SlideShare a Scribd company logo
Mechanical Design Of Transmission Line
(In context of Nepal)
PRESENTED BY
SHULAB SHRESTHA
Third Year
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 1
Introduction:
WHY OVERHEAD LINES???
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 2
ELECTRICAL CONSIDERATIONS FOR TRANSMISSION LINE DESIGN:
 LOW VOLTAGE DROP
 MINIMUM POWER LOSS FOR HIGH EFFICIENCY OF POWER
TRANSMISSION.
 THE LINE SHOULD HAVE SUFFICIENT CURRENT CARRYING CAPACITY SO
THAT THE POWER CAN BE TRANSMITTED WITHOUT EXCESSIVE VOLTAGE
DROP OR OVERHEATING.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 3
The underground cables are rarely used for power transmission due to two main
reasons.
installation costs for underground transmission will be very heavy.
proper insulation to the cables to withstand higher pressures.
Why Not UNDERGROUND CABLES???
Therefore, it has limited use for
distribution in congested areas where
safety and good appearances are the
main considerations.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 4
Main Components of Overhead Lines
1. Conductors
2. Supports: Towers, Poles
3. Insulators: attached to supports and insulate the conductors from the ground.
4. Cross arms: support to the insulators and conductor
5. Guys and Stays: cables fastened to the poles to support the poles
6. Lightening arresters: to discharge excess voltage due to lightening to earth
7. Fuses and Isolation Switches: to isolate different parts of the overhead system
8. Guard Wires: above or below power lines while crowing telephone line to prevent
electromagnetic interference
9. Miscellaneous items: Phase Plate, Danger Plate, Barbed Wire, Vibration Dampers
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 5
Main Components of Overhead Lines
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 6
Main Components of Overhead Lines
GUYS AND STAYS
FUSE
BIRD
GUARDS
GUARD
WIRE
LIGHTENING
ARRESTORS
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 7
CONDUCTOR MATERIALS
• High Electrical Conductivity
• High Tensile Strength
• Low Cost
• Low Specific Gravity
• Easy Availability
• Not so brittle
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 8
COMMONLY USED CONDUCTOR MATERIALS
• Copper
• Aluminum
• Steel-Cored Aluminum
• Galvanized Steel
• Cadmium Copper
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 9
COPPER
• High Electrical Conductivity
 Low resistance = 16.78 nΩ•m at 20 °C
 High Current Density
• Greater Tensile Strength
• Small Cross Section Area
 Low wind resistance → less transverse load in tower
• Expensive
• Durable, high scrap value
• Scarcity
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 10
ALUMINUM
• Cheap and light compare to copper
• Less electrical conductivity and tensile strength
 Conductance = 60% that of copper for same cross section
 For same resistance areaAl = 1.26 areaCu
• Specific gravity of aluminum is less than copper.
 Less weight on supports
 generate greater swings hence large cross arms required
• Low melting point → cannot withstand short-circuit currents
• Used for low voltage distribution lines
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 11
STEEL CORED ALUMINUM
ASCR(Aluminum Conductor Steel Reinforced)
• Core of galvanized steel, aluminum conductors it outer layers
• Cross section ratio steel : Al is 1:6 (1:4 for high tensile strength)
• Increase tensile strength
 less sag
 greater span
 lesser tower height
• Universally used in transmission and
distribution
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 12
GALVANIZED STEEL
• High tensile strength → greater span
• Low conductivity → greater cross sectional area
• Eddy current and hysteresis loss
• Used in small power, small distance system where required cross
section is very low for ACSR or Copper
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 13
CADMIUM COPPER
• Cadmium and Copper alloy
• 1-2% cadmium is added to copper → increase tensile strength by 50%
• Long span is possible
• Expensive
• Used in small power where cross section required is small
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 14
SUPPORTS
Line supports should have following properties:
i. High mechanical strength to withstand the weight of conductors and
wind loads
ii. Light in weight
iii. Economical in cost and maintenance
iv. Longer life
v. Easy accessibility for conductors and insulators for maintenance
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 15
TYPES OF LINE SUPPORTS
1. Wooden Poles
 Cannot be used for high voltage > 20 KV
 Less mechanical strength
 Short life time 20-25 years
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 16
TYPES OF LINE SUPPORTS
2. Steel Poles
 Greater mechanical strength
 Longer life 40 years
 Longer spans 50-80 m
 Lighter in weight
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 17
TYPES OF LINE SUPPORTS
3. RCC Poles
 Reinforced Cement Concrete
 Greater mechanical strength
 Longer life than steel poles
 Longer spans 80-200 m
 Used for up to 33 KV
 Good insulating
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 18
TYPES OF LINE SUPPORTS
4. Steel Tower
 Assembly of galvanized angle sections
 Used for long distance transmission and high voltage (>66 KV)
 Greater mechanical strength, longer life, longer spans than RCC or
steel poles
 High tower → lightening hazard → tower footing grounded to
bypass lightening
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 19
TYPES OF LINE SUPPORTS
220 KV double circuit
transmission tower
220 KV single circuit
transmission tower
110 KV single circuit
transmission tower
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 20
IN CONTEXT OF NEPAL
Pre stressed concrete (PSC) Poles
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 21
IN CONTEXT OF NEPAL
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 22
INSULATOR
Line conductors should be insulated from support system
 to prevent leakage to ground
To prevent potential hazard due to the leakage
 Insulation required depends upon voltage level
Materials: porcelain, glass, rubber
In Nepal Porcelain insulator is largely used
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 23
INSULATOR
The insulators should have the following desirable properties :
1. High mechanical strength
2. High electrical resistance
3. High relative permittivity of insulator material in order that dielectric
strength is high.
4. High ratio of puncture strength to flashover.
5. Economical in cost and maintenance.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 24
TYPES OF INSULATOR
Pin Type Suspension Type Strain Type
Shackle Stay
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 25
TRANSMISSION LINE CHALLENGES IN NEPAL
 There is no access to power for the approx. 58 percent of population.
 NEA has the monopoly in electricity.
 Over the period of 100 years, Nepal has built just 981 KM circuit of transmission line
 which clearly shows NEA has rarely shown any interest in the transmission line
 According to 20 year power generation report :- If Nepal’s economy had a capacity to
absorb 11500 MW (peak hour), it would have required 845 KM long 400 KV lines, the
total cost for which would have been Rs 41 billion and for 612 north south 400 KV
would required Rs 33 billion and for 612 north south 400 KV would require Rs 33
billion.
 If Nepal builds this transmission line, there will be a rush of investors to invest in
Nepal. In case, India agrees, even Nepal will be able to export its power to Bangladesh.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 26
TRANSMISSION LINE CHALLENGES IN NEPAL
 NEA is planning to expand its transmission line to 3272 KM or circuit. This includes 78 kilometers of 33 KV,
1409 kilometers of 132 KV, 755 KM of 200 KV and 1030 KM of 400 KV in the coming ten years.
 to complete this project NEA needs huge amount of investment and manpower (technicians).
 The corridor transmission line projects include Kabeli Damak 132, Kosi corridor (Bashantapur-Kusha) 220
KV, Katari-Okhaldhunga, Solu, Singati-Lamosanghu,Sunkosi-Dolkha,Ramecchap –Garjyan-Khimti, Middle
Marsyangdi-Manang, Kaligandaki 220 KV, Katari-Okhaldhunga-Solu, Singati-Lamosanghu, Sunkosi-Dolkha,
Ramecchap-Garjyan-Khimit, Middle Marsyangdi-Manang, Karnali Corridor (Lamki-Upper Karnali)132 KV.
Under the absorption project are Thanko-Chapagaun-Bhaktapur, 132 KV, Syangja132 substation, Kamane
Substation, Kushum-Hapure 132 KV transmission line, Butwal-Kohalpur, Chapali 132, Matatirtha 132 kv
station. Similarly, the primary phase of project include Bajhang-Dipayal-Attariya Transmission line, Hapure-
Tulsipur Transmission line Surkhet-Dailekh-Jumla Transmission like, Kaligandai-Gulmi (Jhimruk)132 kv
Transmission line, Hetauda Butwal 400 KV Transmission line, Butwal-Lamki 400 KV Transmission line and
Lamki- Mahendranagar 400 KV Transmission line.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 27
TRANSMISSION LINE CHALLENGES IN NEPAL
 Out of all those corridor transmission project NEA has completed just 2 projects.
Hetauda-Kamane 132/33kV Substation Matatirtha Substation Expansion work
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 28
TRANSMISSION LINE CHALLENGES IN NEPAL
 Without construction of transmission lines, one cannot expect any private investment
and even NEA cannot build any project.
 The government has no plans to construct the transmission line in the attractive power
generation sites like road.
 Land acquisition is one of the major challenges for the construction of transmission line.
 Construction of transmission line is matter of major debate and controversy.
 Even the government agrees to construct the transmission line; it has to face several
hurdles at the implementation stage from the people.
For instance, the second circuit of Heatuda Dhalkebar 132 KV Transmission line took a
decade to complete. Thankot, Chapagaun and Bhaktapur (132 KV) Transmission line
project was canceled due to opposition from people.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 29
TRANSMISSION LINE CHALLENGES IN NEPAL
 Private investment company shows
hesitation in investment mainly for
one reasons lack of commitment on
the construction of transmission line
NEA Annual Report 2014
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 30
TRANSMISSION LINE CHALLENGES IN NEPAL
 Nepal-India Transmission line has another painful story to tell.
 Whether to import power from India or to export, Nepal needs grid connection with
India. With the fund available from the World Bank, Nepal-India agreed to complete the
Dhalkebar- Mujafarpur 400 KV transmission line by 2014. However, no progress has
been made yet on the project.
 The annual peak power demand of the Integrated Nepal Power System (INPS) in fiscal
year 2013/14 is estimated to be 1,201 MW, Compared to the preceding fiscal year’s
figure of 1,094.6 MW, the annual peak power demand of the INPS registered a
growth rate of 9.7 %.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 31
TRANSMISSION LINE CHALLENGES IN NEPAL
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 32
TRANSMISSION LINE CHALLENGES IN NEPAL
 The dream to end the immediate load shedding of Nepal by importing electricity
through this grid seems to be just a dream.
 In conclusion, if NEA and government does not give grid development project the
upmost priority, Nepal seems to fail in development in Hydropower.
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 33
REFRENCES
 http://www.slideshare.net/Dhananjayjha2043/electrical-transmission-
line?related=2
 http://www.conceptohub.com/lesson/mechanical-design-of-overhead-
transmission/
 http://www.slideshare.net/search/slideshow?searchfrom=header&q=CONDUCTOR
 https://en.wikipedia.org/wiki/Transmission_tower
 http://www.tpub.com/neets/book4/11e.htm
 file:///C:/Users/Sulav/Downloads/Transmission%20Line%20Challenges%20_%20Ne
wSpotLight%20Nepal%20News%20Magazine.htm
 http://www.bnmahtogroup.com/industry_register/nepal-poles-industries-pvt-ltd/
 http://www.nea.org.np/anual-report.html
 Book : Principle of power System V.K. Mehta
17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 34
THANK YOU

More Related Content

PPT
Switchyard
PPTX
Upfc & fact
PPTX
Power factor
PPTX
SUBSTATION OVERVIEW - A presentation on substation
PPTX
1.substation layouts
PPTX
Electric substation
PPT
PDF
Electrical bus bar and its types
Switchyard
Upfc & fact
Power factor
SUBSTATION OVERVIEW - A presentation on substation
1.substation layouts
Electric substation
Electrical bus bar and its types

What's hot (20)

PPT
transmission line
PDF
Construction EHV Transmission Line
PPTX
Design of substation
PPSX
Substations
PPTX
33kv substation
DOCX
Electrical substations: 132 KV
PDF
Electrical SUBSTATION ppt
PDF
Difference of CT & PT
PPT
Chapter 2 transmission line parameters
PPTX
presentation on substation layout and BUS bar arrangement.
PDF
33/11 KV SUBSTATION
PDF
Electrical Power substation
PPTX
Presentation on 132/33 KVSubstation Training
PDF
POWER SYSTEM SIMULATION - 2 LAB MANUAL (ELECTRICAL ENGINEERING - POWER SYSTEMS)
PPTX
Resistance potential divider
PDF
Training at 132 kv substation
PDF
Basic Electrical Engineering
PPT
Operation and maintenance of transformer
PPTX
Presentation on Distribution Transformer by nirob dhilon chowdhury
transmission line
Construction EHV Transmission Line
Design of substation
Substations
33kv substation
Electrical substations: 132 KV
Electrical SUBSTATION ppt
Difference of CT & PT
Chapter 2 transmission line parameters
presentation on substation layout and BUS bar arrangement.
33/11 KV SUBSTATION
Electrical Power substation
Presentation on 132/33 KVSubstation Training
POWER SYSTEM SIMULATION - 2 LAB MANUAL (ELECTRICAL ENGINEERING - POWER SYSTEMS)
Resistance potential divider
Training at 132 kv substation
Basic Electrical Engineering
Operation and maintenance of transformer
Presentation on Distribution Transformer by nirob dhilon chowdhury
Ad

Viewers also liked (20)

PPTX
Electrical transmission line
PPT
Problems in overhead transmission line
PPT
Tl pre-foundation
PDF
INSULATORS AND ITS TYPES
PDF
Electrical Design of Transmission Line
DOCX
Transmission and distribution line design final
PDF
Surge impedance sil
PPTX
Mechanical design of overhead lines
PDF
PPTX
A mini project on the transmission tower
PPTX
Transmisiion line design concept
PPTX
Types of insulator
ODT
Switchyards (outdoor substations), part 1
PDF
Energy management and energy audit in rupandehi
PPTX
Mechanical Design of Overhead Lines
PDF
Design of transmission lines in india a review of multiple swing angle
PPT
Indian Power Sector- A Study of Effectiveness of Past Power Sector Reforms an...
PDF
Seismic response of transmission tower a case study
PPTX
Attenuation and surge impedance loading
PDF
Tower smart tower_detailing_tips_series_3
Electrical transmission line
Problems in overhead transmission line
Tl pre-foundation
INSULATORS AND ITS TYPES
Electrical Design of Transmission Line
Transmission and distribution line design final
Surge impedance sil
Mechanical design of overhead lines
A mini project on the transmission tower
Transmisiion line design concept
Types of insulator
Switchyards (outdoor substations), part 1
Energy management and energy audit in rupandehi
Mechanical Design of Overhead Lines
Design of transmission lines in india a review of multiple swing angle
Indian Power Sector- A Study of Effectiveness of Past Power Sector Reforms an...
Seismic response of transmission tower a case study
Attenuation and surge impedance loading
Tower smart tower_detailing_tips_series_3
Ad

Similar to Mechanical Design of Transmission Line (In context of Nepal) (20)

DOCX
Electrical Engineering (EE) presentation on POWER CABLES
PDF
Patel Wire Industries, Nashik , Aluminum Wires
PDF
Nexans high-voltage.pdf
PDF
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
PDF
Circuits --Lec 1-Transmission Line_1.pdf
PDF
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
PDF
New generation of copper conductors for overhead lines
PDF
New generation of copper conductors for overhead lines
PPTX
SOUMADIP-FACT.pptx
DOCX
metro naveen
PPTX
ELECTRICAL POWER TRANSMISSION-3.pptx
PDF
presentation smart city projects and JMV Products
PPTX
Underground cables vs overhead lines
PPTX
YBCO: Superconductor
PDF
Conductor materials - Copper and its alternatives
PDF
Copper alloy conductors for overhead lines - CIGRÉ Regional South-East Europe...
PPTX
Cathodic prevention of steel rebars in concrete the international outlook
PDF
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
PDF
Materials for Electric Busways
PDF
Investigation into possible electrical fire outbreaks at welders’ worksho...
Electrical Engineering (EE) presentation on POWER CABLES
Patel Wire Industries, Nashik , Aluminum Wires
Nexans high-voltage.pdf
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Circuits --Lec 1-Transmission Line_1.pdf
Micro-alloyed copper overhead line conductors - PowerGrid International Augus...
New generation of copper conductors for overhead lines
New generation of copper conductors for overhead lines
SOUMADIP-FACT.pptx
metro naveen
ELECTRICAL POWER TRANSMISSION-3.pptx
presentation smart city projects and JMV Products
Underground cables vs overhead lines
YBCO: Superconductor
Conductor materials - Copper and its alternatives
Copper alloy conductors for overhead lines - CIGRÉ Regional South-East Europe...
Cathodic prevention of steel rebars in concrete the international outlook
Copper alloy conductors for overhead lines - Nordic Conference on Electricity...
Materials for Electric Busways
Investigation into possible electrical fire outbreaks at welders’ worksho...

Recently uploaded (20)

PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Soil Improvement Techniques Note - Rabbi
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
Feature types and data preprocessing steps
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPT
Total quality management ppt for engineering students
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Visual Aids for Exploratory Data Analysis.pdf
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Soil Improvement Techniques Note - Rabbi
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Abrasive, erosive and cavitation wear.pdf
Feature types and data preprocessing steps
III.4.1.2_The_Space_Environment.p pdffdf
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Total quality management ppt for engineering students
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Information Storage and Retrieval Techniques Unit III
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx

Mechanical Design of Transmission Line (In context of Nepal)

  • 1. Mechanical Design Of Transmission Line (In context of Nepal) PRESENTED BY SHULAB SHRESTHA Third Year 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 1
  • 2. Introduction: WHY OVERHEAD LINES??? 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 2 ELECTRICAL CONSIDERATIONS FOR TRANSMISSION LINE DESIGN:  LOW VOLTAGE DROP  MINIMUM POWER LOSS FOR HIGH EFFICIENCY OF POWER TRANSMISSION.  THE LINE SHOULD HAVE SUFFICIENT CURRENT CARRYING CAPACITY SO THAT THE POWER CAN BE TRANSMITTED WITHOUT EXCESSIVE VOLTAGE DROP OR OVERHEATING.
  • 3. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 3 The underground cables are rarely used for power transmission due to two main reasons. installation costs for underground transmission will be very heavy. proper insulation to the cables to withstand higher pressures. Why Not UNDERGROUND CABLES??? Therefore, it has limited use for distribution in congested areas where safety and good appearances are the main considerations.
  • 4. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 4 Main Components of Overhead Lines 1. Conductors 2. Supports: Towers, Poles 3. Insulators: attached to supports and insulate the conductors from the ground. 4. Cross arms: support to the insulators and conductor 5. Guys and Stays: cables fastened to the poles to support the poles 6. Lightening arresters: to discharge excess voltage due to lightening to earth 7. Fuses and Isolation Switches: to isolate different parts of the overhead system 8. Guard Wires: above or below power lines while crowing telephone line to prevent electromagnetic interference 9. Miscellaneous items: Phase Plate, Danger Plate, Barbed Wire, Vibration Dampers
  • 5. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 5 Main Components of Overhead Lines
  • 6. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 6 Main Components of Overhead Lines GUYS AND STAYS FUSE BIRD GUARDS GUARD WIRE LIGHTENING ARRESTORS
  • 7. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 7 CONDUCTOR MATERIALS • High Electrical Conductivity • High Tensile Strength • Low Cost • Low Specific Gravity • Easy Availability • Not so brittle
  • 8. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 8 COMMONLY USED CONDUCTOR MATERIALS • Copper • Aluminum • Steel-Cored Aluminum • Galvanized Steel • Cadmium Copper
  • 9. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 9 COPPER • High Electrical Conductivity  Low resistance = 16.78 nΩ•m at 20 °C  High Current Density • Greater Tensile Strength • Small Cross Section Area  Low wind resistance → less transverse load in tower • Expensive • Durable, high scrap value • Scarcity
  • 10. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 10 ALUMINUM • Cheap and light compare to copper • Less electrical conductivity and tensile strength  Conductance = 60% that of copper for same cross section  For same resistance areaAl = 1.26 areaCu • Specific gravity of aluminum is less than copper.  Less weight on supports  generate greater swings hence large cross arms required • Low melting point → cannot withstand short-circuit currents • Used for low voltage distribution lines
  • 11. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 11 STEEL CORED ALUMINUM ASCR(Aluminum Conductor Steel Reinforced) • Core of galvanized steel, aluminum conductors it outer layers • Cross section ratio steel : Al is 1:6 (1:4 for high tensile strength) • Increase tensile strength  less sag  greater span  lesser tower height • Universally used in transmission and distribution
  • 12. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 12 GALVANIZED STEEL • High tensile strength → greater span • Low conductivity → greater cross sectional area • Eddy current and hysteresis loss • Used in small power, small distance system where required cross section is very low for ACSR or Copper
  • 13. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 13 CADMIUM COPPER • Cadmium and Copper alloy • 1-2% cadmium is added to copper → increase tensile strength by 50% • Long span is possible • Expensive • Used in small power where cross section required is small
  • 14. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 14 SUPPORTS Line supports should have following properties: i. High mechanical strength to withstand the weight of conductors and wind loads ii. Light in weight iii. Economical in cost and maintenance iv. Longer life v. Easy accessibility for conductors and insulators for maintenance
  • 15. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 15 TYPES OF LINE SUPPORTS 1. Wooden Poles  Cannot be used for high voltage > 20 KV  Less mechanical strength  Short life time 20-25 years
  • 16. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 16 TYPES OF LINE SUPPORTS 2. Steel Poles  Greater mechanical strength  Longer life 40 years  Longer spans 50-80 m  Lighter in weight
  • 17. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 17 TYPES OF LINE SUPPORTS 3. RCC Poles  Reinforced Cement Concrete  Greater mechanical strength  Longer life than steel poles  Longer spans 80-200 m  Used for up to 33 KV  Good insulating
  • 18. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 18 TYPES OF LINE SUPPORTS 4. Steel Tower  Assembly of galvanized angle sections  Used for long distance transmission and high voltage (>66 KV)  Greater mechanical strength, longer life, longer spans than RCC or steel poles  High tower → lightening hazard → tower footing grounded to bypass lightening
  • 19. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 19 TYPES OF LINE SUPPORTS 220 KV double circuit transmission tower 220 KV single circuit transmission tower 110 KV single circuit transmission tower
  • 20. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 20 IN CONTEXT OF NEPAL Pre stressed concrete (PSC) Poles
  • 21. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 21 IN CONTEXT OF NEPAL
  • 22. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 22 INSULATOR Line conductors should be insulated from support system  to prevent leakage to ground To prevent potential hazard due to the leakage  Insulation required depends upon voltage level Materials: porcelain, glass, rubber In Nepal Porcelain insulator is largely used
  • 23. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 23 INSULATOR The insulators should have the following desirable properties : 1. High mechanical strength 2. High electrical resistance 3. High relative permittivity of insulator material in order that dielectric strength is high. 4. High ratio of puncture strength to flashover. 5. Economical in cost and maintenance.
  • 24. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 24 TYPES OF INSULATOR Pin Type Suspension Type Strain Type Shackle Stay
  • 25. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 25 TRANSMISSION LINE CHALLENGES IN NEPAL  There is no access to power for the approx. 58 percent of population.  NEA has the monopoly in electricity.  Over the period of 100 years, Nepal has built just 981 KM circuit of transmission line  which clearly shows NEA has rarely shown any interest in the transmission line  According to 20 year power generation report :- If Nepal’s economy had a capacity to absorb 11500 MW (peak hour), it would have required 845 KM long 400 KV lines, the total cost for which would have been Rs 41 billion and for 612 north south 400 KV would required Rs 33 billion and for 612 north south 400 KV would require Rs 33 billion.  If Nepal builds this transmission line, there will be a rush of investors to invest in Nepal. In case, India agrees, even Nepal will be able to export its power to Bangladesh.
  • 26. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 26 TRANSMISSION LINE CHALLENGES IN NEPAL  NEA is planning to expand its transmission line to 3272 KM or circuit. This includes 78 kilometers of 33 KV, 1409 kilometers of 132 KV, 755 KM of 200 KV and 1030 KM of 400 KV in the coming ten years.  to complete this project NEA needs huge amount of investment and manpower (technicians).  The corridor transmission line projects include Kabeli Damak 132, Kosi corridor (Bashantapur-Kusha) 220 KV, Katari-Okhaldhunga, Solu, Singati-Lamosanghu,Sunkosi-Dolkha,Ramecchap –Garjyan-Khimti, Middle Marsyangdi-Manang, Kaligandaki 220 KV, Katari-Okhaldhunga-Solu, Singati-Lamosanghu, Sunkosi-Dolkha, Ramecchap-Garjyan-Khimit, Middle Marsyangdi-Manang, Karnali Corridor (Lamki-Upper Karnali)132 KV. Under the absorption project are Thanko-Chapagaun-Bhaktapur, 132 KV, Syangja132 substation, Kamane Substation, Kushum-Hapure 132 KV transmission line, Butwal-Kohalpur, Chapali 132, Matatirtha 132 kv station. Similarly, the primary phase of project include Bajhang-Dipayal-Attariya Transmission line, Hapure- Tulsipur Transmission line Surkhet-Dailekh-Jumla Transmission like, Kaligandai-Gulmi (Jhimruk)132 kv Transmission line, Hetauda Butwal 400 KV Transmission line, Butwal-Lamki 400 KV Transmission line and Lamki- Mahendranagar 400 KV Transmission line.
  • 27. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 27 TRANSMISSION LINE CHALLENGES IN NEPAL  Out of all those corridor transmission project NEA has completed just 2 projects. Hetauda-Kamane 132/33kV Substation Matatirtha Substation Expansion work
  • 28. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 28 TRANSMISSION LINE CHALLENGES IN NEPAL  Without construction of transmission lines, one cannot expect any private investment and even NEA cannot build any project.  The government has no plans to construct the transmission line in the attractive power generation sites like road.  Land acquisition is one of the major challenges for the construction of transmission line.  Construction of transmission line is matter of major debate and controversy.  Even the government agrees to construct the transmission line; it has to face several hurdles at the implementation stage from the people. For instance, the second circuit of Heatuda Dhalkebar 132 KV Transmission line took a decade to complete. Thankot, Chapagaun and Bhaktapur (132 KV) Transmission line project was canceled due to opposition from people.
  • 29. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 29 TRANSMISSION LINE CHALLENGES IN NEPAL  Private investment company shows hesitation in investment mainly for one reasons lack of commitment on the construction of transmission line NEA Annual Report 2014
  • 30. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 30 TRANSMISSION LINE CHALLENGES IN NEPAL  Nepal-India Transmission line has another painful story to tell.  Whether to import power from India or to export, Nepal needs grid connection with India. With the fund available from the World Bank, Nepal-India agreed to complete the Dhalkebar- Mujafarpur 400 KV transmission line by 2014. However, no progress has been made yet on the project.  The annual peak power demand of the Integrated Nepal Power System (INPS) in fiscal year 2013/14 is estimated to be 1,201 MW, Compared to the preceding fiscal year’s figure of 1,094.6 MW, the annual peak power demand of the INPS registered a growth rate of 9.7 %.
  • 31. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 31 TRANSMISSION LINE CHALLENGES IN NEPAL
  • 32. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 32 TRANSMISSION LINE CHALLENGES IN NEPAL  The dream to end the immediate load shedding of Nepal by importing electricity through this grid seems to be just a dream.  In conclusion, if NEA and government does not give grid development project the upmost priority, Nepal seems to fail in development in Hydropower.
  • 33. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 33 REFRENCES  http://www.slideshare.net/Dhananjayjha2043/electrical-transmission- line?related=2  http://www.conceptohub.com/lesson/mechanical-design-of-overhead- transmission/  http://www.slideshare.net/search/slideshow?searchfrom=header&q=CONDUCTOR  https://en.wikipedia.org/wiki/Transmission_tower  http://www.tpub.com/neets/book4/11e.htm  file:///C:/Users/Sulav/Downloads/Transmission%20Line%20Challenges%20_%20Ne wSpotLight%20Nepal%20News%20Magazine.htm  http://www.bnmahtogroup.com/industry_register/nepal-poles-industries-pvt-ltd/  http://www.nea.org.np/anual-report.html  Book : Principle of power System V.K. Mehta
  • 34. 17 October 2016DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING 34 THANK YOU