Confidential & Property of Manni Group
OFF-SITE BUILDING SYSTEM
STEEL TECHNOLOGY
Building Engineering & Modular Buildings
2019, October
Confidential & Property of Manni Group
Manni Group S.p.a.
The Strenght of a Group
MANNI GROUP promotes innovation in the
processing and use of steel for all
applications, developing solutions and
engineering services to meet the
structural, energy efficiency and
sustainability needs of companies, users
and consumers of different markets.
Manni Group is committed to promoting
sustainable, safe and efficient
construction through constant efforts in
the research and development of products,
services and solutions for steel
constructions and the diffusion of
renewable energy sources.
Confidential & Property of Manni Group
Manni Green Tech operates in the market of
quality prefabricated constructions, offering
modular and scalable buildings using lightweight
steel structures and drywalling, which can be
combined with hot rolled steel structures for
special projects and can be implemented with
different kinds of high-performance panels
solutions.
Prefab Buildings achieve important results in
terms of waste reduction, minimization of waste
at construction sites, improvement of working
conditions and quick construction times.
These buildings stand out for being anti-seismic
and for their energy performance and material
recyclability.
The future of the
building industry
Confidential & Property of Manni Group
• Architectural Design and customization
• Architecture and design connected to the
structural and engineering features of
the building
• Digital processes linking production and
design phases
• Products certification and process
optimization
CFS (cold formed steel) Technology
Confidential & Property of Manni Group
Our sevices
Preliminary
Design
Support
Workshop and
Working drawings
Project managementEngineering
& Structural
Design
Logistic following
on site works need
From design idea to
industrialisation
Confidential & Property of Manni Group
From design to logistic:
1 - DESIGN
Support the customer from the early design
phases to find the technological solutions that
best meet the needs of the specific project.
Our qualified ingeneers are the best support in
combining the best technologies and
performances.
Thanks to integration with latest generation
software MGT engineers can quickly and
accurately produce structural calculations for
buildings.
Our services
Confidential & Property of Manni Group
From design to logistic:
2 – MANUFACTURING
Thanks to the careful design and digitisation of
processes, structures are produced with maximum
precision and quality. Construction times can be
significantly reduced thanks to the millimetric
precision of factory production. Each structure
and coating component is designed in detail by
the latest technology system to match perfectly.
Great attention is paid to the choice of
materials and their supply to meet construction
site needs and provide the best possible service
to customers during construction.
Our services
Confidential & Property of Manni Group
From design to logistic:
3 – ASSEMBLY (OFF-SITE)
Respect of times and construction quality
through the qualified network of on and off-
site installers. Clean, safe, rapid
construction site thanks to the attention
paid to materials and coordination of
activities with production the integrated
logistics service, can follow the needs of
each customer.
Our services
Confidential & Property of Manni Group
Case histories
Confidential & Property of Manni Group
Confidential & Property of Manni Group
Suriname
• Logistic hub in Italy
• 100 containers shipped
• Easy and fast installation
• Building V was erected in 9 weeks (3.000 sqm -
120 ton)
• Accurate design: time savings and no waste of
mterials
• Dorms: 180 bedroom
• Canteen: 500 people
Anton De Kom University
Confidential & Property of Manni Group
Confidential & Property of Manni Group
Domaine de Chateau
Nzeb Building
Confidential & Property of Manni Group
General info
Partnership:
• REAL ESTATE & GC
Steel home Srl
Two-family house , 598 sqm
Start works: 12 Apr. 2018
End works: 29 Nov. 2018
Foundation: 1 month
Steel structure: 3 months
Envelope: 2 months
Systems: 2 months
Internal finshing: 1 month
External finishing: 2 months
Transport : 14 trucks for envelope materials and steel structures
Timeline
Confidential & Property of Manni Group
Global energy performances:
• Primary energy demand: 35,3Kwh/mq per year
• Eenrgy demand - heating: 16,6 Kwh/mq per year
Trasmittance of the envelope :
• External Walls: 0,15 W/mqK
• Flat roof: 0,14 W/mqK
• Windows : 0,86 W/mqK
Systems
• Heat pumps + geothermal vertical system
NZEB building
Walls:
• Acoustic performances requirement: Rw 55 db
• Separation walls between two residential unit - requirement Rw 52 db
• Acoustic performance gained – external wall: Rw 65 db
• Acoustic performance gained – separation wall : Rw 61 db
• Fire resistance: REI 90
Contact us
www.mannigreentech.com
sales.mgt@mannigroup.co
11/10/2019 15

More Related Content

DOC
rgb up to date cv
DOC
F. King CV- Jan 2015
PDF
CURRICULUM VITAE Mike Bainbridge 2015 PDF
PDF
CV ziad 2015 09
PPT
About Mro Facilities
DOCX
Christopher Moore
PPTX
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
PDF
LCIC 2018,Berlin, Raul Carlsson 2018 08-31
rgb up to date cv
F. King CV- Jan 2015
CURRICULUM VITAE Mike Bainbridge 2015 PDF
CV ziad 2015 09
About Mro Facilities
Christopher Moore
IQ Academy Lunch & Learn Webinar | Basis of Plant Design with Nick Peatling |...
LCIC 2018,Berlin, Raul Carlsson 2018 08-31

What's hot (12)

PDF
Eng. Muhammad Hegazy Resume #11-2015
PDF
Cv marc andré gauvin en 2015
PDF
RefCard_Altamira CitecDot_11-2016_EN
PDF
BIM Portfolio
PPTX
PDF
1255 - Roy Hill Port Landside
PPTX
Tippo International
PDF
Tippo International
PPT
Precast concrete architecture in spain and latin america
PDF
Ck21 presentation team 3
DOC
Saed Obied Resume
PDF
Construction Estimate, Finding natives
Eng. Muhammad Hegazy Resume #11-2015
Cv marc andré gauvin en 2015
RefCard_Altamira CitecDot_11-2016_EN
BIM Portfolio
1255 - Roy Hill Port Landside
Tippo International
Tippo International
Precast concrete architecture in spain and latin america
Ck21 presentation team 3
Saed Obied Resume
Construction Estimate, Finding natives
Ad

Recently uploaded (20)

PDF
Unit1 - AIML Chapter 1 concept and ethics
PDF
20250617 - IR - Global Guide for HR - 51 pages.pdf
PPTX
Software Engineering and software moduleing
PPTX
mechattonicsand iotwith sensor and actuator
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PDF
Cryptography and Network Security-Module-I.pdf
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PDF
Introduction to Power System StabilityPS
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
PPTX
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
DOC
T Pandian CV Madurai pandi kokkaf illaya
PPTX
Information Storage and Retrieval Techniques Unit III
PPT
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
Petroleum Refining & Petrochemicals.pptx
PPTX
Principal presentation for NAAC (1).pptx
PDF
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PPTX
PRASUNET_20240614003_231416_0000[1].pptx
PDF
August -2025_Top10 Read_Articles_ijait.pdf
Unit1 - AIML Chapter 1 concept and ethics
20250617 - IR - Global Guide for HR - 51 pages.pdf
Software Engineering and software moduleing
mechattonicsand iotwith sensor and actuator
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Cryptography and Network Security-Module-I.pdf
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Introduction to Power System StabilityPS
Soil Improvement Techniques Note - Rabbi
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
CONTRACTS IN CONSTRUCTION PROJECTS: TYPES
T Pandian CV Madurai pandi kokkaf illaya
Information Storage and Retrieval Techniques Unit III
Chapter 1 - Introduction to Manufacturing Technology_2.ppt
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Petroleum Refining & Petrochemicals.pptx
Principal presentation for NAAC (1).pptx
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PRASUNET_20240614003_231416_0000[1].pptx
August -2025_Top10 Read_Articles_ijait.pdf
Ad

Manni Green Tech _Building the future

  • 1. Confidential & Property of Manni Group OFF-SITE BUILDING SYSTEM STEEL TECHNOLOGY Building Engineering & Modular Buildings 2019, October
  • 2. Confidential & Property of Manni Group Manni Group S.p.a. The Strenght of a Group MANNI GROUP promotes innovation in the processing and use of steel for all applications, developing solutions and engineering services to meet the structural, energy efficiency and sustainability needs of companies, users and consumers of different markets. Manni Group is committed to promoting sustainable, safe and efficient construction through constant efforts in the research and development of products, services and solutions for steel constructions and the diffusion of renewable energy sources.
  • 3. Confidential & Property of Manni Group Manni Green Tech operates in the market of quality prefabricated constructions, offering modular and scalable buildings using lightweight steel structures and drywalling, which can be combined with hot rolled steel structures for special projects and can be implemented with different kinds of high-performance panels solutions. Prefab Buildings achieve important results in terms of waste reduction, minimization of waste at construction sites, improvement of working conditions and quick construction times. These buildings stand out for being anti-seismic and for their energy performance and material recyclability. The future of the building industry
  • 4. Confidential & Property of Manni Group • Architectural Design and customization • Architecture and design connected to the structural and engineering features of the building • Digital processes linking production and design phases • Products certification and process optimization CFS (cold formed steel) Technology
  • 5. Confidential & Property of Manni Group Our sevices Preliminary Design Support Workshop and Working drawings Project managementEngineering & Structural Design Logistic following on site works need From design idea to industrialisation
  • 6. Confidential & Property of Manni Group From design to logistic: 1 - DESIGN Support the customer from the early design phases to find the technological solutions that best meet the needs of the specific project. Our qualified ingeneers are the best support in combining the best technologies and performances. Thanks to integration with latest generation software MGT engineers can quickly and accurately produce structural calculations for buildings. Our services
  • 7. Confidential & Property of Manni Group From design to logistic: 2 – MANUFACTURING Thanks to the careful design and digitisation of processes, structures are produced with maximum precision and quality. Construction times can be significantly reduced thanks to the millimetric precision of factory production. Each structure and coating component is designed in detail by the latest technology system to match perfectly. Great attention is paid to the choice of materials and their supply to meet construction site needs and provide the best possible service to customers during construction. Our services
  • 8. Confidential & Property of Manni Group From design to logistic: 3 – ASSEMBLY (OFF-SITE) Respect of times and construction quality through the qualified network of on and off- site installers. Clean, safe, rapid construction site thanks to the attention paid to materials and coordination of activities with production the integrated logistics service, can follow the needs of each customer. Our services
  • 9. Confidential & Property of Manni Group Case histories Confidential & Property of Manni Group
  • 10. Confidential & Property of Manni Group Suriname • Logistic hub in Italy • 100 containers shipped • Easy and fast installation • Building V was erected in 9 weeks (3.000 sqm - 120 ton) • Accurate design: time savings and no waste of mterials • Dorms: 180 bedroom • Canteen: 500 people Anton De Kom University
  • 11. Confidential & Property of Manni Group
  • 12. Confidential & Property of Manni Group Domaine de Chateau Nzeb Building
  • 13. Confidential & Property of Manni Group General info Partnership: • REAL ESTATE & GC Steel home Srl Two-family house , 598 sqm Start works: 12 Apr. 2018 End works: 29 Nov. 2018 Foundation: 1 month Steel structure: 3 months Envelope: 2 months Systems: 2 months Internal finshing: 1 month External finishing: 2 months Transport : 14 trucks for envelope materials and steel structures Timeline
  • 14. Confidential & Property of Manni Group Global energy performances: • Primary energy demand: 35,3Kwh/mq per year • Eenrgy demand - heating: 16,6 Kwh/mq per year Trasmittance of the envelope : • External Walls: 0,15 W/mqK • Flat roof: 0,14 W/mqK • Windows : 0,86 W/mqK Systems • Heat pumps + geothermal vertical system NZEB building Walls: • Acoustic performances requirement: Rw 55 db • Separation walls between two residential unit - requirement Rw 52 db • Acoustic performance gained – external wall: Rw 65 db • Acoustic performance gained – separation wall : Rw 61 db • Fire resistance: REI 90