Maintenance KPI
Prof: John Santana
Tec – 709
Maintenance Engineering
`
KPI = Key Performance Indicator
`
• Improve personnel’s understanding of KPIs and what
they indicate.
• Improve personnel’s awareness of maintenance
performance.
Objectives
+ =
`
What is a KPI?
• KPIs are directly linked to the overall goals of the company.
• Business Objectives are defined at corporate, regional and site level. These
goals determine critical activities (Key Success Factors) that must be done well
for a particular operation to succeed.
• KPIs are utilised to track or measure actual performance against key success
factors.
– Key Success Factors (KSFs) only change if there is a fundamental shift in business objectives.
– Key Performance Indicators (KPIs) change as objectives are met, or management focus shifts.
KPIs track performance against established key success factors.
Business
Objectives
Key Success
Factors (KSFs)
Key Performance
Indicators (KPIs)
Tracked by.
Determine.
No Injuries Safety LTI, LTIFR, LTISR.
`
How do I interpret a KPI?
• If LTI, LTIFR or LTISR increase, this indicates that the business objective, “No
Injuries”, is NOT being fulfilled.
– This should direct attention to the SAFETY key success factor.
– Problems / Issues should be identified and resolved with a view to decreasing safety KPIs and
therefore achieving the business objective.
• If LTI, LTIFR or LTISR decrease, this indicates that the business objective, “No
Injuries”, is being fulfilled.
– This indicates safety practices / mechanisms are proving successful.
Business
Objectives
Key Success
Factors (KSFs)
Key Performance
Indicators (KPIs)
Tracked by.
Determine.
No Injuries Safety LTI, LTIFR, LTISR.
Interpretation of KPIs is KPI dependent.
KPIs do NOT give answers, rather they raise questions and direct attention.
`
What influence do I have on KPIs?
Every person on-site has an influence on certain KPIs and business objectives.
Senior Foremen
• LTIFR
• Incidents
• Property damage ($)
• Cost / unit
• Cost / hour
• Cost of quality
• Maintenance effectiveness
• Maintenance efficiency
• Mean time between failure
• Mean time to repair
Crew
• LTIFR
• Incidents
• Property damage ($)
• Mean time to repair
`
Maintenance KPIs
Seventeen (17) primary maintenance KPIs to be utilised.
– These KPIs will be utilised across the site’s Maintenance Departments.
• LTIFR (both production and maintenance)
• Maintenance Cost per Unit vs. Budget
• Maintenance Cost per Hour vs. Budget
• Cost of Quality
• Maintenance Effectiveness
• Maintenance Efficiency
• Mean Time Between Failure (MTBF)
• Mean Time to Repair (MTTR)
• Preventive Inspection Effectiveness
• Ratio of Preventive to Breakdown Maintenance
• Backlog
• % Scheduled Man Hours Planned
• % Schedule Compliance
• % Planning Effectiveness
• % Man Hours Available
• % Rework
• % Failures Investigated
• MIP Process Effectiveness
KPIs
`
LTIFR
Lost Time Injury Frequency Rate
• LTIFR is a measure of overall safety performance, and indicates the frequency
of Lost Time Injuries (LTIs).
Formula
– Total man hours includes wages, staff and contractor hours associated with both production and
maintenance operations.
Interpretation
LTIFR =
Number of Lost Time Injuries
Total Man Hours
x 1,000,000


 


LTIFR < 5
• Personnel are getting injured.
• Safety practices / mechanisms are ineffective.
• Incident reporting is increasing.
• Personnel are NOT getting injured.
• Safety practices / mechanisms are effective.
• Incident reporting is reducing.
`
Maintenance Cost per Unit vs. Budget
• A measure of the maintenance effort required for a piece of equipment (or
plant) to generate a unit of production.
Formula
– Total maintenance cost includes total costed maintenance man hours, parts and any other costs
associated with the maintenance effort (preventive and corrective).
– Unit of production will match the associated departments current unit.
Interpretation
M aintenance C ost per U nit =
Total M aintenance C ost
U nit of Production
Maintenance Cost per Unit vs. Budget
• Maintenance effort required is increasing.
• Maintenance practices / mechanisms are ineffective.
• Operating conditions are deteriorating.
• Equipment is being over maintained.
• Maintenance cost budgeting was inaccurate.
• Maintenance requirements changed during the fiscal year.
• Maintenance effort required is decreasing.
• Maintenance practices / mechanisms are effective.
• Operating conditions are improving.
• Maintenance cost budgeting was inaccurate.
• Maintenance requirements changed during the fiscal year.
`
Maintenance Cost per Hour vs. Budget
• A measure of the maintenance effort required to generate production time
from a piece of equipment (or plant).
Formula
– Total maintenance cost includes total costed maintenance man hours, parts and any other costs
associated with the maintenance effort (preventive and corrective).
– Operating time is productive time plus production delays.
Interpretation
M aintenance Cost per Hour =
Total M aintenance Cost
Operating Tim e
Maintenance Cost per Hour vs. Budget
• Maintenance effort required is increasing.
• Maintenance practices / mechanisms are ineffective.
• Operating conditions are deteriorating.
• Equipment is being over maintained.
• Maintenance cost budgeting was inaccurate.
• Maintenance requirements changed during the fiscal year.
• Budgeted operating time reduced.
• Maintenance effort required is decreasing.
• Maintenance practices / mechanisms are effective.
• Operating conditions are improving.
• Maintenance cost budgeting was inaccurate.
• Maintenance requirements changed during the fiscal year.
• Budgeted operating time increased.
`
Cost of Quality
• A measure of preventive maintenance effect on corrective and total
maintenance costs.
Concept
`
Cost of Quality (cont.)
– Total maintenance cost, or cost of quality, is the sum of preventive and corrective maintenance
costs.
– Preventive maintenance cost is the cost associated with maintenance carried out at
predetermined intervals or other prescribed criteria intended to reduce the probability of failure
or degradation of performance of equipment (or plant).
– Corrective maintenance cost is the cost associated with maintenance carried out on a defect
which has caused equipment (or plant) to be taken out of service during scheduled operating
time. Corrective maintenance can be either planned or unplanned.
Interpretation
Cost of Quality
• Preventive maintenance effort decreasing.
• Corrective maintenance effort increasing.
• Preventive maintenance effort excessive (beyond optimum).
• Maintenance practices / mechanisms are ineffective.
• Preventive maintenance effort is increasing.
• Corrective maintenance effort in decreasing.
• Preventive to corrective maintenance ratio optimised.
• Maintenance practices / mechanisms are effective.
`
Maintenance Effectiveness
• A measure of the amount of maintenance downtime required to keep
equipment (or plant) operating.
Formula
– Operating time is productive time plus production delays.
– Down time is the total time equipment (or plant) is down for maintenance work (preventive and
corrective).
Interpretation
Maintenance Effectiveness =
Operating Time
Operating Time + Down Time
x 100%






Maintenance Effectiveness > 95%
• Maintenance effort required is increasing.
• Maintenance practices / mechanisms are ineffective.
• Operating conditions are deteriorating.
• Equipment is being over maintained.
• Maintenance effort required is decreasing.
• Maintenance practices / mechanisms are effective.
• Operating conditions are improving.
`
Maintenance Efficiency
• A measure of the maintenance effort required to deliver required
performance levels from equipment (or plant).
Formula
– Maintenance man hours is the actual maintenance man hours spent maintaining an item of
equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor
hours (preventive and corrective).
– Operating time is productive time plus production delays.
Interpretation
M aintenance Efficiency =
M aintenance M an Hours
Operating Time
x 100%






Maintenance Efficiency
• Maintenance effort required is increasing.
• Maintenance practices / mechanisms are ineffective.
• Operating conditions are deteriorating.
• Equipment is being over maintained.
• Maintenance effort required is decreasing.
• Maintenance practices / mechanisms are effective.
• Operating conditions are improving.
`
MTBF
Mean Time Between Failure
• The average amount of operating time between consecutive breakdowns for
an item of equipment (or plant).
Formula
– Operating time is productive time plus production delays.
– Number of failures or breakdown events is the number of failures on an item of equipment (or
plant).
Interpretation
M TBF =
Operating Time
Number of Failures or Breakdown Events
MTBF
• Maintenance effort required is increasing.
• Maintenance practices / mechanisms are ineffective.
• Failure frequency is increasing.
• Operating conditions are deteriorating.
• Maintenance effort required is decreasing.
• Maintenance practices / mechanisms are effective.
• Failure frequency is decreasing.
• Operating conditions are improving.
`
MTTR
Mean Time To Repair
• The average maintenance time required to keep an item of equipment (or
plant) operational.
Formula
– Down time is the total time equipment (or plant) is down for maintenance work (preventive and
corrective).
– Number of failures or breakdown events is the number of failures on an item of equipment (or
plant).
Interpretation
M TTR =
D ow n Tim e
N um ber of Failures or Breakdow n Events
MTTR
• Maintenance practices / mechanisms are effective.
• Clean-up (work preparation) practices effective.
• Effective work practices.
• Maintenance practices / mechanisms are ineffective.
• Poor clean-up (work preparation) practices.
• Ineffective work practices.
`
Preventive Inspection Effectiveness
Ratio of Preventive Repair Man Hours to Preventive Inspection Man Hours.
• A measure of preventive inspection effectiveness.
Formula
– Preventive repair man hours is maintenance that is performed as a result of a preventive
inspection.
– Preventive inspection man hours is work performed that originates from equipment maintenance
strategies; ie. planned services and inspections.
Interpretation
Preventive Inspection Effectiveness
• Preventive inspections are effective.
• Inspection frequency to low.
• Preventive inspection conducted effectively.
Preventive Inspection E ffectiveness =
Preventive R epair M an H ours
Preventive Inspection M an H ours
• Preventive inspections are ineffective.
• Preventive inspections are conducted ineffectively.
• Inspection frequency to high.
`
Ratio of Preventive to Breakdown Maintenance
Ratio of Preventive Man Hours to Breakdown Man Hours.
• A measure of planning / scheduling process effectiveness and its influence on
breakdown maintenance.
Formula
– Preventive repair man hours is maintenance that is performed as a result of a preventive inspection.
– Preventive inspection man hours is work performed that originates from equipment maintenance
strategies; ie. planned services and inspections.
– Breakdown man hours is unplanned corrective maintenance that must occur due to a defect causing
equipment (or plant) to be taken out of service during scheduled operating time (NOT corrective
maintenance man hours).
Interpretation
R a tio o f P re v e n tiv e
to B re a k d o w n M a in te n a n c e =
P re v e n tiv e R e p a ir M a n H o u rs + P re v e n tiv e In sp e c tio n M a n H o u rs
B re a k d o w n M a n H o u rs
Ratio of Preventive to Breakdown Maintenance = 16
• Over maintaining equipment.
• Preventive maintenance practices / strategies are too
effective and should be optimised (optimise costs).
• Preventive inspections are ineffective.
• Faults not being reported.
• Preventive maintenance practices / strategies are ineffective.
`
Backlog
• All maintenance work identified to be done, but as yet incomplete. Indicates
how much outstanding maintenance work exists compared to the resources
available to complete the work.
• Formula
– Total maintenance man hours on outstanding work orders currently includes both backlog and
forward log.
Interpretation
B a c k lo g = T o ta l M a in te n a n c e M a n H o u rs o n O u ts ta n d in g W o rk O rd e rs
Backlog < 1,800 man hours
• Build up of jobs.
• Insufficient labour.
• Maintenance practices / mechanisms are ineffective.
• Preventive inspections are effective (Work identified).
• Preventive inspections are ineffective (No work identified).
• Too much labour.
• Maintenance practices / mechanisms are effective.
`
% Scheduled Man Hours Planned
• The percentage of scheduled man hours that appear on the weekly schedule
that have been planned. A measure of planning process effectiveness.
• Formula
– Planned man hours on weekly schedule is the total planned maintenance hours on the weekly
maintenance schedule.
– Total weekly scheduled man hours is the total maintenance man hours scheduled for the week
(NOT total maintenance man hours available).
Interpretation
% S cheduled M an H ours P lanned =
P lanned M an H ours on W eekly S chedule
T otal W eek ly S cheduled M an H ou rs
x 100%






% Scheduled Man Hours Planned > 80%
• High level of planned work in backlog.
• Minimal job delays.
• Maintenance practices / mechanisms are
effective.
• Too much labour.
• Priority work not being planned.
• Lack of planned work in backlog.
• Maintenance practices / mechanisms are ineffective.
• Insufficient labour.
`
% Scheduled Compliance
• A measure of scheduling process compliance.
Formula
– Scheduled man hours completed is the actual man hours spent performing scheduled
maintenance.
– Total weekly scheduled man hours is the total maintenance man hours scheduled for the week
(NOT total maintenance man hours available).
Interpretation
% Scheduled C om pliance =
Scheduled M an H ours C om pleted
T otal W eekly Scheduled M an H ours
x 100%






% Scheduled Compliance > 80%
• Priority jobs being completed.
• Planned repairs, PM’s being executed.
• Maintenance practices / mechanisms are effective.
• Too much labour.
• Effective work practices.
• Maintenance / Production Department communication /
cooperation effective (Access to equipment).
• Insufficient scheduled man hours to conduct maintenance.
• High level of breakdowns / interruptions.
• Maintenance practices / mechanisms are ineffective.
• Insufficient labour.
• Maintenance / Production Department communication /
cooperation ineffective (Access to equipment).
• Ineffective work practices.
• To many scheduled man hours to conduct maintenance.
`
% Planning Effectiveness
• A measure of planning process compliance.
Formula
– Number of scheduled jobs completed with comments is the number of scheduled jobs
completed with comments on the job ticket identifying issues / problems with the planning
process.
Interpretation
% P lan n in g E ffectiv e n ess =
N u m b er o f S ch ed u led Jo b s C o m p leted w ith C o m m en ts
T o tal N u m b er o f S ch e d u led Jo b s C o m p leted
x 1 0 0 %






% Planning Effectiveness < 20%
• Minimum requirements for a planned job not understood.
• Schedule compliance low.
• High level of job delays.
• Maintenance practices / mechanisms are ineffective.
• Maintenance / Production Department communication /
cooperation ineffective (Access to equipment).
• Planned requirements well understood.
• Schedule compliance high.
• Maintenance practices / mechanisms are effective.
• Maintenance / Production Department communication /
cooperation effective (Access to equipment).
• Job ticket comments not being completed.
`
% Man Hours Available
• Primarily a measure of attendance, but also a useful tool to track training and
future manpower requirements. Indicates effective utilisation of man power.
• Formula
– Absence from work is man hours associated with absenteeism, training and any other diversion
from an employees primary function.
Interpretation
% Man Hours Available =
Total Man Hours Paid - Absence from Work
Total Man Hours Paid
x 100%


 


% Man Hours Available
• Lack of employee development.
• Lack of training.
• Reduction in absenteeism.
• Core function (maintenance) being fulfilled.
• Absenteeism.
• Excessive training.
• Core function (maintenance) not being fulfilled.
`
% Rework
• Maintenance action that is a repeat of a previous, ineffective effort. The work
could have been ineffective due to poor workmanship, poor design, or
improper procedures.
• Formula
– Rework man hours is man hours associated with a maintenance action that is a repeat of a
previous, ineffective effort.
– Maintenance man hours is the actual maintenance man hours spent maintaining an item of
equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor
hours (preventive and corrective).
Interpretation
% Rework =
Rework Man Hours
Maintenance Work Hours
x 100%


 


% Rework < 20%
• Maintenance practices / mechanisms are ineffective.
• Poor design.
• Poor operating practices.
• Ineffective work practices.
• Maintenance practices / mechanisms are effective.
• Effective work practices.
• Good design.
`
% Failures Investigated
• Measure of the Maintenance Department’s effort to continuously improve.
Formula
– Number of corrective job tickets investigated is the number of job tickets investigated, root cause
found, and solutions investigated to prevent future occurrences. Job tickets that are associated
with maintenance work performed on defects which caused equipment (or plant) to be taken out
of service during scheduled operating time.
– Total number of corrective job tickets is the total number of job tickets associated with
maintenance work performed on defects which caused equipment (or plant) to be taken out of
service during scheduled operating time.
Interpretation
% Failures Investigated =
N um ber of Corrective Job Tickets Investigated
Total N um ber of Corrective Job Tickets
x 100%


 


% Failures Investigated > 80%
• Improved equipment reliability.
• Continuously improving maintenance
practices / mechanisms.
• Repetitive equipment failures.
• Repetitive job delays.
• Continuous improvement of maintenance practices /
mechanisms is not occurring.
`
MIP Process Effectiveness
• Measure of the Maintenance Department’s effort to continuously improve.
Concept
– MIP process effectiveness is a combination of the maintenance KPIs, schedule compliance,
planning effectiveness and backlog.
Interpretation MIP Process Effectiveness > 80%
• Maintenance effort is improving.
• Maintenance mechanisms / practices are improving.
• Improved equipment reliability.
• Backlog is decreasing.
• Maintenance effort is deteriorating.
• Maintenance mechanisms / practices are not improving.
• Equipment reliability is deteriorating.
• Backlog is increasing.
`
Summary
• Systems and mechanism implemented to address business objectives (key
success factors) can always be improved.
– A continuous improvement (CI) philosophy should be adopted.
KPIs track performance against established key success factors.
Interpretation of KPIs is KPI dependent.
KPIs do NOT give answers, rather they raise questions and direct attention.
Every person on-site has an influence on certain KPIs and business objectives.
Seventeen (17) primary maintenance KPIs to be utilised.
–These KPIs will be utilised across the site’s Maintenance Departments.

More Related Content

PDF
What is a Key Performance Indicator? Cost of Quality.pdf
PPT
Kpi familiarization
PDF
Kpi 101223064832 Phpapp02
PPT
Reliability and Maintenance in production Management
PPT
Maintenance
PDF
document (1).pdf
PPTX
Asset Managment
What is a Key Performance Indicator? Cost of Quality.pdf
Kpi familiarization
Kpi 101223064832 Phpapp02
Reliability and Maintenance in production Management
Maintenance
document (1).pdf
Asset Managment

Similar to Maintenance_KPI.pdf (20)

PPTX
MAINTENANCE MANAGEMENT.pptx
PPT
Maintenance Management.ppt
PDF
Boost Equipment Performance, Save Money With Proactive Maintenance
PPTX
Aircraft condition monitoring (CM) is a predictive maintenance tool that help...
PPTX
OM2 QTM Unit-4.pptx operation management
PDF
Total Productive Maintenance (TPM)
PPTX
tqm ch total production maintainance.pptx
PPT
Maintenance Management 1.2_Maintenance Philosophy.ppt
PPTX
Basics of maintenance processes
PPTX
Maintenance and material handling methods (1)
PPT
Maintenance Management
PPTX
totalproductivemaintenance-210429042245.pptx
PPTX
Total productive maintenance
PDF
Listado de indicadores clave de mantenimiento y confiabilidad
PPTX
Building Maintenance Program for engineers.pptx
PPTX
Total Productive Maintenance_Magbatoc.pptx
PPT
The Main concepts and definitions for Maintenance .ppt
PPTX
TPM should know or not, it improves performance
PPTX
TPM Seminar - fffffffffffffffffffffffffffffffffffffffff
PPTX
Unit 1 mpa
MAINTENANCE MANAGEMENT.pptx
Maintenance Management.ppt
Boost Equipment Performance, Save Money With Proactive Maintenance
Aircraft condition monitoring (CM) is a predictive maintenance tool that help...
OM2 QTM Unit-4.pptx operation management
Total Productive Maintenance (TPM)
tqm ch total production maintainance.pptx
Maintenance Management 1.2_Maintenance Philosophy.ppt
Basics of maintenance processes
Maintenance and material handling methods (1)
Maintenance Management
totalproductivemaintenance-210429042245.pptx
Total productive maintenance
Listado de indicadores clave de mantenimiento y confiabilidad
Building Maintenance Program for engineers.pptx
Total Productive Maintenance_Magbatoc.pptx
The Main concepts and definitions for Maintenance .ppt
TPM should know or not, it improves performance
TPM Seminar - fffffffffffffffffffffffffffffffffffffffff
Unit 1 mpa
Ad

Recently uploaded (20)

PPTX
Measurement Uncertainty and Measurement System analysis
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PPTX
wireless networks, mobile computing.pptx
PDF
Design of Material Handling Equipment Lecture Note
PPTX
Principal presentation for NAAC (1).pptx
PPTX
Petroleum Refining & Petrochemicals.pptx
PPTX
Amdahl’s law is explained in the above power point presentations
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
Unit1 - AIML Chapter 1 concept and ethics
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PDF
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PPTX
mechattonicsand iotwith sensor and actuator
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Measurement Uncertainty and Measurement System analysis
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
wireless networks, mobile computing.pptx
Design of Material Handling Equipment Lecture Note
Principal presentation for NAAC (1).pptx
Petroleum Refining & Petrochemicals.pptx
Amdahl’s law is explained in the above power point presentations
Module 8- Technological and Communication Skills.pptx
Chemical Technological Processes, Feasibility Study and Chemical Process Indu...
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
August -2025_Top10 Read_Articles_ijait.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Unit1 - AIML Chapter 1 concept and ethics
Information Storage and Retrieval Techniques Unit III
20250617 - IR - Global Guide for HR - 51 pages.pdf
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
mechattonicsand iotwith sensor and actuator
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Ad

Maintenance_KPI.pdf

  • 1. Maintenance KPI Prof: John Santana Tec – 709 Maintenance Engineering
  • 2. ` KPI = Key Performance Indicator
  • 3. ` • Improve personnel’s understanding of KPIs and what they indicate. • Improve personnel’s awareness of maintenance performance. Objectives + =
  • 4. ` What is a KPI? • KPIs are directly linked to the overall goals of the company. • Business Objectives are defined at corporate, regional and site level. These goals determine critical activities (Key Success Factors) that must be done well for a particular operation to succeed. • KPIs are utilised to track or measure actual performance against key success factors. – Key Success Factors (KSFs) only change if there is a fundamental shift in business objectives. – Key Performance Indicators (KPIs) change as objectives are met, or management focus shifts. KPIs track performance against established key success factors. Business Objectives Key Success Factors (KSFs) Key Performance Indicators (KPIs) Tracked by. Determine. No Injuries Safety LTI, LTIFR, LTISR.
  • 5. ` How do I interpret a KPI? • If LTI, LTIFR or LTISR increase, this indicates that the business objective, “No Injuries”, is NOT being fulfilled. – This should direct attention to the SAFETY key success factor. – Problems / Issues should be identified and resolved with a view to decreasing safety KPIs and therefore achieving the business objective. • If LTI, LTIFR or LTISR decrease, this indicates that the business objective, “No Injuries”, is being fulfilled. – This indicates safety practices / mechanisms are proving successful. Business Objectives Key Success Factors (KSFs) Key Performance Indicators (KPIs) Tracked by. Determine. No Injuries Safety LTI, LTIFR, LTISR. Interpretation of KPIs is KPI dependent. KPIs do NOT give answers, rather they raise questions and direct attention.
  • 6. ` What influence do I have on KPIs? Every person on-site has an influence on certain KPIs and business objectives. Senior Foremen • LTIFR • Incidents • Property damage ($) • Cost / unit • Cost / hour • Cost of quality • Maintenance effectiveness • Maintenance efficiency • Mean time between failure • Mean time to repair Crew • LTIFR • Incidents • Property damage ($) • Mean time to repair
  • 7. ` Maintenance KPIs Seventeen (17) primary maintenance KPIs to be utilised. – These KPIs will be utilised across the site’s Maintenance Departments. • LTIFR (both production and maintenance) • Maintenance Cost per Unit vs. Budget • Maintenance Cost per Hour vs. Budget • Cost of Quality • Maintenance Effectiveness • Maintenance Efficiency • Mean Time Between Failure (MTBF) • Mean Time to Repair (MTTR) • Preventive Inspection Effectiveness • Ratio of Preventive to Breakdown Maintenance • Backlog • % Scheduled Man Hours Planned • % Schedule Compliance • % Planning Effectiveness • % Man Hours Available • % Rework • % Failures Investigated • MIP Process Effectiveness KPIs
  • 8. ` LTIFR Lost Time Injury Frequency Rate • LTIFR is a measure of overall safety performance, and indicates the frequency of Lost Time Injuries (LTIs). Formula – Total man hours includes wages, staff and contractor hours associated with both production and maintenance operations. Interpretation LTIFR = Number of Lost Time Injuries Total Man Hours x 1,000,000       LTIFR < 5 • Personnel are getting injured. • Safety practices / mechanisms are ineffective. • Incident reporting is increasing. • Personnel are NOT getting injured. • Safety practices / mechanisms are effective. • Incident reporting is reducing.
  • 9. ` Maintenance Cost per Unit vs. Budget • A measure of the maintenance effort required for a piece of equipment (or plant) to generate a unit of production. Formula – Total maintenance cost includes total costed maintenance man hours, parts and any other costs associated with the maintenance effort (preventive and corrective). – Unit of production will match the associated departments current unit. Interpretation M aintenance C ost per U nit = Total M aintenance C ost U nit of Production Maintenance Cost per Unit vs. Budget • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year.
  • 10. ` Maintenance Cost per Hour vs. Budget • A measure of the maintenance effort required to generate production time from a piece of equipment (or plant). Formula – Total maintenance cost includes total costed maintenance man hours, parts and any other costs associated with the maintenance effort (preventive and corrective). – Operating time is productive time plus production delays. Interpretation M aintenance Cost per Hour = Total M aintenance Cost Operating Tim e Maintenance Cost per Hour vs. Budget • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. • Budgeted operating time reduced. • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving. • Maintenance cost budgeting was inaccurate. • Maintenance requirements changed during the fiscal year. • Budgeted operating time increased.
  • 11. ` Cost of Quality • A measure of preventive maintenance effect on corrective and total maintenance costs. Concept
  • 12. ` Cost of Quality (cont.) – Total maintenance cost, or cost of quality, is the sum of preventive and corrective maintenance costs. – Preventive maintenance cost is the cost associated with maintenance carried out at predetermined intervals or other prescribed criteria intended to reduce the probability of failure or degradation of performance of equipment (or plant). – Corrective maintenance cost is the cost associated with maintenance carried out on a defect which has caused equipment (or plant) to be taken out of service during scheduled operating time. Corrective maintenance can be either planned or unplanned. Interpretation Cost of Quality • Preventive maintenance effort decreasing. • Corrective maintenance effort increasing. • Preventive maintenance effort excessive (beyond optimum). • Maintenance practices / mechanisms are ineffective. • Preventive maintenance effort is increasing. • Corrective maintenance effort in decreasing. • Preventive to corrective maintenance ratio optimised. • Maintenance practices / mechanisms are effective.
  • 13. ` Maintenance Effectiveness • A measure of the amount of maintenance downtime required to keep equipment (or plant) operating. Formula – Operating time is productive time plus production delays. – Down time is the total time equipment (or plant) is down for maintenance work (preventive and corrective). Interpretation Maintenance Effectiveness = Operating Time Operating Time + Down Time x 100%       Maintenance Effectiveness > 95% • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving.
  • 14. ` Maintenance Efficiency • A measure of the maintenance effort required to deliver required performance levels from equipment (or plant). Formula – Maintenance man hours is the actual maintenance man hours spent maintaining an item of equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor hours (preventive and corrective). – Operating time is productive time plus production delays. Interpretation M aintenance Efficiency = M aintenance M an Hours Operating Time x 100%       Maintenance Efficiency • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Operating conditions are deteriorating. • Equipment is being over maintained. • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Operating conditions are improving.
  • 15. ` MTBF Mean Time Between Failure • The average amount of operating time between consecutive breakdowns for an item of equipment (or plant). Formula – Operating time is productive time plus production delays. – Number of failures or breakdown events is the number of failures on an item of equipment (or plant). Interpretation M TBF = Operating Time Number of Failures or Breakdown Events MTBF • Maintenance effort required is increasing. • Maintenance practices / mechanisms are ineffective. • Failure frequency is increasing. • Operating conditions are deteriorating. • Maintenance effort required is decreasing. • Maintenance practices / mechanisms are effective. • Failure frequency is decreasing. • Operating conditions are improving.
  • 16. ` MTTR Mean Time To Repair • The average maintenance time required to keep an item of equipment (or plant) operational. Formula – Down time is the total time equipment (or plant) is down for maintenance work (preventive and corrective). – Number of failures or breakdown events is the number of failures on an item of equipment (or plant). Interpretation M TTR = D ow n Tim e N um ber of Failures or Breakdow n Events MTTR • Maintenance practices / mechanisms are effective. • Clean-up (work preparation) practices effective. • Effective work practices. • Maintenance practices / mechanisms are ineffective. • Poor clean-up (work preparation) practices. • Ineffective work practices.
  • 17. ` Preventive Inspection Effectiveness Ratio of Preventive Repair Man Hours to Preventive Inspection Man Hours. • A measure of preventive inspection effectiveness. Formula – Preventive repair man hours is maintenance that is performed as a result of a preventive inspection. – Preventive inspection man hours is work performed that originates from equipment maintenance strategies; ie. planned services and inspections. Interpretation Preventive Inspection Effectiveness • Preventive inspections are effective. • Inspection frequency to low. • Preventive inspection conducted effectively. Preventive Inspection E ffectiveness = Preventive R epair M an H ours Preventive Inspection M an H ours • Preventive inspections are ineffective. • Preventive inspections are conducted ineffectively. • Inspection frequency to high.
  • 18. ` Ratio of Preventive to Breakdown Maintenance Ratio of Preventive Man Hours to Breakdown Man Hours. • A measure of planning / scheduling process effectiveness and its influence on breakdown maintenance. Formula – Preventive repair man hours is maintenance that is performed as a result of a preventive inspection. – Preventive inspection man hours is work performed that originates from equipment maintenance strategies; ie. planned services and inspections. – Breakdown man hours is unplanned corrective maintenance that must occur due to a defect causing equipment (or plant) to be taken out of service during scheduled operating time (NOT corrective maintenance man hours). Interpretation R a tio o f P re v e n tiv e to B re a k d o w n M a in te n a n c e = P re v e n tiv e R e p a ir M a n H o u rs + P re v e n tiv e In sp e c tio n M a n H o u rs B re a k d o w n M a n H o u rs Ratio of Preventive to Breakdown Maintenance = 16 • Over maintaining equipment. • Preventive maintenance practices / strategies are too effective and should be optimised (optimise costs). • Preventive inspections are ineffective. • Faults not being reported. • Preventive maintenance practices / strategies are ineffective.
  • 19. ` Backlog • All maintenance work identified to be done, but as yet incomplete. Indicates how much outstanding maintenance work exists compared to the resources available to complete the work. • Formula – Total maintenance man hours on outstanding work orders currently includes both backlog and forward log. Interpretation B a c k lo g = T o ta l M a in te n a n c e M a n H o u rs o n O u ts ta n d in g W o rk O rd e rs Backlog < 1,800 man hours • Build up of jobs. • Insufficient labour. • Maintenance practices / mechanisms are ineffective. • Preventive inspections are effective (Work identified). • Preventive inspections are ineffective (No work identified). • Too much labour. • Maintenance practices / mechanisms are effective.
  • 20. ` % Scheduled Man Hours Planned • The percentage of scheduled man hours that appear on the weekly schedule that have been planned. A measure of planning process effectiveness. • Formula – Planned man hours on weekly schedule is the total planned maintenance hours on the weekly maintenance schedule. – Total weekly scheduled man hours is the total maintenance man hours scheduled for the week (NOT total maintenance man hours available). Interpretation % S cheduled M an H ours P lanned = P lanned M an H ours on W eekly S chedule T otal W eek ly S cheduled M an H ou rs x 100%       % Scheduled Man Hours Planned > 80% • High level of planned work in backlog. • Minimal job delays. • Maintenance practices / mechanisms are effective. • Too much labour. • Priority work not being planned. • Lack of planned work in backlog. • Maintenance practices / mechanisms are ineffective. • Insufficient labour.
  • 21. ` % Scheduled Compliance • A measure of scheduling process compliance. Formula – Scheduled man hours completed is the actual man hours spent performing scheduled maintenance. – Total weekly scheduled man hours is the total maintenance man hours scheduled for the week (NOT total maintenance man hours available). Interpretation % Scheduled C om pliance = Scheduled M an H ours C om pleted T otal W eekly Scheduled M an H ours x 100%       % Scheduled Compliance > 80% • Priority jobs being completed. • Planned repairs, PM’s being executed. • Maintenance practices / mechanisms are effective. • Too much labour. • Effective work practices. • Maintenance / Production Department communication / cooperation effective (Access to equipment). • Insufficient scheduled man hours to conduct maintenance. • High level of breakdowns / interruptions. • Maintenance practices / mechanisms are ineffective. • Insufficient labour. • Maintenance / Production Department communication / cooperation ineffective (Access to equipment). • Ineffective work practices. • To many scheduled man hours to conduct maintenance.
  • 22. ` % Planning Effectiveness • A measure of planning process compliance. Formula – Number of scheduled jobs completed with comments is the number of scheduled jobs completed with comments on the job ticket identifying issues / problems with the planning process. Interpretation % P lan n in g E ffectiv e n ess = N u m b er o f S ch ed u led Jo b s C o m p leted w ith C o m m en ts T o tal N u m b er o f S ch e d u led Jo b s C o m p leted x 1 0 0 %       % Planning Effectiveness < 20% • Minimum requirements for a planned job not understood. • Schedule compliance low. • High level of job delays. • Maintenance practices / mechanisms are ineffective. • Maintenance / Production Department communication / cooperation ineffective (Access to equipment). • Planned requirements well understood. • Schedule compliance high. • Maintenance practices / mechanisms are effective. • Maintenance / Production Department communication / cooperation effective (Access to equipment). • Job ticket comments not being completed.
  • 23. ` % Man Hours Available • Primarily a measure of attendance, but also a useful tool to track training and future manpower requirements. Indicates effective utilisation of man power. • Formula – Absence from work is man hours associated with absenteeism, training and any other diversion from an employees primary function. Interpretation % Man Hours Available = Total Man Hours Paid - Absence from Work Total Man Hours Paid x 100%       % Man Hours Available • Lack of employee development. • Lack of training. • Reduction in absenteeism. • Core function (maintenance) being fulfilled. • Absenteeism. • Excessive training. • Core function (maintenance) not being fulfilled.
  • 24. ` % Rework • Maintenance action that is a repeat of a previous, ineffective effort. The work could have been ineffective due to poor workmanship, poor design, or improper procedures. • Formula – Rework man hours is man hours associated with a maintenance action that is a repeat of a previous, ineffective effort. – Maintenance man hours is the actual maintenance man hours spent maintaining an item of equipment (or plant). Maintenance man hours includes maintenance wages, staff and contractor hours (preventive and corrective). Interpretation % Rework = Rework Man Hours Maintenance Work Hours x 100%       % Rework < 20% • Maintenance practices / mechanisms are ineffective. • Poor design. • Poor operating practices. • Ineffective work practices. • Maintenance practices / mechanisms are effective. • Effective work practices. • Good design.
  • 25. ` % Failures Investigated • Measure of the Maintenance Department’s effort to continuously improve. Formula – Number of corrective job tickets investigated is the number of job tickets investigated, root cause found, and solutions investigated to prevent future occurrences. Job tickets that are associated with maintenance work performed on defects which caused equipment (or plant) to be taken out of service during scheduled operating time. – Total number of corrective job tickets is the total number of job tickets associated with maintenance work performed on defects which caused equipment (or plant) to be taken out of service during scheduled operating time. Interpretation % Failures Investigated = N um ber of Corrective Job Tickets Investigated Total N um ber of Corrective Job Tickets x 100%       % Failures Investigated > 80% • Improved equipment reliability. • Continuously improving maintenance practices / mechanisms. • Repetitive equipment failures. • Repetitive job delays. • Continuous improvement of maintenance practices / mechanisms is not occurring.
  • 26. ` MIP Process Effectiveness • Measure of the Maintenance Department’s effort to continuously improve. Concept – MIP process effectiveness is a combination of the maintenance KPIs, schedule compliance, planning effectiveness and backlog. Interpretation MIP Process Effectiveness > 80% • Maintenance effort is improving. • Maintenance mechanisms / practices are improving. • Improved equipment reliability. • Backlog is decreasing. • Maintenance effort is deteriorating. • Maintenance mechanisms / practices are not improving. • Equipment reliability is deteriorating. • Backlog is increasing.
  • 27. ` Summary • Systems and mechanism implemented to address business objectives (key success factors) can always be improved. – A continuous improvement (CI) philosophy should be adopted. KPIs track performance against established key success factors. Interpretation of KPIs is KPI dependent. KPIs do NOT give answers, rather they raise questions and direct attention. Every person on-site has an influence on certain KPIs and business objectives. Seventeen (17) primary maintenance KPIs to be utilised. –These KPIs will be utilised across the site’s Maintenance Departments.