The Logical Framework Approach
The Logical Framework Approach is a project
design methodology which takes the form of a
four x four project table.
The Logical Framework Approach
The four rows are used to describe four
different types of events that take
place as a project is implemented:
• The project Activities,
• The project Outputs,
• The project Purpose and
• The project Goal
LOGICAL FRAMEWORK MATRIX
Narrative
Summary
Verifiable
Indicators
(OVI)
Means of
Verification
(MOV)
Important
Assumptions
GOAL
PURPOSE
OUTPUTS
ACTIVITIES Inputs
LOGICAL FRAMEWORK MATRIX
LOGICAL FRAMEWORK MATRIX
The four columns provide different types of
information about the events in each row.
• The first column is used to provide a Narrative
description of the event (design summary)
• The second column lists one or more Objectively
Verifiable Indicators (OVIs) of these events taking
place. (the performance target)
• The third column describes the Means of
Verification (MoV) where information will be
available on the OVIs, (monitoring mechanism)
and
LOGICAL FRAMEWORK MATRIX
• the fourth column lists the Assumptions & risks)
Assumptions are external factors that it is believed
could influence (positively or negatively) the events
described in the narrative column.
The list of assumptions should include those factors that
potentially impact on the success of the project, but
which cannot be directly controlled by the project or
program managers. In some cases these may include
what could be killer assumptions, which if proved
wrong will have major negative consequences for the
project.
LOGICAL FRAMEWORK MATRIX
The core of the Logical Framework is the
"temporal logic model" that runs through the
matrix.
This takes the form of a series of connected
propositions:
LOGICAL FRAMEWORK MATRIX
The inputs are expected to result in the outputs,
which in turn are expected to achieve the
immediate objective (sometimes called the
purpose) of the project which contributes to
the longer term objectives (sometimes called
the goals of the project.)
LOGICAL FRAMEWORK MATRIX
• If these Activities are implemented, and these
Assumptions hold, then these Outputs will be
delivered
• If these Outputs are delivered, and these
Assumptions hold, then this Purpose will be
achieved.
• If this Purpose is achieved, and these
Assumptions hold, then this Goal will be
achieved.
LOGICAL FRAMEWORK MATRIX
Core concepts underlying the logical framework are
summarized as follows:
• The logical framework presents the key elements of a
development intervention and their interrelationships. The
intervention is usually termed a project or a program.
• The framework clearly identifies the impacts or objectives the
project or program will achieve. It also allocates measurable
and/or tangible performance targets to them.
• The framework also clearly identifies the inputs and outputs
the project or program will deliver to enable achievement of
the proposed objectives.
Thus, the framework presents a cause and
effect matrix where inputs lead to outputs
and outputs lead to immediate objectives,
which in turn lead to longer-term objectives.
Logframework and swort thursday
CORE CONCEPT OF LOGFRAME MATRIX: MEANS
AND END LOGIC
The main concept underlying the Logical
Framework is means and end. The better the
means and end linkages between each level of
aims, the better the programme design.
• By definition, each programme has a “if-then”
or “means-and-end” logic embedded in it. If
we produce certain results under certain
conditions, then we can expect to achieve
certain other outcomes.
LFM
The first column in LFM shows Activity Description
Goal or Impact – The long term development
impact (policy goal) that the activity contributes
at a national or sectoral level
OBJECTIVELY VERIFIABLE INDICATORS (OVI)
Within the LFM it is important to think of the
indicators of the success of the project.
These are called OBJECTIVELY VERIFIABLE INDICATORS
(OVI) (performance targets)
• The quantitative, qualitative, and time-bound
measures that constitute evidence of the
extent to which the aims have been met at
the four levels of the hierarchy. They Indicate
how to recognize success at each level of aim
OBJECTIVELY VERIFIABLE INDICATORS (OVI)
• Indicators must be valid, reliable, precise, cost-
effective and stated independently from other levels.
• Indicators should make clear how the target group will
benefit from the realisation of outputs.
• Indicators should be specific in terms of:
– Quality (what?) - Q
– Quantity (how much?) - Q
– Time (when, how long?) - T
– Target Group (who?) - T
– Place (where?) - P
Means of verification-
It is also important to have Means of verification-
( monitoring mechanism)
The specific sources from which the status of each
of the indicators can be ascertained
Sources of information on the Goal indicator(s) –
including who will collect it and how often
Assumptions
Assumptions and risks:
• The "Assumptions" column is of great importance
in clarifying the extent to which project/program
objectives depend on external factors,
• Assumptions and risks are external conditions
that are outside the control of the programme.
The achievement of aims depends on whether or
not assumptions hold true and the risks do not
materialize.
Assumptions
• When working on a programme, we make
assumptions about the degree of uncertainty
between different levels of aims.
• The lower the uncertainty that certain
assumptions will hold true, the stronger the
programme design.
The failing assumptions can derail a programme
as often as poorly executed outputs.
Assumptions
• Log frame demands that all hypotheses,
assumptions and risks relevant to a
programme are made explicit.
Assumptions
• By implication, this then further demands that
the appropriate action is considered (and if
necessary taken) before problems materialize.
– How important are the assumptions
– How big are the risks
– Should the programme be redesigned?
– Should elements of the proposed programme be
abandoned?
SWOT ANALYSIS
• Strengths,
• Weaknesses,
• Opportunities and
• Threats
SWOT ANALYSIS
Definition:
Strengths, Weaknesses, Opportunities and
Threats (SWOT) Analysis is a business or
project management tool used to evaluate an
organization’s strength’s, weaknesses,
opportunities, and threats.
SWOT ANALYSIS
• The tool is used to produce a model that
can serve to provide direction in the
development, formulation, and
assessment of project management
plans.
SWOT ANALYSIS
• Strengths: characteristics of the business, or
project team that give it an advantage over
others
• Weaknesses (or Limitations): are characteristics
that place the team at a disadvantage relative to
others
• Opportunities: external chances to improve
performance (e.g. make greater profits) in the
environment
• Threats: external elements in the environment
that could cause trouble for the business or
project
SWOT ANALYSIS
• Strengths, Weaknesses, Opportunities
and Threats (SWOT) Analysis can also
identify potential obstacles to success, as
well as flaws in the plan that must be
addressed, controlled, or eliminated if
the desired results are to be achieved.
SWOT ANALYSIS
• In order for the Strengths, Weaknesses,
Opportunities and Threats (SWOT) Analysis to
be effective, project management must do
more than simply identify the strengths,
weaknesses, opportunities, and threats
involved.
SWOT ANALYSIS
• Risk management demands that it is
necessary to avoid, eliminate, or at the very
least, minimize identified weaknesses and
threats.
Weaknesses should be closely scrutinized in
order to determine whether or not it is
possible to convert them into assets.
SWOT ANALYSIS
• Similarly, threats should be closely examined
for the opportunity of building strength in
areas where they stood, once they have been
eliminated.
Strengths and opportunities should be closely
studied as well in order to maximize their
effectiveness.
SWOT ANALYSIS
• Project management would be well
advised to take advantage of this simple,
cost effective management tool and to
make it a fundamental step in the
planning process.
Cost–benefit analysis
Cost–benefit analysis
Cost-benefit analysis:
Benefits (direct + indirect)/Costs
A process by which business/programmes decisions
are analyzed.
The benefits of a given situation or business-related
action are summed and then the costs associated
with taking that action are subtracted.
Cost–benefit analysis
• Cost–benefit analysis (CBA), sometimes called
benefit–cost analysis (BCA), is a systematic
process for calculating and comparing benefits
and costs of a project, decision or government
policy (hereafter, "project"). CBA has two
purposes:
Cost–benefit analysis
1. To determine if it is a sound
investment/decision (justification/feasibility),
2. To provide a basis for comparing projects. It
involves comparing the total expected cost of
each option against the total expected
benefits, to see whether the benefits
outweigh the costs, and by how much.
Cost–benefit analysis
• In CBA, benefits and costs are expressed in
money terms, and are adjusted for the time
value of money, so that all flows of benefits
and flows of project costs over time (which
tend to occur at different points in time) are
expressed on a common basis in terms of their
"net present value."
Cost–benefit analysis
A cost benefit analysis finds, quantifies,
and adds all the positive factors. These
are the benefits.
Then it identifies, quantifies, and subtracts
all the negatives, the costs.
The difference between the two indicates
whether the planned action is advisable.
Cost–benefit analysis
The real trick to doing a cost benefit
analysis well is making sure you
include all the costs and all the
benefits and properly quantify them.
Cost–benefit analysis
There Must Be a Common Unit of Measurement:
In order to reach a conclusion as to the desirability
of a project all aspects of the project, positive
and negative, must be expressed in terms of a
common unit; i.e., there must be a "bottom
line."
The most convenient common unit is money. This
means that all benefits and costs of a project
should be measured in terms of their equivalent
money value.
Cost–benefit analysis
• A program may provide benefits which are
not directly expressed in terms of dollars but
there is some amount of money the recipients
of the benefits would consider just as good as
the project's benefits.
• For example, a project may provide for the
elderly in an area a free monthly visit to a
doctor
Cost–benefit analysis
The value of that benefit to an
elderly recipient is the minimum
amount of money that that
recipient would take instead of
the medical care.
• Examples of programmes/projects
Some examples of nutrition programmes
• Programme to control vitamin A deficiency
• Programme to control Iodine Deficiency disorders
• Programme to control Iodine deficiency anaemia
• Programme for feeding ‘at risk’ groups
School feeding programmes
Emergency feeding programmes
Food for work programmes
• Growth monitoring and promotion
• Programme to improve health and productivity among farmers
• Programme to improve nutritional status of women and
newborn babies
• Programmes to promote and advocate breastfeeding
Assignments:
Group work (three people per group)
1. Develop a nutrition programme/project to address a
certain nutrition problem of your interest
• Logical framework matrix
• Work plan
• budget
Individual assignment
2. Revisit nutrition programmes that have been
implemented in Tanzania
THE END

More Related Content

PPTX
Exit strategy in development programme
PDF
Managing Project Risks & Issues
PDF
ENVIRONMENTAL APPRAISAL OF PROJECTS
RTF
7000 заговоров сибирской целительницы
PPT
6 M&E - Monitoring and Evaluation of Aid Projects
PPT
Lfa Logical Framework Analysis
PPT
Project Monitoring & Evaluation
PPT
Monitoring and evaluation (2)
Exit strategy in development programme
Managing Project Risks & Issues
ENVIRONMENTAL APPRAISAL OF PROJECTS
7000 заговоров сибирской целительницы
6 M&E - Monitoring and Evaluation of Aid Projects
Lfa Logical Framework Analysis
Project Monitoring & Evaluation
Monitoring and evaluation (2)

What's hot (20)

PDF
Project risk management - Methodology and application
PPTX
Monitoring and Evaluation for Project management.
PDF
A3 Management (Part 2 of 2)
PPTX
Action plan
PDF
Logical framework
PPTX
6.5 The Forward and Backward Pass (Critical Path)
PPTX
Risk Management
PPTX
M & E Fundamentals.
PPTX
Understanding the theory of change
PPTX
Vision and mission statements, a set of criteria for development and evaluation
PPTX
Project Stakeholder Management - PMBOK6
PPTX
Monitoring and evaluation of Projects
PDF
Bid, No-Bid Decision Making
PPT
Monitoring and evaluation Learning and Development
PDF
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
PPTX
Wind mills audit report copy
PDF
Stakeholder management
PPSX
Project organization
PPT
Strategic Planning
PPT
Why Projects Fail + Four Steps to Succeed
Project risk management - Methodology and application
Monitoring and Evaluation for Project management.
A3 Management (Part 2 of 2)
Action plan
Logical framework
6.5 The Forward and Backward Pass (Critical Path)
Risk Management
M & E Fundamentals.
Understanding the theory of change
Vision and mission statements, a set of criteria for development and evaluation
Project Stakeholder Management - PMBOK6
Monitoring and evaluation of Projects
Bid, No-Bid Decision Making
Monitoring and evaluation Learning and Development
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
Wind mills audit report copy
Stakeholder management
Project organization
Strategic Planning
Why Projects Fail + Four Steps to Succeed
Ad

Viewers also liked (7)

PPT
Logical framework
PPTX
Introduction to the Logical Framework Approach
PPTX
Preparing a logical framework for your project
PPTX
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
PPT
5 The Logical Framework - a short course for NGOs
PPT
Logical Framework And Project Proposal
PPT
Philippines during japanese occupation
Logical framework
Introduction to the Logical Framework Approach
Preparing a logical framework for your project
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
5 The Logical Framework - a short course for NGOs
Logical Framework And Project Proposal
Philippines during japanese occupation
Ad

Similar to Logframework and swort thursday (20)

PDF
Developing indicators-and-mo vs-sanidad
PPT
PPT
The Logical Framework Approach
PPTX
Logical Framework Approach lecture -10.pptx
PDF
Logical framework analysis
PDF
Monitoring and Evaluation of Project Under Project Management
PPTX
Agriculture Extension evaluation and impact
PPT
Program Evaluation 1
PPTX
Monitoring and evaluation frameworks logical framework
PDF
Perform quantitative risk analysis
PPTX
Software Project Management Chapter --- 4
PDF
Pmbok 5th planning process group part three
PPSX
Result Base Project Management
PPTX
Logical framework
PDF
The Logical Framework Matrix Approach
PDF
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
PDF
Lecture 3 spm
PDF
Logical framework
PPT
Project monitoring-evaluation-sr-1223744598885201-9
PPTX
Developing indicators-and-mo vs-sanidad
The Logical Framework Approach
Logical Framework Approach lecture -10.pptx
Logical framework analysis
Monitoring and Evaluation of Project Under Project Management
Agriculture Extension evaluation and impact
Program Evaluation 1
Monitoring and evaluation frameworks logical framework
Perform quantitative risk analysis
Software Project Management Chapter --- 4
Pmbok 5th planning process group part three
Result Base Project Management
Logical framework
The Logical Framework Matrix Approach
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Lecture 3 spm
Logical framework
Project monitoring-evaluation-sr-1223744598885201-9

More from David mbwiga (10)

PDF
Lecture 5 chemical preservation of food
PDF
Lecture 4 browning reaction
PDF
Lecture 3 intrinsic and extrinsic factors
PDF
Lecture 2
PDF
Lecture 1
PPTX
Nutritional software
PPT
Spss lecture notes
PPT
Steps in designing nutrition programme
PPT
Project development new1
PPT
semester ya 3 Designing and planning nutrition programmes
Lecture 5 chemical preservation of food
Lecture 4 browning reaction
Lecture 3 intrinsic and extrinsic factors
Lecture 2
Lecture 1
Nutritional software
Spss lecture notes
Steps in designing nutrition programme
Project development new1
semester ya 3 Designing and planning nutrition programmes

Recently uploaded (20)

PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
PPTX
DMT - Profile Brief About Business .pptx
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
Hindu Circuler Economy - Model (Concept)
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
IFRS Notes in your pocket for study all the time
PDF
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
DMT - Profile Brief About Business .pptx
Daniels 2024 Inclusive, Sustainable Development
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
Hindu Circuler Economy - Model (Concept)
Nidhal Samdaie CV - International Business Consultant
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
IFRS Notes in your pocket for study all the time
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
Laughter Yoga Basic Learning Workshop Manual
Power and position in leadershipDOC-20250808-WA0011..pdf
Deliverable file - Regulatory guideline analysis.pdf
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
2025 Product Deck V1.0.pptxCATALOGTCLCIA
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx

Logframework and swort thursday

  • 1. The Logical Framework Approach The Logical Framework Approach is a project design methodology which takes the form of a four x four project table.
  • 2. The Logical Framework Approach The four rows are used to describe four different types of events that take place as a project is implemented: • The project Activities, • The project Outputs, • The project Purpose and • The project Goal
  • 3. LOGICAL FRAMEWORK MATRIX Narrative Summary Verifiable Indicators (OVI) Means of Verification (MOV) Important Assumptions GOAL PURPOSE OUTPUTS ACTIVITIES Inputs
  • 5. LOGICAL FRAMEWORK MATRIX The four columns provide different types of information about the events in each row. • The first column is used to provide a Narrative description of the event (design summary) • The second column lists one or more Objectively Verifiable Indicators (OVIs) of these events taking place. (the performance target) • The third column describes the Means of Verification (MoV) where information will be available on the OVIs, (monitoring mechanism) and
  • 6. LOGICAL FRAMEWORK MATRIX • the fourth column lists the Assumptions & risks) Assumptions are external factors that it is believed could influence (positively or negatively) the events described in the narrative column. The list of assumptions should include those factors that potentially impact on the success of the project, but which cannot be directly controlled by the project or program managers. In some cases these may include what could be killer assumptions, which if proved wrong will have major negative consequences for the project.
  • 7. LOGICAL FRAMEWORK MATRIX The core of the Logical Framework is the "temporal logic model" that runs through the matrix. This takes the form of a series of connected propositions:
  • 8. LOGICAL FRAMEWORK MATRIX The inputs are expected to result in the outputs, which in turn are expected to achieve the immediate objective (sometimes called the purpose) of the project which contributes to the longer term objectives (sometimes called the goals of the project.)
  • 9. LOGICAL FRAMEWORK MATRIX • If these Activities are implemented, and these Assumptions hold, then these Outputs will be delivered • If these Outputs are delivered, and these Assumptions hold, then this Purpose will be achieved. • If this Purpose is achieved, and these Assumptions hold, then this Goal will be achieved.
  • 11. Core concepts underlying the logical framework are summarized as follows: • The logical framework presents the key elements of a development intervention and their interrelationships. The intervention is usually termed a project or a program. • The framework clearly identifies the impacts or objectives the project or program will achieve. It also allocates measurable and/or tangible performance targets to them. • The framework also clearly identifies the inputs and outputs the project or program will deliver to enable achievement of the proposed objectives.
  • 12. Thus, the framework presents a cause and effect matrix where inputs lead to outputs and outputs lead to immediate objectives, which in turn lead to longer-term objectives.
  • 14. CORE CONCEPT OF LOGFRAME MATRIX: MEANS AND END LOGIC The main concept underlying the Logical Framework is means and end. The better the means and end linkages between each level of aims, the better the programme design. • By definition, each programme has a “if-then” or “means-and-end” logic embedded in it. If we produce certain results under certain conditions, then we can expect to achieve certain other outcomes.
  • 15. LFM The first column in LFM shows Activity Description Goal or Impact – The long term development impact (policy goal) that the activity contributes at a national or sectoral level
  • 16. OBJECTIVELY VERIFIABLE INDICATORS (OVI) Within the LFM it is important to think of the indicators of the success of the project. These are called OBJECTIVELY VERIFIABLE INDICATORS (OVI) (performance targets) • The quantitative, qualitative, and time-bound measures that constitute evidence of the extent to which the aims have been met at the four levels of the hierarchy. They Indicate how to recognize success at each level of aim
  • 17. OBJECTIVELY VERIFIABLE INDICATORS (OVI) • Indicators must be valid, reliable, precise, cost- effective and stated independently from other levels. • Indicators should make clear how the target group will benefit from the realisation of outputs. • Indicators should be specific in terms of: – Quality (what?) - Q – Quantity (how much?) - Q – Time (when, how long?) - T – Target Group (who?) - T – Place (where?) - P
  • 18. Means of verification- It is also important to have Means of verification- ( monitoring mechanism) The specific sources from which the status of each of the indicators can be ascertained Sources of information on the Goal indicator(s) – including who will collect it and how often
  • 19. Assumptions Assumptions and risks: • The "Assumptions" column is of great importance in clarifying the extent to which project/program objectives depend on external factors, • Assumptions and risks are external conditions that are outside the control of the programme. The achievement of aims depends on whether or not assumptions hold true and the risks do not materialize.
  • 20. Assumptions • When working on a programme, we make assumptions about the degree of uncertainty between different levels of aims. • The lower the uncertainty that certain assumptions will hold true, the stronger the programme design. The failing assumptions can derail a programme as often as poorly executed outputs.
  • 21. Assumptions • Log frame demands that all hypotheses, assumptions and risks relevant to a programme are made explicit.
  • 22. Assumptions • By implication, this then further demands that the appropriate action is considered (and if necessary taken) before problems materialize. – How important are the assumptions – How big are the risks – Should the programme be redesigned? – Should elements of the proposed programme be abandoned?
  • 23. SWOT ANALYSIS • Strengths, • Weaknesses, • Opportunities and • Threats
  • 24. SWOT ANALYSIS Definition: Strengths, Weaknesses, Opportunities and Threats (SWOT) Analysis is a business or project management tool used to evaluate an organization’s strength’s, weaknesses, opportunities, and threats.
  • 25. SWOT ANALYSIS • The tool is used to produce a model that can serve to provide direction in the development, formulation, and assessment of project management plans.
  • 26. SWOT ANALYSIS • Strengths: characteristics of the business, or project team that give it an advantage over others • Weaknesses (or Limitations): are characteristics that place the team at a disadvantage relative to others • Opportunities: external chances to improve performance (e.g. make greater profits) in the environment • Threats: external elements in the environment that could cause trouble for the business or project
  • 27. SWOT ANALYSIS • Strengths, Weaknesses, Opportunities and Threats (SWOT) Analysis can also identify potential obstacles to success, as well as flaws in the plan that must be addressed, controlled, or eliminated if the desired results are to be achieved.
  • 28. SWOT ANALYSIS • In order for the Strengths, Weaknesses, Opportunities and Threats (SWOT) Analysis to be effective, project management must do more than simply identify the strengths, weaknesses, opportunities, and threats involved.
  • 29. SWOT ANALYSIS • Risk management demands that it is necessary to avoid, eliminate, or at the very least, minimize identified weaknesses and threats. Weaknesses should be closely scrutinized in order to determine whether or not it is possible to convert them into assets.
  • 30. SWOT ANALYSIS • Similarly, threats should be closely examined for the opportunity of building strength in areas where they stood, once they have been eliminated. Strengths and opportunities should be closely studied as well in order to maximize their effectiveness.
  • 31. SWOT ANALYSIS • Project management would be well advised to take advantage of this simple, cost effective management tool and to make it a fundamental step in the planning process.
  • 33. Cost–benefit analysis Cost-benefit analysis: Benefits (direct + indirect)/Costs A process by which business/programmes decisions are analyzed. The benefits of a given situation or business-related action are summed and then the costs associated with taking that action are subtracted.
  • 34. Cost–benefit analysis • Cost–benefit analysis (CBA), sometimes called benefit–cost analysis (BCA), is a systematic process for calculating and comparing benefits and costs of a project, decision or government policy (hereafter, "project"). CBA has two purposes:
  • 35. Cost–benefit analysis 1. To determine if it is a sound investment/decision (justification/feasibility), 2. To provide a basis for comparing projects. It involves comparing the total expected cost of each option against the total expected benefits, to see whether the benefits outweigh the costs, and by how much.
  • 36. Cost–benefit analysis • In CBA, benefits and costs are expressed in money terms, and are adjusted for the time value of money, so that all flows of benefits and flows of project costs over time (which tend to occur at different points in time) are expressed on a common basis in terms of their "net present value."
  • 37. Cost–benefit analysis A cost benefit analysis finds, quantifies, and adds all the positive factors. These are the benefits. Then it identifies, quantifies, and subtracts all the negatives, the costs. The difference between the two indicates whether the planned action is advisable.
  • 38. Cost–benefit analysis The real trick to doing a cost benefit analysis well is making sure you include all the costs and all the benefits and properly quantify them.
  • 39. Cost–benefit analysis There Must Be a Common Unit of Measurement: In order to reach a conclusion as to the desirability of a project all aspects of the project, positive and negative, must be expressed in terms of a common unit; i.e., there must be a "bottom line." The most convenient common unit is money. This means that all benefits and costs of a project should be measured in terms of their equivalent money value.
  • 40. Cost–benefit analysis • A program may provide benefits which are not directly expressed in terms of dollars but there is some amount of money the recipients of the benefits would consider just as good as the project's benefits. • For example, a project may provide for the elderly in an area a free monthly visit to a doctor
  • 41. Cost–benefit analysis The value of that benefit to an elderly recipient is the minimum amount of money that that recipient would take instead of the medical care.
  • 42. • Examples of programmes/projects
  • 43. Some examples of nutrition programmes • Programme to control vitamin A deficiency • Programme to control Iodine Deficiency disorders • Programme to control Iodine deficiency anaemia • Programme for feeding ‘at risk’ groups School feeding programmes Emergency feeding programmes Food for work programmes • Growth monitoring and promotion • Programme to improve health and productivity among farmers • Programme to improve nutritional status of women and newborn babies • Programmes to promote and advocate breastfeeding
  • 44. Assignments: Group work (three people per group) 1. Develop a nutrition programme/project to address a certain nutrition problem of your interest • Logical framework matrix • Work plan • budget Individual assignment 2. Revisit nutrition programmes that have been implemented in Tanzania