ISO 9001:2000 Implementation –  Increasing Value and Reducing Lead Time -  Removing Implementation Roadblocks Chad Kymal, CEO Omnex © Omnex  All rights reserved
Speaker Biography Chad Kymal is a widely sought international trainer and consultant whose broad experience includes TQM, setup reduction, technology assessment and inventory analysis, statistical process control, and quality function deployment. He has co-authored or championed most of Omnex's quality training courses. He is on the Malcolm Baldrige Board of Examiners and is an RAB certified Lead Auditor.  He has a Bachelor’s degree Mechanical Engineering from General Motors Institute, a Master's degree in Industrial and Operations Engineering from the University of Michigan, and an MBA from the University of Michigan. Kymal founded Omnex, Inc., a business/quality management solution provider that offers training to semi-conductor, automotive, manufacturing, and service industries.  Omnex has worked with Ford Motor Company, Lucent Technologies, Philips Semiconductor, Magna, and most of the Fortune 500 companies worldwide.  Omnex provides over 50 training courses in subject areas ranging from APQP to Six Sigma and has 15 offices worldwide. Chad is also the founder of AQSR, one of the top five rated Quality System registrars in the US as rated by  Quality Digest.   Chad and AQSR specialize in providing auditing services in ISO 9000, QS-9000, TE Supplement, TS 16949, VDA 6*, AS-9000 and the ISO 14001 series of international standards. He also founded Omnex Systems, which provides Omnex's industry-leading Advance Product Quality Planning Software, AQuA®, which is being used by several leading companies in the industry.  Currently, Omnex Systems is offering the Enterprise-wide Quality Management System (EwQMS™) Suite, which features AQuA, Audit Pro, Boss, Document Pro, MSA Pro, HR Pro, Process Analyzer, Process Pro, and TPM Pro. Chad has recently published a book on ISO 9001:2000 auditing for Paton Press, and is working on a book for ISO/TS 16949:2002 auditing.  Chad led the Omnex team that helped Ford Motor Company rewrite the QOS methodology.  He helped write the QS-9000 requirements and did the first worldwide witness audit for the same.  Chad Kymal worked closely with the Automotive Electronic Council (AEC) to develop the Semiconductor Supplement.  He has also helped Visteon and Delphi in developing their customer specific requirement. Chad was named Executive Director of SAC.  He is currently leading SAC to develop a second party/third party auditing process for the semiconductor supply chain.  He is also helping SAC remove waste and redundancy in quality system requirements auditing in the semiconductor supply chain.
Agenda ISO 9001:2000 Requirements and Deadlines ISO 9001:2000 Roadblocks and Preventing them Transitioning from ISO 9001:1994 – Key Differences Creating Value from ISO 9001:2000 Implementation Creating the culture change and the savings quickly
About Omnex Consulting Omnex provides leading Quality Management and Performance Enhancement consulting and training to an extensive array of both service and manufacturing sectors. Training Omnex is the leading provider of quality-focused training to the manufacturing and service industries. Software Omnex Systems LLC specializes in developing management improvement software to cater to the needs of a variety of quality management systems.
About Omnex  Offices Worldwide Brazil Canada China India Korea Mexico Taiwan Saudi Arabia Germany Thailand UK Venezuela
Omnex Systems EwQMS Suite of Integrated Modules
Agenda ISO 9001:2000 Requirements and Deadlines ISO 9001:2000 Roadblocks and Prevention Transitioning from ISO 9001:1994 – Key Differences Creating Value from ISO 9001:2000 Implementations Creating the culture change and the savings quickly
ISO 9001:2000 Requirements and Deadlines
ISO 9001:2000 Process Model
ISO 9000 Series of Standards Terms and Definitions Guidance QMS Requirements ISO 9000:2000 ISO 9001:2000 ISO 9004:2000
ISO 9001:2000 Registration Process Documentation Review Onsite Audit Corrective Action Certificate Issuance Surveillance
Steps to ISO 9001:2000 Implementation
ISO 9001:2000 Deadlines Organizations need to get registered by Dec.31, 2003 to retain their ISO Certification Organizations not upgraded to ISO 9001:2000 will lose their ISO certification ANSI/RAB and registrars will not continue to support ISO 9001:1994 past the deadline
ISO 9001:2000 Roadblocks and Prevention
Roadblocks and Problems Top Management commitment and involvement ISO 9001:2000 Implementation seen as a Quality Department effort Goal of Implementation is passing the audit No Plan or leadership for the implementation.  Providing Customer Focus/Measuring Customer Satisfaction Over documentation Understanding steps for Process Focus Implementing a process for continual improvement Objectives deployment and Business Review Poor internal audits
Transitioning from ISO 9001:1994 - Key Differences
Transitioning from ISO 9001:1994 - Key Differences Process Focus and business process measurement Documentation of Procedures Customer Focus Objectives Deployment Management Review
Transitioning from ISO 9001:1994 - Key Differences (cont’d) Resources Planning and including Competency Customer Satisfaction Analysis of Data Continual Improvement
Providing Value In ISO 9001:2000 Implementations
Getting Value from Your Implementation Set Objectives for your ISO/TS 16949:2002 Implementations Find crucial senior management problems to work on  SAVE Money with the implementation For example: Setting business objectives and a management process Implement Six Sigma or Lean as a part of the continual improvement process – Save Money Process  and documentation Commonization Improved Problem solving with lead time and cost savings target Become Process focused –process map, process list, BMS control plans, and alignment charts
Getting Value from Your Implementation (cont’d) Use the alignment methodology to become customer focused Train your implementation team and Auditors Use the idea of a BMS and not a QMS Use software which has prescribed Best In Class Methods. Use it to optimize the implementation and make it easy. Use web based software Documentation Customer Focus and Continual Improvement New Product Development (FMEAs?) Process Mapping and Process Flows Get your top management involved in the implementation
Creating the culture change and the savings quickly
ISO 9001:2000 Implementation Plan Form Overall Objectives and Strategy  Form Team and Train Team  Form ISO and Software Implementation Plan Develop Documentation Implement Software Modules – Documentation, Process Focus, Customer Focus Train Auditors and Conduct Audit –implement Audit Pro
ISO 9001:2000 Implementation Plan Form Overall Objectives and Strategy – Month 1  Form Team and Train Team – Month 1 Form ISO and Software Implementation Plan – Month 1 Develop Documentation – Month 2 Implement Software Modules – Documentation, Process Focus, Customer Focus – Month 2 to 4 Train Auditors and Conduct Audit –implement Audit Pro – Month 5
Month 1 Conduct Discovery Analysis and formulate overall objectives and strategy for ISO 9001:2000 Form ISO and Software Implementation Plan  Conduct Executive Overview for Senior Management Form Team and Train Team
Month 2 – Develop Documentation Required Procedures – Most can be reused from ISO 9001:1994 system Document Control Records Control Internal Audit Non Conforming Product Corrective Action Preventive Action Review documentation from current system and decide which to keep Identify additional value added documentation  Keep documentation to a minimum. Use software To implement and provide evidence of a process
Month 2 to 4 – Implement Software Modules 4.1, 4.2  building the process model, review of process metrics    and managing process variation.   4.2    document management.  5.1 - 5.4, 6.1  managing customer expectations, customer satisfaction,     continual improvement, and data analysis.   5.5 6.2, 6.4  human performance management functions, competency,     training management and satisfaction surveys     6.3    preventive and reactive maintenance.   7.1    project management.   7.1, 7.3    APQP, PPAP processes 7.4, 7.5    document management.  7.5  preventive and reactive maintenance. 7.4, 8.2.2  internal and external audit function with a focus on  process improvement.     7.6, 8.4  calibration and measurement systems analyses.   8.2.1  human performance management functions, competency,   training management and satisfaction surveys 8.2.3, 8.4, 8.5 managing customer expectations, customer satisfaction, continual improvement, and data analysis.   8.5.2, 8.5.3  document management.  Process Pro  Document Pro BOSS  HR Pro   TPM Pro  Project Planner  AQuA Pr Document Pro TPM Pro  Audit Pro  MSA Pro     HR Pro   BOSS Document Pro
Process Focus - Process Pro
The process flow shows the linkages between each step  within the process. You can then click to see the process flow definition.
 
Business Management System Control Plan – Example A
Customer Focus and Continual Improvement - BOSS
It all starts with the customer
Quality is what the customer says it is! Multiple customers and multiple expectations categories.
You can then align customer quality expectations with company driven process improvement activities.  EwQMS helps you measure key processes.
OFI’s can trigger improvement proposals so the team can  make adjustments to the process.
If  results indicate further analysis, team meetings  can be held to determine OFI’s.
Data for process measurables is kept within the EwQMS system for analysis and continuous improvement activities.
Excel data can also be imported using Data Exchanger, an EwQMS tool  giving you total flexibility in data collection.
You can then use the EwQMS report generator to report detailed information on a variety of process metrics.
EwQMS drill down functionality allows  management to quickly find the root cause  of process variation.
Again, EwQMS visual management tools allow  easy interpretation of metrics data.
Improvement proposals can be documented and tracked against  results.
Documentation – Document Pro
 
The Document Management Process  Spans multiple sites, groups and levels. No limited file types; graphics, audio, video  Action items with email support Automated routing and escalation  Records management Document draft functionality  User defined login default On line revision history and reference documents EwQMS module hot links Customer complaint and concern management
Month 5 – Train Auditors and Conduct Audit Train Internal Auditors Conduct Internal Audit using Audit Pro Use Audit Pro to follow up on Corrective Actions
Audit Pro
The Auditing Process   Scheduling of Audits  Auditor selection criteria ( i.e. qualifications)  Auditor calendar and date verification  Managing Audits  Visual audit status  Audit query and report capability Visual CAR status Reminders and escalation functionality  Custom email messages Sharing across the Enterprise  Audit information  Auditee information Auditors
 
 
Conduct Registration Audit Conduct Registration Audit Track and record – overall objectives accomplished Provide Senior Management Presentation

More Related Content

PPT
Barber process basedintegrating9001_14k_18k_final
PPSX
Workshop on ISO 9001 2008
PDF
QuEST Forum TL 9000 R6.0 Requirements & ISO 9001:2015
PPTX
ISO 9001:2015 Revision Update Part 5
PPT
Introduction to iso 9001
PDF
Iso 9001 2008 awareness training-slides
PPTX
9001-2015
PPT
Iso awarenee training dr. amsavel
Barber process basedintegrating9001_14k_18k_final
Workshop on ISO 9001 2008
QuEST Forum TL 9000 R6.0 Requirements & ISO 9001:2015
ISO 9001:2015 Revision Update Part 5
Introduction to iso 9001
Iso 9001 2008 awareness training-slides
9001-2015
Iso awarenee training dr. amsavel

What's hot (19)

PDF
ISO 9001
PDF
Omnex 2019 Newsletter Navigator
PPT
Iso9001 implementation increasing-value_reducing_leadtime
PPTX
ISO9001:2015 presentation
PDF
ISO 9001:2015 Overview: Revisions & Impact - Part 1
PPTX
Are you prepared to transition to ISO 9001:2015?
PPT
ISO/TS 16949 Automotive Quality Management
PPT
Iso 9001 2008 qms
DOCX
Iso 9001.2015 full module
PDF
7 steps to world class manufacturing.pdf
PPT
free training on Quality Management systems in software industry.Iso 9000,ISO...
PPTX
ISO 9001 2015 | Join-The-Dots
PPTX
ISO 9001:2015 - Greendot Management Solutions
PPT
Procedure of ISO 9001:2008 QMS
PDF
Iso 9001 training
PPTX
Certification Body Approach to ISO 9001:2015 by NQA
PPT
Iso 9001 2008
PPT
Iso awareness training
PPTX
ISO 9001:2015 Revision Overview: part 2
ISO 9001
Omnex 2019 Newsletter Navigator
Iso9001 implementation increasing-value_reducing_leadtime
ISO9001:2015 presentation
ISO 9001:2015 Overview: Revisions & Impact - Part 1
Are you prepared to transition to ISO 9001:2015?
ISO/TS 16949 Automotive Quality Management
Iso 9001 2008 qms
Iso 9001.2015 full module
7 steps to world class manufacturing.pdf
free training on Quality Management systems in software industry.Iso 9000,ISO...
ISO 9001 2015 | Join-The-Dots
ISO 9001:2015 - Greendot Management Solutions
Procedure of ISO 9001:2008 QMS
Iso 9001 training
Certification Body Approach to ISO 9001:2015 by NQA
Iso 9001 2008
Iso awareness training
ISO 9001:2015 Revision Overview: part 2
Ad

Viewers also liked (8)

PPT
Compliance roadmap
PPT
Enterprise Excellence: The Future of Quality
PPT
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
PPTX
Process Audit and ISO
PPT
Process auditing as per VDA 6.3
PPTX
Presentation 3 - Audit Program & Procedure
PPTX
Internal Audit Methodology
PPTX
Basic Internal Auditing Presentation
Compliance roadmap
Enterprise Excellence: The Future of Quality
How To Beat The Recession: BOS, Operations Excellence and a Problem Solving C...
Process Audit and ISO
Process auditing as per VDA 6.3
Presentation 3 - Audit Program & Procedure
Internal Audit Methodology
Basic Internal Auditing Presentation
Ad

Similar to Reducing timeincreasingvalue0503 (20)

PPT
Implementing ts strategic-choices_5_2003
PPTX
ISO 9001 - 2008 Awareness training programme by Salamah.pptx
PPT
Omne xsales
PPTX
MBA ISO Awareness Training
PDF
QMS Conversion A Process Approach 2nd Edition David Hoyle
PPS
Business Excellence Through QMS
PDF
QMS Conversion A Process Approach 2nd Edition David Hoyle
DOCX
Quality Assurance, Elevated The Power of ISO 9001.docx
PPT
Quality Management System
PDF
Leadership Through ISO/TS 16949
PPT
Training - Implementing a QMS.ppt
PPT
Iso 1216828154098338-8
PDF
QMS Conversion A Process Approach 2nd Edition David Hoyle
PPTX
Qualit management systems
PPT
TS 16949 ASQ Presentation.ppt
PDF
Bsi iso-9001-implementation-guide
PPTX
ISO 9001 Employee Awareness (for employees).pptx
PPT
Omnexsystem spresentation
PDF
ISO 9000 certification(Quality Management System)
Implementing ts strategic-choices_5_2003
ISO 9001 - 2008 Awareness training programme by Salamah.pptx
Omne xsales
MBA ISO Awareness Training
QMS Conversion A Process Approach 2nd Edition David Hoyle
Business Excellence Through QMS
QMS Conversion A Process Approach 2nd Edition David Hoyle
Quality Assurance, Elevated The Power of ISO 9001.docx
Quality Management System
Leadership Through ISO/TS 16949
Training - Implementing a QMS.ppt
Iso 1216828154098338-8
QMS Conversion A Process Approach 2nd Edition David Hoyle
Qualit management systems
TS 16949 ASQ Presentation.ppt
Bsi iso-9001-implementation-guide
ISO 9001 Employee Awareness (for employees).pptx
Omnexsystem spresentation
ISO 9000 certification(Quality Management System)

More from Omnex Inc. (20)

PDF
Omnex 2018 Navigator Newsletter
DOC
Semiconductor newsletter8 01
PPT
Rollout
PPT
Omnex semiconductor1 may_2000
PPT
Quality tools-asq-london-may-10-2006
PPT
New ts16949
PPT
Omnex semiconductor2 sac_board_may2000
PPT
Omnex sac may01
PPT
Lss pharma presentation2-2006
PPT
Key changes ts169492002
PPT
Iso ts-implementation-webinar5-17-05
PPT
Integrating lssiso9ts
PPT
Hitachi case study(22 11)
PPT
Ew qms asq_kitchner
PPT
Costof quality
PPT
Comparison ts16949 2002_qs9000
PPT
Comparis
PPT
Case for integrated_management_systems
PPT
Asq toronto10 jan2007effectcorraction
PPT
Asq int lss
Omnex 2018 Navigator Newsletter
Semiconductor newsletter8 01
Rollout
Omnex semiconductor1 may_2000
Quality tools-asq-london-may-10-2006
New ts16949
Omnex semiconductor2 sac_board_may2000
Omnex sac may01
Lss pharma presentation2-2006
Key changes ts169492002
Iso ts-implementation-webinar5-17-05
Integrating lssiso9ts
Hitachi case study(22 11)
Ew qms asq_kitchner
Costof quality
Comparison ts16949 2002_qs9000
Comparis
Case for integrated_management_systems
Asq toronto10 jan2007effectcorraction
Asq int lss

Reducing timeincreasingvalue0503

  • 1. ISO 9001:2000 Implementation – Increasing Value and Reducing Lead Time - Removing Implementation Roadblocks Chad Kymal, CEO Omnex © Omnex All rights reserved
  • 2. Speaker Biography Chad Kymal is a widely sought international trainer and consultant whose broad experience includes TQM, setup reduction, technology assessment and inventory analysis, statistical process control, and quality function deployment. He has co-authored or championed most of Omnex's quality training courses. He is on the Malcolm Baldrige Board of Examiners and is an RAB certified Lead Auditor. He has a Bachelor’s degree Mechanical Engineering from General Motors Institute, a Master's degree in Industrial and Operations Engineering from the University of Michigan, and an MBA from the University of Michigan. Kymal founded Omnex, Inc., a business/quality management solution provider that offers training to semi-conductor, automotive, manufacturing, and service industries. Omnex has worked with Ford Motor Company, Lucent Technologies, Philips Semiconductor, Magna, and most of the Fortune 500 companies worldwide. Omnex provides over 50 training courses in subject areas ranging from APQP to Six Sigma and has 15 offices worldwide. Chad is also the founder of AQSR, one of the top five rated Quality System registrars in the US as rated by Quality Digest. Chad and AQSR specialize in providing auditing services in ISO 9000, QS-9000, TE Supplement, TS 16949, VDA 6*, AS-9000 and the ISO 14001 series of international standards. He also founded Omnex Systems, which provides Omnex's industry-leading Advance Product Quality Planning Software, AQuA®, which is being used by several leading companies in the industry. Currently, Omnex Systems is offering the Enterprise-wide Quality Management System (EwQMS™) Suite, which features AQuA, Audit Pro, Boss, Document Pro, MSA Pro, HR Pro, Process Analyzer, Process Pro, and TPM Pro. Chad has recently published a book on ISO 9001:2000 auditing for Paton Press, and is working on a book for ISO/TS 16949:2002 auditing. Chad led the Omnex team that helped Ford Motor Company rewrite the QOS methodology. He helped write the QS-9000 requirements and did the first worldwide witness audit for the same. Chad Kymal worked closely with the Automotive Electronic Council (AEC) to develop the Semiconductor Supplement. He has also helped Visteon and Delphi in developing their customer specific requirement. Chad was named Executive Director of SAC. He is currently leading SAC to develop a second party/third party auditing process for the semiconductor supply chain. He is also helping SAC remove waste and redundancy in quality system requirements auditing in the semiconductor supply chain.
  • 3. Agenda ISO 9001:2000 Requirements and Deadlines ISO 9001:2000 Roadblocks and Preventing them Transitioning from ISO 9001:1994 – Key Differences Creating Value from ISO 9001:2000 Implementation Creating the culture change and the savings quickly
  • 4. About Omnex Consulting Omnex provides leading Quality Management and Performance Enhancement consulting and training to an extensive array of both service and manufacturing sectors. Training Omnex is the leading provider of quality-focused training to the manufacturing and service industries. Software Omnex Systems LLC specializes in developing management improvement software to cater to the needs of a variety of quality management systems.
  • 5. About Omnex Offices Worldwide Brazil Canada China India Korea Mexico Taiwan Saudi Arabia Germany Thailand UK Venezuela
  • 6. Omnex Systems EwQMS Suite of Integrated Modules
  • 7. Agenda ISO 9001:2000 Requirements and Deadlines ISO 9001:2000 Roadblocks and Prevention Transitioning from ISO 9001:1994 – Key Differences Creating Value from ISO 9001:2000 Implementations Creating the culture change and the savings quickly
  • 10. ISO 9000 Series of Standards Terms and Definitions Guidance QMS Requirements ISO 9000:2000 ISO 9001:2000 ISO 9004:2000
  • 11. ISO 9001:2000 Registration Process Documentation Review Onsite Audit Corrective Action Certificate Issuance Surveillance
  • 12. Steps to ISO 9001:2000 Implementation
  • 13. ISO 9001:2000 Deadlines Organizations need to get registered by Dec.31, 2003 to retain their ISO Certification Organizations not upgraded to ISO 9001:2000 will lose their ISO certification ANSI/RAB and registrars will not continue to support ISO 9001:1994 past the deadline
  • 14. ISO 9001:2000 Roadblocks and Prevention
  • 15. Roadblocks and Problems Top Management commitment and involvement ISO 9001:2000 Implementation seen as a Quality Department effort Goal of Implementation is passing the audit No Plan or leadership for the implementation. Providing Customer Focus/Measuring Customer Satisfaction Over documentation Understanding steps for Process Focus Implementing a process for continual improvement Objectives deployment and Business Review Poor internal audits
  • 16. Transitioning from ISO 9001:1994 - Key Differences
  • 17. Transitioning from ISO 9001:1994 - Key Differences Process Focus and business process measurement Documentation of Procedures Customer Focus Objectives Deployment Management Review
  • 18. Transitioning from ISO 9001:1994 - Key Differences (cont’d) Resources Planning and including Competency Customer Satisfaction Analysis of Data Continual Improvement
  • 19. Providing Value In ISO 9001:2000 Implementations
  • 20. Getting Value from Your Implementation Set Objectives for your ISO/TS 16949:2002 Implementations Find crucial senior management problems to work on SAVE Money with the implementation For example: Setting business objectives and a management process Implement Six Sigma or Lean as a part of the continual improvement process – Save Money Process and documentation Commonization Improved Problem solving with lead time and cost savings target Become Process focused –process map, process list, BMS control plans, and alignment charts
  • 21. Getting Value from Your Implementation (cont’d) Use the alignment methodology to become customer focused Train your implementation team and Auditors Use the idea of a BMS and not a QMS Use software which has prescribed Best In Class Methods. Use it to optimize the implementation and make it easy. Use web based software Documentation Customer Focus and Continual Improvement New Product Development (FMEAs?) Process Mapping and Process Flows Get your top management involved in the implementation
  • 22. Creating the culture change and the savings quickly
  • 23. ISO 9001:2000 Implementation Plan Form Overall Objectives and Strategy Form Team and Train Team Form ISO and Software Implementation Plan Develop Documentation Implement Software Modules – Documentation, Process Focus, Customer Focus Train Auditors and Conduct Audit –implement Audit Pro
  • 24. ISO 9001:2000 Implementation Plan Form Overall Objectives and Strategy – Month 1 Form Team and Train Team – Month 1 Form ISO and Software Implementation Plan – Month 1 Develop Documentation – Month 2 Implement Software Modules – Documentation, Process Focus, Customer Focus – Month 2 to 4 Train Auditors and Conduct Audit –implement Audit Pro – Month 5
  • 25. Month 1 Conduct Discovery Analysis and formulate overall objectives and strategy for ISO 9001:2000 Form ISO and Software Implementation Plan Conduct Executive Overview for Senior Management Form Team and Train Team
  • 26. Month 2 – Develop Documentation Required Procedures – Most can be reused from ISO 9001:1994 system Document Control Records Control Internal Audit Non Conforming Product Corrective Action Preventive Action Review documentation from current system and decide which to keep Identify additional value added documentation Keep documentation to a minimum. Use software To implement and provide evidence of a process
  • 27. Month 2 to 4 – Implement Software Modules 4.1, 4.2 building the process model, review of process metrics and managing process variation. 4.2 document management. 5.1 - 5.4, 6.1 managing customer expectations, customer satisfaction, continual improvement, and data analysis. 5.5 6.2, 6.4 human performance management functions, competency, training management and satisfaction surveys 6.3 preventive and reactive maintenance. 7.1 project management. 7.1, 7.3 APQP, PPAP processes 7.4, 7.5 document management. 7.5 preventive and reactive maintenance. 7.4, 8.2.2 internal and external audit function with a focus on process improvement. 7.6, 8.4 calibration and measurement systems analyses. 8.2.1 human performance management functions, competency, training management and satisfaction surveys 8.2.3, 8.4, 8.5 managing customer expectations, customer satisfaction, continual improvement, and data analysis. 8.5.2, 8.5.3 document management. Process Pro Document Pro BOSS HR Pro TPM Pro Project Planner AQuA Pr Document Pro TPM Pro Audit Pro MSA Pro HR Pro BOSS Document Pro
  • 28. Process Focus - Process Pro
  • 29. The process flow shows the linkages between each step within the process. You can then click to see the process flow definition.
  • 30.  
  • 31. Business Management System Control Plan – Example A
  • 32. Customer Focus and Continual Improvement - BOSS
  • 33. It all starts with the customer
  • 34. Quality is what the customer says it is! Multiple customers and multiple expectations categories.
  • 35. You can then align customer quality expectations with company driven process improvement activities. EwQMS helps you measure key processes.
  • 36. OFI’s can trigger improvement proposals so the team can make adjustments to the process.
  • 37. If results indicate further analysis, team meetings can be held to determine OFI’s.
  • 38. Data for process measurables is kept within the EwQMS system for analysis and continuous improvement activities.
  • 39. Excel data can also be imported using Data Exchanger, an EwQMS tool giving you total flexibility in data collection.
  • 40. You can then use the EwQMS report generator to report detailed information on a variety of process metrics.
  • 41. EwQMS drill down functionality allows management to quickly find the root cause of process variation.
  • 42. Again, EwQMS visual management tools allow easy interpretation of metrics data.
  • 43. Improvement proposals can be documented and tracked against results.
  • 45.  
  • 46. The Document Management Process Spans multiple sites, groups and levels. No limited file types; graphics, audio, video Action items with email support Automated routing and escalation Records management Document draft functionality User defined login default On line revision history and reference documents EwQMS module hot links Customer complaint and concern management
  • 47. Month 5 – Train Auditors and Conduct Audit Train Internal Auditors Conduct Internal Audit using Audit Pro Use Audit Pro to follow up on Corrective Actions
  • 49. The Auditing Process Scheduling of Audits Auditor selection criteria ( i.e. qualifications) Auditor calendar and date verification Managing Audits Visual audit status Audit query and report capability Visual CAR status Reminders and escalation functionality Custom email messages Sharing across the Enterprise Audit information Auditee information Auditors
  • 50.  
  • 51.  
  • 52. Conduct Registration Audit Conduct Registration Audit Track and record – overall objectives accomplished Provide Senior Management Presentation