcy
   Cost: Unknown, but IBM listed as $5.5M creditor
   Goal: Outsource ERP to IBM (financials, inventory, etc.)
   Background: ALF spun out of Freightliner
   Failure: Software problems interfere with inventory
    tracking and other issues, causing late deliveries,
    customer service issues, and quality control
   Result: Bankruptcy filing
   Causes:
        ALF distracted by deteriorating relationship with Freightliner, problems
         with constructing new facility, and economic downturn
        Poor project planning and oversight by IBM



http://blogs.zdnet.com/projectfailures/?p=583

                                                © Copyright 2009 Asuret Inc. All rights reserved.
[W]hen you’re marching through hell,
just keep marching.
    Charles Burbridge
    LAUSD’s CFO
    (LA Times, 3/19/07)




                    © Copyright 2009 Asuret Inc. All rights reserved.
LAUSD payroll broken: teachers suffer
   Budget: $95M; Expected: $135M
   System integrator: Deloitte Consulting
   Software vendor: SAP
   Goal: Replace payroll system
   Failure: Teachers not paid
   Causes:
        University payroll is inherently complex
        Roll out and testing were likely flawed (Union: system not
         run in parallel)
        Complicated work rules
        Deloitte did not press LAUSD for complete information
        SAP did not want to interfere with Deloitte’s account

http://blogs.zdnet.com/projectfailures/?p=130
http://blogs.zdnet.com/projectfailures/?p=436
http://blogs.zdnet.com/projectfailures/?p=576   © Copyright 2009 Asuret Inc. All rights reserved.
Devil’s Triangle relationships
Conflicts of interest are embedded in the structure of the
industry (customer gets fleeced)
   Interlocking and conflicting agendas
       Customer
       System integrator (consultants)
       Technology vendor
   Confused buyers
       Silos and internal conflicts
   Wacky system integrators
       Customer success vs. consulting revenue
   Schizophrenic software vendors
       Loyalties split between customers and integrators


                                 © Copyright 2009 Asuret Inc. All rights reserved.
Oak Park Angst




  © Copyright 2009 Asuret Inc. All rights reserved.
Oak Park, IL: Complete abandonment
   Cost: $2M
   Time frame: complete abandonment after 5-year project
   Software vendor: PeopleSoft
   Project goal: Replace payroll and financials
   Failure: Accounting and finance errors, such as vendors
    paid twice
   Causes:
        Lack of Oak Park sophistication regarding enterprise software
         process, scope, costs over time, management, and so on
        Low-skill finance employees, lacking basic computer skills, did not
         enter data into system
        Insufficient change management and user training

http://blogs.zdnet.com/projectfailures/?p=1304
http://blogs.zdnet.com/projectfailures/?p=1358
                                                 © Copyright 2009 Asuret Inc. All rights reserved.
Project Ocean: Philadelphia’s biggest
and most complex IT system.
    Kumar Kishinchand
    Former City Water Commissioner
    (Computer World, 8/10/06)




                      © Copyright 2009 Asuret Inc. All rights reserved.
Project Ocean: IT overrules experts
   Budget: $9M; Actual: $18M
   Schedule plan: 1.5 yrs; Actual: 3+ years
   Software vendor: Oracle
   Failure: Late, over-budget project
   Causes:
        Water billing is complex: off the shelf software requires customization
        Oracle inexperienced: selected by IT department
        Project manager / executive sponsor turnover
        Finance dep’t in charge; Water dep’t was customer
        Politics and empire-building
        Separately: consultant billing irregularities


http://blogs.zdnet.com/projectfailures/?p=220
http://blogs.zdnet.com/projectfailures/?p=250
                                                © Copyright 2009 Asuret Inc. All rights reserved.
Alignment mismatches drive poor decisions
Poor communication, agendas, and different measures of
success create alignment gaps:

   Information silos
       IT / lines of business
       Internal / external groups
   Distortions: poor judgment, politics,
    and personal agendas
   Extreme case: “Successful” process / failed outcome




                               © Copyright 2009 Asuret Inc. All rights reserved.
Management
   pressure
and the IT divide




              © Copyright 2009 Asuret Inc. All rights reserved.
© Copyright 2009 Asuret Inc. All rights reserved.
J.Crew: Management overrules IT?
   Cost: $3M plus lost sales and dissatisfied customers
   Failure: Impaired ability to capture, process, ship, and
    service orders
   Causes:
        Aggressive internal planning and schedule
        Insufficient testing of new system before replacing old
        Management accepted responsibility
        Plausible scenario: management pressured IT to accept aggressive
         schedule




http://blogs.zdnet.com/projectfailures/?p=1015

                                                 © Copyright 2009 Asuret Inc. All rights reserved.
Industry analyst /
vendor
pay to play game
Subtle, insidious, and real




                       © Copyright 2009 Asuret Inc. All rights reserved.
IT Failure and Waste
Solving the problem
Sweeping changes are needed
   Detect weak signals
       Early warning systems
       Locate problems, amplify message, and communicate to management
   Create feedback loops
       Increase management awareness
       Create a culture of continuous improvement
       Management must listen and act
   Distortions interfere with success
       Denial is the handmaiden of failure
       Political agendas push against success
       Poor judgment is endemic in failure situations
   Industry structure contributes to repeated failure
       Devil’s Triangle
       Analyst conflicts


                                  © Copyright 2009 Asuret Inc. All rights reserved.
Detect weak signals
Work across departments to leverage the collective
intelligence and experience of all stakeholders.




                      © Copyright 2009 Asuret Inc. All rights reserved.
Facilitate consensus across silos
Use non-threatening techniques to:

   Avoid bias
   Remove emotion and political pressures
   Create organizational consensus and enhance
    collaboration




                      © Copyright 2009 Asuret Inc. All rights reserved.
Identify vulnerability hotspots




                © Copyright 2009 Asuret Inc. All rights reserved.
Pinpoint top management priorities




               © Copyright 2009 Asuret Inc. All rights reserved.
Reveal mismatched expectations

Executive management view:
          Business case has
           high vulnerability




                                                                                    IT department view:
                                                                                    Business case has
                                                                                    low vulnerability


                                © Copyright 2009 Asuret Inc. All rights reserved.
Identify critics / champions
Analyze differences in stakeholder opinion across
the organization, helping management target areas
needing communication, training, and support.




                                                                                                                                                                      Participant 10

                                                                                                                                                                                       Participant 11


                                                                                                                                                                                                        Participant 12
                    Participant 1

                                      Participant 2


                                                      Participant 3


                                                                      Participant 4

                                                                                      Participant 5


                                                                                                      Participant 6

                                                                                                                      Participant 7


                                                                                                                                      Participant 8

                                                                                                                                                      Participant 9
                                    Critic                                                               Champion


                                    © Copyright 2009 Asuret Inc. All rights reserved.
Deliver comprehensive reporting
Suitable for Board, management, staff, and partners:
   Identify critical health indicators
   Highlight specific vulnerabilities
   Target immediate and actionable next steps




                       © Copyright 2009 Asuret Inc. All rights reserved.
Trusted, objective advisor
   Independent authority on IT success
   Absolutely vendor-neutral
    For more information contact:
    Michael Krigsman, CEO
    Email: mkrigsman@asuret.com
    Web: http://asuret.com
    Blog: http://blogs.zdnet.com/projectfailures
    + 1 (617) 905-5950

                                 © Copyright 2009 Asuret Inc. All rights reserved.

More Related Content

PDF
IT Failures Town Hall: Risks of Survival
PDF
Preventing CRM failures
PPTX
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
PPTX
IS Failures - state of the art ?
PDF
Business Continuation The Basics
PPT
2007 CPM West Keynote Presentation
PDF
The Lost World of Problem Management (2009)
PPT
Preparing For The Governance Backlash
IT Failures Town Hall: Risks of Survival
Preventing CRM failures
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
IS Failures - state of the art ?
Business Continuation The Basics
2007 CPM West Keynote Presentation
The Lost World of Problem Management (2009)
Preparing For The Governance Backlash

What's hot (20)

PDF
We Have Met The Enemy - He is Us - The human factor in project failure
PDF
Chaos report
PDF
201210 Insurance and Technology: Changing Times- How CIO's Can Increase Influ...
PDF
Chaos report 2012
PDF
CloudSource-white paper
PPTX
Taxonomy Change Management
PDF
disaster-recovery-online
PDF
Consequences of a Failed ECM Implementation
PPTX
2014 10 16_challenge of natural security systems
PDF
High-Reliability Organizations: Managing Risk In Complex Operating Environments
PDF
Technology Challenges Facing Small Staff Associations
PPT
Destination CRM
PDF
Garrett, Muha, and Shaw "Why Publishing Systems and Platforms Require Re-Engi...
PDF
Six IT decisions should not be taken by IT people
PPT
Federated Access Management, JISC Presentation
PDF
5 Best Practices for Successful Cloud Deployments – and the Pitfalls to Avoid
PDF
Organizational Agility: The Hidden Goal (And Often Missed Opportunity) of Agi...
PDF
HUB International: "Broker Insight Report: Business Interruption Insurance"
PDF
Amalfi core coop-v5a
PPT
Semantech Inc. Architecture Fusion
We Have Met The Enemy - He is Us - The human factor in project failure
Chaos report
201210 Insurance and Technology: Changing Times- How CIO's Can Increase Influ...
Chaos report 2012
CloudSource-white paper
Taxonomy Change Management
disaster-recovery-online
Consequences of a Failed ECM Implementation
2014 10 16_challenge of natural security systems
High-Reliability Organizations: Managing Risk In Complex Operating Environments
Technology Challenges Facing Small Staff Associations
Destination CRM
Garrett, Muha, and Shaw "Why Publishing Systems and Platforms Require Re-Engi...
Six IT decisions should not be taken by IT people
Federated Access Management, JISC Presentation
5 Best Practices for Successful Cloud Deployments – and the Pitfalls to Avoid
Organizational Agility: The Hidden Goal (And Often Missed Opportunity) of Agi...
HUB International: "Broker Insight Report: Business Interruption Insurance"
Amalfi core coop-v5a
Semantech Inc. Architecture Fusion
Ad

Viewers also liked (15)

PPT
Edi 2Ecommerce data interchange
PPTX
Electronic Data Interchange
PPTX
Edi new
PPT
Ed ipresentation dpp
PPTX
Basics of ecommerce part2
PPT
electronic data interchange
PDF
Edi Best Practice
PPTX
Electronic data interchange
PPTX
PPTX
Presentation - Electronic Data Interchange
PPT
PPTX
Electronic data interchange
PPT
Edi ppt
PPT
ELECTRONIC DATA INTERCHANGE
PPTX
Introduction to EDI Basics
 
Edi 2Ecommerce data interchange
Electronic Data Interchange
Edi new
Ed ipresentation dpp
Basics of ecommerce part2
electronic data interchange
Edi Best Practice
Electronic data interchange
Presentation - Electronic Data Interchange
Electronic data interchange
Edi ppt
ELECTRONIC DATA INTERCHANGE
Introduction to EDI Basics
 
Ad

Similar to IT Failure and Waste (20)

PDF
Why Projects Fail: Obstacles and Solutions
PDF
Project Governance and Failure
PPT
How Poor Or Missing Requirements Can Kill An It Project
DOCX
Introduction Where last week we examined specific and quan.docx
PPTX
PuppetConf2012GeneKim
PPTX
Does the project manager stand a chance?
PPTX
When IT Fails The Business Fails...
PDF
Early Warning Signs of IT Project Failure -- The Deadly Dozen and the Four Ho...
PDF
Stop Blaming The Software - Corporate Profiling for IT Project Success
PDF
Minimize IT Project Failures!
PPTX
Matinée PMI - Why so many technology projects failing
PPT
Breakthroughs In [It] Project Management Slideshare
PDF
Large Project Value Realization
PDF
Project rescue fix it ot kill it
PDF
Ministry of Justice Transforming Resource Management SFIA
PDF
Creating Great Computer & Software Contracts that Protect All Parties
PDF
Avoiding IT Litigation with Great IT & Software Development Contracts
PPT
KEY
IT Litigators Library
Why Projects Fail: Obstacles and Solutions
Project Governance and Failure
How Poor Or Missing Requirements Can Kill An It Project
Introduction Where last week we examined specific and quan.docx
PuppetConf2012GeneKim
Does the project manager stand a chance?
When IT Fails The Business Fails...
Early Warning Signs of IT Project Failure -- The Deadly Dozen and the Four Ho...
Stop Blaming The Software - Corporate Profiling for IT Project Success
Minimize IT Project Failures!
Matinée PMI - Why so many technology projects failing
Breakthroughs In [It] Project Management Slideshare
Large Project Value Realization
Project rescue fix it ot kill it
Ministry of Justice Transforming Resource Management SFIA
Creating Great Computer & Software Contracts that Protect All Parties
Avoiding IT Litigation with Great IT & Software Development Contracts
IT Litigators Library

More from Michael Krigsman (9)

PDF
20 Influential Chief Information Officers
PDF
CXOTalk: 20 Influential Chief Digital Officers
PPTX
Understanding the Marketing Technology Landscape
PPTX
Startups and Corporate Innovation
PDF
Innovation in higher education: Beyond the social campus
PDF
Success and failure in the time of social
PDF
BriefingsDirect : Psychology of project management and SOA governance
PDF
Asuret Overview
PDF
HMRC Poynter Review - IT failure analysis
20 Influential Chief Information Officers
CXOTalk: 20 Influential Chief Digital Officers
Understanding the Marketing Technology Landscape
Startups and Corporate Innovation
Innovation in higher education: Beyond the social campus
Success and failure in the time of social
BriefingsDirect : Psychology of project management and SOA governance
Asuret Overview
HMRC Poynter Review - IT failure analysis

Recently uploaded (20)

PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Electronic commerce courselecture one. Pdf
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
cuic standard and advanced reporting.pdf
PDF
Approach and Philosophy of On baking technology
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Machine learning based COVID-19 study performance prediction
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
KodekX | Application Modernization Development
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PPTX
Spectroscopy.pptx food analysis technology
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Diabetes mellitus diagnosis method based random forest with bat algorithm
Per capita expenditure prediction using model stacking based on satellite ima...
Electronic commerce courselecture one. Pdf
Network Security Unit 5.pdf for BCA BBA.
Review of recent advances in non-invasive hemoglobin estimation
cuic standard and advanced reporting.pdf
Approach and Philosophy of On baking technology
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Chapter 3 Spatial Domain Image Processing.pdf
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Machine learning based COVID-19 study performance prediction
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Advanced methodologies resolving dimensionality complications for autism neur...
KodekX | Application Modernization Development
Agricultural_Statistics_at_a_Glance_2022_0.pdf
“AI and Expert System Decision Support & Business Intelligence Systems”
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Spectroscopy.pptx food analysis technology
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx

IT Failure and Waste

  • 1. Michael Krigsman Asuret, Inc. IT waste: 617-905-5950 mkrigsman@asuret.com A world-class problem © Copyright 2009 Asuret Inc. All rights reserved.
  • 2. Failure is common: 30-70% of projects are late, over-budget, or don’t meet plan. © Copyright 2009 Asuret Inc. All rights reserved.
  • 3. Total failure worldwide: maybe $6 trillion (SWAG*) *silly wild-ass guess http://blogs.zdnet.com/projectfailures/?p=6142 © Copyright 2009 Asuret Inc. All rights reserved.
  • 4. Many of us ignore the warning signs © Copyright 2009 Asuret Inc. All rights reserved.
  • 5. So What? “That’s the IT Department’s problem, not mine.” © Copyright 2009 Asuret Inc. All rights reserved.
  • 6. Nightmare S c e na rio Levis can’t fill orders for one week = 98% decline in quarterly profits http://blogs.zdnet.com/projectfailures/?p=917 http://blogs.zdnet.com/projectfailures/?p=935 © Copyright 2009 Asuret Inc. All rights reserved. Image © LS&CO
  • 7. Understanding failure © Copyright 2009 Asuret Inc. All rights reserved.
  • 8. Business vulnerabilities, not technology, cause the problems Project Management Executive Change Sponsorship Management Stakeholder Third-Party Involvement Relationships IT Business Case Project Resource Availability Success © Copyright 2009 Asuret Inc. All rights reserved.
  • 9. Managing pain was part of the plan. Adrian Sannier University Technology Officer, ASU (Wall Street Journal, 9/25/07) © Copyright 2009 Asuret Inc. All rights reserved.
  • 10. Guns at Arizona State University  Expected: $70M; Plan: $30M  Typical schedule: 4 yrs; Plan: 1.5 years  Software vendor: Oracle  Project goal: Replace payroll system  Failure: Incorrect paychecks cause severe morale problems, including need for armed guards on payday  Causes:  Complexity of university payroll  Primary project strategy: maintain schedule at all cost  Accepting high error rate, with plan to fix over time http://blogs.zdnet.com/projectfailures/?p=412 http://blogs.zdnet.com/projectfailures/?p=418 © Copyright 2009 Asuret Inc. All rights reserved.
  • 11. American LaFrance: Custom emergency equipment © Copyright 2009 Asuret Inc. All rights reserved.
  • 12. ALF blames IBM for bankruptcy  Cost: Unknown, but IBM listed as $5.5M creditor  Goal: Outsource ERP to IBM (financials, inventory, etc.)  Background: ALF spun out of Freightliner  Failure: Software problems interfere with inventory tracking and other issues, causing late deliveries, customer service issues, and quality control  Result: Bankruptcy filing  Causes:  ALF distracted by deteriorating relationship with Freightliner, problems with constructing new facility, and economic downturn  Poor project planning and oversight by IBM http://blogs.zdnet.com/projectfailures/?p=583 © Copyright 2009 Asuret Inc. All rights reserved.
  • 13. [W]hen you’re marching through hell, just keep marching. Charles Burbridge LAUSD’s CFO (LA Times, 3/19/07) © Copyright 2009 Asuret Inc. All rights reserved.
  • 14. LAUSD payroll broken: teachers suffer  Budget: $95M; Expected: $135M  System integrator: Deloitte Consulting  Software vendor: SAP  Goal: Replace payroll system  Failure: Teachers not paid  Causes:  University payroll is inherently complex  Roll out and testing were likely flawed (Union: system not run in parallel)  Complicated work rules  Deloitte did not press LAUSD for complete information  SAP did not want to interfere with Deloitte’s account http://blogs.zdnet.com/projectfailures/?p=130 http://blogs.zdnet.com/projectfailures/?p=436 http://blogs.zdnet.com/projectfailures/?p=576 © Copyright 2009 Asuret Inc. All rights reserved.
  • 15. Devil’s Triangle relationships Conflicts of interest are embedded in the structure of the industry (customer gets fleeced)  Interlocking and conflicting agendas  Customer  System integrator (consultants)  Technology vendor  Confused buyers  Silos and internal conflicts  Wacky system integrators  Customer success vs. consulting revenue  Schizophrenic software vendors  Loyalties split between customers and integrators © Copyright 2009 Asuret Inc. All rights reserved.
  • 16. Oak Park Angst © Copyright 2009 Asuret Inc. All rights reserved.
  • 17. Oak Park, IL: Complete abandonment  Cost: $2M  Time frame: complete abandonment after 5-year project  Software vendor: PeopleSoft  Project goal: Replace payroll and financials  Failure: Accounting and finance errors, such as vendors paid twice  Causes:  Lack of Oak Park sophistication regarding enterprise software process, scope, costs over time, management, and so on  Low-skill finance employees, lacking basic computer skills, did not enter data into system  Insufficient change management and user training http://blogs.zdnet.com/projectfailures/?p=1304 http://blogs.zdnet.com/projectfailures/?p=1358 © Copyright 2009 Asuret Inc. All rights reserved.
  • 18. Project Ocean: Philadelphia’s biggest and most complex IT system. Kumar Kishinchand Former City Water Commissioner (Computer World, 8/10/06) © Copyright 2009 Asuret Inc. All rights reserved.
  • 19. Project Ocean: IT overrules experts  Budget: $9M; Actual: $18M  Schedule plan: 1.5 yrs; Actual: 3+ years  Software vendor: Oracle  Failure: Late, over-budget project  Causes:  Water billing is complex: off the shelf software requires customization  Oracle inexperienced: selected by IT department  Project manager / executive sponsor turnover  Finance dep’t in charge; Water dep’t was customer  Politics and empire-building  Separately: consultant billing irregularities http://blogs.zdnet.com/projectfailures/?p=220 http://blogs.zdnet.com/projectfailures/?p=250 © Copyright 2009 Asuret Inc. All rights reserved.
  • 20. Alignment mismatches drive poor decisions Poor communication, agendas, and different measures of success create alignment gaps:  Information silos  IT / lines of business  Internal / external groups  Distortions: poor judgment, politics, and personal agendas  Extreme case: “Successful” process / failed outcome © Copyright 2009 Asuret Inc. All rights reserved.
  • 21. Management pressure and the IT divide © Copyright 2009 Asuret Inc. All rights reserved.
  • 22. © Copyright 2009 Asuret Inc. All rights reserved.
  • 23. J.Crew: Management overrules IT?  Cost: $3M plus lost sales and dissatisfied customers  Failure: Impaired ability to capture, process, ship, and service orders  Causes:  Aggressive internal planning and schedule  Insufficient testing of new system before replacing old  Management accepted responsibility  Plausible scenario: management pressured IT to accept aggressive schedule http://blogs.zdnet.com/projectfailures/?p=1015 © Copyright 2009 Asuret Inc. All rights reserved.
  • 24. Industry analyst / vendor pay to play game Subtle, insidious, and real © Copyright 2009 Asuret Inc. All rights reserved.
  • 27. Sweeping changes are needed  Detect weak signals  Early warning systems  Locate problems, amplify message, and communicate to management  Create feedback loops  Increase management awareness  Create a culture of continuous improvement  Management must listen and act  Distortions interfere with success  Denial is the handmaiden of failure  Political agendas push against success  Poor judgment is endemic in failure situations  Industry structure contributes to repeated failure  Devil’s Triangle  Analyst conflicts © Copyright 2009 Asuret Inc. All rights reserved.
  • 28. Detect weak signals Work across departments to leverage the collective intelligence and experience of all stakeholders. © Copyright 2009 Asuret Inc. All rights reserved.
  • 29. Facilitate consensus across silos Use non-threatening techniques to:  Avoid bias  Remove emotion and political pressures  Create organizational consensus and enhance collaboration © Copyright 2009 Asuret Inc. All rights reserved.
  • 30. Identify vulnerability hotspots © Copyright 2009 Asuret Inc. All rights reserved.
  • 31. Pinpoint top management priorities © Copyright 2009 Asuret Inc. All rights reserved.
  • 32. Reveal mismatched expectations Executive management view: Business case has high vulnerability IT department view: Business case has low vulnerability © Copyright 2009 Asuret Inc. All rights reserved.
  • 33. Identify critics / champions Analyze differences in stakeholder opinion across the organization, helping management target areas needing communication, training, and support. Participant 10 Participant 11 Participant 12 Participant 1 Participant 2 Participant 3 Participant 4 Participant 5 Participant 6 Participant 7 Participant 8 Participant 9 Critic Champion © Copyright 2009 Asuret Inc. All rights reserved.
  • 34. Deliver comprehensive reporting Suitable for Board, management, staff, and partners:  Identify critical health indicators  Highlight specific vulnerabilities  Target immediate and actionable next steps © Copyright 2009 Asuret Inc. All rights reserved.
  • 35. Trusted, objective advisor  Independent authority on IT success  Absolutely vendor-neutral For more information contact: Michael Krigsman, CEO Email: mkrigsman@asuret.com Web: http://asuret.com Blog: http://blogs.zdnet.com/projectfailures + 1 (617) 905-5950 © Copyright 2009 Asuret Inc. All rights reserved.