WORK-FACTOR
PRESENTED BY: ANANT PATEL
MTO9IND010
M.Tech.
Industrial Engineering,
VNIT, NAGPUR.
2009-10
CONTENTS
 Introduction
 Types of predetermined time standards
 Definitions of Work-Factor terms
 Work-Factor Systems
• Detailed Work-Factor
• Simplified Work-Factor
• Abbreviated Work-Factor
• Ready Work-Factor
• Brief Work-Factor
• Detailed Mento-Factor
 Work-Factor notation
 Recording the Analysis
 Work-Factor standard elements of work
INTRODUCTION
 Work-Factor (WF) is an elemental time
systems for compiling time standards to
establish the expected productivity of the
human when performing useful manual and
mental work.
TYPES OF PREDETERMINED TIME STANDARDS
 Methods Time Analysis (MTA), 1925
 Work-Factor (WF), 1938
 Engstrom, 1940
 400 system, 1944
 Methods Time Measurements (MTM), 1948
 Methods Time Standards (MTS), 1950
 Basic Motion Timestudy (BMT), 1951
 Dimension Motion Time (DMT), 1954
 Maynard’s Operation Sequence Technique (MOST),1967
DEFINITIONS OF WORK-FACTOR TERMS
 Work-Factor Time
 Adequate Task Physique
 Adequate Task Intelligence
 Adequate Task Vision
 Work-Factor Analysis
 Basic Motion
 Work-Factor
 Work-Factor Standards Elements of Work
WORK-FACTOR SYSTEMS
 The requirements of work measurement vary
according to the factors of
 operation,
 uniformity,
 frequency of repetition,
 purpose of measurements....
 WF system consists integrated
systems….
 Detailed Work-Factor
 Simplified Work-Factor
 Ready Work-Factor
 Abbreviated Work-Factor
 Brief Work-Factor
 Detailed Mento Factor
DETAILED WORK-FACTOR
 DWF is utilized for operation which need
Accurate time standards.
 The Work-Factor system is based on the
principle that the Four Major Variables
which affect the time to perform manual
motions are:
1. Body Member used
2. Distance Moved
3. Manual Control required
4. weight or Resistance involved
1. Body Member
 7 definite body members…
1) Finger or Hand
2) Arm
3) Forearm Swivel
4) Trunk
5) Foot
6) Leg
7) Head
Time values for these body members are illustrated in
table.
2. Distance
 All distances are measurements in straight lines
between the starting and stopping points of the
motion as described by body members.
 Measured in inches.
 Tables specify the point at which various body
members motion has to be measured.
3. Manual control
 Definite Stop Work-Factor
 Steer Work-Factor
 Precaution Work-Factor
 Direction Change Work-Factor
• Its evaluation is made more difficult as
there is no physical measuring device
with which its effects can be checked
4. Weight or Resistance
 Effect of weight on time varies with
 Body Members used
 Sex of operator
 Measured in pounds for all Body
Members except Forearm Swivel.
 Forearm Swivel Motions are rotary,
measured in pound-inches of torque.
Work factor-Anant Patel
Work factor-Anant Patel
Work factor-Anant Patel
Work factor-Anant Patel
Work factor-Anant Patel
Work factor-Anant Patel
EXAMPLE 1
 ARM MOVES 18 inches to TOSS A
SMALL COIN IN A TRAY….
 Body member involve is Arm (A)
 Distance 18 inch
 No manual controls requirements
 Basic Motion
 As per table, value is 55, corresponds to
0.0055 minutes
WORK-FACTOR NOTATION
Body members Symbol
• Finger F
• Hand H
• Arm A
• Forearm Swivel FS
• Trunk T
• Foot Ft
• Leg L
• Head Turn HT
Work-Factors Symbols
• Weight W
• Steer S
• Precaution P
• Direction Change U
• Definite Stop D
RECORDING THE ANALYSIS
 Toss small part aside 10 in. (Basic Motion)
 A10
 0.0042 minutes
 Reach 30 inches to bolt in bin (Definite
Stop Motion)
 A30D
 0.0096 minutes
 Move 4 pound brick 30 in. from pile to
place on work table (Weight, Definite Stop
Motion)
 A30WD
 0.0119 minutes
WORK-FACTOR STANDARD
ELEMENTS OF WORK
 8 Work-Factor Standard Elements of
Work…
1. Transport (Reach & Move) (R, M)
2. Grasp (Gr)
3. Pre-position (PP)
4. Assemble (Asy)
5. Use (Manual, Process or Machine Time) (Use)
6. Disassemble (Dsy)
7. Mental Process (MP)
8. Release (Rl)
TRANSPORT
 The Standard Element Transport
involves a single motion by a given
body member.
 Reach
 Move
GRASP
 Act of obtaining Manual Control of an
object for the purpose of
transporting, using, or holding.
PRE-POSITION
 Act of turning or orienting an object to a
correct position for a subsequent Standard
Element of Work.
 A bolt 2 inches long weighing 3 pound can be
pre-positioned for assembly into a tapped hole
by turning it end-for-end with one hand. An
average of 3 Finger Motion is required to
complete the Pre-position.
 Analysis for this Pre-position is V3F1-50%.
ASSEMBLE
 Act of joining objects together or placing them
in useful locations.
 Assemble begins immediately after the Move
bringing the objects to a position where
Assemble can start.
 All Work-Factor Assembles utilize the concept
of Plug and Target, where a Plug is inserted
into or placed on a Target.
RELEASE
 Contact Release
 Gravity Release
 The Unwrap Release
MENTAL PROCESS
 Concurrent Mental Process
 Sequential Mental Process
SIMPLIFIED WORK-FACTOR
 General higher level system
 Suitable for medium quantity
production
 Developed from Detailed Work-Factor
 Quite effective in preparing estimates
before actual production starts.
ABBREVIATED WORK-FACTOR
 Developed from Detailed Work-Factor
 Suitable for small quantity job shops.
 Abbreviated time unit is 0.005
(recorded as 5) minutes rather than
0.0001 minutes used in the DWF.
 Accuracy of AWF is expected to
average +12 percent of the DWF.
READY WORK-FACTOR
 Based on Detailed Work-Factor
 Normally utilized in evaluating
manual work in industry.
 One Ready Units equals 10 Detailed
Work-Factor Time Units (0.0010
minutes)
 15 inch Arm factor with two Work-
Factor required 9 Ready Units, or
0.009 minute.
BRIEF WORK-FACTOR
 BWF system is relatively new and like
the AWF uses the time unit of 0.005
minute.
 It was developed to make the format
conform with the Detailed, and with
the Ready systems.
DETAILED MENTO FACTOR
 It is a basic level system which is
used for measuring mental processes
such as …
 Inspection
 Proof reading
 Colour matching
 Calculations
 Any repetitive predominantly mental
operation
References
 Quick J. H., Duncan J. H., Malcolm J. A., Jr.,
Work-Factor Time Standards, McGraw-Hill
Book Company, New York, 1962.
 Barnes R. M., Motion and Time Study- Design
and Measurement of Work, Seventh Edition,
John Wiley and Sons.
 Sharma S. K., Work Study and Ergonomics,
Katson Books, Delhi, 2003-04.
 ILO, Introduction to Work Study, vol-3, 1986.
THANK YOU

More Related Content

PPTX
Final line balancing ppt 4
PPTX
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PPTX
Micro-Macro Motion Study
PPTX
TIME STUDY
PPTX
Method study
PPTX
Assembly line balancing
PDF
Aiar. unit ii. transfer lines
PDF
Manual Assembly Lines
Final line balancing ppt 4
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
Micro-Macro Motion Study
TIME STUDY
Method study
Assembly line balancing
Aiar. unit ii. transfer lines
Manual Assembly Lines

What's hot (20)

PPT
Measurment techniques
PPTX
ALLOWANCES
PDF
Industrial engineering and management
PPT
Air compressor
DOCX
Method study
PPTX
Work study
PPTX
Most (Maynard Operation Sequence Technique)
PPTX
method study- micromotion vs memo motion
PPT
Flexible Manufacturing System
PPTX
Time study
PPT
Acutal Cycles and Their Analysis - Unit-I
PPT
Reliability and Maintenance in production Management
PPTX
Group Technology
PPT
Machine maintenance presentation
PPTX
Aircraft refrigeration system (air cooling system)
PPTX
Unit ii Process Planning
PPTX
CYCLE AND CHRONOCYCLE GRAPH
PDF
Electrochemical Machining
PPT
Work study method and time study-final - copy
Measurment techniques
ALLOWANCES
Industrial engineering and management
Air compressor
Method study
Work study
Most (Maynard Operation Sequence Technique)
method study- micromotion vs memo motion
Flexible Manufacturing System
Time study
Acutal Cycles and Their Analysis - Unit-I
Reliability and Maintenance in production Management
Group Technology
Machine maintenance presentation
Aircraft refrigeration system (air cooling system)
Unit ii Process Planning
CYCLE AND CHRONOCYCLE GRAPH
Electrochemical Machining
Work study method and time study-final - copy
Ad

Viewers also liked (20)

DOCX
estudio del trabajo
PPT
Ergonomics Presentation
PDF
Motion and time study
PPT
Motion economy and work design
DOCX
Métodos directos para solución de sistemas ecuaciones lineales
PPTX
Lecture 3 motion economy work study
PPT
Técnicas de estándares de tiempo
PPTX
Firewalls
PPT
Iso 9000 2000 Internal Audits
PPTX
District industries centres(dics)
PPTX
Principles of Motion Economy
PPTX
Iso 22000 2005 food safety management system certification practice guide
PPTX
The 'District Industries Centre' (DICs)
PPTX
District industrial centre2
PPT
Modapts
PPTX
PPT
Time And Motion Study
PPT
Motion And Time Study
PPT
ISO 9000 : 2000 Outline
estudio del trabajo
Ergonomics Presentation
Motion and time study
Motion economy and work design
Métodos directos para solución de sistemas ecuaciones lineales
Lecture 3 motion economy work study
Técnicas de estándares de tiempo
Firewalls
Iso 9000 2000 Internal Audits
District industries centres(dics)
Principles of Motion Economy
Iso 22000 2005 food safety management system certification practice guide
The 'District Industries Centre' (DICs)
District industrial centre2
Modapts
Time And Motion Study
Motion And Time Study
ISO 9000 : 2000 Outline
Ad

Similar to Work factor-Anant Patel (20)

PPT
Om4 bbm(l) 25.03.11
PPT
Line Balancing In Garments Industry
PPTX
BASICS OF MOST & ITS APPLICATION IN INDUSTRY
PPTX
Motion and time study english
PDF
A line in apparel
PPTX
02_Ch(2)_Work Systems and How They Work.pptx
PDF
Work measurement
PPTX
Time study part 2
DOCX
Therbligs details
PPT
Standardized Work
PPTX
ROBOT CYCLE TIME ANALYSIS
PPT
Work sample
PDF
30320140501002
PPT
Line balancing
PPT
Chapter-2-Manual_Work_and_Worker-MachineSystems.ppt
PDF
APPAREL PRODUCTION MANAGEMNET
PPTX
Maynards operation sequence technique
PPT
3...work study
PPT
Chapter 2 line_balancing no pics
Om4 bbm(l) 25.03.11
Line Balancing In Garments Industry
BASICS OF MOST & ITS APPLICATION IN INDUSTRY
Motion and time study english
A line in apparel
02_Ch(2)_Work Systems and How They Work.pptx
Work measurement
Time study part 2
Therbligs details
Standardized Work
ROBOT CYCLE TIME ANALYSIS
Work sample
30320140501002
Line balancing
Chapter-2-Manual_Work_and_Worker-MachineSystems.ppt
APPAREL PRODUCTION MANAGEMNET
Maynards operation sequence technique
3...work study
Chapter 2 line_balancing no pics

Recently uploaded (20)

PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PPTX
Pharma ospi slides which help in ospi learning
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Classroom Observation Tools for Teachers
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Yogi Goddess Pres Conference Studio Updates
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
01-Introduction-to-Information-Management.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
RMMM.pdf make it easy to upload and study
A systematic review of self-coping strategies used by university students to ...
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Final Presentation General Medicine 03-08-2024.pptx
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Pharma ospi slides which help in ospi learning
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Final Presentation General Medicine 03-08-2024.pptx
Classroom Observation Tools for Teachers
O5-L3 Freight Transport Ops (International) V1.pdf
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
2.FourierTransform-ShortQuestionswithAnswers.pdf
human mycosis Human fungal infections are called human mycosis..pptx
Yogi Goddess Pres Conference Studio Updates
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
01-Introduction-to-Information-Management.pdf
Supply Chain Operations Speaking Notes -ICLT Program
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Module 4: Burden of Disease Tutorial Slides S2 2025
RMMM.pdf make it easy to upload and study

Work factor-Anant Patel

  • 1. WORK-FACTOR PRESENTED BY: ANANT PATEL MTO9IND010 M.Tech. Industrial Engineering, VNIT, NAGPUR. 2009-10
  • 2. CONTENTS  Introduction  Types of predetermined time standards  Definitions of Work-Factor terms  Work-Factor Systems • Detailed Work-Factor • Simplified Work-Factor • Abbreviated Work-Factor • Ready Work-Factor • Brief Work-Factor • Detailed Mento-Factor  Work-Factor notation  Recording the Analysis  Work-Factor standard elements of work
  • 3. INTRODUCTION  Work-Factor (WF) is an elemental time systems for compiling time standards to establish the expected productivity of the human when performing useful manual and mental work.
  • 4. TYPES OF PREDETERMINED TIME STANDARDS  Methods Time Analysis (MTA), 1925  Work-Factor (WF), 1938  Engstrom, 1940  400 system, 1944  Methods Time Measurements (MTM), 1948  Methods Time Standards (MTS), 1950  Basic Motion Timestudy (BMT), 1951  Dimension Motion Time (DMT), 1954  Maynard’s Operation Sequence Technique (MOST),1967
  • 5. DEFINITIONS OF WORK-FACTOR TERMS  Work-Factor Time  Adequate Task Physique  Adequate Task Intelligence  Adequate Task Vision  Work-Factor Analysis  Basic Motion  Work-Factor  Work-Factor Standards Elements of Work
  • 6. WORK-FACTOR SYSTEMS  The requirements of work measurement vary according to the factors of  operation,  uniformity,  frequency of repetition,  purpose of measurements....
  • 7.  WF system consists integrated systems….  Detailed Work-Factor  Simplified Work-Factor  Ready Work-Factor  Abbreviated Work-Factor  Brief Work-Factor  Detailed Mento Factor
  • 8. DETAILED WORK-FACTOR  DWF is utilized for operation which need Accurate time standards.  The Work-Factor system is based on the principle that the Four Major Variables which affect the time to perform manual motions are: 1. Body Member used 2. Distance Moved 3. Manual Control required 4. weight or Resistance involved
  • 9. 1. Body Member  7 definite body members… 1) Finger or Hand 2) Arm 3) Forearm Swivel 4) Trunk 5) Foot 6) Leg 7) Head Time values for these body members are illustrated in table.
  • 10. 2. Distance  All distances are measurements in straight lines between the starting and stopping points of the motion as described by body members.  Measured in inches.  Tables specify the point at which various body members motion has to be measured.
  • 11. 3. Manual control  Definite Stop Work-Factor  Steer Work-Factor  Precaution Work-Factor  Direction Change Work-Factor • Its evaluation is made more difficult as there is no physical measuring device with which its effects can be checked
  • 12. 4. Weight or Resistance  Effect of weight on time varies with  Body Members used  Sex of operator  Measured in pounds for all Body Members except Forearm Swivel.  Forearm Swivel Motions are rotary, measured in pound-inches of torque.
  • 19. EXAMPLE 1  ARM MOVES 18 inches to TOSS A SMALL COIN IN A TRAY….  Body member involve is Arm (A)  Distance 18 inch  No manual controls requirements  Basic Motion  As per table, value is 55, corresponds to 0.0055 minutes
  • 20. WORK-FACTOR NOTATION Body members Symbol • Finger F • Hand H • Arm A • Forearm Swivel FS • Trunk T • Foot Ft • Leg L • Head Turn HT
  • 21. Work-Factors Symbols • Weight W • Steer S • Precaution P • Direction Change U • Definite Stop D
  • 22. RECORDING THE ANALYSIS  Toss small part aside 10 in. (Basic Motion)  A10  0.0042 minutes  Reach 30 inches to bolt in bin (Definite Stop Motion)  A30D  0.0096 minutes  Move 4 pound brick 30 in. from pile to place on work table (Weight, Definite Stop Motion)  A30WD  0.0119 minutes
  • 23. WORK-FACTOR STANDARD ELEMENTS OF WORK  8 Work-Factor Standard Elements of Work… 1. Transport (Reach & Move) (R, M) 2. Grasp (Gr) 3. Pre-position (PP) 4. Assemble (Asy) 5. Use (Manual, Process or Machine Time) (Use) 6. Disassemble (Dsy) 7. Mental Process (MP) 8. Release (Rl)
  • 24. TRANSPORT  The Standard Element Transport involves a single motion by a given body member.  Reach  Move
  • 25. GRASP  Act of obtaining Manual Control of an object for the purpose of transporting, using, or holding.
  • 26. PRE-POSITION  Act of turning or orienting an object to a correct position for a subsequent Standard Element of Work.  A bolt 2 inches long weighing 3 pound can be pre-positioned for assembly into a tapped hole by turning it end-for-end with one hand. An average of 3 Finger Motion is required to complete the Pre-position.  Analysis for this Pre-position is V3F1-50%.
  • 27. ASSEMBLE  Act of joining objects together or placing them in useful locations.  Assemble begins immediately after the Move bringing the objects to a position where Assemble can start.  All Work-Factor Assembles utilize the concept of Plug and Target, where a Plug is inserted into or placed on a Target.
  • 28. RELEASE  Contact Release  Gravity Release  The Unwrap Release MENTAL PROCESS  Concurrent Mental Process  Sequential Mental Process
  • 29. SIMPLIFIED WORK-FACTOR  General higher level system  Suitable for medium quantity production  Developed from Detailed Work-Factor  Quite effective in preparing estimates before actual production starts.
  • 30. ABBREVIATED WORK-FACTOR  Developed from Detailed Work-Factor  Suitable for small quantity job shops.  Abbreviated time unit is 0.005 (recorded as 5) minutes rather than 0.0001 minutes used in the DWF.  Accuracy of AWF is expected to average +12 percent of the DWF.
  • 31. READY WORK-FACTOR  Based on Detailed Work-Factor  Normally utilized in evaluating manual work in industry.  One Ready Units equals 10 Detailed Work-Factor Time Units (0.0010 minutes)  15 inch Arm factor with two Work- Factor required 9 Ready Units, or 0.009 minute.
  • 32. BRIEF WORK-FACTOR  BWF system is relatively new and like the AWF uses the time unit of 0.005 minute.  It was developed to make the format conform with the Detailed, and with the Ready systems.
  • 33. DETAILED MENTO FACTOR  It is a basic level system which is used for measuring mental processes such as …  Inspection  Proof reading  Colour matching  Calculations  Any repetitive predominantly mental operation
  • 34. References  Quick J. H., Duncan J. H., Malcolm J. A., Jr., Work-Factor Time Standards, McGraw-Hill Book Company, New York, 1962.  Barnes R. M., Motion and Time Study- Design and Measurement of Work, Seventh Edition, John Wiley and Sons.  Sharma S. K., Work Study and Ergonomics, Katson Books, Delhi, 2003-04.  ILO, Introduction to Work Study, vol-3, 1986.