Time Study
Presented by:-
Chhavi Narayan
Khushboo singh
Abhishek sahoo
Dhondup
CONTENTS
• Introduction
• Objectives of Time study
• Advantages
• Time study by stop watch
• Diff between Time and Motion study
• Type of Elements
• Methods
• Sample calculation
• Computation of NT & ST
• Applications
• Conclusion
INTRODUCTION
WORK STUDY:-
 Motion study
 Time study:-
o A qualified, well trained operator
o Normal pace
o Doing a specific task
OBJECTIVES OF TIME STUDY
• To increase productivity
 To set labour standard for satisfactory performance.
 To determine basic times/normal times.
 To determine the number of machines an operator can
handle.
 To determine standards costs.
Advantages
To develop suitable working conditions
To improve utilization of resources
To reduce human effort by proper design of
processes
TIME STUDY MOTION STUDY
 Notes the time involved
in carrying out each
element of operation.
 Aims at fixing the
standard time for
carrying out a job.
 Is not suitable for
workers where quality is
prime consideration
 Study of motions on an
operation
 To reduce wastage of
time
 Suitable for all types of
jobs.
Diff between time & motion study
TIME STUDY
Types of elements involved in a job
 Repetitive element:- Occurs in every work cycle of the job.
 Occasional element:- Occurs at intervals.
 Constant element:- Basic or normal time remains constant.
 Variable element:- Basic or normal time varies.
 Manual element:- Performed manually.
 Governing element :- Occupies a longer time than any other
element.
TIME STUDY
Methods
 1.Predetermined time standard system
 2.Stop watch reading
a) Continuous
b) Snap-back
 3.Work sampling
TIME STUDY
Sample calculation
1. E=2√
𝒑(𝟏−𝒑)
𝒏
2. 𝒏 =
𝟒𝒑(𝟏−𝒑)
𝑬 𝟐
P=proportion of phoning of
activity
E=error
n=sample size
Que. A preliminary study indicates that the proportion of
idle time of a machine is 30% ; rest of the time it is
working . To get a good estimate of the idle time with a
precision of ±1% , then what should be the sample size?
n=
4(0.30)(1−0.30)
(0.01)2 =8400
Computation of NT & ST
Work
element
a b c d*
Obs. rating 0.56min 0.25min 0.50min 1.10min
Performanc
e rating
100% 80% 110% 100%
* Irregular element performed every 5
cycles
PFD allowance=15%
Normal
time=0.56(1.0)+0.25(0.80)+0.50(1.10)+1.10(1.0)/5=1.53min
Standard time=1.53(1+0.15)=1.76
Applications
 In decision making
 Provides accuracy
 Organisation and method
Conclusion
TIME STUDY

More Related Content

PPTX
Time study
PPTX
Work measurement
PDF
Work study method study-work measurement
PPT
Work study method and time study-final - copy
PPTX
cycle time, normal time and standard allowance
PPT
Work measurement
PPTX
Performance rating
PPT
Work sample
Time study
Work measurement
Work study method study-work measurement
Work study method and time study-final - copy
cycle time, normal time and standard allowance
Work measurement
Performance rating
Work sample

What's hot (20)

PPTX
Work study
PPT
work measurement_operation management
PDF
Industrial Engineering (Method Study and Work study)
PPTX
Line balancing
PPT
Work Study
PPTX
Line balancing
PPTX
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PPT
Method Study
PPT
Production Planning and Control
PPTX
Time study
DOCX
Method study
PPT
Recording techniques used in method study ppt
PPT
PPTX
Micro-Macro Motion Study
PPT
Work Study- Methods Study
PPTX
Assembly line balancing
PPTX
Work study work measurement
Work study
work measurement_operation management
Industrial Engineering (Method Study and Work study)
Line balancing
Work Study
Line balancing
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
Method Study
Production Planning and Control
Time study
Method study
Recording techniques used in method study ppt
Micro-Macro Motion Study
Work Study- Methods Study
Assembly line balancing
Work study work measurement
Ad

Viewers also liked (20)

PPTX
Learning curve
PPT
C5 process & layout
PPTX
Learning Curve Sample Problem
PPT
Operations strategy and competitiveness
PPTX
Product designing strategy
PPT
Product design and development ch2
PDF
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
PDF
Learn curve
PDF
Learning curve
PPT
Product design and development ch4
PPT
Learning Curves in Production Management
PPT
Product design and development ch3
PPT
Product design
PPTX
Operation strategy at galanze
PPT
operations strategy and competitiveness
PPTX
Aggregate planning and mps om
PPTX
Work Study & Productivity
PPT
Operations strategy and competitiveness
PPTX
7. work study and method measurement
PPTX
Product design and development
Learning curve
C5 process & layout
Learning Curve Sample Problem
Operations strategy and competitiveness
Product designing strategy
Product design and development ch2
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
Learn curve
Learning curve
Product design and development ch4
Learning Curves in Production Management
Product design and development ch3
Product design
Operation strategy at galanze
operations strategy and competitiveness
Aggregate planning and mps om
Work Study & Productivity
Operations strategy and competitiveness
7. work study and method measurement
Product design and development
Ad

Similar to TIME STUDY (20)

PPTX
Work measuressssssssssssssssssssssssssment ppt.pptx
PDF
Unit 3 problems
PPTX
presentation group 5.pptx
PPT
Measurment techniques
PPT
Om4 bbm(l) 25.03.11
PPT
Chapter-7-Direct_Time_Study in industry.ppt
PDF
Good work measurement
PPTX
Cu mba operation managment module 4 calicut university
PPTX
Basic of work study, work measurement & job design om
PDF
Production & Operation Management Chapter15[1]
PPT
Chapter 10 work measurements and standards
PPT
Chapter 28 swts
PPTX
Unit 3 iem part 2
PPT
Work study method-and_time_study-final
PPTX
Analysis of sewing section efficiency by using time study technique in Appare...
PPT
Work Study.ppt
PPTX
Work measurement
PPTX
IE training
Work measuressssssssssssssssssssssssssment ppt.pptx
Unit 3 problems
presentation group 5.pptx
Measurment techniques
Om4 bbm(l) 25.03.11
Chapter-7-Direct_Time_Study in industry.ppt
Good work measurement
Cu mba operation managment module 4 calicut university
Basic of work study, work measurement & job design om
Production & Operation Management Chapter15[1]
Chapter 10 work measurements and standards
Chapter 28 swts
Unit 3 iem part 2
Work study method-and_time_study-final
Analysis of sewing section efficiency by using time study technique in Appare...
Work Study.ppt
Work measurement
IE training

Recently uploaded (20)

DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Unit 1 Cost Accounting - Cost sheet
DOCX
Business Management - unit 1 and 2
PPT
Chapter four Project-Preparation material
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
IFRS Notes in your pocket for study all the time
PDF
MSPs in 10 Words - Created by US MSP Network
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PPTX
5 Stages of group development guide.pptx
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Laughter Yoga Basic Learning Workshop Manual
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Unit 1 Cost Accounting - Cost sheet
Business Management - unit 1 and 2
Chapter four Project-Preparation material
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Probability Distribution, binomial distribution, poisson distribution
ICG2025_ICG 6th steering committee 30-8-24.pptx
Ôn tập tiếng anh trong kinh doanh nâng cao
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Belch_12e_PPT_Ch18_Accessible_university.pptx
IFRS Notes in your pocket for study all the time
MSPs in 10 Words - Created by US MSP Network
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
DOC-20250806-WA0002._20250806_112011_0000.pdf
5 Stages of group development guide.pptx
HR Introduction Slide (1).pptx on hr intro
Laughter Yoga Basic Learning Workshop Manual
unit 1 COST ACCOUNTING AND COST SHEET
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...

TIME STUDY

  • 1. Time Study Presented by:- Chhavi Narayan Khushboo singh Abhishek sahoo Dhondup
  • 2. CONTENTS • Introduction • Objectives of Time study • Advantages • Time study by stop watch • Diff between Time and Motion study • Type of Elements • Methods • Sample calculation • Computation of NT & ST • Applications • Conclusion
  • 3. INTRODUCTION WORK STUDY:-  Motion study  Time study:- o A qualified, well trained operator o Normal pace o Doing a specific task
  • 4. OBJECTIVES OF TIME STUDY • To increase productivity  To set labour standard for satisfactory performance.  To determine basic times/normal times.  To determine the number of machines an operator can handle.  To determine standards costs.
  • 5. Advantages To develop suitable working conditions To improve utilization of resources To reduce human effort by proper design of processes
  • 6. TIME STUDY MOTION STUDY  Notes the time involved in carrying out each element of operation.  Aims at fixing the standard time for carrying out a job.  Is not suitable for workers where quality is prime consideration  Study of motions on an operation  To reduce wastage of time  Suitable for all types of jobs. Diff between time & motion study
  • 8. Types of elements involved in a job  Repetitive element:- Occurs in every work cycle of the job.  Occasional element:- Occurs at intervals.  Constant element:- Basic or normal time remains constant.  Variable element:- Basic or normal time varies.  Manual element:- Performed manually.  Governing element :- Occupies a longer time than any other element.
  • 10. Methods  1.Predetermined time standard system  2.Stop watch reading a) Continuous b) Snap-back  3.Work sampling
  • 12. Sample calculation 1. E=2√ 𝒑(𝟏−𝒑) 𝒏 2. 𝒏 = 𝟒𝒑(𝟏−𝒑) 𝑬 𝟐 P=proportion of phoning of activity E=error n=sample size Que. A preliminary study indicates that the proportion of idle time of a machine is 30% ; rest of the time it is working . To get a good estimate of the idle time with a precision of ±1% , then what should be the sample size? n= 4(0.30)(1−0.30) (0.01)2 =8400
  • 13. Computation of NT & ST Work element a b c d* Obs. rating 0.56min 0.25min 0.50min 1.10min Performanc e rating 100% 80% 110% 100% * Irregular element performed every 5 cycles PFD allowance=15% Normal time=0.56(1.0)+0.25(0.80)+0.50(1.10)+1.10(1.0)/5=1.53min Standard time=1.53(1+0.15)=1.76
  • 14. Applications  In decision making  Provides accuracy  Organisation and method