The document contains 28 multiple choice questions about system analysis and design life cycle phases including:
- Requirements determination aims to determine what information is needed by an organization. Requirements can be determined through interviews and prioritization is necessary due to constraints.
- Requirement specification is carried out after requirements are determined and the role of an analyst is similar to an architect. Consultation with top, middle, and operational managers as well as users is important.
- A feasibility study is carried out before finalizing requirements specifications to assess if requirements can be met given constraints. The study is conducted by analysts in consultation with managers.
- Final specifications are drawn up by analysts in consultation with management to communicate to management how