EE 369
POWER SYSTEM ANALYSIS
Lecture 16
Economic Dispatch
Tom Overbye and Ross Baldick
1
Announcements
Read Chapter 12, concentrating on sections
12.4 and 12.5.
Read Chapter 7.
Homework 12 is 6.59, 6.61, 12.19, 12.22,
12.24, 12.26, 12.28, 12.29, 7.1, 7.3, 7.4, 7.5,
7.6, 7.9, 7.12, 7.16; due Thursday, 12/3.
2
Economic Dispatch: Formulation
The goal of economic dispatch is to
determine the generation dispatch that
minimizes the instantaneous operating cost,
subject to the constraint that total
generation = total load + losses
T
1
1
Minimize C ( )
Such that
m
i Gi
i
m
Gi D Losses
i
C P
P P P
=
=
= +
∑
∑
@
Initially we'll
ignore generator
limits and the
losses
3
Unconstrained Minimization
This is a minimization problem with a single
equality constraint
For an unconstrained minimization a
necessary (but not sufficient) condition for a
minimum is the gradient of the function
must be zero,
The gradient generalizes the first derivative
for multi-variable problems:
1 2
( ) ( ) ( )
( ) , , ,
nx x x
 ∂ ∂ ∂
∇  ∂ ∂ ∂ 
f x f x f x
f x K@
( )∇ =f x 0
4
Minimization with Equality Constraint
When the minimization is constrained with an
equality constraint we can solve the problem
using the method of Lagrange Multipliers
Key idea is to represent a constrained
minimization problem as an unconstrained
problem.
That is, for the general problem
minimize ( ) s.t. ( )
We define the Lagrangian L( , ) ( ) ( )
Then a necessary condition for a minimum is the
L ( , ) 0 and L ( , ) 0
T
=
= +
∇ = ∇ =xλ
f x g x 0
xλ f x λ g x
xλ x λ 5
Economic Dispatch Lagrangian
G
1 1
G
For the economic dispatch we have a minimization
constrained with a single equality constraint
L( , ) ( ) ( ) (no losses)
The necessary conditions for a minimum are
L
( , )
m m
i Gi D Gi
i i
Gi
C P P P
dC
P
λ λ
λ
= =
= + −
∂
=
∂
∑ ∑P
P
1
( ) 0 (for 1 to )
0
i
Gi
Gi
m
D Gi
i
P i m
dP
P P
λ
=
− = =
− =∑
6
Economic Dispatch Example
1 2
2
1 1 1 1
2
2 2 2 2
1
1
1
What is economic dispatch for a two generator
system 500 MW and
( ) 1000 20 0.01 $/h
( ) 400 15 0.03 $/h
Using the Lagrange multiplier method we know:
( ) 20 0.0
D G G
G G G
G G G
G
G
P P P
C P P P
C P P P
dC
P
dP
λ
= + =
= + +
= + +
− = + 1
2
2 2
2
1 2
2 0
( ) 15 0.06 0
500 0
G
G G
G
G G
P
dC
P P
dP
P P
λ
λ λ
− =
− = + − =
− − =
7
Economic Dispatch Example,
cont’d
1
2
1 2
1
2
1
2
We therefore need to solve three linear equations
20 0.02 0
15 0.06 0
500 0
0.02 0 1 20
0 0.06 1 15
1 1 0 500
312.5 MW
187.5 MW
26.2 $/MW
G
G
G G
G
G
G
G
P
P
P P
P
P
P
P
λ
λ
λ
λ
+ − =
+ − =
− − =
− −    
    − = −
    
− − −        
 
  =
 
   h
 
 
 
   8
Economic dispatch example, cont’d
• At the solution, both generators have the
same marginal (or incremental) cost, and this
common marginal cost is equal to λ.
• Intuition behind solution:
– If marginal costs of generators were different,
then by decreasing production at higher marginal
cost generator, and increasing production at
lower marginal cost generator we could lower
overall costs.
– Generalizes to any number of generators.
• If demand changes, then change in total costs
can be estimated from λ. 9
Economic dispatch example, cont’d
• Another way to solve the equations is to:
– Rearrange the first two equations to solve for PG1
and PG2 in terms of λ,
– Plug into third equation and solve for λ,
– Use the solved value of λ to evaluate PG1 and PG2.
• This works even when relationship between
generation levels and λ is more complicated:
– Equations are more complicated than linear when
there are maximum and minimum generation
limits or we consider losses. 10
Lambda-Iteration Solution Method
• Discussion on previous page leads to “lambda-
iteration” method:
– this method requires a unique mapping from a value
of lambda (marginal cost) to each generator’s MW
output:
– for any choice of lambda (common marginal cost),
the generators collectively produce a total MW
output,
– the method then starts with values of lambda below
and above the optimal value (corresponding to too
little and too much total output), and then
iteratively brackets the optimal value. •11
( ).Gi
P λ
Lambda-Iteration Algorithm
L H
1 1
H L
M H L
H M
1
L M
Pick and such that
( ) 0 ( ) 0
While Do
( )/2
If ( ) 0 Then
Else
End While
m m
L H
Gi D Gi D
i i
m
M
Gi D
i
P P P P
P P
λ λ
λ λ
λ λ ε
λ λ λ
λ λ λ
λ λ
= =
=
− < − >
− >
= +
− > =
=
∑ ∑
∑
12
Lambda-Iteration: Graphical View
In the graph shown below for each value of lambda
there is a unique PGi for each generator. This
relationship is the PGi(λ) function.
13
Lambda-Iteration Example
1 1 1
2 2 2
3 3 3
1 2 3
Consider a three generator system with
( ) 15 0.02 $/MWh
( ) 20 0.01 $/MWh
( ) 18 0.025 $/MWh
and with constraint 1000MW
Rewriting generation as a function of , (
G G
G G
G G
G G G
Gi
IC P P
IC P P
IC P P
P P P
P
λ
λ
λ
λ
= + =
= + =
= + =
+ + =
1 2
3
),
we have
15 20
( ) ( )
0.02 0.01
18
( )
0.025
G G
G
P P
P
λ
λ λ
λ λ
λ
λ
− −
= =
−
=
14
Lambda-Iteration Example, cont’d
m
i=1
m
i=1
1
H
1
Pick so ( ) 1000 0 and
( ) 1000 0
Try 20 then (20) 1000
15 20 18
1000 670 MW
0.02 0.01 0.025
Try 30 then (30) 1000 1230 MW
L L
Gi
H
Gi
m
L
Gi
i
m
Gi
i
P
P
P
P
λ λ
λ
λ
λ λ λ
λ
=
=
− <
− >
= − =
− − −
+ + − = −
= − =
∑
∑
∑
∑
15
Lambda-Iteration Example, cont’d
1
1
Pick convergence tolerance 0.05 $/MWh
Then iterate since 0.05
( )/ 2 25
Then since (25) 1000 280 we set 25
Since 25 20 0.05
(25 20)/ 2 22.5
(22.5) 1000 195 we set 2
H L
M H L
m
H
Gi
i
M
m
L
Gi
i
P
P
ε
λ λ
λ λ λ
λ
λ
λ
=
=
=
− >
= + =
− = =
− >
= + =
− = − =
∑
∑ 2.5
16
Lambda-Iteration Example, cont’d
H
*
*
1
2
3
Continue iterating until 0.05
The solution value of , , is 23.53 $/MWh
Once is known we can calculate the
23.53 15
(23.5) 426 MW
0.02
23.53 20
(23.5) 353 MW
0.01
23.53 18
(23.5)
0.025
L
Gi
G
G
G
P
P
P
P
λ λ
λ λ
λ
− <
−
= =
−
= =
−
= 221 MW=
17
Thirty Bus ED Example
Case is economically dispatched (without considering
the incremental impact of the system losses).
18
Generator MW Limits
Generators have limits on the minimum and
maximum amount of power they can
produce
Typically the minimum limit is not zero.
Because of varying system economics
usually many generators in a system are
operated at their maximum MW limits:
Baseload generators are at their maximum
limits except during the off-peak.
19
Lambda-Iteration with Gen Limits
,max
,max
In the lambda-iteration method the limits are taken
into account when calculating ( ) :
if calculated production for
then set ( )
if calculated production for
Gi
Gi Gi
Gi Gi
P
P P
P P
λ
λ
>
=
,min
,minthen set ( )
Gi Gi
Gi Gi
P P
P Pλ
<
=
20
Lambda-Iteration Gen Limit Example
1 2
3
1 2 3
1
In the previous three generator example assume
the same cost characteristics but also with limits
0 300 MW 100 500 MW
200 600 MW
With limits we get:
(20) 1000 (20) (20) (20) 10
G G
G
m
Gi G G G
i
P P
P
P P P P
=
≤ ≤ ≤ ≤
≤ ≤
− = + + −∑
1
00
250 100 200 1000
450 MW (compared to 670MW)
(30) 1000 300 500 480 1000 280 MW
m
Gi
i
P
=
= + + −
= − −
− = + + − =∑ 21
Lambda-Iteration Limit Example,cont’d
Again we continue iterating until the convergence
condition is satisfied.
With limits the final solution of , is 24.43 $/MWh
(compared to 23.53 $/MWh without limits).
Maximum limits will always caus
λ
1
2
3
e to either increase
or remain the same.
Final solution is:
(24.43) 300 MW (at maximum limit)
(24.43) 443 MW
(24.43) 257 MW
G
G
G
P
P
P
λ
=
=
=
22
Back of Envelope Values
$/MWhr = fuelcost * heatrate + variable O&M
Typical incremental costs can be roughly
approximated:
– Typical heatrate for a coal plant is 10, modern
combustion turbine is 10, combined cycle plant is 6
to 8, older combustion turbine 15.
– Fuel costs ($/MBtu) are quite variable, with current
values around 2 for coal, 3 to 5 for natural gas, 0.5
for nuclear, probably 10 for fuel oil.
– Hydro costs tend to be quite low, but are fuel (water)
constrained
– Wind and solar costs are zero. 23
Inclusion of Transmission Losses
The losses on the transmission system are a
function of the generation dispatch.
In general, using generators closer to the
load results in lower losses
This impact on losses should be included
when doing the economic dispatch
Losses can be included by slightly rewriting
the Lagrangian to include losses PL:
G
1 1
L( , ) ( ) ( )
m m
i Gi D L G Gi
i i
C P P P P Pλ λ
= =
 
= + + − ÷
 
∑ ∑P
24
Impact of Transmission Losses
G
1 1
G
The inclusion of losses then impacts the necessary
conditions for an optimal economic dispatch:
L( , ) ( ) ( ) .
The necessary conditions for a minimum are now:
L
(
m m
i Gi D L G Gi
i i
Gi
C P P P P P
P
λ λ
= =
 
= + + − ÷
 
∂
∂
∑ ∑P
P
1
, ) ( ) 1 ( ) 0
( ) 0
i L
Gi G
Gi Gi
m
D L G Gi
i
dC P
P P
dP P
P P P P
λ λ
=
 ∂
= − − = ÷∂ 
+ − =∑
25
Impact of Transmission Losses
th
Solving for , we get: ( ) 1 ( ) 0
1
( )
1 ( )
Define the penalty factor for the generator
(don't confuse with Lagrangian L!!!)
1
1 ( )
i L
Gi G
Gi Gi
i
Gi
GiL
G
Gi
i
i
L
G
Gi
dC P
P P
dP P
dC
P
dPP
P
P
L i
L
P
P
P
λ λ
λ
 ∂
− − = ÷∂ 
=
 ∂
− ÷∂ 
=
 ∂
− ∂

÷

The penalty factor
at the slack bus is
always unity!
26
Impact of Transmission Losses
1 1 1 2 2 2
The condition for optimal dispatch with losses is then
( ) ( ) ( )
1
. So, if increasing increases
1 ( )
the losses then ( ) 0 1.0
This makes generator
G G m m Gm
i Gi
L
G
Gi
L
G i
Gi
L IC P L IC P L IC P
L P
P
P
P
P
P L
P
λ= = =
=
 ∂
− ÷∂ 
∂
> ⇒ >
∂
appear to be more expensive
(i.e., it is penalized). Likewise 1.0 makes a generator
appear less expensive.
i
i
L <
27
Calculation of Penalty Factors
Unfortunately, the analytic calculation of is
somewhat involved. The problem is a small change
in the generation at impacts the flows and hence
the losses throughout the entire system. However,
i
Gi
L
P
using a power flow you can approximate this function
by making a small change to and then seeing how
the losses change:
1
( )
1
Gi
L L
G i
LGi Gi
Gi
P
P P
P L
PP P
P
∂ ∆
≈ ≈
∆∂ ∆ −
∆ 28
Two Bus Penalty Factor Example
2 2
2 2
0.37
( ) 0.0387 0.037
10
0.9627 0.9643
L L
G
G G
P P MW
P
P P MW
L L
∂ ∆ −
= − = = −
∂ ∆
= ≈ 29
Thirty Bus ED Example
Now consider losses.
Because of the penalty factors the generator incremental
costs are no longer identical.
30
Area Supply Curve
0 100 200 300 400
Total AreaGeneration(MW)
0.00
2.50
5.00
7.50
10.00
The area supply curve shows the cost to produce the
next MW of electricity, assuming area is economically
dispatched
Supply
curve for
thirty bus
system
31
Economic Dispatch - Summary
Economic dispatch determines the best way to
minimize the current generator operating costs.
The lambda-iteration method is a good approach for
solving the economic dispatch problem:
– generator limits are easily handled,
– penalty factors are used to consider the impact of losses.
Economic dispatch is not concerned with determining
which units to turn on/off (this is the unit commitment
problem).
Basic form of economic dispatch ignores the
transmission system limitations.
32
Security Constrained ED
or Optimal Power Flow
Transmission constraints often limit ability to
use lower cost power.
Such limits require deviations from what would
otherwise be minimum cost dispatch in order to
maintain system “security.”
Need to solve or approximate power flow in
order to consider transmission constraints.
33
Security Constrained ED
or Optimal Power Flow
The goal of a security constrained ED or
optimal power flow (OPF) is to determine the
“best” way to instantaneously operate a
power system, considering transmission
limits.
Usually “best” = minimizing operating cost,
while keeping flows on transmission below
limits.
In three bus case the generation at bus 3
must be limited to avoid overloading the line 34
Security Constrained Dispatch
Bus 2 Bus 1
Bus 3Home Area
Scheduled Transactions
357 MW
179 MVR
194 MW
448 MW
19 MVR
232 MVR
179 MW
89 MVR
1.00 PU
-22 MW
4 MVR
22 MW
-4 MVR
-142 MW
49 MVR
145 MW
-37 MVR
124 MW
-33 MVR
-122 MW
41 MVR
1.00 PU
1.00 PU
0 MW
37 MVR100%
100%
100 MW
OFF AGC
AVR ON
AGC ON
AVR ON
100.0 MW
Need to dispatch to keep line
from bus 3 to bus 2 from overloading
35
Multi-Area Operation
In multi-area system, “rules” have been established
regarding transactions on tie-lines:
– In Eastern interconnection, in principle, up to “nominal”
thermal interconnection capacity,
– In Western interconnection there are more complicated
rules
The actual power that flows through the entire network
depends on the impedance of the transmission lines,
and ultimately determine what are acceptable patterns
of dispatch:
Can result in need to “curtail” transactions that otherwise
satisfy rules.
Economically uncompensated flow through other areas
is known as “parallel path” or “loop flows.”
Since ERCOT is one area, all of the flows on AC lines are
inside ERCOT and there is no uncompensated flow on
AC lines. 36
Seven Bus Case: One-line
Top Area Cost
Left Area Cost Right Area Cost
1
2
3 4
5
6 7
106 MW
168 MW
200 MW 201 MW
110 MW
40 MVR
80 MW
30 MVR
130 MW
40 MVR
40 MW
20 MVR
1.00 PU
1.01 PU
1.04 PU1.04 PU
1.04 PU
0.99 PU1.05 PU
62 MW
-61 MW
44 MW -42 MW -31 MW 31 MW
38 MW
-37 MW
79 MW -77 MW
-32 MW
32 MW
-14 MW
-39 MW
40 MW
-20 MW20 MW
40 MW
-40 MW
94 MW
200 MW
0 MVR
200 MW
0 MVR
20 MW -20 MW
AGC ON
AGC ON
AGC ON
AGC ON
AGC ON
8029 $/MWH
4715 $/MWH4189 $/MWH
Case Hourly Cost
16933 $/MWH
System has
three areas
Left area
has one
bus
Right area has one
bus
Top area
has five
buses
37
No net
interchange
between
Any areas.
Seven Bus Case: Area View
System has
40 MW of
“Loop Flow”
Actual
flow
between
areas
Loop flow can result in higher losses
Area Losses
Area Losses Area Losses
Top
Left Right
-40.1 MW
0.0 MW
0.0 MW
0.0 MW
40.1 MW
40.1 MW
7.09 MW
0.33 MW 0.65 MW
Scheduled
flow
38
Seven Bus - Loop Flow?
Area Losses
Area Losses Area Losses
Top
Left Right
-4.8 MW
0.0 MW
100.0 MW
0.0 MW
104.8 MW
4.8 MW
9.44 MW
-0.00 MW 4.34 MW
100 MW Transaction
between Left and Right
Transaction has
actually decreased
the loop flow
Note that
Top’s
Losses have
increased
from
7.09MW to
9.44 MW
39

More Related Content

PPTX
Overcurrent Protection
PPTX
Inter Connected Power System(Turbine Speed Governing Mechanism )
PPTX
Load forecasting
PPSX
Load Forecasting
PPTX
Series & shunt compensation and FACTs Devices
PPTX
Equal Area Criterion for Transient Stability Studynew.pptx
DOCX
Directional over current relay
PPTX
BREAKDOWN IN LIQUIDS_NDS
Overcurrent Protection
Inter Connected Power System(Turbine Speed Governing Mechanism )
Load forecasting
Load Forecasting
Series & shunt compensation and FACTs Devices
Equal Area Criterion for Transient Stability Studynew.pptx
Directional over current relay
BREAKDOWN IN LIQUIDS_NDS

What's hot (20)

PPT
Newton Raphson method for load flow analysis
PPT
Power System Protection basics
PPTX
Various Bus-Bar Arrangements.
PDF
Load Forecasting Techniques.pdf
PDF
Transformer differential protection
PPTX
Economic dispatch
PDF
Automatic load frequency control
PDF
PPTX
Load forecasting
PPT
Tripping and control of impulse generators
PPTX
Circuit Breaker
PPTX
Objectives of shunt compensation
PDF
Phasor Measurement Unit (PMU)
PPTX
Economic load dispatch
PPTX
PPTX
Per unit representation
PPTX
Streamer theory
PPT
Deregulation in power industry
PPTX
Generation of High D.C. Voltage (HVDC generation)
PDF
Introduction
Newton Raphson method for load flow analysis
Power System Protection basics
Various Bus-Bar Arrangements.
Load Forecasting Techniques.pdf
Transformer differential protection
Economic dispatch
Automatic load frequency control
Load forecasting
Tripping and control of impulse generators
Circuit Breaker
Objectives of shunt compensation
Phasor Measurement Unit (PMU)
Economic load dispatch
Per unit representation
Streamer theory
Deregulation in power industry
Generation of High D.C. Voltage (HVDC generation)
Introduction
Ad

Viewers also liked (20)

PPTX
Economic load dispatch problem solving using "Cuckoo Search"
PPTX
ECONOMIC LOAD DISPATCH USING PARTICLE SWARM OPTIMIZATION
PPTX
Economic operation of Power systems by Unit commitment
PPT
Minvrom 06 Mul
PPT
Ece4762011 lect16
PPTX
Dynamic economic load dispatch a review of solution methodologies48
PPTX
Optimization of power sytem
PDF
Concept kit: PWM Boost Converter Average Model
DOCX
Unit commitment
PDF
Pm imp. book
PPT
Unit Commitment
PPTX
Economic load dispatch
PPTX
ANT COLONY OPTIMIZATION FOR IMAGE EDGE DETECTION
PPTX
Project on economic load dispatch
PDF
Genetic Algorithms and Ant Colony Optimisation (lecture slides)
PPTX
Power system analysis (III-EEE)
PPT
PLANNING ,DECISION MAKING & ORGANIZING
PPTX
Economic load dispatch
PDF
Commitment management in sap
PDF
Ee 1351 power system analysis
Economic load dispatch problem solving using "Cuckoo Search"
ECONOMIC LOAD DISPATCH USING PARTICLE SWARM OPTIMIZATION
Economic operation of Power systems by Unit commitment
Minvrom 06 Mul
Ece4762011 lect16
Dynamic economic load dispatch a review of solution methodologies48
Optimization of power sytem
Concept kit: PWM Boost Converter Average Model
Unit commitment
Pm imp. book
Unit Commitment
Economic load dispatch
ANT COLONY OPTIMIZATION FOR IMAGE EDGE DETECTION
Project on economic load dispatch
Genetic Algorithms and Ant Colony Optimisation (lecture slides)
Power system analysis (III-EEE)
PLANNING ,DECISION MAKING & ORGANIZING
Economic load dispatch
Commitment management in sap
Ee 1351 power system analysis
Ad

Similar to Lecture 16 (20)

PPT
Power System analysis slides - economic dispatch
PPT
Lecture_16.ppt
PPT
Power station practice (NEE-702) unit-4
PPTX
ECE476_2016_Lect17.pptx
PPT
ECE4762011_Lect16.ppt
PPTX
Economic Dispatch Research paper solution slides
PDF
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
PDF
Economic_Load_Dispatch.pdf
PDF
Economic_Load_Dispatch and loakd forecasting
PPT
UNIT-4-PPT.ppt
PDF
Farag1995
PDF
Economicloaddispatch 111213025406-phpapp01
PDF
COMBINED ECONOMIC AND EMISSION DISPATCH WITH AND WITHOUT CONSIDERING TRANSMIS...
PPT
Economic Load Dispatch.ppt
PDF
Economic dipatch
PDF
DFisher ETLS 747 Paper - Optimal Power Flow
PDF
2.Direct Method without TL Losshhhhhhhhhhhhhhhhhh.pdf
PDF
Modified sub-gradient based combined objective technique and evolutionary pro...
PPT
Economic dispatch control ppt in unit 4
PPTX
Unit 5 Economic Load Dispatch and Unit Commitment
Power System analysis slides - economic dispatch
Lecture_16.ppt
Power station practice (NEE-702) unit-4
ECE476_2016_Lect17.pptx
ECE4762011_Lect16.ppt
Economic Dispatch Research paper solution slides
Economic Dispatch of Generated Power Using Modified Lambda-Iteration Method
Economic_Load_Dispatch.pdf
Economic_Load_Dispatch and loakd forecasting
UNIT-4-PPT.ppt
Farag1995
Economicloaddispatch 111213025406-phpapp01
COMBINED ECONOMIC AND EMISSION DISPATCH WITH AND WITHOUT CONSIDERING TRANSMIS...
Economic Load Dispatch.ppt
Economic dipatch
DFisher ETLS 747 Paper - Optimal Power Flow
2.Direct Method without TL Losshhhhhhhhhhhhhhhhhh.pdf
Modified sub-gradient based combined objective technique and evolutionary pro...
Economic dispatch control ppt in unit 4
Unit 5 Economic Load Dispatch and Unit Commitment

More from Forward2025 (20)

PPT
Lecture 6
PPT
Lecture 5
PPT
Lecture 4
PPT
Lecture 3
PPT
Lecture 2
PPT
Lecture 1
PPT
Lecture 18
PPT
Lecture 17
PPT
Lecture 15
PPT
Lecture 14
PPT
Lecture 13
PPT
Lecture 12
PPT
Lecture 11
PPT
Lecture 10
PPT
Lecture 9
PPT
Lecture 8
PPT
Lecture 7
PDF
Radar 2009 a 19 electronic counter measures
PDF
Radar 2009 a 18 synthetic aperture radar
PDF
Radar 2009 a 17 transmitters and receivers
Lecture 6
Lecture 5
Lecture 4
Lecture 3
Lecture 2
Lecture 1
Lecture 18
Lecture 17
Lecture 15
Lecture 14
Lecture 13
Lecture 12
Lecture 11
Lecture 10
Lecture 9
Lecture 8
Lecture 7
Radar 2009 a 19 electronic counter measures
Radar 2009 a 18 synthetic aperture radar
Radar 2009 a 17 transmitters and receivers

Recently uploaded (20)

PPTX
Welding lecture in detail for understanding
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
Lecture Notes Electrical Wiring System Components
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
PPT on Performance Review to get promotions
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Sustainable Sites - Green Building Construction
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
additive manufacturing of ss316l using mig welding
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Internet of Things (IOT) - A guide to understanding
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Welding lecture in detail for understanding
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Lecture Notes Electrical Wiring System Components
Embodied AI: Ushering in the Next Era of Intelligent Systems
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPT on Performance Review to get promotions
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Foundation to blockchain - A guide to Blockchain Tech
UNIT 4 Total Quality Management .pptx
Sustainable Sites - Green Building Construction
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
bas. eng. economics group 4 presentation 1.pptx
additive manufacturing of ss316l using mig welding
OOP with Java - Java Introduction (Basics)
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Internet of Things (IOT) - A guide to understanding
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx

Lecture 16

  • 1. EE 369 POWER SYSTEM ANALYSIS Lecture 16 Economic Dispatch Tom Overbye and Ross Baldick 1
  • 2. Announcements Read Chapter 12, concentrating on sections 12.4 and 12.5. Read Chapter 7. Homework 12 is 6.59, 6.61, 12.19, 12.22, 12.24, 12.26, 12.28, 12.29, 7.1, 7.3, 7.4, 7.5, 7.6, 7.9, 7.12, 7.16; due Thursday, 12/3. 2
  • 3. Economic Dispatch: Formulation The goal of economic dispatch is to determine the generation dispatch that minimizes the instantaneous operating cost, subject to the constraint that total generation = total load + losses T 1 1 Minimize C ( ) Such that m i Gi i m Gi D Losses i C P P P P = = = + ∑ ∑ @ Initially we'll ignore generator limits and the losses 3
  • 4. Unconstrained Minimization This is a minimization problem with a single equality constraint For an unconstrained minimization a necessary (but not sufficient) condition for a minimum is the gradient of the function must be zero, The gradient generalizes the first derivative for multi-variable problems: 1 2 ( ) ( ) ( ) ( ) , , , nx x x  ∂ ∂ ∂ ∇  ∂ ∂ ∂  f x f x f x f x K@ ( )∇ =f x 0 4
  • 5. Minimization with Equality Constraint When the minimization is constrained with an equality constraint we can solve the problem using the method of Lagrange Multipliers Key idea is to represent a constrained minimization problem as an unconstrained problem. That is, for the general problem minimize ( ) s.t. ( ) We define the Lagrangian L( , ) ( ) ( ) Then a necessary condition for a minimum is the L ( , ) 0 and L ( , ) 0 T = = + ∇ = ∇ =xλ f x g x 0 xλ f x λ g x xλ x λ 5
  • 6. Economic Dispatch Lagrangian G 1 1 G For the economic dispatch we have a minimization constrained with a single equality constraint L( , ) ( ) ( ) (no losses) The necessary conditions for a minimum are L ( , ) m m i Gi D Gi i i Gi C P P P dC P λ λ λ = = = + − ∂ = ∂ ∑ ∑P P 1 ( ) 0 (for 1 to ) 0 i Gi Gi m D Gi i P i m dP P P λ = − = = − =∑ 6
  • 7. Economic Dispatch Example 1 2 2 1 1 1 1 2 2 2 2 2 1 1 1 What is economic dispatch for a two generator system 500 MW and ( ) 1000 20 0.01 $/h ( ) 400 15 0.03 $/h Using the Lagrange multiplier method we know: ( ) 20 0.0 D G G G G G G G G G G P P P C P P P C P P P dC P dP λ = + = = + + = + + − = + 1 2 2 2 2 1 2 2 0 ( ) 15 0.06 0 500 0 G G G G G G P dC P P dP P P λ λ λ − = − = + − = − − = 7
  • 8. Economic Dispatch Example, cont’d 1 2 1 2 1 2 1 2 We therefore need to solve three linear equations 20 0.02 0 15 0.06 0 500 0 0.02 0 1 20 0 0.06 1 15 1 1 0 500 312.5 MW 187.5 MW 26.2 $/MW G G G G G G G G P P P P P P P P λ λ λ λ + − = + − = − − = − −         − = −      − − −             =      h          8
  • 9. Economic dispatch example, cont’d • At the solution, both generators have the same marginal (or incremental) cost, and this common marginal cost is equal to λ. • Intuition behind solution: – If marginal costs of generators were different, then by decreasing production at higher marginal cost generator, and increasing production at lower marginal cost generator we could lower overall costs. – Generalizes to any number of generators. • If demand changes, then change in total costs can be estimated from λ. 9
  • 10. Economic dispatch example, cont’d • Another way to solve the equations is to: – Rearrange the first two equations to solve for PG1 and PG2 in terms of λ, – Plug into third equation and solve for λ, – Use the solved value of λ to evaluate PG1 and PG2. • This works even when relationship between generation levels and λ is more complicated: – Equations are more complicated than linear when there are maximum and minimum generation limits or we consider losses. 10
  • 11. Lambda-Iteration Solution Method • Discussion on previous page leads to “lambda- iteration” method: – this method requires a unique mapping from a value of lambda (marginal cost) to each generator’s MW output: – for any choice of lambda (common marginal cost), the generators collectively produce a total MW output, – the method then starts with values of lambda below and above the optimal value (corresponding to too little and too much total output), and then iteratively brackets the optimal value. •11 ( ).Gi P λ
  • 12. Lambda-Iteration Algorithm L H 1 1 H L M H L H M 1 L M Pick and such that ( ) 0 ( ) 0 While Do ( )/2 If ( ) 0 Then Else End While m m L H Gi D Gi D i i m M Gi D i P P P P P P λ λ λ λ λ λ ε λ λ λ λ λ λ λ λ = = = − < − > − > = + − > = = ∑ ∑ ∑ 12
  • 13. Lambda-Iteration: Graphical View In the graph shown below for each value of lambda there is a unique PGi for each generator. This relationship is the PGi(λ) function. 13
  • 14. Lambda-Iteration Example 1 1 1 2 2 2 3 3 3 1 2 3 Consider a three generator system with ( ) 15 0.02 $/MWh ( ) 20 0.01 $/MWh ( ) 18 0.025 $/MWh and with constraint 1000MW Rewriting generation as a function of , ( G G G G G G G G G Gi IC P P IC P P IC P P P P P P λ λ λ λ = + = = + = = + = + + = 1 2 3 ), we have 15 20 ( ) ( ) 0.02 0.01 18 ( ) 0.025 G G G P P P λ λ λ λ λ λ λ − − = = − = 14
  • 15. Lambda-Iteration Example, cont’d m i=1 m i=1 1 H 1 Pick so ( ) 1000 0 and ( ) 1000 0 Try 20 then (20) 1000 15 20 18 1000 670 MW 0.02 0.01 0.025 Try 30 then (30) 1000 1230 MW L L Gi H Gi m L Gi i m Gi i P P P P λ λ λ λ λ λ λ λ = = − < − > = − = − − − + + − = − = − = ∑ ∑ ∑ ∑ 15
  • 16. Lambda-Iteration Example, cont’d 1 1 Pick convergence tolerance 0.05 $/MWh Then iterate since 0.05 ( )/ 2 25 Then since (25) 1000 280 we set 25 Since 25 20 0.05 (25 20)/ 2 22.5 (22.5) 1000 195 we set 2 H L M H L m H Gi i M m L Gi i P P ε λ λ λ λ λ λ λ λ = = = − > = + = − = = − > = + = − = − = ∑ ∑ 2.5 16
  • 17. Lambda-Iteration Example, cont’d H * * 1 2 3 Continue iterating until 0.05 The solution value of , , is 23.53 $/MWh Once is known we can calculate the 23.53 15 (23.5) 426 MW 0.02 23.53 20 (23.5) 353 MW 0.01 23.53 18 (23.5) 0.025 L Gi G G G P P P P λ λ λ λ λ − < − = = − = = − = 221 MW= 17
  • 18. Thirty Bus ED Example Case is economically dispatched (without considering the incremental impact of the system losses). 18
  • 19. Generator MW Limits Generators have limits on the minimum and maximum amount of power they can produce Typically the minimum limit is not zero. Because of varying system economics usually many generators in a system are operated at their maximum MW limits: Baseload generators are at their maximum limits except during the off-peak. 19
  • 20. Lambda-Iteration with Gen Limits ,max ,max In the lambda-iteration method the limits are taken into account when calculating ( ) : if calculated production for then set ( ) if calculated production for Gi Gi Gi Gi Gi P P P P P λ λ > = ,min ,minthen set ( ) Gi Gi Gi Gi P P P Pλ < = 20
  • 21. Lambda-Iteration Gen Limit Example 1 2 3 1 2 3 1 In the previous three generator example assume the same cost characteristics but also with limits 0 300 MW 100 500 MW 200 600 MW With limits we get: (20) 1000 (20) (20) (20) 10 G G G m Gi G G G i P P P P P P P = ≤ ≤ ≤ ≤ ≤ ≤ − = + + −∑ 1 00 250 100 200 1000 450 MW (compared to 670MW) (30) 1000 300 500 480 1000 280 MW m Gi i P = = + + − = − − − = + + − =∑ 21
  • 22. Lambda-Iteration Limit Example,cont’d Again we continue iterating until the convergence condition is satisfied. With limits the final solution of , is 24.43 $/MWh (compared to 23.53 $/MWh without limits). Maximum limits will always caus λ 1 2 3 e to either increase or remain the same. Final solution is: (24.43) 300 MW (at maximum limit) (24.43) 443 MW (24.43) 257 MW G G G P P P λ = = = 22
  • 23. Back of Envelope Values $/MWhr = fuelcost * heatrate + variable O&M Typical incremental costs can be roughly approximated: – Typical heatrate for a coal plant is 10, modern combustion turbine is 10, combined cycle plant is 6 to 8, older combustion turbine 15. – Fuel costs ($/MBtu) are quite variable, with current values around 2 for coal, 3 to 5 for natural gas, 0.5 for nuclear, probably 10 for fuel oil. – Hydro costs tend to be quite low, but are fuel (water) constrained – Wind and solar costs are zero. 23
  • 24. Inclusion of Transmission Losses The losses on the transmission system are a function of the generation dispatch. In general, using generators closer to the load results in lower losses This impact on losses should be included when doing the economic dispatch Losses can be included by slightly rewriting the Lagrangian to include losses PL: G 1 1 L( , ) ( ) ( ) m m i Gi D L G Gi i i C P P P P Pλ λ = =   = + + − ÷   ∑ ∑P 24
  • 25. Impact of Transmission Losses G 1 1 G The inclusion of losses then impacts the necessary conditions for an optimal economic dispatch: L( , ) ( ) ( ) . The necessary conditions for a minimum are now: L ( m m i Gi D L G Gi i i Gi C P P P P P P λ λ = =   = + + − ÷   ∂ ∂ ∑ ∑P P 1 , ) ( ) 1 ( ) 0 ( ) 0 i L Gi G Gi Gi m D L G Gi i dC P P P dP P P P P P λ λ =  ∂ = − − = ÷∂  + − =∑ 25
  • 26. Impact of Transmission Losses th Solving for , we get: ( ) 1 ( ) 0 1 ( ) 1 ( ) Define the penalty factor for the generator (don't confuse with Lagrangian L!!!) 1 1 ( ) i L Gi G Gi Gi i Gi GiL G Gi i i L G Gi dC P P P dP P dC P dPP P P L i L P P P λ λ λ  ∂ − − = ÷∂  =  ∂ − ÷∂  =  ∂ − ∂  ÷  The penalty factor at the slack bus is always unity! 26
  • 27. Impact of Transmission Losses 1 1 1 2 2 2 The condition for optimal dispatch with losses is then ( ) ( ) ( ) 1 . So, if increasing increases 1 ( ) the losses then ( ) 0 1.0 This makes generator G G m m Gm i Gi L G Gi L G i Gi L IC P L IC P L IC P L P P P P P P L P λ= = = =  ∂ − ÷∂  ∂ > ⇒ > ∂ appear to be more expensive (i.e., it is penalized). Likewise 1.0 makes a generator appear less expensive. i i L < 27
  • 28. Calculation of Penalty Factors Unfortunately, the analytic calculation of is somewhat involved. The problem is a small change in the generation at impacts the flows and hence the losses throughout the entire system. However, i Gi L P using a power flow you can approximate this function by making a small change to and then seeing how the losses change: 1 ( ) 1 Gi L L G i LGi Gi Gi P P P P L PP P P ∂ ∆ ≈ ≈ ∆∂ ∆ − ∆ 28
  • 29. Two Bus Penalty Factor Example 2 2 2 2 0.37 ( ) 0.0387 0.037 10 0.9627 0.9643 L L G G G P P MW P P P MW L L ∂ ∆ − = − = = − ∂ ∆ = ≈ 29
  • 30. Thirty Bus ED Example Now consider losses. Because of the penalty factors the generator incremental costs are no longer identical. 30
  • 31. Area Supply Curve 0 100 200 300 400 Total AreaGeneration(MW) 0.00 2.50 5.00 7.50 10.00 The area supply curve shows the cost to produce the next MW of electricity, assuming area is economically dispatched Supply curve for thirty bus system 31
  • 32. Economic Dispatch - Summary Economic dispatch determines the best way to minimize the current generator operating costs. The lambda-iteration method is a good approach for solving the economic dispatch problem: – generator limits are easily handled, – penalty factors are used to consider the impact of losses. Economic dispatch is not concerned with determining which units to turn on/off (this is the unit commitment problem). Basic form of economic dispatch ignores the transmission system limitations. 32
  • 33. Security Constrained ED or Optimal Power Flow Transmission constraints often limit ability to use lower cost power. Such limits require deviations from what would otherwise be minimum cost dispatch in order to maintain system “security.” Need to solve or approximate power flow in order to consider transmission constraints. 33
  • 34. Security Constrained ED or Optimal Power Flow The goal of a security constrained ED or optimal power flow (OPF) is to determine the “best” way to instantaneously operate a power system, considering transmission limits. Usually “best” = minimizing operating cost, while keeping flows on transmission below limits. In three bus case the generation at bus 3 must be limited to avoid overloading the line 34
  • 35. Security Constrained Dispatch Bus 2 Bus 1 Bus 3Home Area Scheduled Transactions 357 MW 179 MVR 194 MW 448 MW 19 MVR 232 MVR 179 MW 89 MVR 1.00 PU -22 MW 4 MVR 22 MW -4 MVR -142 MW 49 MVR 145 MW -37 MVR 124 MW -33 MVR -122 MW 41 MVR 1.00 PU 1.00 PU 0 MW 37 MVR100% 100% 100 MW OFF AGC AVR ON AGC ON AVR ON 100.0 MW Need to dispatch to keep line from bus 3 to bus 2 from overloading 35
  • 36. Multi-Area Operation In multi-area system, “rules” have been established regarding transactions on tie-lines: – In Eastern interconnection, in principle, up to “nominal” thermal interconnection capacity, – In Western interconnection there are more complicated rules The actual power that flows through the entire network depends on the impedance of the transmission lines, and ultimately determine what are acceptable patterns of dispatch: Can result in need to “curtail” transactions that otherwise satisfy rules. Economically uncompensated flow through other areas is known as “parallel path” or “loop flows.” Since ERCOT is one area, all of the flows on AC lines are inside ERCOT and there is no uncompensated flow on AC lines. 36
  • 37. Seven Bus Case: One-line Top Area Cost Left Area Cost Right Area Cost 1 2 3 4 5 6 7 106 MW 168 MW 200 MW 201 MW 110 MW 40 MVR 80 MW 30 MVR 130 MW 40 MVR 40 MW 20 MVR 1.00 PU 1.01 PU 1.04 PU1.04 PU 1.04 PU 0.99 PU1.05 PU 62 MW -61 MW 44 MW -42 MW -31 MW 31 MW 38 MW -37 MW 79 MW -77 MW -32 MW 32 MW -14 MW -39 MW 40 MW -20 MW20 MW 40 MW -40 MW 94 MW 200 MW 0 MVR 200 MW 0 MVR 20 MW -20 MW AGC ON AGC ON AGC ON AGC ON AGC ON 8029 $/MWH 4715 $/MWH4189 $/MWH Case Hourly Cost 16933 $/MWH System has three areas Left area has one bus Right area has one bus Top area has five buses 37 No net interchange between Any areas.
  • 38. Seven Bus Case: Area View System has 40 MW of “Loop Flow” Actual flow between areas Loop flow can result in higher losses Area Losses Area Losses Area Losses Top Left Right -40.1 MW 0.0 MW 0.0 MW 0.0 MW 40.1 MW 40.1 MW 7.09 MW 0.33 MW 0.65 MW Scheduled flow 38
  • 39. Seven Bus - Loop Flow? Area Losses Area Losses Area Losses Top Left Right -4.8 MW 0.0 MW 100.0 MW 0.0 MW 104.8 MW 4.8 MW 9.44 MW -0.00 MW 4.34 MW 100 MW Transaction between Left and Right Transaction has actually decreased the loop flow Note that Top’s Losses have increased from 7.09MW to 9.44 MW 39