SlideShare a Scribd company logo
How the elements have moved from 1 st  edition to 2 nd  edition X 4.11 X 4.12 X 4.14 X 4.13 X X (Max) X X X 4.2 X 4.3 X (Max) X 4.4 X 4.5 X X(Max) 4.6 X 4.7 X 4.8 X X(Max) X 4.9 X(Max) X 4.10 X Chap-6 X (Max) Chap-5 X Chap-7 Chap-4 X Chap-8 4.1 Element number
How the elements have moved from 1 st  edition to 2 nd  edition X 4.16 X 4.17 X 4.18 X 4.19 X 4.20 10 13 5 2 3 Summary of relocation (includes overlap) 5 11 1 1 2 Summary of relocation (without overlap – Sum is equal to 20 elements) Chap-6 Chap-5 X(Max) Chap-7 Chap-4 X Chap-8 4.15 Element number
Summary of the movements More focus on Product realization – 11 elements have moved on to product realization Next focus is on Measurement – 5 elements have moved on to measurement Considering the overlaps also the focus is on Product realization and Measurement with Resources coming next 7.5.2.1 – Validation of Production processes – Shall apply to all production processes Changes have not been done only in 17 areas (See table for details) Almost in every requirement, change is made either in wording or in removal of certain requirements.
Comparison between 1 st  and 2 nd  edition Scope, Application , Terms and Definitions Key definition added as part of 3.0 3. Terms and Definition ISO9000:2000 added Removed ISO8402:1994 ISO/IEC 17025 1.2 Application added TS 16949 – 2 nd  edition No change in Scope. Applicable throughout the automotive supply chain  Comments  2. Normative reference 1. Scope TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.1 – Management Responsibility 8.2.1.1 – Customer satisfaction – Supplemental 5.4.1.1 – Quality Objectives – Supplemental TS 16949 – 2 nd  edition Removed “Documented Process” Monitored through Performance indicators. Mandatory indicators are Delivered part quality performance, Customer disruptions including field failures, Delivery schedule performance (including premium freight),Special status customer notifications relating to quality or delivery issues Added “ The organization shall monitor manufacturing processes’ performance to demonstrate compliance with customer requirements for product quality and efficiency of the process. Changed to “ Top management shall define quality objectives and measurements in the business plan to deploy the quality policy.   Comments  4.1.1.3 Customer Satisfaction 4.1.1.2 Objectives TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition Wordings changed “Shall define a process for continual improvement” “ See examples in annex B of ISO9004:2000” added Note 1 and Note 2 deleted 8.5.1.1 – Continual improvement of the Organization 4.1.1.4 – Remaining requirements Minor wording changes 5.5.1.1 – Responsibility of Quality 4.1.2.1.3  - Quality responsibility Minor wording changes 5.5.2.1 – Customer representative 4.1.2.1.2 – Customer representative Minor wording changes 5.5.1.1 – Responsibility of Quality 4.1.2.2.2 – Shift resources Removed TS 16949 – 2 nd  edition Continuous improvement in quality, cost … shall be provided in Quality policy removed Comments  4.1.1.4 Continuous Improvement  TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition Word “trends” added in Performance Added “Input to Management review shall include an analysis of actual and potential field-failures and their impact on quality, safety or the environment 5.6.1.1 – Quality management system performance 5.6.2.1- Review Input - Supplemental 4.1.3.2 Management review – Supplemental 4.2.8 – Quality system performance  (Above elements  are moved to 5.6.1.1) 7.3.1.1 – Multi – Disciplinary approach 7.2.3.1 – Customer communication supplemental TS 16949 – 2 nd  edition “ The organization shall have the ability to communicate necessary information  including data  in a customer specified language and format ,  (e.g. computer-aided design data, electronic data exchange,…)  “ Comments  4.1.2.4 – Organizational interfaces TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition Removed” Supplier shall document trends in quality, operational performance and current quality objectives” (Still reviewing Cost of poor quality is mandatory under 5.6.1.1) 8.4.1 – Analysis and use of data 4.1.5 – Analysis and use of Company level data Added as Note-2 7.2.1 – Determination of requirements relating to product 4.1.7.2 – Regulations Removed “Potential risks to Customers, users and the environment”. Only “Risk to employees” is there 6.4.1 Personnel Safety to achieve Product Quality 4.1.7.1 Product Safety Added “Technological awareness” along with Quality Added “Process to measure the extent to which the personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of Quality objectives” In the above word “Satisfaction” removed Note deleted. 6.2.2.4 – Employee motivation and empowerment 4.1.6 – Employee motivation, empowerment and satisfaction Removed TS 16949 – 2 nd  edition Requirements are removed, but Business plan Reference is there in 5.4.1.1 and 5.6.1.1 Comments  4.1.4 – Business Plan TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.2 Quality Systems Minor wording changes “ shall be included in the planning of the product realization as a component of Quality plan” 7.1.1 – Planning of Product Realization - Supplemental 4.2.3.2 – Quality Plan requirements Deleted Removed 4.2.4.3 – Review cycle “ Measurements at specified stages of Design and Development shall be defined, analyzed and reported with summary results as input to Management review”. Lot of wording changes from the current one (More clarity) Input to Management review is mandatory now Note added to show what could be measured. 7.3.4.1 – Monitoring 4.2.4.2 - Measurements Only Note-1 retained. Requirements relating to project management approach and a project team is removed. Minor word changes in Note-1 No change 7.1 – Product realization 7.1.3 - Confidentiality 4.2.4.1 – Product Realization – General Removed TS 16949 – 2 nd  edition No requirement of Documented Processes except for the 6 ISO9001:2000 processes Comments  4.2.2.2 – Quality System documentation TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.2 Quality Systems Last para “The supplier shall perform process studies…… as well as acceptance criteria” is moved to this element 8.2.3.1 – Monitoring and measurement manufacturing Processes 4.2.4.5 Tools and techniques Entire 4.2.4.6 is removed. Instead the follg is added “The Organization shall ensure that personnel with Product design responsibility are competent to achieve design requirements and are skilled in applicable tools and techniques. Applicable tools and techniques shall be identified by the organization” 6.2.2.1 – Product design skills 4.2.4.6 – Computer aided design In this “Use of product mistake proofing is added. This already contains “Mistake proofing” , this is retained in the same element. First two paras in 4.2.4.5 is removed Added in Note (7.3.2.2) 7.3.3.1 – Product design outputs - Supplemental 7.3.3.2 – Manufacturing Process design outputs 7.3.2.2 – Manufacturing Process design input 4.2.4.5 Tools and techniques 7.3.1.1 – Multi disciplinary approach TS 16949 – 2 nd  edition No Change Comments  4.2.4.4 – Multidisciplinary approach TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.2 Quality Systems “ applicable regulations” removed “ such as Design FMEA’s” removed Note added relating to error proofing 7.3.2.2 – Manufacturing process design input 4.2.4.9.2 – Process design inputs “ manufacturing process flow chart/layout” added “ Control plan” added Everwhere the work “Mistake proofing” changed to “Error proofing” 7.3.3.2 – Manufacturing process design output 4.2.4.9.3 – Process design output “ including risk analysis” added. Minor wording changes makes it more clear now 7.2.2.2 – Organization Manufacturing feasibility 4.2.4.8 – Feasibility reviews Removed 4.2.4.9.1 – Management of Process design – General 7.3.2.3 – Special characteristics TS 16949 – 2 nd  edition “ appropriate methods” removed.  Wording changes – now requirements are very clear Note –2 removed Comments  4.2.4.7 – Special characteristics TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.2 Quality Systems Minor wording changes 7.1.4 – Change control 4.2.4.11 – Product Approval process “ prototype control plan when required by customer” removed “ have a control plan that takes into account the Design and Process FMEA Outputs” – Word changes (Mandatory to link now FMEA and Control Plan) “ Control plan updation based on Logistics, Supply sources and FMEA” added Wording changes – Now very clear 7.5.1.1 – Control Plan 4.2.4.10 – Control Plan Important note added “Product Approval should be subsequent to the verification of Manufacturing process”  Otherwise minor wording changes 7.3.6.3 – Product Approval Process 4.2.4.11 – Product Approval Process 7.3.5 – Design and Development verification TS 16949 – 2 nd  edition This is part of Design and Development verification since now Design and Development includes “Product and Process design” which is added at the beginning of 7.3 under title “Important” Comments  4.2.4.9.4 – Process verification TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.2 Quality Systems Minor wording changes This is a new requirement but is a redundant along with the above one 5.6.1.1 – Quality Management System performance 5.1.1 – Process efficiency 4.2.8 – Quality System performance Minor wording changes Note added : “This requirement also applies to tooling availability for vehicle spare parts” 7.5.1.5 – Management of Production tooling 4.2.6 – Tooling management “ Manufacturing process improvement shall continuously focus upon control & reduction of variation in product characteristics and process parameters” Two new notes added “ Highest priority on SC’s” removed 8.5.1.2 – Manufacturing Process Improvement 4.2.7 – Process Improvement 6.3.1 – Plant, facility and equipment planning TS 16949 – 2 nd  edition “ Plant layouts shall minimize material travel” changed to “Plant layouts shall optimize material travel” In Methods shall be developed, added “implemented” Note added saying “These requirements should focus on Lean manufacturing Principles and the link to the effectiveness of QMS” Comments  4.2.5 – Plant, facility and equipment planning TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.3 Contract review Removed TS 16949 – 2 nd  edition This requirement is removed Comments  4.3.2.2 – Review – Supplemental TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.4 Design Control Just says that Suppliers resources should be qualified to achieve design requirements and skilled tools and techniques. List of skills has been removed 6.2.2.1 – Product design skills 4.4.2.2 Required skills Deleted Removed 4.4.2.3 Research and Development 7.3 – Design and Development TS 16949 – 2 nd  edition Added “The requirements of 7.3 are applicable to Product and manufacturing design and development and should focus on error prevention rather than detection”. This is a big change Comments  4.4 Design Control – Important TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.4 Design Control Added the following outputs “ Product definitions including drawings, mathematically based data, Product design review results, Diagnostic guidelines where applicable” “ Optimization requirements” are removed 7.3.3.1 – Product design outputs - Supplemental 4.4.5.2 – Design Optimization Word changes . “Design and Development validation shall be performed in accordance with the customer requirements including timing” “ Procedure for corrective and preventive action shall be followed “ removed 7.3.6.1 – Design and development validation – supplemental 4.4.8.2 – Design Validation – Supplemental No Change 7.3.6.2 – Prototype program 4.4.8.3 – Prototype Programme The existing requirement added as one of the inputs to Product design 7.3.2.1 – Product design inputs 4.4.4.3 – Use of information 7.3.2.1 – Product design inputs TS 16949 – 2 nd  edition The existing requirement added as one of the inputs to Product design Comments  4.4.4.2 Reliability Objectives TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.4 Design Control 7.1.4 – Change control TS 16949 – 2 nd  edition Incorporated as part of Change control Comments  4.4.9.2 – Evaluation of design change TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.5 Document and data control “ Timely review should be as soon as possible and shall not exceed two working weeks” added Note –2 retained 4.2.3.1 – Engineering Specifications 4.5.2.2 Engineering specifications Removed TS 16949 – 2 nd  edition Note is Removed Comments  4.5.2.1 Note TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.6 Purchasing “ applicable to country of manufacture and sale” removed 7.4.1.1 – Regulatory compliance 4.6.1.3 – Regulatory compliance “ including tool and gaging suppliers” added “ Contract (like drawings, specifications)” Word change 7.4.1.3 -  Customer approved sources 4.6.1.2 – Customer approved subcontractors Note removed and added two notes under 7.4.1 TS 16949 – 2 nd  edition Note removed pertaining to Definition 3.1 in ISO9001”1994 2 Notes added: Note-1 “Purchased products above includes all products and services that impact customer requirements such as sub-assembly, sequencing, sorting, rework and calibration services” Note-2 “where there are mergers, acquisitions and affiliations associated with suppliers, the organization should verify the continuity of suppliers quality system and effectiveness” Comments  4.6.1.1 Note TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.6 Purchasing “ Suppliers performance shall be monitored through the follg: indicators Delivered product quality Customer disruptions including field returns Delivery schedule performance (includes freight) Special status customer notifications relating to quality or delivery issues The organization shall promote supplier monitoring of their manufacturing processes” 7.4.3.2 – Supplier Monitoring 4.6.2.3 – Scheduling subcontractors 7.4.1.2 – Supplier Quality management system development TS 16949 – 2 nd  edition “ Conformity with ISO9001:2000 is the first step in achieving this goal” added Note 2 retained Note 1 – removed “ Unless otherwise specified by the customer, Suppliers to the Organization shall be third party registered to ISO9001:2000 by an accredited Third party certification body” – Added. This is a big big change Comments  4.6.2.2 – Subcontractor development TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.7 Control of customer supplied product 7.5.4.1 – Customer owned Production tooling TS 16949 – 2 nd  edition “ manufacturing,test,inspection tooling and equipment” added. Comments  4.7.2 – Customer owned tooling TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.8 Product identification and traceability 7.5.3 – Product Identification and traceability 7.5.3.1 – Identification and Traceability - Supplemental TS 16949 – 2 nd  edition No change Note added giving clarity on certain aspects of Inspection and test status Comments  4.8 TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.9 Process Control Minor wording changes 7.2.1.1 – Customer designated special characteristics 4.9.1.4 – Designation of special characteristics “ Predictive methods to continually improve the effectiveness and efficiency of Production equipments” added 7.5.1.4 – Preventive and predictive maintenance 4.9.1.5 – Preventive maintenance “ to satisfy the customer specified requirements” added Natural disaster and force majeur removed Minor wording changes “ Field returns” added 6.3.2 – Contingency plans 4.9.1.3 – Contingency plans 6.4.2 – Cleanliness of premises TS 16949 – 2 nd  edition Minor wording changes Comments  4.9.1.2 Cleanliness of Premises TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.9 Process Control “ significant time period between runs” removed 7.5.1.3 – Verification of Job setups 4.9.4 Verification of job-setups No Change 8.2.4.2 – Appearance items 4.9.5 Appearance items Word “exceed” removed Minor wording changes 8.2.3.1 –Monitoring and measurement of processes – Supplemental 4.9.3 Maintaining process control 7.5.1.2 – Work instructions TS 16949 – 2 nd  edition “ Job instructions” changed to “Work instruction” “ without disruption of job” removed “ Job instructions shall include or reference ….” removed Note 1 and Note 2 removed Comments  4.9.2 – Job instructions TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.10 Inspection and Testing Changed to  “Acceptance criteria shall be defined by the customer and documented by the organization”. Attribute data sampling plan shall have zero defects as acceptance criteria” 7.1.2 – Acceptance Criteria 4.10.1.2 Acceptance criteria No change 7.4.3.1 – Incoming Product Quality 4.10.2.4 – Incoming product quality 8.2.4 – Monitoring and Measurement of Product TS 16949 – 2 nd  edition Existing note removed. New note pertaining to selection of measurement types added. In parking lot Comments  4.10.1.1 Note TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.10 Inspection and Testing Compliance with ISO/IEC 17025 removed. Now it is not mandatory. Word changes makes reqmt. clear Lab “shall be included in the quality system” Word “External” added in addition to “Commercial/Independent” Lab Scope of External lab is must now “ Evidence of external lab acceptable to the customer” is required if the external lab is not an accredited lab 1 note added pertaining on how the customer acceptance of lab can be demonstrated. 1 note on what has to be done if the equipment is calibrated by Manufacturer is provided 7.6.3 – Laboratory requirements 7.6.3.1 – Internal Labs 7.6.3.2 – External Labs 4.10.6 Laboratory requirements 8.2.4.1– Layout  and functional testing TS 16949 – 2 nd  edition Note added explaining what is Layout inspection Comments  4.10.4.2 – Layout inspection and functional testing TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.11 Control of inspection, measuring and test equipment “ an assessment of the impact of the out-of specification condition” and “equipment identification including master standard against which the equipment is calibrated” added 7.6.2 – Calibration records 4.11.3 – Records 7.6.1 – Measurement System analysis TS 16949 – 2 nd  edition Minor wording changes Comments  4.11.1.2 – Measurement System Analysis TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.12 Inspection and Test status 7.5.3 – Product identification and traceability TS 16949 – 2 nd  edition No change. Merged with Product identification and traceability Comments  4.12 – Inspection and Test status TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.13 Control of nonconforming product “ Instructions including re-inspection” added - Minor wording change 8.3.2 – Control of reworked product 4.13.3 – Control of reworked product Change – “Shall obtain customer concession or deviation permit prior to changing product/process” Minor wording changes 8.3.4 – Customer waiver 4.13.4 – Engineering approved authorization “ Customer shall be informed promptly in the event that non-conforming product is shipped” – word changes Requirement relating to quantify,analyze and initiating actions removed 8.3.3 – Customer information 4.13.1.3 – Corrective action plan 8.3.1 – Control of nonconforming product - Supplemental TS 16949 – 2 nd  edition “ Product with unidentified or suspect status shall be classified as non-conforming product” – Word changes Comments  4.13.1.2 Suspect material or product TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.14 Corrective and Preventive action Minor wording changes 8.5.2.3 – Corrective action impact 4.14.2.2 – Corrective action impact The word “Return” changed to “Rejected”. This means the scope is bigger now, it also includes the customer line rejections, receiving rejections etc..  No change 8.5.2.4 – Rejected product test/analysis 4.14.2.3 – Returned product test/analysis No Change – “Mistake” changed to “Error” 8.5.2.2 – Error Proofing 4.14.1.3 Mistake proofing 8.5.2.1 – Problem Solving TS 16949 – 2 nd  edition “ Shall have a process for problem solving leading to root cause identification and elimination” (Wording change) Comments  4.14.1.2 Problem solving TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.15 Handling, Storage, packaging,preservation and delivery Same as above 7.1.1 4.15.4.3 – Labelling “ Delivery schedule performance including premium freight” is one of the indicators to be tracked “ Organization shall monitor process performance to meet the customer quality and efficiency of process” (This is for lead time tracking). Removed “Lead time requirements” Removed the first sentence of current 4.15.6.2 8.2.1.1 –Customer satisfaction – Supplemental 4.15.6.2 – Performance monitoring of supplier delivery “ Customer requirements and references to its technical specifications shall be included in the planning of Product realization” 7.1.1 – Planning of Product realization – Supplemental 4.15.4.2 Customer packaging standards 7.5.5.1 – Storage and inventory TS 16949 – 2 nd  edition No Change Comments  4.15.3.2 – Inventory TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.15 Handling, Storage, packaging,preservation and delivery 7.1.1 4.15.6.5 – Shipment notification system 7.1.1 4.15.6.4 – Electronic communication 7.5.1.6 – Production scheduling TS 16949 – 2 nd  edition Minor wording changes Comments  4.15.6.3 – Production scheduling TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.16 Control of Quality Records 4.2.4.1 – Record retention TS 16949 – 2 nd  edition Minor wording changes Comments  4.16.2 Record retention TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.17 – Internal quality audits Removed the word “Product realization”. Now the focus is only on manufacturing process. 8.2.2.2 – Manufacturing Process audit 4.17.2.3 – Process audit No change 8.2.2.3 – Product audit 4.17.2.4 – Product audit No change.  8.2.2.5 – Internal auditor qualification 4.17.3 – Auditor qualification “ Audits shall cover all activities and shifts” moved to 8.2.2.4  8.2.2.1 – Quality Management system audit 4.17.2.2 – System audit 8.2.2.4 – Internal audit plans TS 16949 – 2 nd  edition No change Comments  4.17.2.1 – Internal quality audits – supplemental – General TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.18 – Training “ Special attention shall be given on customer specific requirements” is moved to 6.2.2.2 Note is removed 6.2.2.2 – Training No change 6.2.2.3 – Training on the job 4.18.3 – Training on the job Effectiveness requirements is added now as part of ISO9001:2000 6.2.2.c 6.2.2.c  4.18.2 Training effectiveness 6.2.2.2 – Training TS 16949 – 2 nd  edition Even though this is ISO9000:1994 requirement, this is not a requirement in ISO9001:2000. In the 2 nd  edition, this along with the 2 notes which were present in ISO9000:1994 have been added in this element without any change Comments  4.18.1 – Training TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.19 - Servicing Earlier it was “Special purpose tools” now it is “Special purpose tools or measuring equipments” 7.5.1.8 – Servicing agreement with customer 4.19.3 – Servicing agreement with customer No change 7.5.1.7 – Feedback of information from service 4.19.2 Feedback of information from service Note removed TS 16949 – 2 nd  edition Comments  4.19.1 Servicing – Note TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition 4.20 – Statistical techniques Word “where appropriate” removed 8.1.2 – Knowledge of basic statistical concepts 4.20.4 – Knowledge of basic statistical concepts 8.1.1 – Identification of Statistical tools TS 16949 – 2 nd  edition No change Comments  4.20.3 – Identification of statistical tools TS 16949 1st edition
Comparison between 1 st  and 2 nd  edition New requirements 7.5.2.1 – Validation of Processes and Service provision - Supplemental TS 16949 – 2 nd  edition Validation of Processes and Service provision is applicable to all processes of Production and Service provision Comments  TS 16949 1st edition

More Related Content

PPTX
Ch 9(spi)cm mi reqm
PPT
Comparis
PPT
Iso ts16949 day two supplement 1
PPTX
Ch 10(spi)cm mi-cm-ppqa
PPTX
Simple Change Management Control
PDF
Mps alexandru
Ch 9(spi)cm mi reqm
Comparis
Iso ts16949 day two supplement 1
Ch 10(spi)cm mi-cm-ppqa
Simple Change Management Control
Mps alexandru

What's hot (18)

PPT
Facility & Equipment Quality System Outline
DOCX
Process validation
DOC
Design Control Regulation Comparison
PDF
Mitra matra iatf 16949 honda module 5
DOC
QualityAssurancePlan
PDF
Gmpchecklist
DOCX
Tiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giá
PPTX
Quality management
PPTX
8.3 Control Quality
DOC
Quality management form
PPT
Ppap training ppt
PDF
TMC Quality Manual
DOC
Unit 8 final
PPTX
Manufacturing planning and self inspection in pharmaceutical industries
PPT
Introduction to software quality assurance by QuontraSolutions
PPT
Validation Part5
PDF
I software quality
Facility & Equipment Quality System Outline
Process validation
Design Control Regulation Comparison
Mitra matra iatf 16949 honda module 5
QualityAssurancePlan
Gmpchecklist
Tiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giá
Quality management
8.3 Control Quality
Quality management form
Ppap training ppt
TMC Quality Manual
Unit 8 final
Manufacturing planning and self inspection in pharmaceutical industries
Introduction to software quality assurance by QuontraSolutions
Validation Part5
I software quality
Ad

Similar to Key changes ts169492002 (20)

PPT
New ts16949
PPT
Comparison ts16949 2002_qs9000
PPTX
Awareness of iatf 16949
PDF
Awareness session on iatf 16949 2016 standard
PPTX
Correlation matrix with TS 16949-Iatf 16949
PPTX
Correlation between Ts16949-Iatf 16949
PDF
Gap analysis for IATF 16949 2016
PPT
Omnex sac may01
PPT
Omnexsystem spresentation
PPTX
Awareness of IATF 16949.pptx
PPT
IMS Awarness session that will be useful
PPT
Iso 9001: 2008 Revisions & Changes
PPT
Iso ts-implementation-webinar5-17-05
PDF
NQA - ISO 13485 Gap Guide
PDF
NQA ISO 13485 Gap Guide – what’s changed?
PPTX
Ch 10(spi)cm mi-cm-ppqa
PPT
Cmmi%20 model%20changes%20for%20high%20maturity%20v01[1]
PDF
List of mandatory IATF 16949 documents
PDF
PPT
0737851.ppt
New ts16949
Comparison ts16949 2002_qs9000
Awareness of iatf 16949
Awareness session on iatf 16949 2016 standard
Correlation matrix with TS 16949-Iatf 16949
Correlation between Ts16949-Iatf 16949
Gap analysis for IATF 16949 2016
Omnex sac may01
Omnexsystem spresentation
Awareness of IATF 16949.pptx
IMS Awarness session that will be useful
Iso 9001: 2008 Revisions & Changes
Iso ts-implementation-webinar5-17-05
NQA - ISO 13485 Gap Guide
NQA ISO 13485 Gap Guide – what’s changed?
Ch 10(spi)cm mi-cm-ppqa
Cmmi%20 model%20changes%20for%20high%20maturity%20v01[1]
List of mandatory IATF 16949 documents
0737851.ppt
Ad

More from Omnex Inc. (20)

PDF
Omnex 2019 Newsletter Navigator
PDF
Omnex 2018 Navigator Newsletter
DOC
Semiconductor newsletter8 01
PPT
Rollout
PPT
Reducing timeincreasingvalue0503
PPT
Omnex semiconductor1 may_2000
PPT
Quality tools-asq-london-may-10-2006
PPT
Omnex semiconductor2 sac_board_may2000
PPT
Omne xsales
PPT
Lss pharma presentation2-2006
PPT
Iso9001 implementation increasing-value_reducing_leadtime
PPT
Integrating lssiso9ts
PPT
Implementing ts strategic-choices_5_2003
PPT
Hitachi case study(22 11)
PPT
Ew qms asq_kitchner
PPT
Costof quality
PPT
Case for integrated_management_systems
PPT
Barber process basedintegrating9001_14k_18k_final
PPT
Asq toronto10 jan2007effectcorraction
PPT
Asq int lss
Omnex 2019 Newsletter Navigator
Omnex 2018 Navigator Newsletter
Semiconductor newsletter8 01
Rollout
Reducing timeincreasingvalue0503
Omnex semiconductor1 may_2000
Quality tools-asq-london-may-10-2006
Omnex semiconductor2 sac_board_may2000
Omne xsales
Lss pharma presentation2-2006
Iso9001 implementation increasing-value_reducing_leadtime
Integrating lssiso9ts
Implementing ts strategic-choices_5_2003
Hitachi case study(22 11)
Ew qms asq_kitchner
Costof quality
Case for integrated_management_systems
Barber process basedintegrating9001_14k_18k_final
Asq toronto10 jan2007effectcorraction
Asq int lss

Recently uploaded (20)

PDF
NewMind AI Monthly Chronicles - July 2025
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Empathic Computing: Creating Shared Understanding
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
CIFDAQ's Market Insight: SEC Turns Pro Crypto
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Modernizing your data center with Dell and AMD
PPTX
A Presentation on Artificial Intelligence
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Encapsulation theory and applications.pdf
PDF
Approach and Philosophy of On baking technology
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
NewMind AI Monthly Chronicles - July 2025
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
Chapter 3 Spatial Domain Image Processing.pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Encapsulation_ Review paper, used for researhc scholars
Empathic Computing: Creating Shared Understanding
Understanding_Digital_Forensics_Presentation.pptx
20250228 LYD VKU AI Blended-Learning.pptx
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
CIFDAQ's Market Insight: SEC Turns Pro Crypto
The AUB Centre for AI in Media Proposal.docx
Modernizing your data center with Dell and AMD
A Presentation on Artificial Intelligence
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Encapsulation theory and applications.pdf
Approach and Philosophy of On baking technology
MYSQL Presentation for SQL database connectivity
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Building Integrated photovoltaic BIPV_UPV.pdf

Key changes ts169492002

  • 1. How the elements have moved from 1 st edition to 2 nd edition X 4.11 X 4.12 X 4.14 X 4.13 X X (Max) X X X 4.2 X 4.3 X (Max) X 4.4 X 4.5 X X(Max) 4.6 X 4.7 X 4.8 X X(Max) X 4.9 X(Max) X 4.10 X Chap-6 X (Max) Chap-5 X Chap-7 Chap-4 X Chap-8 4.1 Element number
  • 2. How the elements have moved from 1 st edition to 2 nd edition X 4.16 X 4.17 X 4.18 X 4.19 X 4.20 10 13 5 2 3 Summary of relocation (includes overlap) 5 11 1 1 2 Summary of relocation (without overlap – Sum is equal to 20 elements) Chap-6 Chap-5 X(Max) Chap-7 Chap-4 X Chap-8 4.15 Element number
  • 3. Summary of the movements More focus on Product realization – 11 elements have moved on to product realization Next focus is on Measurement – 5 elements have moved on to measurement Considering the overlaps also the focus is on Product realization and Measurement with Resources coming next 7.5.2.1 – Validation of Production processes – Shall apply to all production processes Changes have not been done only in 17 areas (See table for details) Almost in every requirement, change is made either in wording or in removal of certain requirements.
  • 4. Comparison between 1 st and 2 nd edition Scope, Application , Terms and Definitions Key definition added as part of 3.0 3. Terms and Definition ISO9000:2000 added Removed ISO8402:1994 ISO/IEC 17025 1.2 Application added TS 16949 – 2 nd edition No change in Scope. Applicable throughout the automotive supply chain Comments 2. Normative reference 1. Scope TS 16949 1st edition
  • 5. Comparison between 1 st and 2 nd edition 4.1 – Management Responsibility 8.2.1.1 – Customer satisfaction – Supplemental 5.4.1.1 – Quality Objectives – Supplemental TS 16949 – 2 nd edition Removed “Documented Process” Monitored through Performance indicators. Mandatory indicators are Delivered part quality performance, Customer disruptions including field failures, Delivery schedule performance (including premium freight),Special status customer notifications relating to quality or delivery issues Added “ The organization shall monitor manufacturing processes’ performance to demonstrate compliance with customer requirements for product quality and efficiency of the process. Changed to “ Top management shall define quality objectives and measurements in the business plan to deploy the quality policy. Comments 4.1.1.3 Customer Satisfaction 4.1.1.2 Objectives TS 16949 1st edition
  • 6. Comparison between 1 st and 2 nd edition Wordings changed “Shall define a process for continual improvement” “ See examples in annex B of ISO9004:2000” added Note 1 and Note 2 deleted 8.5.1.1 – Continual improvement of the Organization 4.1.1.4 – Remaining requirements Minor wording changes 5.5.1.1 – Responsibility of Quality 4.1.2.1.3 - Quality responsibility Minor wording changes 5.5.2.1 – Customer representative 4.1.2.1.2 – Customer representative Minor wording changes 5.5.1.1 – Responsibility of Quality 4.1.2.2.2 – Shift resources Removed TS 16949 – 2 nd edition Continuous improvement in quality, cost … shall be provided in Quality policy removed Comments 4.1.1.4 Continuous Improvement TS 16949 1st edition
  • 7. Comparison between 1 st and 2 nd edition Word “trends” added in Performance Added “Input to Management review shall include an analysis of actual and potential field-failures and their impact on quality, safety or the environment 5.6.1.1 – Quality management system performance 5.6.2.1- Review Input - Supplemental 4.1.3.2 Management review – Supplemental 4.2.8 – Quality system performance (Above elements are moved to 5.6.1.1) 7.3.1.1 – Multi – Disciplinary approach 7.2.3.1 – Customer communication supplemental TS 16949 – 2 nd edition “ The organization shall have the ability to communicate necessary information including data in a customer specified language and format , (e.g. computer-aided design data, electronic data exchange,…) “ Comments 4.1.2.4 – Organizational interfaces TS 16949 1st edition
  • 8. Comparison between 1 st and 2 nd edition Removed” Supplier shall document trends in quality, operational performance and current quality objectives” (Still reviewing Cost of poor quality is mandatory under 5.6.1.1) 8.4.1 – Analysis and use of data 4.1.5 – Analysis and use of Company level data Added as Note-2 7.2.1 – Determination of requirements relating to product 4.1.7.2 – Regulations Removed “Potential risks to Customers, users and the environment”. Only “Risk to employees” is there 6.4.1 Personnel Safety to achieve Product Quality 4.1.7.1 Product Safety Added “Technological awareness” along with Quality Added “Process to measure the extent to which the personnel are aware of the relevance and importance of their activities and how they contribute to the achievement of Quality objectives” In the above word “Satisfaction” removed Note deleted. 6.2.2.4 – Employee motivation and empowerment 4.1.6 – Employee motivation, empowerment and satisfaction Removed TS 16949 – 2 nd edition Requirements are removed, but Business plan Reference is there in 5.4.1.1 and 5.6.1.1 Comments 4.1.4 – Business Plan TS 16949 1st edition
  • 9. Comparison between 1 st and 2 nd edition 4.2 Quality Systems Minor wording changes “ shall be included in the planning of the product realization as a component of Quality plan” 7.1.1 – Planning of Product Realization - Supplemental 4.2.3.2 – Quality Plan requirements Deleted Removed 4.2.4.3 – Review cycle “ Measurements at specified stages of Design and Development shall be defined, analyzed and reported with summary results as input to Management review”. Lot of wording changes from the current one (More clarity) Input to Management review is mandatory now Note added to show what could be measured. 7.3.4.1 – Monitoring 4.2.4.2 - Measurements Only Note-1 retained. Requirements relating to project management approach and a project team is removed. Minor word changes in Note-1 No change 7.1 – Product realization 7.1.3 - Confidentiality 4.2.4.1 – Product Realization – General Removed TS 16949 – 2 nd edition No requirement of Documented Processes except for the 6 ISO9001:2000 processes Comments 4.2.2.2 – Quality System documentation TS 16949 1st edition
  • 10. Comparison between 1 st and 2 nd edition 4.2 Quality Systems Last para “The supplier shall perform process studies…… as well as acceptance criteria” is moved to this element 8.2.3.1 – Monitoring and measurement manufacturing Processes 4.2.4.5 Tools and techniques Entire 4.2.4.6 is removed. Instead the follg is added “The Organization shall ensure that personnel with Product design responsibility are competent to achieve design requirements and are skilled in applicable tools and techniques. Applicable tools and techniques shall be identified by the organization” 6.2.2.1 – Product design skills 4.2.4.6 – Computer aided design In this “Use of product mistake proofing is added. This already contains “Mistake proofing” , this is retained in the same element. First two paras in 4.2.4.5 is removed Added in Note (7.3.2.2) 7.3.3.1 – Product design outputs - Supplemental 7.3.3.2 – Manufacturing Process design outputs 7.3.2.2 – Manufacturing Process design input 4.2.4.5 Tools and techniques 7.3.1.1 – Multi disciplinary approach TS 16949 – 2 nd edition No Change Comments 4.2.4.4 – Multidisciplinary approach TS 16949 1st edition
  • 11. Comparison between 1 st and 2 nd edition 4.2 Quality Systems “ applicable regulations” removed “ such as Design FMEA’s” removed Note added relating to error proofing 7.3.2.2 – Manufacturing process design input 4.2.4.9.2 – Process design inputs “ manufacturing process flow chart/layout” added “ Control plan” added Everwhere the work “Mistake proofing” changed to “Error proofing” 7.3.3.2 – Manufacturing process design output 4.2.4.9.3 – Process design output “ including risk analysis” added. Minor wording changes makes it more clear now 7.2.2.2 – Organization Manufacturing feasibility 4.2.4.8 – Feasibility reviews Removed 4.2.4.9.1 – Management of Process design – General 7.3.2.3 – Special characteristics TS 16949 – 2 nd edition “ appropriate methods” removed. Wording changes – now requirements are very clear Note –2 removed Comments 4.2.4.7 – Special characteristics TS 16949 1st edition
  • 12. Comparison between 1 st and 2 nd edition 4.2 Quality Systems Minor wording changes 7.1.4 – Change control 4.2.4.11 – Product Approval process “ prototype control plan when required by customer” removed “ have a control plan that takes into account the Design and Process FMEA Outputs” – Word changes (Mandatory to link now FMEA and Control Plan) “ Control plan updation based on Logistics, Supply sources and FMEA” added Wording changes – Now very clear 7.5.1.1 – Control Plan 4.2.4.10 – Control Plan Important note added “Product Approval should be subsequent to the verification of Manufacturing process” Otherwise minor wording changes 7.3.6.3 – Product Approval Process 4.2.4.11 – Product Approval Process 7.3.5 – Design and Development verification TS 16949 – 2 nd edition This is part of Design and Development verification since now Design and Development includes “Product and Process design” which is added at the beginning of 7.3 under title “Important” Comments 4.2.4.9.4 – Process verification TS 16949 1st edition
  • 13. Comparison between 1 st and 2 nd edition 4.2 Quality Systems Minor wording changes This is a new requirement but is a redundant along with the above one 5.6.1.1 – Quality Management System performance 5.1.1 – Process efficiency 4.2.8 – Quality System performance Minor wording changes Note added : “This requirement also applies to tooling availability for vehicle spare parts” 7.5.1.5 – Management of Production tooling 4.2.6 – Tooling management “ Manufacturing process improvement shall continuously focus upon control & reduction of variation in product characteristics and process parameters” Two new notes added “ Highest priority on SC’s” removed 8.5.1.2 – Manufacturing Process Improvement 4.2.7 – Process Improvement 6.3.1 – Plant, facility and equipment planning TS 16949 – 2 nd edition “ Plant layouts shall minimize material travel” changed to “Plant layouts shall optimize material travel” In Methods shall be developed, added “implemented” Note added saying “These requirements should focus on Lean manufacturing Principles and the link to the effectiveness of QMS” Comments 4.2.5 – Plant, facility and equipment planning TS 16949 1st edition
  • 14. Comparison between 1 st and 2 nd edition 4.3 Contract review Removed TS 16949 – 2 nd edition This requirement is removed Comments 4.3.2.2 – Review – Supplemental TS 16949 1st edition
  • 15. Comparison between 1 st and 2 nd edition 4.4 Design Control Just says that Suppliers resources should be qualified to achieve design requirements and skilled tools and techniques. List of skills has been removed 6.2.2.1 – Product design skills 4.4.2.2 Required skills Deleted Removed 4.4.2.3 Research and Development 7.3 – Design and Development TS 16949 – 2 nd edition Added “The requirements of 7.3 are applicable to Product and manufacturing design and development and should focus on error prevention rather than detection”. This is a big change Comments 4.4 Design Control – Important TS 16949 1st edition
  • 16. Comparison between 1 st and 2 nd edition 4.4 Design Control Added the following outputs “ Product definitions including drawings, mathematically based data, Product design review results, Diagnostic guidelines where applicable” “ Optimization requirements” are removed 7.3.3.1 – Product design outputs - Supplemental 4.4.5.2 – Design Optimization Word changes . “Design and Development validation shall be performed in accordance with the customer requirements including timing” “ Procedure for corrective and preventive action shall be followed “ removed 7.3.6.1 – Design and development validation – supplemental 4.4.8.2 – Design Validation – Supplemental No Change 7.3.6.2 – Prototype program 4.4.8.3 – Prototype Programme The existing requirement added as one of the inputs to Product design 7.3.2.1 – Product design inputs 4.4.4.3 – Use of information 7.3.2.1 – Product design inputs TS 16949 – 2 nd edition The existing requirement added as one of the inputs to Product design Comments 4.4.4.2 Reliability Objectives TS 16949 1st edition
  • 17. Comparison between 1 st and 2 nd edition 4.4 Design Control 7.1.4 – Change control TS 16949 – 2 nd edition Incorporated as part of Change control Comments 4.4.9.2 – Evaluation of design change TS 16949 1st edition
  • 18. Comparison between 1 st and 2 nd edition 4.5 Document and data control “ Timely review should be as soon as possible and shall not exceed two working weeks” added Note –2 retained 4.2.3.1 – Engineering Specifications 4.5.2.2 Engineering specifications Removed TS 16949 – 2 nd edition Note is Removed Comments 4.5.2.1 Note TS 16949 1st edition
  • 19. Comparison between 1 st and 2 nd edition 4.6 Purchasing “ applicable to country of manufacture and sale” removed 7.4.1.1 – Regulatory compliance 4.6.1.3 – Regulatory compliance “ including tool and gaging suppliers” added “ Contract (like drawings, specifications)” Word change 7.4.1.3 - Customer approved sources 4.6.1.2 – Customer approved subcontractors Note removed and added two notes under 7.4.1 TS 16949 – 2 nd edition Note removed pertaining to Definition 3.1 in ISO9001”1994 2 Notes added: Note-1 “Purchased products above includes all products and services that impact customer requirements such as sub-assembly, sequencing, sorting, rework and calibration services” Note-2 “where there are mergers, acquisitions and affiliations associated with suppliers, the organization should verify the continuity of suppliers quality system and effectiveness” Comments 4.6.1.1 Note TS 16949 1st edition
  • 20. Comparison between 1 st and 2 nd edition 4.6 Purchasing “ Suppliers performance shall be monitored through the follg: indicators Delivered product quality Customer disruptions including field returns Delivery schedule performance (includes freight) Special status customer notifications relating to quality or delivery issues The organization shall promote supplier monitoring of their manufacturing processes” 7.4.3.2 – Supplier Monitoring 4.6.2.3 – Scheduling subcontractors 7.4.1.2 – Supplier Quality management system development TS 16949 – 2 nd edition “ Conformity with ISO9001:2000 is the first step in achieving this goal” added Note 2 retained Note 1 – removed “ Unless otherwise specified by the customer, Suppliers to the Organization shall be third party registered to ISO9001:2000 by an accredited Third party certification body” – Added. This is a big big change Comments 4.6.2.2 – Subcontractor development TS 16949 1st edition
  • 21. Comparison between 1 st and 2 nd edition 4.7 Control of customer supplied product 7.5.4.1 – Customer owned Production tooling TS 16949 – 2 nd edition “ manufacturing,test,inspection tooling and equipment” added. Comments 4.7.2 – Customer owned tooling TS 16949 1st edition
  • 22. Comparison between 1 st and 2 nd edition 4.8 Product identification and traceability 7.5.3 – Product Identification and traceability 7.5.3.1 – Identification and Traceability - Supplemental TS 16949 – 2 nd edition No change Note added giving clarity on certain aspects of Inspection and test status Comments 4.8 TS 16949 1st edition
  • 23. Comparison between 1 st and 2 nd edition 4.9 Process Control Minor wording changes 7.2.1.1 – Customer designated special characteristics 4.9.1.4 – Designation of special characteristics “ Predictive methods to continually improve the effectiveness and efficiency of Production equipments” added 7.5.1.4 – Preventive and predictive maintenance 4.9.1.5 – Preventive maintenance “ to satisfy the customer specified requirements” added Natural disaster and force majeur removed Minor wording changes “ Field returns” added 6.3.2 – Contingency plans 4.9.1.3 – Contingency plans 6.4.2 – Cleanliness of premises TS 16949 – 2 nd edition Minor wording changes Comments 4.9.1.2 Cleanliness of Premises TS 16949 1st edition
  • 24. Comparison between 1 st and 2 nd edition 4.9 Process Control “ significant time period between runs” removed 7.5.1.3 – Verification of Job setups 4.9.4 Verification of job-setups No Change 8.2.4.2 – Appearance items 4.9.5 Appearance items Word “exceed” removed Minor wording changes 8.2.3.1 –Monitoring and measurement of processes – Supplemental 4.9.3 Maintaining process control 7.5.1.2 – Work instructions TS 16949 – 2 nd edition “ Job instructions” changed to “Work instruction” “ without disruption of job” removed “ Job instructions shall include or reference ….” removed Note 1 and Note 2 removed Comments 4.9.2 – Job instructions TS 16949 1st edition
  • 25. Comparison between 1 st and 2 nd edition 4.10 Inspection and Testing Changed to “Acceptance criteria shall be defined by the customer and documented by the organization”. Attribute data sampling plan shall have zero defects as acceptance criteria” 7.1.2 – Acceptance Criteria 4.10.1.2 Acceptance criteria No change 7.4.3.1 – Incoming Product Quality 4.10.2.4 – Incoming product quality 8.2.4 – Monitoring and Measurement of Product TS 16949 – 2 nd edition Existing note removed. New note pertaining to selection of measurement types added. In parking lot Comments 4.10.1.1 Note TS 16949 1st edition
  • 26. Comparison between 1 st and 2 nd edition 4.10 Inspection and Testing Compliance with ISO/IEC 17025 removed. Now it is not mandatory. Word changes makes reqmt. clear Lab “shall be included in the quality system” Word “External” added in addition to “Commercial/Independent” Lab Scope of External lab is must now “ Evidence of external lab acceptable to the customer” is required if the external lab is not an accredited lab 1 note added pertaining on how the customer acceptance of lab can be demonstrated. 1 note on what has to be done if the equipment is calibrated by Manufacturer is provided 7.6.3 – Laboratory requirements 7.6.3.1 – Internal Labs 7.6.3.2 – External Labs 4.10.6 Laboratory requirements 8.2.4.1– Layout and functional testing TS 16949 – 2 nd edition Note added explaining what is Layout inspection Comments 4.10.4.2 – Layout inspection and functional testing TS 16949 1st edition
  • 27. Comparison between 1 st and 2 nd edition 4.11 Control of inspection, measuring and test equipment “ an assessment of the impact of the out-of specification condition” and “equipment identification including master standard against which the equipment is calibrated” added 7.6.2 – Calibration records 4.11.3 – Records 7.6.1 – Measurement System analysis TS 16949 – 2 nd edition Minor wording changes Comments 4.11.1.2 – Measurement System Analysis TS 16949 1st edition
  • 28. Comparison between 1 st and 2 nd edition 4.12 Inspection and Test status 7.5.3 – Product identification and traceability TS 16949 – 2 nd edition No change. Merged with Product identification and traceability Comments 4.12 – Inspection and Test status TS 16949 1st edition
  • 29. Comparison between 1 st and 2 nd edition 4.13 Control of nonconforming product “ Instructions including re-inspection” added - Minor wording change 8.3.2 – Control of reworked product 4.13.3 – Control of reworked product Change – “Shall obtain customer concession or deviation permit prior to changing product/process” Minor wording changes 8.3.4 – Customer waiver 4.13.4 – Engineering approved authorization “ Customer shall be informed promptly in the event that non-conforming product is shipped” – word changes Requirement relating to quantify,analyze and initiating actions removed 8.3.3 – Customer information 4.13.1.3 – Corrective action plan 8.3.1 – Control of nonconforming product - Supplemental TS 16949 – 2 nd edition “ Product with unidentified or suspect status shall be classified as non-conforming product” – Word changes Comments 4.13.1.2 Suspect material or product TS 16949 1st edition
  • 30. Comparison between 1 st and 2 nd edition 4.14 Corrective and Preventive action Minor wording changes 8.5.2.3 – Corrective action impact 4.14.2.2 – Corrective action impact The word “Return” changed to “Rejected”. This means the scope is bigger now, it also includes the customer line rejections, receiving rejections etc.. No change 8.5.2.4 – Rejected product test/analysis 4.14.2.3 – Returned product test/analysis No Change – “Mistake” changed to “Error” 8.5.2.2 – Error Proofing 4.14.1.3 Mistake proofing 8.5.2.1 – Problem Solving TS 16949 – 2 nd edition “ Shall have a process for problem solving leading to root cause identification and elimination” (Wording change) Comments 4.14.1.2 Problem solving TS 16949 1st edition
  • 31. Comparison between 1 st and 2 nd edition 4.15 Handling, Storage, packaging,preservation and delivery Same as above 7.1.1 4.15.4.3 – Labelling “ Delivery schedule performance including premium freight” is one of the indicators to be tracked “ Organization shall monitor process performance to meet the customer quality and efficiency of process” (This is for lead time tracking). Removed “Lead time requirements” Removed the first sentence of current 4.15.6.2 8.2.1.1 –Customer satisfaction – Supplemental 4.15.6.2 – Performance monitoring of supplier delivery “ Customer requirements and references to its technical specifications shall be included in the planning of Product realization” 7.1.1 – Planning of Product realization – Supplemental 4.15.4.2 Customer packaging standards 7.5.5.1 – Storage and inventory TS 16949 – 2 nd edition No Change Comments 4.15.3.2 – Inventory TS 16949 1st edition
  • 32. Comparison between 1 st and 2 nd edition 4.15 Handling, Storage, packaging,preservation and delivery 7.1.1 4.15.6.5 – Shipment notification system 7.1.1 4.15.6.4 – Electronic communication 7.5.1.6 – Production scheduling TS 16949 – 2 nd edition Minor wording changes Comments 4.15.6.3 – Production scheduling TS 16949 1st edition
  • 33. Comparison between 1 st and 2 nd edition 4.16 Control of Quality Records 4.2.4.1 – Record retention TS 16949 – 2 nd edition Minor wording changes Comments 4.16.2 Record retention TS 16949 1st edition
  • 34. Comparison between 1 st and 2 nd edition 4.17 – Internal quality audits Removed the word “Product realization”. Now the focus is only on manufacturing process. 8.2.2.2 – Manufacturing Process audit 4.17.2.3 – Process audit No change 8.2.2.3 – Product audit 4.17.2.4 – Product audit No change. 8.2.2.5 – Internal auditor qualification 4.17.3 – Auditor qualification “ Audits shall cover all activities and shifts” moved to 8.2.2.4 8.2.2.1 – Quality Management system audit 4.17.2.2 – System audit 8.2.2.4 – Internal audit plans TS 16949 – 2 nd edition No change Comments 4.17.2.1 – Internal quality audits – supplemental – General TS 16949 1st edition
  • 35. Comparison between 1 st and 2 nd edition 4.18 – Training “ Special attention shall be given on customer specific requirements” is moved to 6.2.2.2 Note is removed 6.2.2.2 – Training No change 6.2.2.3 – Training on the job 4.18.3 – Training on the job Effectiveness requirements is added now as part of ISO9001:2000 6.2.2.c 6.2.2.c 4.18.2 Training effectiveness 6.2.2.2 – Training TS 16949 – 2 nd edition Even though this is ISO9000:1994 requirement, this is not a requirement in ISO9001:2000. In the 2 nd edition, this along with the 2 notes which were present in ISO9000:1994 have been added in this element without any change Comments 4.18.1 – Training TS 16949 1st edition
  • 36. Comparison between 1 st and 2 nd edition 4.19 - Servicing Earlier it was “Special purpose tools” now it is “Special purpose tools or measuring equipments” 7.5.1.8 – Servicing agreement with customer 4.19.3 – Servicing agreement with customer No change 7.5.1.7 – Feedback of information from service 4.19.2 Feedback of information from service Note removed TS 16949 – 2 nd edition Comments 4.19.1 Servicing – Note TS 16949 1st edition
  • 37. Comparison between 1 st and 2 nd edition 4.20 – Statistical techniques Word “where appropriate” removed 8.1.2 – Knowledge of basic statistical concepts 4.20.4 – Knowledge of basic statistical concepts 8.1.1 – Identification of Statistical tools TS 16949 – 2 nd edition No change Comments 4.20.3 – Identification of statistical tools TS 16949 1st edition
  • 38. Comparison between 1 st and 2 nd edition New requirements 7.5.2.1 – Validation of Processes and Service provision - Supplemental TS 16949 – 2 nd edition Validation of Processes and Service provision is applicable to all processes of Production and Service provision Comments TS 16949 1st edition