SlideShare a Scribd company logo
Tahapan perencanaan
terminal agribisnis
Sumber:
Wholesale markets, Planning and design manual
by J. D. Tracey-White
FAO 1991
(diolah)

Kawi Boedisetio
Telebiro.bandung0@clubmember.org
Wieke Irawati Kodri
fe_bandung@yahoo.com
Pengantar
• Dokumen ini berisi diagram proses untuk
melakukan perancangan dan perencanaan
pembangunan Pasar Sayur atau “Sub-Terminal
Agribisnis”
Untuk memudahkan pembacaan, 9 slide berikut
perlu di-print dan hasilnya disambung-sambung,
sesuai dengan “connector” yang ada.

A1

B1

A2

B2

A3

B3

A4

B4
Figure 4 – A Design Methodology
STAGE I

ACTIVITIES

Management
and Operations

Location and
Planning

Construction
and Implementation

STAGE II

STAGE III

STAGE IV

Project Identification and
pre-feasibility

Detailed
Design
Development

Project
formulation
and feasibility

Project
Implementation

National
Policy &
Goals, Institutional
Structure

Context,
review of
Facilities &
Site Selection

Operation
Plan &
Management
Procedures

Plan options
& Land Use Traffic
Master Plan

Building
options,
Structure,
Materials &
Costs

Staffing,
Training,
and Initiate
Operations

Plan
Evaluation &
Financial
Analysis

FUNCTIONS

Administrators
and
Policy Maker

Planners
and
Economists

Tender
Documents,
Construction
&
Procurement

Engineers
And
Architects
A1

Data
Collection

Surveys

National
Agricultural Policy

Existing Marketing
Studies
Existing Market
Records
Agricultural
Production Data
National
Consumption Data

Data
Analysis

Preliminary
Physical Survey of
Market

Tabulate Existing
Market Facilities

Reconnaissance
Survey of Market
Operations

Define Market
Functionaries

Identify Existing
Shortcomings

Appraisal of Market
Facilities

Analysis of Existing
Marketing System

Define Marketing
Channels
Tabulate Catchment Production

Demographic Data

Tabulate
Population Data

Legislation &
Ordinance

Extract Relevant
Laws

Synthesis
Definition of Project
Goals

Tabulate Relevant
Development
Policies

Regional Planning
Studies
Existing Sector
Programme

Data
Processing

Estimate Market
Turnover

Estimate Design
Population

Review Suitability
of Site Size &
Location

Definition of Project
Risks
Project Future
Needs

Identify Project
Beneficiaries
Identify Management Options
A2

Data
Collection

Stage 1 Context
data & Studies:
• Existing
Marketing Studies
• Existing Market
records
• Agricultural
Production
• National
Consumption
• Demography
• Management
Proposals

Detailed Survey of
Market Operations

Data
Analysis
Define End-of
Project Status

Review Design
Population

Stage 1 definition
of Project Goals

Data
Processing
Review Development Policies

Surveys

Quantify Project
Beneficiaries

Review Market
Functionaries

Review Marketing
Channels
Detailed Field
Suirvey of Traders
& Turnover

Review Catchment
Production
Manual/Computer
Spreadsheet

Stage 2 Final
Master Plan

Stage 2 Civil Works
Budget

Appraisal of
Operations &
Management
Options
Analysis of Existing
Marketing System
Project Market
Turnover

Synthesis

Define Project’s
Immediate
Objectives &
Outputs

Define Project’s
Inputs

Formulate Market
Procedures &
Agree Staffing
Establishment

Estimate Utilization
of Market Facilities

Phasing of Design
Options
Agree Equipment
Needs
A3

Data
Collection

Surveys

Data
Processing

Check Stage 1
Findings on
Existing
Shortcomings,
Project Risks,
Issues &
Beneficiaries

Stage 1 Review
Proposals/Issues
Local Planning
Studies

Maps and Aerial
Photographs
Climatic / Hydrogeology Studies
Existing Geotechnical Studies

Survey of Traders
& Turnover
Engineering
Survey of Markets:
• Historic
• Topographic
• Geodetic
• Site Features
• Services
• Soils

Survey of Traffic
Modes & Volumes

Manual / Computer
Spreadsheets
Tabulate existing
market facilities
Base Map
Preparation

Official Rates &
Cost data
Stage 1 Draft
Project Budget

Construction
Materials
Availability

Further analysis of
existing market
facilities

Tabulate suitable
materials

Collate cost Data
Local Construction
Cost Review

Revise estimate of
Demand & Trade
Volumes

Constraints &
Opportunities
Mapping

Planning / Building
Regulations
Construction
Materials Studies

Data
Analysis

Synthesis
Revision of Project
Goals

Refine Stage 1
Estimate of Phisical
needs
Define
Accomodation Brief

Review Site
Planning Options
Review Building
Design Options:
• Modules
• Facilities
• Overall Form
• Climatic Design

Prepare Unit Rates
Review Stage 1
Draft Budget
A4

Data
Collection
List of Monitoring &
Evaluation
Indicators
Stage 3
Management
Structure &
Institutions Report

Surveys

Studies/Survey:
• Training
• MIS System
• Regulations
• Facilities

Technical
Assistance Needs

Data
Processing

Stage 2 Phasing
Programme

Stage 2 Final
Master Plan &
Development Brief
Stage 2 Building
Design Drawings

Agreed M & E
Programme

Review training
proposals

Agreed Scope of
Training
Programme

Review issues to
be resolved

Finalize Staffing
Establishment

Review Work Plan
& Phasing
Programme

Stage 3 Project
Work Plan

Detailed Stage 3 &
Stage 2 Civil Works
Budgets

Synthesis

Review M & E
Requirements

Establishment of
Market
management
Board &
Appointment of
Core Management
& Operations Staff

Data
Analysis

Detailed Engineering Surveys:
• Geotechnic
• Geodetic
• Materials

Selection and
Appointment of
Design &
Supervision
Consultants

Survey SubContractors reports

Review budget
allocations
Review Design
Changes

Agreed Phasing of
Development

Confirm Availability
of Finance
Agreed Design
Drawing
Programme
B1

RecommendatIons
Outline
Consultation
Procedure

Client Policy
Making Body &
Donors

Budget Request
Form

Final

Output
User

Project Identification & PreFeasibility report

Detailed

Output
Form

Finance Ministry &
Donors

Land Purchase
Form

Lands / Survey
Ministry

Terms of reference
for Initial Surveys:
•Engineering
•Social
•Marketing

Public Works Dept.
/ Engineering
Consultans

Preliminary Estimate of Phisical
requirements
Define Issues to be
resolved
Adjustment of
Development
Programme,
Budget Estimate &
Preliminary
Financial Analysis

Draft Budget
Requirements
Land Acquisition
Requirements
Further Survey
Requirements

Marketing Dept. or
Authority

Institutional
Proposals

Draft management
Structure &
Institutions Report

Law Ministry /
Client Body
B2

Figure 6 Stage II - detailed design development
RecommendatIons
Output
Output
Form
User
Outline
Detailed
Final
Consultation &
Agree Parameters
to be used in
Analysis
Review of Design
Options & Project
Risks
Estimate recurrent
Costs:
•Salaries
•Qverheads
•Depreciation
•Repairs &
Maintenance
Estimate Annual
Revenues:
•Levies
•Rents
•Parking Fees
Estimate Capital
Costs:
•Land Purchase
•Surveys
•Civil Works
•Equipment

Justification of
Project Benefits &
Risks

Overall Project
Design, Financial &
Economic Analysis,
including Sensitivity
testing

Final Institutional
Strategy
Further Issues to
be Resolved
Agreed Coordination
Arrangements
Further Survey
Requirements

Technical
Assistance
Requirements
Prepare Cash
Flows for Basic
Options
Final Budget
Requirements

Project Feasibility
Report

Final Management
Structure &
Institutions Report

Client Policy
Making Body &
Donors
Law Ministry

Project Work Plan /
Bar Chart
List of Monitoring &
Evaluation
Indicators
Terms of reference
for further Studies /
Surveys:
•Training
•MIS System
•Market
Regulations
•Facilities
•EIA
Detailed Budget
Form

Marketing Dept. or
Authority

Management /
Engineering
Consultant

Finance Ministry &
Donors
B3

RecommendatIons
Outline

Detailed

Final

Consultation
Procedure: staffing,
costs, demand,
phasing & Facilities

Adjustments from
Consultation &
Stage 3 Feasibility
Study

Output
Form

Further Issues to
be Resolved

Draft Master Plan

Sketch Design of
Buildings &
Facilities

Detailed Site
Planning and
Engineering
Studies:
•Earthworks
•Reclamation
•Conservation
•Land Drainage
•Roads/Parking
•Site Services
•Urban Design
•Landscaping
Detailed Building
Design:
•Circulation
•Space Needs
•Services
•Expansion
•Evaluation of
Structure &
Materials

Client Policy
Making Body &
Donors

Final Land Use &
Traffic Master Plan
Phasing
Programme
Defined Off Site
Infrastructure
Requirements

Further Survey
Requirements

Project Master Plan
report
&
Detailed
Development Brief

Terms of reference
for Detailed
Surveys:
•Geotechnic
•Geodetic
•Materials

Final Building
Designs
Outline
Specification Notes
& Final Cost
Estimate

Output
User

Building Design
Drawings

Final Civil Works
Budget

Marketing Dept. or
Authority
Local Planning
Authority
Public Works Dept.
/ Engineering
Consultants
Survey
Subcontractors
Lands/Survey
Ministry
Construction
Consultants
Finance Ministry &
Donors
B4

RecommendatIons
Outline
Preparation of
Overall Training
programme
Define Training
Recipients
Define Salary
Scales
Define Context:
•Cost Plan
•Materials Supply
•Contract Types
•Phasing Targets
•Pre-qualification

Detailed
Prepare Training
Material & Pilot
Test Training
Programme
Initiate Staff
Recruitment
Trader/Public
Participation
Design Accounting
System
Agreed Financial
Management
System

Preparation of
Working Drawings,
Specifications &
Bills of Quantities
for Civil Works

Tendering
Procedure:
•Analysis
•Award

Review Equipment
Needs

Final Equipment
List/Specification

Final
Finalize M & E
System

Staff Training
Initiated
Agreed Rents,
Tolls, Levies &
Parking Fees
Selection of
Applicants/
Stallholders
Finalize Market
Procedures
Selection of
Contractors &
Contract Start

Output
Form

Output
User

M & E Guidelines

Client Policy
Making Body &
Donors

Trained Staff
Schedule of Tolls &
Levies
Register of
Traders/Leases
Management
Manual:
•Procedures
•Training
•Accounts

Finalize Working
Details

Contract
Documents:
•Drawings/Spec.
•Signed Contract
•Materials Testing
Programme

Equipment
Procurement

Procurement
Scedules

Training Body TA
Consultants

Private Sector
Investors/Traders
Marketing
Authority/Board
Management
Consultants
Finance Ministry &
Donors
Appointed
Contractors
Design & Supervision Consultants
Materials/Equipment Suppliers
Mulai dibuat

Fonts tambahan

Jumlah halaman

07/09/2002

Comic Sans MS

32
Kawi Boedisetio

+62 817 219 755
telebiro.bandung0@clubmember.org

kawi.4shared.com

More Related Content

PDF
HB264 significant changes
PDF
Multi sites construction management and supervision - Oracle Primavera P6 Co...
PPT
2011 APA Positioning Planning Deaprtments - Minneapolis
DOC
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
DOC
Plan for technology
PDF
Land Development Systems Modernization
PDF
Tobacco road meets the technology highway part iii ppt
PPTX
Zoning Ordinance Modernization Project (zMOD): April 13, 2017
HB264 significant changes
Multi sites construction management and supervision - Oracle Primavera P6 Co...
2011 APA Positioning Planning Deaprtments - Minneapolis
KIM ALLISON KELLEY 2016 - NEW - Linkedin Resume as 10262016
Plan for technology
Land Development Systems Modernization
Tobacco road meets the technology highway part iii ppt
Zoning Ordinance Modernization Project (zMOD): April 13, 2017

What's hot (20)

PPTX
Parking Initiatives Update: May 11, 2017
PPTX
Rural Economic Development Program Application Tips 2018
DOCX
Turnkey implementation of distribution projects
PPTX
6 sept project fiche
PPT
Non-technological Aspects of Service-Orien Map Production
PPT
I1495 tac1
PPTX
NVBIA NAIOP GOAL 3 Update
PDF
Northgate Study and Operations Plan
PPTX
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
PPTX
Project Monitoring System (PMIS)
PPS
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
PDF
Time & Schedule, Submittals, Site visits, Testing and Inspection
DOC
CV - SimonV7
PPT
Benchmark Historic Tax Credit Presentation
DOC
Generic rlresume
PPT
Baseline Condition Assessment
PPSX
Chapter 2 construction project planning and scheduling
PPTX
CONSTRUCTION MANAGEMENT
PDF
PROJECT MANAGEMENT
DOC
CV Prakash Mistry
Parking Initiatives Update: May 11, 2017
Rural Economic Development Program Application Tips 2018
Turnkey implementation of distribution projects
6 sept project fiche
Non-technological Aspects of Service-Orien Map Production
I1495 tac1
NVBIA NAIOP GOAL 3 Update
Northgate Study and Operations Plan
Adding Flexibility to Fairfax County's Public Facilities Manual (PFM)
Project Monitoring System (PMIS)
Urbanistic Equalization and Compensatory Mechanism - From Legislation to GIS
Time & Schedule, Submittals, Site visits, Testing and Inspection
CV - SimonV7
Benchmark Historic Tax Credit Presentation
Generic rlresume
Baseline Condition Assessment
Chapter 2 construction project planning and scheduling
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
CV Prakash Mistry
Ad

Viewers also liked (19)

PDF
KB oyama &-yufuin-02
PDF
KB FGD-3-r05
PDF
KB pelatihan basis-data-02
PDF
KB mitos dan realitas-03
PDF
Kb sistem inovasi- daerah-21
PDF
KB Diamond-01
PDF
Kb ovop-01
PDF
KB survai-14
PDF
KB campaign-05
PDF
Kb sistem inovasi daerah-23
PDF
KB jamurklaster-03
PDF
KB techno pemuda-04
PDF
KB migrasi-03
PDF
Kb layanan kemasan-02
PDF
Kb sengatan sengata-12
PDF
KB whitebook-03
PDF
KB contoh klaster-31
PDF
KB innovative financing-02
PDF
Kb pohon industri-11
KB oyama &-yufuin-02
KB FGD-3-r05
KB pelatihan basis-data-02
KB mitos dan realitas-03
Kb sistem inovasi- daerah-21
KB Diamond-01
Kb ovop-01
KB survai-14
KB campaign-05
Kb sistem inovasi daerah-23
KB jamurklaster-03
KB techno pemuda-04
KB migrasi-03
Kb layanan kemasan-02
Kb sengatan sengata-12
KB whitebook-03
KB contoh klaster-31
KB innovative financing-02
Kb pohon industri-11
Ad

Similar to KB design methodology-02 (20)

PPTX
Infinity studio project report
PDF
Project Management Project 1 Report
DOCX
Proposal a pasar desa
DOCX
PDF
Project Management and Development Economics Project (Slides)
PPTX
Technical analysis in project.khudshfkwjjjjjjjjjjs
PPT
How to Prepare Innovative Feasibility Study in transitional economy
PPTX
PDF
Project Management.Project 1
PPTX
Ici project brief2
PPT
Mundra SEZ
DOCX
Major aspects of Feasibility Study
PPT
Design process spring 2013
PPT
Feasibility studies
PPTX
Feasibility Study in Indonesia_intro.pptx
PDF
Project report of a business
PPTX
Techno Economic Feasibility Report I Gaurav Singh Rajput
PPTX
426973215-Reviewer-Mas-2.pptx
DOCX
Indicative information required in detailed project report for finance, sub...
Infinity studio project report
Project Management Project 1 Report
Proposal a pasar desa
Project Management and Development Economics Project (Slides)
Technical analysis in project.khudshfkwjjjjjjjjjjs
How to Prepare Innovative Feasibility Study in transitional economy
Project Management.Project 1
Ici project brief2
Mundra SEZ
Major aspects of Feasibility Study
Design process spring 2013
Feasibility studies
Feasibility Study in Indonesia_intro.pptx
Project report of a business
Techno Economic Feasibility Report I Gaurav Singh Rajput
426973215-Reviewer-Mas-2.pptx
Indicative information required in detailed project report for finance, sub...

More from PUPUK (20)

PDF
KB inclusive business-02
PDF
KB Pohon Industri-20
PDF
KB pohon industri-19
PDF
KB Bahan Bacaan-36
PDF
KB state_of_the_arts-03
PDF
KB FGD-7-r04
PDF
KB FGD-6-r05
PDF
KB FGD-5-r02
PDF
KB FGD-4-r03
PDF
KB FGD-2-r19
PDF
KB FGD-1-r25
PDF
KB greenbook-3-ind-06
PDF
KB CSR 02
PDF
KB studipasar-04
PDF
KB san ojego-07
PDF
KB lembar kerja_CSR-02
PDF
KB lokabiz-03
PDF
KB Cluster Game-08
PDF
KB input-output table-r05
PDF
KB Komponen Teknologi-04
KB inclusive business-02
KB Pohon Industri-20
KB pohon industri-19
KB Bahan Bacaan-36
KB state_of_the_arts-03
KB FGD-7-r04
KB FGD-6-r05
KB FGD-5-r02
KB FGD-4-r03
KB FGD-2-r19
KB FGD-1-r25
KB greenbook-3-ind-06
KB CSR 02
KB studipasar-04
KB san ojego-07
KB lembar kerja_CSR-02
KB lokabiz-03
KB Cluster Game-08
KB input-output table-r05
KB Komponen Teknologi-04

Recently uploaded (20)

PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
RMMM.pdf make it easy to upload and study
PDF
Anesthesia in Laparoscopic Surgery in India
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Classroom Observation Tools for Teachers
PDF
01-Introduction-to-Information-Management.pdf
PPTX
Lesson notes of climatology university.
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Trump Administration's workforce development strategy
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Complications of Minimal Access Surgery at WLH
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
RMMM.pdf make it easy to upload and study
Anesthesia in Laparoscopic Surgery in India
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Classroom Observation Tools for Teachers
01-Introduction-to-Information-Management.pdf
Lesson notes of climatology university.
STATICS OF THE RIGID BODIES Hibbelers.pdf
Weekly quiz Compilation Jan -July 25.pdf
human mycosis Human fungal infections are called human mycosis..pptx
Computing-Curriculum for Schools in Ghana
Microbial diseases, their pathogenesis and prophylaxis
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Trump Administration's workforce development strategy
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Complications of Minimal Access Surgery at WLH
Supply Chain Operations Speaking Notes -ICLT Program
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Abdominal Access Techniques with Prof. Dr. R K Mishra

KB design methodology-02

  • 1. Tahapan perencanaan terminal agribisnis Sumber: Wholesale markets, Planning and design manual by J. D. Tracey-White FAO 1991 (diolah) Kawi Boedisetio Telebiro.bandung0@clubmember.org Wieke Irawati Kodri fe_bandung@yahoo.com
  • 2. Pengantar • Dokumen ini berisi diagram proses untuk melakukan perancangan dan perencanaan pembangunan Pasar Sayur atau “Sub-Terminal Agribisnis”
  • 3. Untuk memudahkan pembacaan, 9 slide berikut perlu di-print dan hasilnya disambung-sambung, sesuai dengan “connector” yang ada. A1 B1 A2 B2 A3 B3 A4 B4
  • 4. Figure 4 – A Design Methodology STAGE I ACTIVITIES Management and Operations Location and Planning Construction and Implementation STAGE II STAGE III STAGE IV Project Identification and pre-feasibility Detailed Design Development Project formulation and feasibility Project Implementation National Policy & Goals, Institutional Structure Context, review of Facilities & Site Selection Operation Plan & Management Procedures Plan options & Land Use Traffic Master Plan Building options, Structure, Materials & Costs Staffing, Training, and Initiate Operations Plan Evaluation & Financial Analysis FUNCTIONS Administrators and Policy Maker Planners and Economists Tender Documents, Construction & Procurement Engineers And Architects
  • 5. A1 Data Collection Surveys National Agricultural Policy Existing Marketing Studies Existing Market Records Agricultural Production Data National Consumption Data Data Analysis Preliminary Physical Survey of Market Tabulate Existing Market Facilities Reconnaissance Survey of Market Operations Define Market Functionaries Identify Existing Shortcomings Appraisal of Market Facilities Analysis of Existing Marketing System Define Marketing Channels Tabulate Catchment Production Demographic Data Tabulate Population Data Legislation & Ordinance Extract Relevant Laws Synthesis Definition of Project Goals Tabulate Relevant Development Policies Regional Planning Studies Existing Sector Programme Data Processing Estimate Market Turnover Estimate Design Population Review Suitability of Site Size & Location Definition of Project Risks Project Future Needs Identify Project Beneficiaries Identify Management Options
  • 6. A2 Data Collection Stage 1 Context data & Studies: • Existing Marketing Studies • Existing Market records • Agricultural Production • National Consumption • Demography • Management Proposals Detailed Survey of Market Operations Data Analysis Define End-of Project Status Review Design Population Stage 1 definition of Project Goals Data Processing Review Development Policies Surveys Quantify Project Beneficiaries Review Market Functionaries Review Marketing Channels Detailed Field Suirvey of Traders & Turnover Review Catchment Production Manual/Computer Spreadsheet Stage 2 Final Master Plan Stage 2 Civil Works Budget Appraisal of Operations & Management Options Analysis of Existing Marketing System Project Market Turnover Synthesis Define Project’s Immediate Objectives & Outputs Define Project’s Inputs Formulate Market Procedures & Agree Staffing Establishment Estimate Utilization of Market Facilities Phasing of Design Options Agree Equipment Needs
  • 7. A3 Data Collection Surveys Data Processing Check Stage 1 Findings on Existing Shortcomings, Project Risks, Issues & Beneficiaries Stage 1 Review Proposals/Issues Local Planning Studies Maps and Aerial Photographs Climatic / Hydrogeology Studies Existing Geotechnical Studies Survey of Traders & Turnover Engineering Survey of Markets: • Historic • Topographic • Geodetic • Site Features • Services • Soils Survey of Traffic Modes & Volumes Manual / Computer Spreadsheets Tabulate existing market facilities Base Map Preparation Official Rates & Cost data Stage 1 Draft Project Budget Construction Materials Availability Further analysis of existing market facilities Tabulate suitable materials Collate cost Data Local Construction Cost Review Revise estimate of Demand & Trade Volumes Constraints & Opportunities Mapping Planning / Building Regulations Construction Materials Studies Data Analysis Synthesis Revision of Project Goals Refine Stage 1 Estimate of Phisical needs Define Accomodation Brief Review Site Planning Options Review Building Design Options: • Modules • Facilities • Overall Form • Climatic Design Prepare Unit Rates Review Stage 1 Draft Budget
  • 8. A4 Data Collection List of Monitoring & Evaluation Indicators Stage 3 Management Structure & Institutions Report Surveys Studies/Survey: • Training • MIS System • Regulations • Facilities Technical Assistance Needs Data Processing Stage 2 Phasing Programme Stage 2 Final Master Plan & Development Brief Stage 2 Building Design Drawings Agreed M & E Programme Review training proposals Agreed Scope of Training Programme Review issues to be resolved Finalize Staffing Establishment Review Work Plan & Phasing Programme Stage 3 Project Work Plan Detailed Stage 3 & Stage 2 Civil Works Budgets Synthesis Review M & E Requirements Establishment of Market management Board & Appointment of Core Management & Operations Staff Data Analysis Detailed Engineering Surveys: • Geotechnic • Geodetic • Materials Selection and Appointment of Design & Supervision Consultants Survey SubContractors reports Review budget allocations Review Design Changes Agreed Phasing of Development Confirm Availability of Finance Agreed Design Drawing Programme
  • 9. B1 RecommendatIons Outline Consultation Procedure Client Policy Making Body & Donors Budget Request Form Final Output User Project Identification & PreFeasibility report Detailed Output Form Finance Ministry & Donors Land Purchase Form Lands / Survey Ministry Terms of reference for Initial Surveys: •Engineering •Social •Marketing Public Works Dept. / Engineering Consultans Preliminary Estimate of Phisical requirements Define Issues to be resolved Adjustment of Development Programme, Budget Estimate & Preliminary Financial Analysis Draft Budget Requirements Land Acquisition Requirements Further Survey Requirements Marketing Dept. or Authority Institutional Proposals Draft management Structure & Institutions Report Law Ministry / Client Body
  • 10. B2 Figure 6 Stage II - detailed design development RecommendatIons Output Output Form User Outline Detailed Final Consultation & Agree Parameters to be used in Analysis Review of Design Options & Project Risks Estimate recurrent Costs: •Salaries •Qverheads •Depreciation •Repairs & Maintenance Estimate Annual Revenues: •Levies •Rents •Parking Fees Estimate Capital Costs: •Land Purchase •Surveys •Civil Works •Equipment Justification of Project Benefits & Risks Overall Project Design, Financial & Economic Analysis, including Sensitivity testing Final Institutional Strategy Further Issues to be Resolved Agreed Coordination Arrangements Further Survey Requirements Technical Assistance Requirements Prepare Cash Flows for Basic Options Final Budget Requirements Project Feasibility Report Final Management Structure & Institutions Report Client Policy Making Body & Donors Law Ministry Project Work Plan / Bar Chart List of Monitoring & Evaluation Indicators Terms of reference for further Studies / Surveys: •Training •MIS System •Market Regulations •Facilities •EIA Detailed Budget Form Marketing Dept. or Authority Management / Engineering Consultant Finance Ministry & Donors
  • 11. B3 RecommendatIons Outline Detailed Final Consultation Procedure: staffing, costs, demand, phasing & Facilities Adjustments from Consultation & Stage 3 Feasibility Study Output Form Further Issues to be Resolved Draft Master Plan Sketch Design of Buildings & Facilities Detailed Site Planning and Engineering Studies: •Earthworks •Reclamation •Conservation •Land Drainage •Roads/Parking •Site Services •Urban Design •Landscaping Detailed Building Design: •Circulation •Space Needs •Services •Expansion •Evaluation of Structure & Materials Client Policy Making Body & Donors Final Land Use & Traffic Master Plan Phasing Programme Defined Off Site Infrastructure Requirements Further Survey Requirements Project Master Plan report & Detailed Development Brief Terms of reference for Detailed Surveys: •Geotechnic •Geodetic •Materials Final Building Designs Outline Specification Notes & Final Cost Estimate Output User Building Design Drawings Final Civil Works Budget Marketing Dept. or Authority Local Planning Authority Public Works Dept. / Engineering Consultants Survey Subcontractors Lands/Survey Ministry Construction Consultants Finance Ministry & Donors
  • 12. B4 RecommendatIons Outline Preparation of Overall Training programme Define Training Recipients Define Salary Scales Define Context: •Cost Plan •Materials Supply •Contract Types •Phasing Targets •Pre-qualification Detailed Prepare Training Material & Pilot Test Training Programme Initiate Staff Recruitment Trader/Public Participation Design Accounting System Agreed Financial Management System Preparation of Working Drawings, Specifications & Bills of Quantities for Civil Works Tendering Procedure: •Analysis •Award Review Equipment Needs Final Equipment List/Specification Final Finalize M & E System Staff Training Initiated Agreed Rents, Tolls, Levies & Parking Fees Selection of Applicants/ Stallholders Finalize Market Procedures Selection of Contractors & Contract Start Output Form Output User M & E Guidelines Client Policy Making Body & Donors Trained Staff Schedule of Tolls & Levies Register of Traders/Leases Management Manual: •Procedures •Training •Accounts Finalize Working Details Contract Documents: •Drawings/Spec. •Signed Contract •Materials Testing Programme Equipment Procurement Procurement Scedules Training Body TA Consultants Private Sector Investors/Traders Marketing Authority/Board Management Consultants Finance Ministry & Donors Appointed Contractors Design & Supervision Consultants Materials/Equipment Suppliers
  • 13. Mulai dibuat Fonts tambahan Jumlah halaman 07/09/2002 Comic Sans MS 32