Project Warehouse
MATERIAL CONTROL MANAGEMENT
Summarized Workflow
Warehouse Service
2. Unloading 3. Conference 4. Storage 5. Registration 7. Inventory
6. Material
Release
1. Pre-inspection
Inbound Outbound
Additional
Control
Pre-inspection of
the cargo outside
the project gate
house prior to the
receiving,
checking visible
damages and
documentation.
Unloading the
goods with
cranes and/or
forklifts, based on
the size and
weight,
separating on
pre-defined areas
for further
checking.
Quantity and
quality
conference
based on packing
lists and delivery
notes, identifying
possible non
conformances.
Storage of the
materials in pre-
defined areas,
with pre-defined
locations and
according to the
storage plan and
TAG.
Registration of all
packing lists
received,
confirming the
locations and
comparing the
estimated x
received
quantities and
specs.
Separation and
issuance of
material when
requested by the
contractors.
Periodic
inventories, to
check the
completeness of
the items,
location and
specs.
Main Activities
Warehouse Service
• Management of the warehouse operations, such as, inbound, outbound and inventories of all the items procured
by the client for the project, providing reports and controlling pre-established KPI´s;
• Preparation of storage layouts and storage plans, to define the warehouse locations and position of each
material prior to the receiving;
• Implementation and definition of the barcode labels in steel structures and conveyor systems together with the
suppliers, to guarantee a visual and clear information about each part, improving the warehouse operation and
the erection performance;
• Registration in the Warehouse management system of all inbound and outbound operations, providing reliable
and controlled information over the material received and issued to the contractors at site;
• Provide support to the client for the payment of invoices related to material supply, keeping available all
necessary documents and reports;
• Document control and archiving of all the packing lists, delivery notes, pick slips, Non Conformance Reports,
PO´s, supplier manuals and certificates received during the project;
• Inventories at the warehouses and storage areas to ensure the completeness of the items, avoiding surprises
with missing and damaged parts during the erection;
• Control over the preservation/conservation plan, ensuring the integrity of the materials and equipments during
the storage period;
• Technical support to the erection teams on meetings and action plans, with reports and statistics regarding the
material received;
Warehouse Mangement System
Warehouse Service
Reports / Inventory Sheets
Pick Slips
Packing Lists
Input Output
NCR´s
PO´s
MTO´s
System
Warehouse
Management System
WMS & ERP SAP (Payment and Transfer of Spare Parts) - Example
Warehouse Service
Input OutputSystem
Confirmation of receiving by the
warehouse (TAG, Weight and Quantities)
Goods Receipt in SAP (MIGO) and
Payment according with the
material received by the warehouse
Invoice Payed
The spare parts identified by the
warehouse are transferred to the
SAP system
Warehouse
Management System
Spare Parts are registered and identified
in the WMS using the SAP number from
the Master Data
The Spare parts are now stock
items in SAP and can be physically
transferred to the operation
warehouse
Warehouse
Management System
Warehouse Service
The necessary
Preservation
services are carried
out
Equipment is
TAGGED with the
preservation label
The preservation
control sheet is
update with
relevant
informations
The next
preservation
checking dates are
defined
Equipment inspected
Cargo is inspected
with the
preservation check-
list of each
discipline
- The equipments that need some kind of preservation during the storage period are checked during the
receiving using the check-list of preservation created based in other projects.
Preservation Process
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
See note 1
Responsible:
2013
Preservation Label of Material and Equipment
TAG: Monthly activities concluded:
E M I
TAG:
Description:
Location: W1 W2 SY1 SY2
Area:
ITEM Yes No NA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PRESERVATION RECORD - ELECTRICAL EQUIPMENT
Inspector:
Date:
Inspection
Number:
GU-C-013E
Rev.0
The insulation resistance was measured in a period not older than 1 month
from the delivery date?
The non-terminated cable ends are sealed with heat shrink or shrinking
shroud?
All spare cable entrances in panels and boxes are plugged?
Manufacturer:
DESCRIPTION
The electric or electronic equipment exposed to humidity is protected with
desiccant or vapor corrosion inhibitor?
The electrical heater is being preserved according with the supplier's
preservation instructions?
The electrical heater resistance or another anti-condensation system is
safely connected electrically?
Electrical panel cable termination point protected with temporary blind plug?
Lubricate door hinges, grease nipples and fastener?
Sensitive equipment stored indoor in heated and humidity controlled storage
areas?
All the gaskets and O-rings are greased with acid free vaseline or equal?
All exposed unpainted-machined surfaces coated with rust preventive wax?
Stored level for electrical transformer is in recommended hight?
Openings of electrical panels is protected againts moisture or dust
contaminations?
Equipment supplied with inert gas, the pressure is measured periodically
according to the manufacture's instruction?
Preservation/Conservation of Materials (Examples)
Warehouse Service
Conveyor Drives energized and protected from rain and sun. Cold Room for storage of fragile instruments.
Pulleys and Idlers protected
from sun and rain.
Previous Project – Storage Areas
Warehouse Service
Previous Project – Storage Areas
Warehouse Service
Previous Project – Storage Areas
Warehouse Service

More Related Content

PPT
5 Ways To Improve Warehouse
PPTX
04 Warehousing - KPIs and targets.pptx
PDF
Lean logistics and warehousing final
PPTX
Physical inventory & warehouse layout planning
PDF
Storage & warehousing
PPT
Storemanagement
PPTX
Warehouse and Logistics Sessions 1 - 2 (Day 1)
5 Ways To Improve Warehouse
04 Warehousing - KPIs and targets.pptx
Lean logistics and warehousing final
Physical inventory & warehouse layout planning
Storage & warehousing
Storemanagement
Warehouse and Logistics Sessions 1 - 2 (Day 1)

What's hot (20)

PPTX
WAREHOUSE OPERATION
PPTX
WAREHOUSE .pptx
PPT
Managing warehouse operations. How to manage and run warehouse operations by ...
PPT
Warehouse management and operations. How to increase eirther the performances...
PPT
Inventory control
PPTX
Warehouse system racking and mapping
PPTX
Warehouselayout
PPTX
Stores presentations
PPTX
Lean Inventory
PDF
Leaning The Warehouse
PDF
Stores and store keeping
PPTX
Presentation on picking
PPTX
Purchase management
PPTX
Store mgmt
PPT
Warehouse management system
PPTX
Warehouse Operations and WMS
PPTX
WMS (Warehouse Management System)
PDF
10 Tips to Improve Your Warehouse Productivity
PPS
Purchase Presentation 1
WAREHOUSE OPERATION
WAREHOUSE .pptx
Managing warehouse operations. How to manage and run warehouse operations by ...
Warehouse management and operations. How to increase eirther the performances...
Inventory control
Warehouse system racking and mapping
Warehouselayout
Stores presentations
Lean Inventory
Leaning The Warehouse
Stores and store keeping
Presentation on picking
Purchase management
Store mgmt
Warehouse management system
Warehouse Operations and WMS
WMS (Warehouse Management System)
10 Tips to Improve Your Warehouse Productivity
Purchase Presentation 1
Ad

Viewers also liked (12)

PPT
Material Control- techniques
PDF
5S: A Lean Transformation Tool
PPTX
Material management & Inventory control
PDF
Project Management Plan - Cafe Au Lait.PDF
PPTX
Material Management & Inventory Management
PDF
Warehousing layout-design-and-processes-setup
PPT
Materials Management
DOC
Project Management Plan Template
PPTX
5 s powerpoint presentation
PPTX
Building Construction
DOC
Sample project plan
PDF
Setting up a Project Management Office (PMO)
Material Control- techniques
5S: A Lean Transformation Tool
Material management & Inventory control
Project Management Plan - Cafe Au Lait.PDF
Material Management & Inventory Management
Warehousing layout-design-and-processes-setup
Materials Management
Project Management Plan Template
5 s powerpoint presentation
Building Construction
Sample project plan
Setting up a Project Management Office (PMO)
Ad

Similar to Material control in projects (20)

PPT
Warehousing management final copy
PPTX
Warehousing, stuff to know before discussing how to go digital
PPTX
WAREHOUSING AND STORAGE IN SUPPLY CHAIN MANAGEMENT
DOC
warehouse-checklist.doc
PPTX
Management 106
PPT
Presentation On Warehousing
PDF
Warehousing unit -1 study material about warehousing
PDF
PPTX
INDUSTRIAL TRAINING PHASE 1 PPT.pptx
PPTX
WAREHOUSING MANAGEMENT | Supply Chain Management
PPT
WAREHOUSING MANAGEMENT inward and outward final_copy.ppt
PPT
WAREHOUSING_MANAGEMENT_final_copy_1.ppt parung panjang
PPT
WAREHOUSING MANAGEMENT final_copy.ppt
PPT
WAREHOUSING MANAGEMENT file in belize org
PPTX
WAREHOUSING MANAGEMENT final_copy (1).pptx
PPTX
โลจิสติกส์
PDF
AAYUSH SRIVASTAVA-2123-SCM-001.pdf
PPT
Saner Tanju Atis_ Material Management System Industrial
PPT
NNR Shanghai new tapa wh
PPT
WAREHOUSING MANAGEMENT final_copy (1).ppt
Warehousing management final copy
Warehousing, stuff to know before discussing how to go digital
WAREHOUSING AND STORAGE IN SUPPLY CHAIN MANAGEMENT
warehouse-checklist.doc
Management 106
Presentation On Warehousing
Warehousing unit -1 study material about warehousing
INDUSTRIAL TRAINING PHASE 1 PPT.pptx
WAREHOUSING MANAGEMENT | Supply Chain Management
WAREHOUSING MANAGEMENT inward and outward final_copy.ppt
WAREHOUSING_MANAGEMENT_final_copy_1.ppt parung panjang
WAREHOUSING MANAGEMENT final_copy.ppt
WAREHOUSING MANAGEMENT file in belize org
WAREHOUSING MANAGEMENT final_copy (1).pptx
โลจิสติกส์
AAYUSH SRIVASTAVA-2123-SCM-001.pdf
Saner Tanju Atis_ Material Management System Industrial
NNR Shanghai new tapa wh
WAREHOUSING MANAGEMENT final_copy (1).ppt

Recently uploaded (20)

PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
86236642-Electric-Loco-Shed.pdf jfkduklg
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PPTX
Current and future trends in Computer Vision.pptx
PDF
PPT on Performance Review to get promotions
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
communication and presentation skills 01
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
III.4.1.2_The_Space_Environment.p pdffdf
Information Storage and Retrieval Techniques Unit III
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
86236642-Electric-Loco-Shed.pdf jfkduklg
Categorization of Factors Affecting Classification Algorithms Selection
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Current and future trends in Computer Vision.pptx
PPT on Performance Review to get promotions
Fundamentals of Mechanical Engineering.pptx
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
Visual Aids for Exploratory Data Analysis.pdf
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Fundamentals of safety and accident prevention -final (1).pptx
communication and presentation skills 01
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Abrasive, erosive and cavitation wear.pdf
III.4.1.2_The_Space_Environment.p pdffdf

Material control in projects

  • 2. Summarized Workflow Warehouse Service 2. Unloading 3. Conference 4. Storage 5. Registration 7. Inventory 6. Material Release 1. Pre-inspection Inbound Outbound Additional Control Pre-inspection of the cargo outside the project gate house prior to the receiving, checking visible damages and documentation. Unloading the goods with cranes and/or forklifts, based on the size and weight, separating on pre-defined areas for further checking. Quantity and quality conference based on packing lists and delivery notes, identifying possible non conformances. Storage of the materials in pre- defined areas, with pre-defined locations and according to the storage plan and TAG. Registration of all packing lists received, confirming the locations and comparing the estimated x received quantities and specs. Separation and issuance of material when requested by the contractors. Periodic inventories, to check the completeness of the items, location and specs.
  • 3. Main Activities Warehouse Service • Management of the warehouse operations, such as, inbound, outbound and inventories of all the items procured by the client for the project, providing reports and controlling pre-established KPI´s; • Preparation of storage layouts and storage plans, to define the warehouse locations and position of each material prior to the receiving; • Implementation and definition of the barcode labels in steel structures and conveyor systems together with the suppliers, to guarantee a visual and clear information about each part, improving the warehouse operation and the erection performance; • Registration in the Warehouse management system of all inbound and outbound operations, providing reliable and controlled information over the material received and issued to the contractors at site; • Provide support to the client for the payment of invoices related to material supply, keeping available all necessary documents and reports; • Document control and archiving of all the packing lists, delivery notes, pick slips, Non Conformance Reports, PO´s, supplier manuals and certificates received during the project; • Inventories at the warehouses and storage areas to ensure the completeness of the items, avoiding surprises with missing and damaged parts during the erection; • Control over the preservation/conservation plan, ensuring the integrity of the materials and equipments during the storage period; • Technical support to the erection teams on meetings and action plans, with reports and statistics regarding the material received;
  • 4. Warehouse Mangement System Warehouse Service Reports / Inventory Sheets Pick Slips Packing Lists Input Output NCR´s PO´s MTO´s System Warehouse Management System
  • 5. WMS & ERP SAP (Payment and Transfer of Spare Parts) - Example Warehouse Service Input OutputSystem Confirmation of receiving by the warehouse (TAG, Weight and Quantities) Goods Receipt in SAP (MIGO) and Payment according with the material received by the warehouse Invoice Payed The spare parts identified by the warehouse are transferred to the SAP system Warehouse Management System Spare Parts are registered and identified in the WMS using the SAP number from the Master Data The Spare parts are now stock items in SAP and can be physically transferred to the operation warehouse Warehouse Management System
  • 6. Warehouse Service The necessary Preservation services are carried out Equipment is TAGGED with the preservation label The preservation control sheet is update with relevant informations The next preservation checking dates are defined Equipment inspected Cargo is inspected with the preservation check- list of each discipline - The equipments that need some kind of preservation during the storage period are checked during the receiving using the check-list of preservation created based in other projects. Preservation Process Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec See note 1 Responsible: 2013 Preservation Label of Material and Equipment TAG: Monthly activities concluded: E M I TAG: Description: Location: W1 W2 SY1 SY2 Area: ITEM Yes No NA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 PRESERVATION RECORD - ELECTRICAL EQUIPMENT Inspector: Date: Inspection Number: GU-C-013E Rev.0 The insulation resistance was measured in a period not older than 1 month from the delivery date? The non-terminated cable ends are sealed with heat shrink or shrinking shroud? All spare cable entrances in panels and boxes are plugged? Manufacturer: DESCRIPTION The electric or electronic equipment exposed to humidity is protected with desiccant or vapor corrosion inhibitor? The electrical heater is being preserved according with the supplier's preservation instructions? The electrical heater resistance or another anti-condensation system is safely connected electrically? Electrical panel cable termination point protected with temporary blind plug? Lubricate door hinges, grease nipples and fastener? Sensitive equipment stored indoor in heated and humidity controlled storage areas? All the gaskets and O-rings are greased with acid free vaseline or equal? All exposed unpainted-machined surfaces coated with rust preventive wax? Stored level for electrical transformer is in recommended hight? Openings of electrical panels is protected againts moisture or dust contaminations? Equipment supplied with inert gas, the pressure is measured periodically according to the manufacture's instruction?
  • 7. Preservation/Conservation of Materials (Examples) Warehouse Service Conveyor Drives energized and protected from rain and sun. Cold Room for storage of fragile instruments. Pulleys and Idlers protected from sun and rain.
  • 8. Previous Project – Storage Areas Warehouse Service
  • 9. Previous Project – Storage Areas Warehouse Service
  • 10. Previous Project – Storage Areas Warehouse Service