MODULE 1
Process Planning and Standard
Time Calculation
Production System
Production system is a set of interacting
subsystems with the purpose of
transforming production inputs into
production outputs.
Production System
Production System Parameter
• Production
• Productivity
• Efficiency
• Effectiveness
• Utilitie
• Quality
• Capacity
MRP II (Manufacturing Resource Planning)
Relationship Between MRP and
MRP II
Just In Time (JIT)
• Just In Time is a production system or a modern
fabrication management system developed by
Japanese – American named Taichi Ohno of
Toyota motor vehicles companies.
• JIT is a concept in which the raw materials used
for production activity brought from the supplier of
the material was right on time needed by the
production process, so it will greatly save even
eliminate the cost of inventory.
• The tool that is used in the JIT called Kanban
Kanban
• JIT production system using a flow of
information in the form of a Kanban card-shaped
or other equipment such as flags, lights, and
others
7 types of waste
• Over production
• Waiting
• Transporting
• Unnecessary process
• Inventory
• Unnecessary movement
• Rejection
5 S
Bill Of Material (BOM)
• BOM (Bill of Material) is a list of the number of
components, material and the ingredients
Operation Process Chart
• Operation Process Chart is a chart performs the
process of raw material into a product which the
operation steps and inspection belongs.
OPC
• The Benefit of OPC:
 To know the production costs and machine
To know raw material spent (efficiency
consideration in each step and inspection)
A tool for layout and facilities design.
 A tool to diagnose work method.
 A tool for work experience
OPC sign
Standard Time
• Standard time is the time needed by the
worker on average to do the assignment
without pressure in a workstation.
• Methods to calculating:
a. Directly
b. Indirectly
Directly Methods
a. Stopwatch
The steps are:
– Measure the initial time per activity
– Uniformity test
– Sufficiency test
– Standard time decision
Directly Methods using
Stopwatch
• Uniform Test
• Sufficiency test:
If N’>N, then need more data
Standard Time Calculation
pWsWn
N
Ws xi
)1( kWnWb
Calculate the cycle time (Ws)
Calculate the standard time(Wb)
Calculate the normal time (Wn)
Standard time calculation(notes)
= total measurements times
N = Number of measurements
P (adjustment factors) = 1+∑operator
performance level
k = allowance
xi
Indirectly Calculation
a. Standard Time Data
Standard time data is an indirectly time
measurement, by tables, curves and formulas
gained by direct measurement. It is about the
historical data of time needed. In addition, the
standard time is known
a. Motion Time Data
It is different with company’s standard time which
has been developed. Motion time data uses
developed table by some institute

More Related Content

PPT
PPT
Work study method and time study-final - copy
PPTX
Time study
PPTX
Work study
PPT
Motion and Time Study Presentation Mayra Calderon.ppt
PPTX
Industrial engineering
PPTX
Work study work measurement
PPTX
cycle time, normal time and standard allowance
Work study method and time study-final - copy
Time study
Work study
Motion and Time Study Presentation Mayra Calderon.ppt
Industrial engineering
Work study work measurement
cycle time, normal time and standard allowance

What's hot (20)

PPTX
Manufacturing resource planning and capacity resource planning ppt
PPT
Method study
PPTX
7. work study and method measurement
PPTX
Performance rating
PPTX
Mba ii pmom_unit-1.2 production planning & control a
PDF
Production Planning and Control (PPC), Capacity Planning, Material Requiremen...
PPTX
QCO presentation
PDF
Time and Motion Study
PPSX
Aggregate planning
PPTX
Work measurement
PPT
Measurment techniques
PDF
8. chapter 7 work study (time and motion study)
PPT
PPTX
Line balancing
PPT
Purchase procedure
PPTX
ALLOWANCES
PPTX
Work measurement (1)
PPTX
assembly line balancing
PPT
Work factor-Anant Patel
Manufacturing resource planning and capacity resource planning ppt
Method study
7. work study and method measurement
Performance rating
Mba ii pmom_unit-1.2 production planning & control a
Production Planning and Control (PPC), Capacity Planning, Material Requiremen...
QCO presentation
Time and Motion Study
Aggregate planning
Work measurement
Measurment techniques
8. chapter 7 work study (time and motion study)
Line balancing
Purchase procedure
ALLOWANCES
Work measurement (1)
assembly line balancing
Work factor-Anant Patel
Ad

Viewers also liked (19)

PPTX
manufacturing resource planning
PDF
Design Assignment 1a Full Brief
PPT
D7 dell analysis
PDF
Calculation_Tubelock_Load_Capacity
PPT
Ratio analysis by Neeraj Bhandari ( Surkhet.Nepal )
PPTX
Managing inventory and work
PDF
Design With Solid works Software and Planning Calculation Analysis of Fire Tu...
PPT
Industrial Engineering Tools & Activities of a RMG !!!
PPT
Process Planning
PPTX
Work sampling
PPTX
Group Layout (Manufacturing Management)
PDF
MRP1 vs MRP2
PPTX
Facility location and layout planning
PDF
An Introduction to Operations Management
PPTX
Computer Aided Process Planning
PPTX
COMPUTER AIDED PROCESS PLANNING (CAPP)
PPTX
MRP I and MRP II
PPT
Capacity planning
DOC
Zuhaitz guztiak1
manufacturing resource planning
Design Assignment 1a Full Brief
D7 dell analysis
Calculation_Tubelock_Load_Capacity
Ratio analysis by Neeraj Bhandari ( Surkhet.Nepal )
Managing inventory and work
Design With Solid works Software and Planning Calculation Analysis of Fire Tu...
Industrial Engineering Tools & Activities of a RMG !!!
Process Planning
Work sampling
Group Layout (Manufacturing Management)
MRP1 vs MRP2
Facility location and layout planning
An Introduction to Operations Management
Computer Aided Process Planning
COMPUTER AIDED PROCESS PLANNING (CAPP)
MRP I and MRP II
Capacity planning
Zuhaitz guztiak1
Ad

Similar to Modul 1 process planning and standard time calculation (20)

PDF
LEAN STANDARDIZED WORK TOOL
PDF
standardised-work-overview-and-documents
DOCX
Standardization & digitalization of sewing operations
PPT
Generic Lean Overview For Future Employer Of Alan S Desrocher
PPTX
Standardised work for garment industry- Prakhar Jain
PDF
synopsis
PDF
Applying Lean Six Sigma to improve garment production processes-A case study
PDF
H0432045055
PPTX
tpsandleanmanufacturing-130709101251-phpapp01.pptx
PPTX
MRP,MRP-II,JIT
PPT
Chapter-4-Motion_and_Time_Study in industry.ppt
PPTX
2.IE Presentation.pptx
PPTX
3755921fdsgvd gfwgwgweg wgvwrgvwrvwevregwe
PPT
Just in-time systems
PDF
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
PPTX
Lean in fishing net
PDF
vignesh conference
PPTX
Work Measurement.pptx
PPTX
Chapter-7 Job Design and Work Measurement Final.pptx
PPT
Motion & time study
LEAN STANDARDIZED WORK TOOL
standardised-work-overview-and-documents
Standardization & digitalization of sewing operations
Generic Lean Overview For Future Employer Of Alan S Desrocher
Standardised work for garment industry- Prakhar Jain
synopsis
Applying Lean Six Sigma to improve garment production processes-A case study
H0432045055
tpsandleanmanufacturing-130709101251-phpapp01.pptx
MRP,MRP-II,JIT
Chapter-4-Motion_and_Time_Study in industry.ppt
2.IE Presentation.pptx
3755921fdsgvd gfwgwgweg wgvwrgvwrvwevregwe
Just in-time systems
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
Lean in fishing net
vignesh conference
Work Measurement.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
Motion & time study

Recently uploaded (20)

PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Getting Started with Data Integration: FME Form 101
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PPTX
cloud_computing_Infrastucture_as_cloud_p
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
TLE Review Electricity (Electricity).pptx
PDF
Empathic Computing: Creating Shared Understanding
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
OMC Textile Division Presentation 2021.pptx
PPTX
A Presentation on Artificial Intelligence
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
August Patch Tuesday
PPTX
Spectroscopy.pptx food analysis technology
PDF
A comparative study of natural language inference in Swahili using monolingua...
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Getting Started with Data Integration: FME Form 101
SOPHOS-XG Firewall Administrator PPT.pptx
cloud_computing_Infrastucture_as_cloud_p
Digital-Transformation-Roadmap-for-Companies.pptx
Per capita expenditure prediction using model stacking based on satellite ima...
Network Security Unit 5.pdf for BCA BBA.
TLE Review Electricity (Electricity).pptx
Empathic Computing: Creating Shared Understanding
Mobile App Security Testing_ A Comprehensive Guide.pdf
Encapsulation_ Review paper, used for researhc scholars
Agricultural_Statistics_at_a_Glance_2022_0.pdf
OMC Textile Division Presentation 2021.pptx
A Presentation on Artificial Intelligence
Advanced methodologies resolving dimensionality complications for autism neur...
NewMind AI Weekly Chronicles - August'25-Week II
August Patch Tuesday
Spectroscopy.pptx food analysis technology
A comparative study of natural language inference in Swahili using monolingua...

Modul 1 process planning and standard time calculation

  • 1. MODULE 1 Process Planning and Standard Time Calculation
  • 2. Production System Production system is a set of interacting subsystems with the purpose of transforming production inputs into production outputs.
  • 4. Production System Parameter • Production • Productivity • Efficiency • Effectiveness • Utilitie • Quality • Capacity
  • 5. MRP II (Manufacturing Resource Planning)
  • 7. Just In Time (JIT) • Just In Time is a production system or a modern fabrication management system developed by Japanese – American named Taichi Ohno of Toyota motor vehicles companies. • JIT is a concept in which the raw materials used for production activity brought from the supplier of the material was right on time needed by the production process, so it will greatly save even eliminate the cost of inventory. • The tool that is used in the JIT called Kanban
  • 8. Kanban • JIT production system using a flow of information in the form of a Kanban card-shaped or other equipment such as flags, lights, and others
  • 9. 7 types of waste • Over production • Waiting • Transporting • Unnecessary process • Inventory • Unnecessary movement • Rejection
  • 10. 5 S
  • 11. Bill Of Material (BOM) • BOM (Bill of Material) is a list of the number of components, material and the ingredients
  • 12. Operation Process Chart • Operation Process Chart is a chart performs the process of raw material into a product which the operation steps and inspection belongs.
  • 13. OPC • The Benefit of OPC:  To know the production costs and machine To know raw material spent (efficiency consideration in each step and inspection) A tool for layout and facilities design.  A tool to diagnose work method.  A tool for work experience
  • 15. Standard Time • Standard time is the time needed by the worker on average to do the assignment without pressure in a workstation. • Methods to calculating: a. Directly b. Indirectly
  • 16. Directly Methods a. Stopwatch The steps are: – Measure the initial time per activity – Uniformity test – Sufficiency test – Standard time decision
  • 17. Directly Methods using Stopwatch • Uniform Test • Sufficiency test: If N’>N, then need more data
  • 18. Standard Time Calculation pWsWn N Ws xi )1( kWnWb Calculate the cycle time (Ws) Calculate the standard time(Wb) Calculate the normal time (Wn)
  • 19. Standard time calculation(notes) = total measurements times N = Number of measurements P (adjustment factors) = 1+∑operator performance level k = allowance xi
  • 20. Indirectly Calculation a. Standard Time Data Standard time data is an indirectly time measurement, by tables, curves and formulas gained by direct measurement. It is about the historical data of time needed. In addition, the standard time is known a. Motion Time Data It is different with company’s standard time which has been developed. Motion time data uses developed table by some institute