SlideShare a Scribd company logo
7
Most read
9
Most read
12
Most read
SPECIALASSIGNMENT
LEANANDPROCESSIMPROVEMENTS(Subway)
Product and inventory control systems
NAME :SIDHARTH JAYANTH KINI
UTA ID :1001241754
CLASS :IE 5329 – 006
DATE : 4/18/2016
CONTENTS :
1. Introduction
2. Flow chart for Ordering
3. Assembly Flow Chart
4. Kanban in Subway
5. JIT in subway
6. Supply chain in Subway
7. Bottleneck
8. WIP and Throughput
9. Lean Process improvement
10. Conclusion
11. References
INTRODUCTION :
Aim of an Industrial Engineer is optimization of existing processes, improvements of involved
methods and looking trying to increase throughput by using minimum effort and cost.
In this assignment the Subway an American fast food restaurant franchise was chosen for the study.
The processes involved in sandwich making starting from taking an order to the billing were
observed from an inventory point of angle.
The Process flowcharts and assembly charts were designed for better understanding of the processes.
Then the concept like Kanban, JIT , supply chain scenario were tried to implicate. The reasons for
bottlenecks were detected and reasons were discussed. To increase the Throughput various lean
process improvements initiatives were suggested.
 Kanban: Kanban is a scheduling system used in lean and JIT manufacturing.
 JIT: Just in time production is also known as Toyota production system (TPS) and
aim of JIT is to reduce the inventories that flow into workstation and to reduce
the response times from suppliers and to customers. Kanban is an element of
JIT.
FLOW CHART FOR ORDERING A SANDWICH IN SUBWAY
PROCESS FLOW CHART FOR ORDERING
Process flow chart for ordering a sandwich consists of three main parts
1) Selection of Sandwich : In this process the customer reads the menu and decides which sandwich
to order, and places the order.
2) Preparation of sandwich : In this process the Sandwich is made according to given order by
customs
includes selections of bread , adding meat, heating , adding veggies.
3) Packing and Billing : This includes wrapping the sandwich with cover and charging the
customer
according to the order made.
ASSEMBLY FLOW CHART
5 sec 15sec 5 sec
25
sec
7 sec
20sec 11sec 7sec
4sec
Subway restaurant ( Work place )
In the picture (from right to left) we
can observe that customer can select
the type of bread ( Wheat , Honey
oats, Italian herbs and flat bread) in
first section, meat (Turkey, roasted
beef, ham oven chicken ) and type of
cheese (Cedar , American & Pepper
Jack)in the second section.
Later based on customer’s
requirement the bread is toasted in the
oven. In the final section veggies
(Tomato,Bell peppers, onions
spinach etc ) and type of sauce is
added to prepare the sandwich.
And then it is wrapped in the packing
section.
Possible KANBANs in Subways
 Kanban is a pull system and production is carried out according to the Demand.
 In subway there is a need for constant refilling of bread, meat ,cheese and Veggies at respective
sections
 With One Card Kanban system this can be easily achieved with less time.
 The container size and quantity of product to be filled is pre-decided and once the product gets
empty respective card ( which includes the quantity to be filled ) is removed from that section and
placed in Inventory section. The worker see the requirements and that particular section is
replenished.
 This can be simplified by making 3 different sections for meat , Veggies and Cheese & sauce and
cards are kept in respective sections.
 Kanban thus prevents excess of inventory storage.
JUST IN TIME scenarios
 Just in time concept is producing only what is required. The main Aim is to reduce the wastages
and Inventories (cost related to it )
 Kanban which was proposed in earlier slide is an element of the Just in Time system.
 The Sandwich is always made fresh, only after customer places an order. This helps in reduction
of wastage of uncooked food, as they can be preserved.
 As Kanban system is used and it takes care replenishment of products in each section and hence
no excess inventories.
 Pull systems works on demand ,if there is increase in the demand there should be enough quantity
of products and it should be easily accessed.
 The quality of the Sandwich will also be good because sandwich will be freshly prepared and thus
also results in good customer satisfaction.
SUPPLY CHAIN Scenario in subways
 A supply chain is the network of all the individuals, organizations, resources, activities and
technology involved in the creation and sale of a product, from the delivery of source materials from
the supplier to the manufacturer, through to its eventual delivery to the end user.
 The Raw materials like bread dough, vegetables , meat can be purchased from wholesale dealer at
lower and it can be distributed to restaurants.
 It is planned in such a way that goods are usually delivered one day before the delivery date, to
avoid late deliveries due to uncontrollable situations.
SUPPLY CHAIN scenario in subway
 Supply Chain in Restaurant fields deals mainly with buying the different raw material from
different vendors and storing the perishable food items.
 We can see the raw materials from different sources is moving into Restaurant storage.
 The restaurant will have small storages to accommodate the products until next delivery.
BOTTLENECKS
 Bottleneck of a line is rate of workstation having the highest long term (outages) utilization. In
other words it is nothing but congestion in the assembly/production line. If the bottleneck exists in
a line it causes delay in processes.
 In Subway the bottleneck can be seen during Toasting the bread in oven and during billing.
 There will many orders during peak hours and usually only one oven will be there.
 The oven can toast maximum of two sandwich at a time and thus other orders are kept in waiting.
 During the Billing, there are chances that one person orders more than 5 different type sandwiches
and it will take more time to bill one customer. And there will be congestion.
 Bottlenecks at one section will affect other sections, The veggies section will be idle until the
bread is toasted.
 Thus measures must be taken to avoid Bottlenecks.
WIPAND THROUGHPUT
 Work in process (WIP) : Inventory between the starting point to end point of product routing
 WIP = TH x CT
Where TH= throughput of a system , CT= cycle time.
 Then TH= WIP/ CT. This shows that reducing the cycle time will increase the Throughput.
 Time taken to make one sandwich is 99 secs or 1.65 min. If restaurant is working for 8 hours, then
the capacity of the system in approximately 290 sandwich.
 Throughput = 290/8=36.25 => 36 sandwich per hour
 If the time for make one sandwich is reduced the we will have system with higher throughput.
LEAN PROCESS IMPROVEMENTS
 Lean is process of eliminating the non value added activities and improving the quality of product
and service. It is process of retaining the activities with value for which customer is willing to pay.
 To improve the throughput we should always ensure that process is carried out smoothly.
 This can be done by reducing the bottlenecks and other non value added activities.
 The Bottlenecks is seen in toasting section and during billing . The bottleneck in toasting is
reduced by increasing the size or number of ovens. More the number of ovens , more sandwich
can be toasted together and sent to veggies section.
 The Bottleneck during billing can be reduced by automatic billing system. This can be done by
attaching the sensors/ buttons in each section which will automatically reflect the amount on
screen as sandwich passes through each section.
 The other procedure that can reduce the bottleneck at billing is Standardization of Sandwich ,
once the customers select the particular sandwich , it’s cost will be depicted on the screen. Thus it
will be a quicker and easy process. And by the time sandwich is made bill will be ready. earlier
Standardization of Sandwich will also reduce the wastage of veggies or meat , as amount and
type of meat, veggies and Cheese/ Sauce is pre-determined.
CONCLUSION
 The process of Sandwich making in Subway was thoroughly studied. The Kanban , JIT, Supply
chain management and Bottleneck Scenarios were observed during the process.
 The reason for bottleneck was discovered and suitable lean process improvements like Automatic
billing , Increasing size or number of Oven and Standardization of Sandwich were suggested.
 It was also evident that reducing cycle time will increase the Throughput.
 Thus implementing the modern production strategies in Restaurants will surely make considerable
changes within short span of time.
References
 Factory Physics - Third Edition Wallace J. Hopp, Mark L. Spearman
 www.lean.org
 www.wikipedia.com
THANK YOU !!!!

More Related Content

PPTX
SUPPLY AND DISTRIBUTION CHANNEL OF SUBWAY
PDF
SUBWAY
PPTX
Subway operations ppt
PPTX
Presentation on SUBWAY Covering TQM
PPTX
Supply chain management of mcdonalds
PPTX
Capacity Planning with reference to McDonlds
PDF
Subway-Business Model
DOCX
Subway -marketing_plan
SUPPLY AND DISTRIBUTION CHANNEL OF SUBWAY
SUBWAY
Subway operations ppt
Presentation on SUBWAY Covering TQM
Supply chain management of mcdonalds
Capacity Planning with reference to McDonlds
Subway-Business Model
Subway -marketing_plan

What's hot (20)

PPT
Subway Fast food shop
PPTX
Operations strategies of KFC
PPTX
presentaition
PDF
Simulation of food serving system of EWU canteen using Arena software
PPTX
Pizza hut international business
PPTX
McDonald's - Strategic Management [BUSS444]
PPTX
Kfc competitive advantage
PPTX
Supply chain managenment of Pepsi.co India
DOCX
Kfc operations
DOCX
Dominoz service package analysis
PPTX
Pizza hut : Case Study
PPTX
Mc donalds india
PPTX
Sub-way project
PPTX
Strategic planning of subway
PPT
Fast food industry
DOCX
Scm in pepsico
PPTX
Shan food
PPTX
Service marketing in Domino's Pizza
DOCX
Distribution Channel
Subway Fast food shop
Operations strategies of KFC
presentaition
Simulation of food serving system of EWU canteen using Arena software
Pizza hut international business
McDonald's - Strategic Management [BUSS444]
Kfc competitive advantage
Supply chain managenment of Pepsi.co India
Kfc operations
Dominoz service package analysis
Pizza hut : Case Study
Mc donalds india
Sub-way project
Strategic planning of subway
Fast food industry
Scm in pepsico
Shan food
Service marketing in Domino's Pizza
Distribution Channel
Ad

Similar to Lean and Process Improvement Implementation at Subway Restaurant (20)

PDF
Lean manufacturing for Management Consultants and Business Analysts
PDF
Lean Supply Streams for the Web Era by Daniel T Jones
PDF
Essential Lean Manufacturing for Management Consultants
PDF
Production for Management Consultants and Business Analysts
PPTX
1. Lean, Agile, Leagile & AAA Supply chain (1).pptx
PPTX
Optimizing food ordering and serving process at a restaurant
PPTX
Supply Chain Management Project
PPTX
On the challenges and opportunities of implementing lean practices in northe...
PDF
FINAL PROJECT
PPTX
Chap14.pptx
PPTX
Lean Manufacturing Presentation on Copper Kettle Catering
PPT
Streamlining the mfg process webinar
PPTX
Customer Supplier chain TQM
PPTX
Canteen Ordering System For UnilIver.pptx
PPT
Lean manufacturing & 6s
PPTX
Vikash opc ppt
DOCX
Sustainable sourcing
PDF
Liquidity Management for Management Consultants & Managers
PDF
In&outwich shop business plan
DOCX
An Analysis Of How Mc Donalds Delivers Its Products And Services
Lean manufacturing for Management Consultants and Business Analysts
Lean Supply Streams for the Web Era by Daniel T Jones
Essential Lean Manufacturing for Management Consultants
Production for Management Consultants and Business Analysts
1. Lean, Agile, Leagile & AAA Supply chain (1).pptx
Optimizing food ordering and serving process at a restaurant
Supply Chain Management Project
On the challenges and opportunities of implementing lean practices in northe...
FINAL PROJECT
Chap14.pptx
Lean Manufacturing Presentation on Copper Kettle Catering
Streamlining the mfg process webinar
Customer Supplier chain TQM
Canteen Ordering System For UnilIver.pptx
Lean manufacturing & 6s
Vikash opc ppt
Sustainable sourcing
Liquidity Management for Management Consultants & Managers
In&outwich shop business plan
An Analysis Of How Mc Donalds Delivers Its Products And Services
Ad

Recently uploaded (20)

PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Feature types and data preprocessing steps
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
Safety Seminar civil to be ensured for safe working.
PPTX
Current and future trends in Computer Vision.pptx
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
communication and presentation skills 01
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
Software Engineering and software moduleing
PPT
Total quality management ppt for engineering students
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
August 2025 - Top 10 Read Articles in Network Security & Its Applications
"Array and Linked List in Data Structures with Types, Operations, Implementat...
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Module 8- Technological and Communication Skills.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Fundamentals of Mechanical Engineering.pptx
Feature types and data preprocessing steps
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Safety Seminar civil to be ensured for safe working.
Current and future trends in Computer Vision.pptx
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
communication and presentation skills 01
Categorization of Factors Affecting Classification Algorithms Selection
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Software Engineering and software moduleing
Total quality management ppt for engineering students
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Exploratory_Data_Analysis_Fundamentals.pdf
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...

Lean and Process Improvement Implementation at Subway Restaurant

  • 1. SPECIALASSIGNMENT LEANANDPROCESSIMPROVEMENTS(Subway) Product and inventory control systems NAME :SIDHARTH JAYANTH KINI UTA ID :1001241754 CLASS :IE 5329 – 006 DATE : 4/18/2016
  • 2. CONTENTS : 1. Introduction 2. Flow chart for Ordering 3. Assembly Flow Chart 4. Kanban in Subway 5. JIT in subway 6. Supply chain in Subway 7. Bottleneck 8. WIP and Throughput 9. Lean Process improvement 10. Conclusion 11. References
  • 3. INTRODUCTION : Aim of an Industrial Engineer is optimization of existing processes, improvements of involved methods and looking trying to increase throughput by using minimum effort and cost. In this assignment the Subway an American fast food restaurant franchise was chosen for the study. The processes involved in sandwich making starting from taking an order to the billing were observed from an inventory point of angle. The Process flowcharts and assembly charts were designed for better understanding of the processes. Then the concept like Kanban, JIT , supply chain scenario were tried to implicate. The reasons for bottlenecks were detected and reasons were discussed. To increase the Throughput various lean process improvements initiatives were suggested.  Kanban: Kanban is a scheduling system used in lean and JIT manufacturing.  JIT: Just in time production is also known as Toyota production system (TPS) and aim of JIT is to reduce the inventories that flow into workstation and to reduce the response times from suppliers and to customers. Kanban is an element of JIT.
  • 4. FLOW CHART FOR ORDERING A SANDWICH IN SUBWAY
  • 5. PROCESS FLOW CHART FOR ORDERING Process flow chart for ordering a sandwich consists of three main parts 1) Selection of Sandwich : In this process the customer reads the menu and decides which sandwich to order, and places the order. 2) Preparation of sandwich : In this process the Sandwich is made according to given order by customs includes selections of bread , adding meat, heating , adding veggies. 3) Packing and Billing : This includes wrapping the sandwich with cover and charging the customer according to the order made.
  • 6. ASSEMBLY FLOW CHART 5 sec 15sec 5 sec 25 sec 7 sec 20sec 11sec 7sec 4sec
  • 7. Subway restaurant ( Work place ) In the picture (from right to left) we can observe that customer can select the type of bread ( Wheat , Honey oats, Italian herbs and flat bread) in first section, meat (Turkey, roasted beef, ham oven chicken ) and type of cheese (Cedar , American & Pepper Jack)in the second section. Later based on customer’s requirement the bread is toasted in the oven. In the final section veggies (Tomato,Bell peppers, onions spinach etc ) and type of sauce is added to prepare the sandwich. And then it is wrapped in the packing section.
  • 8. Possible KANBANs in Subways  Kanban is a pull system and production is carried out according to the Demand.  In subway there is a need for constant refilling of bread, meat ,cheese and Veggies at respective sections  With One Card Kanban system this can be easily achieved with less time.  The container size and quantity of product to be filled is pre-decided and once the product gets empty respective card ( which includes the quantity to be filled ) is removed from that section and placed in Inventory section. The worker see the requirements and that particular section is replenished.  This can be simplified by making 3 different sections for meat , Veggies and Cheese & sauce and cards are kept in respective sections.  Kanban thus prevents excess of inventory storage.
  • 9. JUST IN TIME scenarios  Just in time concept is producing only what is required. The main Aim is to reduce the wastages and Inventories (cost related to it )  Kanban which was proposed in earlier slide is an element of the Just in Time system.  The Sandwich is always made fresh, only after customer places an order. This helps in reduction of wastage of uncooked food, as they can be preserved.  As Kanban system is used and it takes care replenishment of products in each section and hence no excess inventories.  Pull systems works on demand ,if there is increase in the demand there should be enough quantity of products and it should be easily accessed.  The quality of the Sandwich will also be good because sandwich will be freshly prepared and thus also results in good customer satisfaction.
  • 10. SUPPLY CHAIN Scenario in subways  A supply chain is the network of all the individuals, organizations, resources, activities and technology involved in the creation and sale of a product, from the delivery of source materials from the supplier to the manufacturer, through to its eventual delivery to the end user.  The Raw materials like bread dough, vegetables , meat can be purchased from wholesale dealer at lower and it can be distributed to restaurants.  It is planned in such a way that goods are usually delivered one day before the delivery date, to avoid late deliveries due to uncontrollable situations.
  • 11. SUPPLY CHAIN scenario in subway  Supply Chain in Restaurant fields deals mainly with buying the different raw material from different vendors and storing the perishable food items.  We can see the raw materials from different sources is moving into Restaurant storage.  The restaurant will have small storages to accommodate the products until next delivery.
  • 12. BOTTLENECKS  Bottleneck of a line is rate of workstation having the highest long term (outages) utilization. In other words it is nothing but congestion in the assembly/production line. If the bottleneck exists in a line it causes delay in processes.  In Subway the bottleneck can be seen during Toasting the bread in oven and during billing.  There will many orders during peak hours and usually only one oven will be there.  The oven can toast maximum of two sandwich at a time and thus other orders are kept in waiting.  During the Billing, there are chances that one person orders more than 5 different type sandwiches and it will take more time to bill one customer. And there will be congestion.  Bottlenecks at one section will affect other sections, The veggies section will be idle until the bread is toasted.  Thus measures must be taken to avoid Bottlenecks.
  • 13. WIPAND THROUGHPUT  Work in process (WIP) : Inventory between the starting point to end point of product routing  WIP = TH x CT Where TH= throughput of a system , CT= cycle time.  Then TH= WIP/ CT. This shows that reducing the cycle time will increase the Throughput.  Time taken to make one sandwich is 99 secs or 1.65 min. If restaurant is working for 8 hours, then the capacity of the system in approximately 290 sandwich.  Throughput = 290/8=36.25 => 36 sandwich per hour  If the time for make one sandwich is reduced the we will have system with higher throughput.
  • 14. LEAN PROCESS IMPROVEMENTS  Lean is process of eliminating the non value added activities and improving the quality of product and service. It is process of retaining the activities with value for which customer is willing to pay.  To improve the throughput we should always ensure that process is carried out smoothly.  This can be done by reducing the bottlenecks and other non value added activities.  The Bottlenecks is seen in toasting section and during billing . The bottleneck in toasting is reduced by increasing the size or number of ovens. More the number of ovens , more sandwich can be toasted together and sent to veggies section.  The Bottleneck during billing can be reduced by automatic billing system. This can be done by attaching the sensors/ buttons in each section which will automatically reflect the amount on screen as sandwich passes through each section.  The other procedure that can reduce the bottleneck at billing is Standardization of Sandwich , once the customers select the particular sandwich , it’s cost will be depicted on the screen. Thus it will be a quicker and easy process. And by the time sandwich is made bill will be ready. earlier Standardization of Sandwich will also reduce the wastage of veggies or meat , as amount and type of meat, veggies and Cheese/ Sauce is pre-determined.
  • 15. CONCLUSION  The process of Sandwich making in Subway was thoroughly studied. The Kanban , JIT, Supply chain management and Bottleneck Scenarios were observed during the process.  The reason for bottleneck was discovered and suitable lean process improvements like Automatic billing , Increasing size or number of Oven and Standardization of Sandwich were suggested.  It was also evident that reducing cycle time will increase the Throughput.  Thus implementing the modern production strategies in Restaurants will surely make considerable changes within short span of time.
  • 16. References  Factory Physics - Third Edition Wallace J. Hopp, Mark L. Spearman  www.lean.org  www.wikipedia.com