SlideShare a Scribd company logo
USAID Climate Change Adaptation Project Preparation Facility for Asia and the Pacific
(USAID Adapt Asia-Pacific)
Session 12:
Managing Design Phase Tasks
for Climate Change Adaptation
Projects
January 19, 2017
USAID Adapt Asia-Pacific
Course Overview
• Day 1: Project Presentations,
Climate Finance, and Climate
Impacts
• Day 2: Planning, Risk
Management, and “Bounding” the
Project
• Day 3: Economic Analysis,
Safeguards, and Project Logic
• Day 4: Public-Private Partnerships,
Blended Finance, & Managing
Project Design
• Day 5: Monitoring & Evaluation
and Final Presentations
USAID Adapt Asia-Pacific
Orientation to Process
Project
Concept
Recruit
Design Team
Project
design &
Management
framework
Economic,
Social & Env’t
Analyses
Project
Appraisal
Project
Approval
• Project need has been identified
• Develop Terms of Reference (TOR)
• Recruit design team
• Design team conducts feasibility study
• Government appraises feasibility study
• Approved feasibility incorporates appraisal findings
• Project document for financial approval and implementation
Project Design
USAID Adapt Asia-Pacific
Project Cycle Responsibilities
Project Cycle Step Who’s Responsible? Managerial
Responsibilities
1. Climate policy &
strategy
Government Be informed and alert
2. Project design Financier, lead
agency, contractor
(design team)
Project concept, TOR
for design,
supervision of
contractors
3. Project appraisal Financier, lead
agency, contractor
Verify quality,
feedback. Yes/no
4. Project
implementation
Implementing entity Supervision, reports
5. Monitoring &
evaluation
Implementing entity Supervision
USAID Adapt Asia-Pacific
PREPARING FOR PROJECT
DESIGN
5
USAID Adapt Asia-Pacific
Revisiting the Project Cycle
RESULTS
Policy &
Strategy
Project
Design
Implementation
Appraisal/
Approval
• Project Concept
• Recruit Design
Team
• Project Design &
Management
Framework
• Economic, Social,
and Environmental
Analyses
USAID Adapt Asia-Pacific
Project Concept: Urban Water Supply
and Wastewater Management in Fiji
Project
Concept
Recruit
Design Team
Project
design &
Management
framework
Economic,
Social &
Env’t
Analyses
Project
Appraisal
Project
Approval
• ADB and Fiji agree on the project concept
• TA Report is prepared to obtain funds for project preparation. It
covers:
• (i) Issues
• (ii) Impact and Outcome
• (iii) Methodology and Key Activities
• (iv) Cost and Financing
• (v) Implementation
Project Design
USAID Adapt Asia-Pacific
Terms of Reference: Urban Water Supply
and Wastewater Management in Fiji
Project
Concept
Recruit
Design
Team
Project
design &
Management
framework
Economic,
Social &
Env’t
Analyses
Project
Appraisal
Project
Approval
• Attached to the TA report discussed in the previous slide is a
Design and Monitoring Framework, Cost Estimate and
Financing Plan and outline TOR
• The TOR sets out the following:
• (i) Overview
• (ii) Scope of Work
• (iii) Reporting and Schedule
Project Design
USAID Adapt Asia-Pacific
Design Team Recruited for: Urban Water
Supply and Wastewater Management in Fiji
• Following the approval of the TA report that sets out the project
concept, scope of work, TOR, cost and financing, implementation
arrangements and reporting schedule, a design team can be recruited
to undertake the Feasibility Study
• Allow about 8-10 weeks for bids by shortlisted consulting firms,
evaluation of bids and award of contract. Then the FS team is fielded
and starts work
This Module discusses your role in recruiting the design team and
supervising the project design process
Project Design
Project
Concept
Recruit
Design
Team
Project
design &
Management
framework
Economic,
Social &
Env’t
Analyses
Project
Appraisal
Project
Approval
USAID Adapt Asia-Pacific
Economic, Social, & Environmental
Analysis Timeline
Inception
Report:
1 Month
• Coordinate meetings & review of inception report
• Agree with design team on details in final
inception report
Draft
Feasibility
Study: 4
Months
• Coordinate meetings & review draft feasibility
report
• Appraise project: Yes/No decision
• Provide revisions for final feasibility report
Final
Feasibility
Study: 1
Month
• Coordinate with design team
• Review and approve final feasibility report
Design & Management Framework.
Economic, social, environmental analyses
Comply with requirements of financier Draft
Feasibility Study
Address gov’t & financier appraisal
edits and revisions  final feasibility
report & project document
Design Team
Responsibilities (CONDUCT)
Management Team
Responsibilities (SUPERVISE)
Consultations with government,
preliminary visits, develop work
plan, budgetinception report
Final Project Document
USAID Adapt Asia-Pacific
Session 12 Objectives
121.A. Identify key principles associated with organizing and
structuring a government management team.
12.1.B. Describe necessary components for a Terms of Reference
and will apply best practices to the development of their own TORs.
12.1.C. Describe key considerations and milestones associated
with consultant selection.
12.1.D. Explain key considerations for negotiating a consulting
agreement.
12.1.E. Describe management team responsibilities related to
logistics, setup, and orientation once the design team is recruited.
USAID Adapt Asia-Pacific
The Manager’s Task:
ENSURE QUALITY
• Be aware and beware of “consultant bias”!
• Bear in mind political and social feasibility
issues for potential project activities
• Assess the capabilities of the implementing
entities or agencies
USAID Adapt Asia-Pacific
Enabling Effective Project
Design
Management
Team
Terms of
Reference
Consultant
Selection &
Negotiating
Agreement
Logistics &
Orientation
USAID Adapt Asia-Pacific
Your Management Team
• Primary function: support and
oversee the design team
• Identify the most relevant
institutional partners & clarify
responsibilities
• Identify and liaise with key
stakeholders
• Ensure allocation of sufficient
resources
• Avoid interagency politics
USAID Adapt Asia-Pacific
ADB Considerations for
Consultants
• Need for high-quality services
• Need for economy and
efficiency
• Need to give all qualified
consultants an opportunity to
compete in providing the
services financed by ADB
• ADB’s interest in encouraging
the development and use of
national consultants from
developing member countries
• Need for transparency in
selection process
• Need for increasing focus on
anticorruption and observance
of ethics
USAID Adapt Asia-Pacific
Terms of Reference (TOR)
I. Introduction
II. Objectives
III. Deliverables
IV. Team composition & time
V. Background & stakeholders
VI. Issues to address, SOW, mid-
term review
VII. Qualifications & experience
VIII.Duration & reporting
IX. Implementation arrangements
X. Information details &
references
XI. Budget & implementation
schedule
The quality of TORs
and the budget
available to undertake
project preparation can
significantly affect the
quality of the project
proposal!
USAID Adapt Asia-Pacific
Typical Team Composition
• Team leader
• Gender & social inclusion
• Technical specialists depending on sector
• Economic & financial analyst(s)
• Environment specialist
• Climate specialist
• Other specialists depending on circumstances
(e.g. legal, governance, institutions)
USAID Adapt Asia-Pacific
Consultant selection
• Shortlisting
• Request for proposals
(RFP)
• Bids
• Bid evaluation
Know your country’s rules and
procedures!
USAID Adapt Asia-Pacific
Negotiating a Consulting
Agreement
• Explicit discussion of all
aspects of the TOR
• Follow procedures required
by project financier
• Supervision of consultants
• Clear channels of
communication
Clarity up front helps
to ensure quality
results!
How to drive away good
professionals (or “how to fail”)
• Cheapest = best
• Nepotism, favoritism
• Inadequate budget or time
• Lack of support/confidence
USAID Adapt Asia-Pacific
Logistics & Orientation
• Office logistics
• Transport services
• Secretarial & banking
• Arrange orientation visits
• Facilitate contacts with stakeholders
Don’t be a “gatekeeper”
USAID Adapt Asia-Pacific
Session 12 Question 1
What types of experts will be
required on your project design
team, and how much time will
be required for each expert?
USAID Adapt Asia-Pacific
Session 12 Question 2
Does your country have
specific guidelines for the
hiring of consultants? If so,
have you familiarized yourself
with these procedures? Where
should you go if you have
questions about these
procedures?
USAID Adapt Asia-Pacific
Resources for Session 12
• General Procedures for Selecting and Engaging Consultants.
ADB 2014.
• Guidelines on the Use of Consultants by ADB & its Borrowers.
ADB 2013.
• Guidelines for Selection and Employment of Consultants by
World Bank Borrowers. World Bank 1997.

More Related Content

PPTX
Planning within Existing Frameworks - Session 4 Managing Project Preparation ...
PPTX
Climate Change Processes and Impacts - Session 3 Managing Project Preparation...
PPTX
Narrowing the Options A Economic Considerations - Session 7 Managing Project ...
PPTX
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
PPTX
Understanding and Articulating the Problem - Session 6 Managing Project Prepa...
PPTX
Narrowing the Options B Social and Evironmental Considerations - Session 8 Ma...
PPTX
Understanding Basic Risk Management System - Session 5 Managing Project Prep...
PPTX
Understanding the Finanacial Landscape - Session 2 Managing Project Preparati...
Planning within Existing Frameworks - Session 4 Managing Project Preparation ...
Climate Change Processes and Impacts - Session 3 Managing Project Preparation...
Narrowing the Options A Economic Considerations - Session 7 Managing Project ...
Developing a Project Logic/Results Framework - Session 9 Managing Project Pre...
Understanding and Articulating the Problem - Session 6 Managing Project Prepa...
Narrowing the Options B Social and Evironmental Considerations - Session 8 Ma...
Understanding Basic Risk Management System - Session 5 Managing Project Prep...
Understanding the Finanacial Landscape - Session 2 Managing Project Preparati...

What's hot (20)

PPTX
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
PPTX
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
PPTX
NAP Training Viet Nam - Mainstreaming Climate Change Adaptation into Planning...
PPTX
NAP Training Viet Nam - Session 8 Moving Toward Actions
PDF
NAP Training Viet Nam - Designing and Monitoring Gender Indicators in Climate...
PPTX
NAP Training Viet Nam - Session 6 Monitoring and Evaluation
PPTX
NAP Training Viet Nam - Stock Taking for National Adaptation Planning
PPTX
Analysis of Cost and Schedule Performance of International Development Projects
PDF
Strategic Environmental Assessment and International System Development
PDF
Paul Gilliland Marine Planning in England What are we learning?
PPTX
Designing redd+ projects johnp
PPTX
Strategic environmental assessment for energy production
PDF
Compiling the NAP
PPT
Public Sector Enterprise Risk Management
PDF
Christian B Wunsch - Resume V2.1 Linked In
PPT
The Duty – Experience from examinations
PPTX
Concept & Classification of Project - Entrepreneurship Development
PPT
Community associations budgeting
PPT
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Blended Finance - Session 11 Managing Project Preparation for Climate Change ...
NAP Training Viet Nam - Session 7 Appraising Adaptation Options
NAP Training Viet Nam - Mainstreaming Climate Change Adaptation into Planning...
NAP Training Viet Nam - Session 8 Moving Toward Actions
NAP Training Viet Nam - Designing and Monitoring Gender Indicators in Climate...
NAP Training Viet Nam - Session 6 Monitoring and Evaluation
NAP Training Viet Nam - Stock Taking for National Adaptation Planning
Analysis of Cost and Schedule Performance of International Development Projects
Strategic Environmental Assessment and International System Development
Paul Gilliland Marine Planning in England What are we learning?
Designing redd+ projects johnp
Strategic environmental assessment for energy production
Compiling the NAP
Public Sector Enterprise Risk Management
Christian B Wunsch - Resume V2.1 Linked In
The Duty – Experience from examinations
Concept & Classification of Project - Entrepreneurship Development
Community associations budgeting
Progress towards Results: Overall Performance Study of the GEF (IWC5 Presenta...
Ad

Viewers also liked (9)

PPTX
Designing a Sustainable Public-Private Partnership - Session 10 Managing Proj...
DOCX
PDF
RAPTA - Training-Workshop to Develop Concept Notes of Indigenous Peoples for ...
PPTX
NAP Training Viet Nam - Session 2 Conceptual Understanding of the NAP Process
PDF
NAP Training Viet Nam - Mainstreaming Ecosystem-Based Adaptation in Viet Nam
PPTX
NAP Training Viet Nam - Vulnerability and Adapting to Climate Change
PDF
NAP Training Viet Nam - Mainstreaming Climate Change and Public Expenditures ...
PDF
NAP Training Viet Nam - Cost Benefit Analysis and Development Adaptation Options
PDF
NAP Training Viet Nam - Climate Change and Viet Nam's NAP
Designing a Sustainable Public-Private Partnership - Session 10 Managing Proj...
RAPTA - Training-Workshop to Develop Concept Notes of Indigenous Peoples for ...
NAP Training Viet Nam - Session 2 Conceptual Understanding of the NAP Process
NAP Training Viet Nam - Mainstreaming Ecosystem-Based Adaptation in Viet Nam
NAP Training Viet Nam - Vulnerability and Adapting to Climate Change
NAP Training Viet Nam - Mainstreaming Climate Change and Public Expenditures ...
NAP Training Viet Nam - Cost Benefit Analysis and Development Adaptation Options
NAP Training Viet Nam - Climate Change and Viet Nam's NAP
Ad

Similar to Managing Design Phase Tasks for Climate Change Adaptation Projects - Session 12 Managing Project Preparation for Climate Change Adaptation (20)

PPTX
Top Pillars | PMP training I Mr. Riad Thalji
PDF
Overview of Project Management in Bangladesh.pdf
PPTX
Introduction to Project Managment a busin
PPT
Fundamentals of Project Management
PPT
Project management_0.ppt
PPTX
pmi project management principles.pptx
PDF
NCET Biz Bite | Project Management Tips and Tools | January 2018
PDF
PROJECT MANAGEMENT_Framework.pdf
PDF
Project Management Toolkit_Final v1.0
PPTX
Introduction to Project Management 9 May 2023-1.pptx
PPTX
OIT Project Management - Day 1
PPTX
OIT Project Management - Day 1
PPTX
Elements of Project Management
PPTX
Elements of Project Management
PDF
PMI Project Management fundamentos basicos
PDF
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
PPTX
Introduction to PM & Roles and responsibilities of project manager.pptx
PDF
Project management
PDF
Project Design and Management
PPTX
Project management lecture 33.pptx
Top Pillars | PMP training I Mr. Riad Thalji
Overview of Project Management in Bangladesh.pdf
Introduction to Project Managment a busin
Fundamentals of Project Management
Project management_0.ppt
pmi project management principles.pptx
NCET Biz Bite | Project Management Tips and Tools | January 2018
PROJECT MANAGEMENT_Framework.pdf
Project Management Toolkit_Final v1.0
Introduction to Project Management 9 May 2023-1.pptx
OIT Project Management - Day 1
OIT Project Management - Day 1
Elements of Project Management
Elements of Project Management
PMI Project Management fundamentos basicos
GAFM Academy - THE ESSENTIALS OF PLANNING AND SCOPING A PROJECT
Introduction to PM & Roles and responsibilities of project manager.pptx
Project management
Project Design and Management
Project management lecture 33.pptx

More from UNDP Climate (20)

PDF
Adaptation Innovation Marketplace
PPTX
UNDP Climate Change Adaptation Impact
PPTX
Coordinating NDCs and NAPs - Addressing agricultural resilience in long term ...
PPTX
NAP-Ag - Addressing agricultural resilience in long term climate planning ins...
PPTX
Uganda - Addressing agricultural resilience in long term climate planning ins...
PDF
Nap Ciudades Uruguay
PDF
Climate Change Adaptation in the Arab States
PDF
National Adaptation Plans in Uruguay - A Sectoral Approach
PPTX
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
PPTX
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
PPTX
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
PDF
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
PDF
Uruguay Case Study - NAP-Ag Programme
PDF
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
PDF
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
PDF
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
PDF
Building Institutional Capacity in Thailand to Design and Implement Climate P...
PDF
Building Institutional Capacity in Thailand to Design and Implement Climate P...
PDF
Building Institutional Capacity in Thailand to Design and Implement Climate P...
PPTX
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...
Adaptation Innovation Marketplace
UNDP Climate Change Adaptation Impact
Coordinating NDCs and NAPs - Addressing agricultural resilience in long term ...
NAP-Ag - Addressing agricultural resilience in long term climate planning ins...
Uganda - Addressing agricultural resilience in long term climate planning ins...
Nap Ciudades Uruguay
Climate Change Adaptation in the Arab States
National Adaptation Plans in Uruguay - A Sectoral Approach
Country Experiences Malawi and Nepal - National Adaptation Plans under the UN...
UNFCCC Overview of Process to Formulate and Implement NAPs - National Adaptat...
Climate Finance - National Adaptation Plans under the UNFCCC Process - Webinar
UNDP-FAO Integrating Agriculture in National Adaptation Plans Highlights
Uruguay Case Study - NAP-Ag Programme
FAO-UNDP Integrating Agriculture in National Adaptation Plans programme (NAP-...
Kenya Case Study - FAO-UNDP Integrating Agriculture in National Adaptation Pl...
Thailand UNDP-GIZ workshop on CBA - Appraisal outcomes
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Building Institutional Capacity in Thailand to Design and Implement Climate P...
Thailand UNDP-GIZ workshop on CBA - Effective water management and sustainabl...

Recently uploaded (20)

PPTX
SOMANJAN PRAMANIK_3500032 2042.pptx
PDF
26.1.2025 venugopal K Awarded with commendation certificate.pdf
PPTX
26.1.2025 venugopal K Awarded with commendation certificate.pptx
PPTX
Weekly Report 17-10-2024_cybersecutity.pptx
PDF
How FPOs Are Reshaping Agriculture in Maharashtra?
PDF
PPT - Primary Rules of Interpretation (1).pdf
PPTX
STG - Sarikei 2025 Coordination Meeting.pptx
PDF
Creating Memorable Moments_ Personalized Plant Gifts.pdf
PDF
Items # 6&7 - 900 Cambridge Oval Right-of-Way
PPTX
Portland FPDR Oregon Legislature 2025.pptx
PDF
Storytelling youth indigenous from Bolivia 2025.pdf
PDF
Courtesy Meeting NIPA and MBS Australia.
PDF
Item # 2 - 934 Patterson Specific Use Permit (SUP)
PPTX
Nur Shakila Assesmentlwemkf;m;mwee f.pptx
PPT
Adolescent Health Orientation and Health care
PDF
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
PDF
Abhay Bhutada and Other Visionary Leaders Reinventing Governance in India
PPTX
The DFARS - Part 250 - Extraordinary Contractual Actions
PPTX
GOVERNMENT-ACCOUNTING1. bsa 4 government accounting
PDF
ISO-9001-2015-gap-analysis-checklist-sample.pdf
SOMANJAN PRAMANIK_3500032 2042.pptx
26.1.2025 venugopal K Awarded with commendation certificate.pdf
26.1.2025 venugopal K Awarded with commendation certificate.pptx
Weekly Report 17-10-2024_cybersecutity.pptx
How FPOs Are Reshaping Agriculture in Maharashtra?
PPT - Primary Rules of Interpretation (1).pdf
STG - Sarikei 2025 Coordination Meeting.pptx
Creating Memorable Moments_ Personalized Plant Gifts.pdf
Items # 6&7 - 900 Cambridge Oval Right-of-Way
Portland FPDR Oregon Legislature 2025.pptx
Storytelling youth indigenous from Bolivia 2025.pdf
Courtesy Meeting NIPA and MBS Australia.
Item # 2 - 934 Patterson Specific Use Permit (SUP)
Nur Shakila Assesmentlwemkf;m;mwee f.pptx
Adolescent Health Orientation and Health care
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
Abhay Bhutada and Other Visionary Leaders Reinventing Governance in India
The DFARS - Part 250 - Extraordinary Contractual Actions
GOVERNMENT-ACCOUNTING1. bsa 4 government accounting
ISO-9001-2015-gap-analysis-checklist-sample.pdf

Managing Design Phase Tasks for Climate Change Adaptation Projects - Session 12 Managing Project Preparation for Climate Change Adaptation

  • 1. USAID Climate Change Adaptation Project Preparation Facility for Asia and the Pacific (USAID Adapt Asia-Pacific) Session 12: Managing Design Phase Tasks for Climate Change Adaptation Projects January 19, 2017
  • 2. USAID Adapt Asia-Pacific Course Overview • Day 1: Project Presentations, Climate Finance, and Climate Impacts • Day 2: Planning, Risk Management, and “Bounding” the Project • Day 3: Economic Analysis, Safeguards, and Project Logic • Day 4: Public-Private Partnerships, Blended Finance, & Managing Project Design • Day 5: Monitoring & Evaluation and Final Presentations
  • 3. USAID Adapt Asia-Pacific Orientation to Process Project Concept Recruit Design Team Project design & Management framework Economic, Social & Env’t Analyses Project Appraisal Project Approval • Project need has been identified • Develop Terms of Reference (TOR) • Recruit design team • Design team conducts feasibility study • Government appraises feasibility study • Approved feasibility incorporates appraisal findings • Project document for financial approval and implementation Project Design
  • 4. USAID Adapt Asia-Pacific Project Cycle Responsibilities Project Cycle Step Who’s Responsible? Managerial Responsibilities 1. Climate policy & strategy Government Be informed and alert 2. Project design Financier, lead agency, contractor (design team) Project concept, TOR for design, supervision of contractors 3. Project appraisal Financier, lead agency, contractor Verify quality, feedback. Yes/no 4. Project implementation Implementing entity Supervision, reports 5. Monitoring & evaluation Implementing entity Supervision
  • 5. USAID Adapt Asia-Pacific PREPARING FOR PROJECT DESIGN 5
  • 6. USAID Adapt Asia-Pacific Revisiting the Project Cycle RESULTS Policy & Strategy Project Design Implementation Appraisal/ Approval • Project Concept • Recruit Design Team • Project Design & Management Framework • Economic, Social, and Environmental Analyses
  • 7. USAID Adapt Asia-Pacific Project Concept: Urban Water Supply and Wastewater Management in Fiji Project Concept Recruit Design Team Project design & Management framework Economic, Social & Env’t Analyses Project Appraisal Project Approval • ADB and Fiji agree on the project concept • TA Report is prepared to obtain funds for project preparation. It covers: • (i) Issues • (ii) Impact and Outcome • (iii) Methodology and Key Activities • (iv) Cost and Financing • (v) Implementation Project Design
  • 8. USAID Adapt Asia-Pacific Terms of Reference: Urban Water Supply and Wastewater Management in Fiji Project Concept Recruit Design Team Project design & Management framework Economic, Social & Env’t Analyses Project Appraisal Project Approval • Attached to the TA report discussed in the previous slide is a Design and Monitoring Framework, Cost Estimate and Financing Plan and outline TOR • The TOR sets out the following: • (i) Overview • (ii) Scope of Work • (iii) Reporting and Schedule Project Design
  • 9. USAID Adapt Asia-Pacific Design Team Recruited for: Urban Water Supply and Wastewater Management in Fiji • Following the approval of the TA report that sets out the project concept, scope of work, TOR, cost and financing, implementation arrangements and reporting schedule, a design team can be recruited to undertake the Feasibility Study • Allow about 8-10 weeks for bids by shortlisted consulting firms, evaluation of bids and award of contract. Then the FS team is fielded and starts work This Module discusses your role in recruiting the design team and supervising the project design process Project Design Project Concept Recruit Design Team Project design & Management framework Economic, Social & Env’t Analyses Project Appraisal Project Approval
  • 10. USAID Adapt Asia-Pacific Economic, Social, & Environmental Analysis Timeline Inception Report: 1 Month • Coordinate meetings & review of inception report • Agree with design team on details in final inception report Draft Feasibility Study: 4 Months • Coordinate meetings & review draft feasibility report • Appraise project: Yes/No decision • Provide revisions for final feasibility report Final Feasibility Study: 1 Month • Coordinate with design team • Review and approve final feasibility report Design & Management Framework. Economic, social, environmental analyses Comply with requirements of financier Draft Feasibility Study Address gov’t & financier appraisal edits and revisions  final feasibility report & project document Design Team Responsibilities (CONDUCT) Management Team Responsibilities (SUPERVISE) Consultations with government, preliminary visits, develop work plan, budgetinception report Final Project Document
  • 11. USAID Adapt Asia-Pacific Session 12 Objectives 121.A. Identify key principles associated with organizing and structuring a government management team. 12.1.B. Describe necessary components for a Terms of Reference and will apply best practices to the development of their own TORs. 12.1.C. Describe key considerations and milestones associated with consultant selection. 12.1.D. Explain key considerations for negotiating a consulting agreement. 12.1.E. Describe management team responsibilities related to logistics, setup, and orientation once the design team is recruited.
  • 12. USAID Adapt Asia-Pacific The Manager’s Task: ENSURE QUALITY • Be aware and beware of “consultant bias”! • Bear in mind political and social feasibility issues for potential project activities • Assess the capabilities of the implementing entities or agencies
  • 13. USAID Adapt Asia-Pacific Enabling Effective Project Design Management Team Terms of Reference Consultant Selection & Negotiating Agreement Logistics & Orientation
  • 14. USAID Adapt Asia-Pacific Your Management Team • Primary function: support and oversee the design team • Identify the most relevant institutional partners & clarify responsibilities • Identify and liaise with key stakeholders • Ensure allocation of sufficient resources • Avoid interagency politics
  • 15. USAID Adapt Asia-Pacific ADB Considerations for Consultants • Need for high-quality services • Need for economy and efficiency • Need to give all qualified consultants an opportunity to compete in providing the services financed by ADB • ADB’s interest in encouraging the development and use of national consultants from developing member countries • Need for transparency in selection process • Need for increasing focus on anticorruption and observance of ethics
  • 16. USAID Adapt Asia-Pacific Terms of Reference (TOR) I. Introduction II. Objectives III. Deliverables IV. Team composition & time V. Background & stakeholders VI. Issues to address, SOW, mid- term review VII. Qualifications & experience VIII.Duration & reporting IX. Implementation arrangements X. Information details & references XI. Budget & implementation schedule The quality of TORs and the budget available to undertake project preparation can significantly affect the quality of the project proposal!
  • 17. USAID Adapt Asia-Pacific Typical Team Composition • Team leader • Gender & social inclusion • Technical specialists depending on sector • Economic & financial analyst(s) • Environment specialist • Climate specialist • Other specialists depending on circumstances (e.g. legal, governance, institutions)
  • 18. USAID Adapt Asia-Pacific Consultant selection • Shortlisting • Request for proposals (RFP) • Bids • Bid evaluation Know your country’s rules and procedures!
  • 19. USAID Adapt Asia-Pacific Negotiating a Consulting Agreement • Explicit discussion of all aspects of the TOR • Follow procedures required by project financier • Supervision of consultants • Clear channels of communication Clarity up front helps to ensure quality results! How to drive away good professionals (or “how to fail”) • Cheapest = best • Nepotism, favoritism • Inadequate budget or time • Lack of support/confidence
  • 20. USAID Adapt Asia-Pacific Logistics & Orientation • Office logistics • Transport services • Secretarial & banking • Arrange orientation visits • Facilitate contacts with stakeholders Don’t be a “gatekeeper”
  • 21. USAID Adapt Asia-Pacific Session 12 Question 1 What types of experts will be required on your project design team, and how much time will be required for each expert?
  • 22. USAID Adapt Asia-Pacific Session 12 Question 2 Does your country have specific guidelines for the hiring of consultants? If so, have you familiarized yourself with these procedures? Where should you go if you have questions about these procedures?
  • 23. USAID Adapt Asia-Pacific Resources for Session 12 • General Procedures for Selecting and Engaging Consultants. ADB 2014. • Guidelines on the Use of Consultants by ADB & its Borrowers. ADB 2013. • Guidelines for Selection and Employment of Consultants by World Bank Borrowers. World Bank 1997.