Work Study
 Work study is an area of knowledge that addresses the problem of
work simplification with the basic objectives of PRODUCTIVITYPRODUCTIVITY
ENHANCEMENT, HUMAN COMFORT & SAFETYENHANCEMENT, HUMAN COMFORT & SAFETY
Method Study
Systematic recording and critical examination of
existing and proposed ways of doing work, as a
means of developing and applying easier and more
effective methods and reducing cost
The main purpose of method study is to
eliminate the unnecessary operations and to
achieve the best method of performing the
operation
Work study method-and_time_study-final
Method Study ( Steps)
 Select job/process to be examined & observe current
performance
• high process cost, bottlenecks, tortuous route, low
productivity, erratic quality
 Record & document facts
• activities performed
• operators involved - how etc
• equipment and tools used
• materials processed or moved
 Apply critical examination - challenge job components &
necessity (purpose, place, sequence, method).
 Develop alternative methods & present proposals
 Document as base for new work system
 Install, monitor (slippage) & maintain
Method Study (Objectives)
Improvement in use of all inputs
Economy in human effort
Layout improvement
Improvement in design of plant and
machinery
Improvement in safety standards and
procedures
Work measurement- Introduction
Work measurement (WM) is concerned with
investigating, reducing and eliminating ineffective
time, whatever may be the cause.
WM is the means of measuring the time taken in
the performance of an operation or series of
operations in such a way that the ineffective time is
shown up and can be separated out.
Purpose of WM
To reveal the nature and extent of ineffective time,
from whatever cause,
So that action can be taken to eliminate it; and
then,
To set standards of performance that are attainable
only if all avoidable ineffective time is eliminated
and work is performed by the best method
available.
Uses of WM
To compare the efficiency of alternative methods.
Other conditions being equal, the method which
takes the least time will be the best method.
To balance the work of members of teams, in
association with the multiple activity charts, so
that, as far as possible, each member has tasks
taking an equal time.
To determine, in association with man and
machine multiple activity charts, the number of
machines an worker can run.
Work Study (Benefits)
Increased productivity and increased efficiency
Reduced manufacturing costs
Improved work place layout
Better manpower planning and capacity planning
Improved work flow Provides better job satisfaction to
employees
Work Measurement (Techniques)
Stop – watch time study
Work sampling
Predetermined times standards
Standard data
Time Study
One of the most common types of work
measurement is time study
For example - Purpose
An international coffee shop chain may want to
find out how long a barista should take to make a
specific coffee drink. Some of the stated
condition may include using cold milk that needs
to be steamed, rather than already steamed milk.
Time Study
Observations
A qualified practitioner should observe the
employee using a time measurement device. The
observer should also assess the quality of work
Observed Person
The observed person in the time study must be
fully trained in the measured task
Time StudiesTime Studies
1.1. Define the task to be studiedDefine the task to be studied
2.2. Divide the task into precise elementsDivide the task into precise elements
3.3. Decide how many times to measure the taskDecide how many times to measure the task
4.4. Time and record element times and rating ofTime and record element times and rating of
performanceperformance
Time StudiesTime Studies
5.5. Compute average observed timeCompute average observed time
AverageAverage
observed timeobserved time
Sum of the times recorded to performSum of the times recorded to perform
each elementeach element
Number of observationsNumber of observations==
6.6. Determine performance rating andDetermine performance rating and
normal timenormal time
Normal time =Normal time =
Average observedAverage observed
time Xtime X Performance ratingPerformance rating
factorfactor
7.7. Add the normal times for each element to develop theAdd the normal times for each element to develop the
total normal time for the tasktotal normal time for the task
8.8. Compute the standard timeCompute the standard time
 Standard time= total normal time/1-allowance factor
Time Study ExampleTime Study Example
Average observed time = 4.0 minutesAverage observed time = 4.0 minutes
Worker rating = 85%Worker rating = 85%
Allowance factor = 13%Allowance factor = 13%
Normal time = (Average observed time) x (Rating factor)Normal time = (Average observed time) x (Rating factor)
= (4.0)(.85)= (4.0)(.85)
= 3.4 minutes= 3.4 minutes
Standard time = = =Standard time = = =
Normal timeNormal time
1 - Allowance factor1 - Allowance factor
3.43.4
1 - .131 - .13
3.43.4
.87.87
= 3.9 minutes= 3.9 minutes
Time Study Example -1Time Study Example -1
Allowance factor = 15%Allowance factor = 15%
PerformancePerformance
Job ElementJob Element 11 22 33 44 55 RatingRating
(A)(A) Compose and type letterCompose and type letter 88 1010 99 21*21* 1111 120%120%
(B)(B) Type envelope addressType envelope address 22 33 22 11 33 105%105%
(C)(C) Stuff, stamp, seal, andStuff, stamp, seal, and 22 11 5*5* 22 11 110%110%
sort envelopessort envelopes
Cycle Observed (in minutes)Cycle Observed (in minutes)
1.1. Delete unusual or nonrecurring observations (marked with *)Delete unusual or nonrecurring observations (marked with *)
2.2. Compute average times for each elementCompute average times for each element
Average time for A = (8 + 10 + 9 + 11)/4 = 9.5 minutesAverage time for A = (8 + 10 + 9 + 11)/4 = 9.5 minutes
Average time for B = (2 + 3 + 2 + 1 + 3)/5 = 2.2 minutesAverage time for B = (2 + 3 + 2 + 1 + 3)/5 = 2.2 minutes
Average time for C = (2 + 1 + 2 + 1)/4 = 1.5 minutesAverage time for C = (2 + 1 + 2 + 1)/4 = 1.5 minutes
Time Study Example -2Time Study Example -2
3.3. Compute the normal time for each elementCompute the normal time for each element
Normal time for A = (9.5)(1.2) = 11.4 minutesNormal time for A = (9.5)(1.2) = 11.4 minutes
Normal time for B = (2.2)(1.05) = 2.31 minutesNormal time for B = (2.2)(1.05) = 2.31 minutes
Normal time for C = (1.5)(1.10) = 1.65 minutesNormal time for C = (1.5)(1.10) = 1.65 minutes
Normal time = (Average observed time) x (Rating)Normal time = (Average observed time) x (Rating)
4.4. Add the normal times to find the total normal timeAdd the normal times to find the total normal time
Total normal time = 11.40 + 2.31 + 1.65 = 15.36 minutesTotal normal time = 11.40 + 2.31 + 1.65 = 15.36 minutes
Time Study Example S2Time Study Example S2
5.5. Compute the standard time for the jobCompute the standard time for the job
Standard time =Standard time =
Total normal timeTotal normal time
1 - Allowance factor1 - Allowance factor
= = 18.07 minutes= = 18.07 minutes
15.3615.36
1 - .151 - .15
Thank youThank you

More Related Content

PPTX
Work measurement
PPTX
HISTORY & DEVELOPMENT OF WORK STUDY
PPT
137 work study
PPTX
7. work study and method measurement
PDF
Work study method study-work measurement
PPTX
Time study
PPTX
Work sampling
Work measurement
HISTORY & DEVELOPMENT OF WORK STUDY
137 work study
7. work study and method measurement
Work study method study-work measurement
Time study
Work sampling

What's hot (20)

PPTX
History of workstudy - Workmeasurement - Job design
PPTX
cycle time, normal time and standard allowance
PPT
Time & motion study
PPTX
Work study work measurement
PPT
Work Study
PPT
Time And Motion Study
PPT
3...work study
PPTX
Lecture 1 work study according to amravati university syllabus
PPT
Work Study
PPTX
Time and Motion Study
PPT
Introduction to time study
PPTX
Time study
PPTX
Work Study & Productivity
PPT
Time and motion study
PPTX
Basic of work study, work measurement & job design om
PPTX
TIME STUDY
PPTX
Recording techniques in method study
PPTX
Basic of work study
PPT
Method Study
DOCX
Method study
History of workstudy - Workmeasurement - Job design
cycle time, normal time and standard allowance
Time & motion study
Work study work measurement
Work Study
Time And Motion Study
3...work study
Lecture 1 work study according to amravati university syllabus
Work Study
Time and Motion Study
Introduction to time study
Time study
Work Study & Productivity
Time and motion study
Basic of work study, work measurement & job design om
TIME STUDY
Recording techniques in method study
Basic of work study
Method Study
Method study
Ad

Viewers also liked (13)

PPT
Work study - production and operations management
PPT
Work study method and time study-final - copy
PPTX
Effect of work study & time study on production and quality
PPTX
Measure phase lean six sigma tollgate template
PPTX
Dimensions of Product & Service Quality
PPT
Motion And Time Study
PPT
Time and motion study
PPT
Work Study: Method Study & Work Measurement
PPT
Chapter 2 The Evolution Of Management Theory
PPTX
Productivity
PDF
Motion and time study
PPT
Ch11
PPTX
Work measurement and productivity
Work study - production and operations management
Work study method and time study-final - copy
Effect of work study & time study on production and quality
Measure phase lean six sigma tollgate template
Dimensions of Product & Service Quality
Motion And Time Study
Time and motion study
Work Study: Method Study & Work Measurement
Chapter 2 The Evolution Of Management Theory
Productivity
Motion and time study
Ch11
Work measurement and productivity
Ad

Similar to Work study method-and_time_study-final (20)

PPT
Job Design and Work Measurement
PDF
Good work measurement
PPTX
Improving the productivity_and_introducing_the_work_study
PDF
WORK STUDY -method study & time study all in one.pdf
PPT
Om4 bbm(l) 25.03.11
PPT
Work study
PPT
Work Study
PPT
Work measurement
PPT
Work measurement
PPT
P roduction ppt
PPT
module 3 OM.ppt
PPTX
Management tools
PPT
Production & Operation Management
PPT
PPTX
Design of Work Systems
DOC
195846452 work-study-layout
PPTX
Work study ......operational management presentation
PPT
Work study-1223702337445335-9
Job Design and Work Measurement
Good work measurement
Improving the productivity_and_introducing_the_work_study
WORK STUDY -method study & time study all in one.pdf
Om4 bbm(l) 25.03.11
Work study
Work Study
Work measurement
Work measurement
P roduction ppt
module 3 OM.ppt
Management tools
Production & Operation Management
Design of Work Systems
195846452 work-study-layout
Work study ......operational management presentation
Work study-1223702337445335-9

More from Hareesh M (19)

PPTX
Sampling types-presentation-business research
PPTX
Mutual funds types-presentation-hareesh
DOCX
factories act, bonus act, trade union act- industrial relations
DOCX
leasing and hire purchase
PPTX
Factories act,bonus act,trade union act presentation-hareesh
PPTX
Derivatives futures,options-presentation-hareesh
DOCX
Business research term paper-hareesh
PPTX
Hypothesis
PPTX
Indian,japanese,u.s style of management ppt-final
PPT
Indian,japanese,u.s style of management ppt-final
DOCX
Customer satisfaction final
PPTX
Customer satisfaction analysis final
PPTX
Cluster development final
DOCX
Cluster development in india print out
DOCX
Cluster development in india final
PPTX
Employee engagement final
PPT
Auctions final
PPTX
Hrms presentation-hareesh
PPT
Supply chain management presentation
Sampling types-presentation-business research
Mutual funds types-presentation-hareesh
factories act, bonus act, trade union act- industrial relations
leasing and hire purchase
Factories act,bonus act,trade union act presentation-hareesh
Derivatives futures,options-presentation-hareesh
Business research term paper-hareesh
Hypothesis
Indian,japanese,u.s style of management ppt-final
Indian,japanese,u.s style of management ppt-final
Customer satisfaction final
Customer satisfaction analysis final
Cluster development final
Cluster development in india print out
Cluster development in india final
Employee engagement final
Auctions final
Hrms presentation-hareesh
Supply chain management presentation

Recently uploaded (20)

PPTX
Strategic Plan 2023-2024 Presentation.pptx
PDF
The Cyber SwarmShield by Stéphane Nappo
PDF
Phillips model training for evaluation pdf
PPTX
Course Overview of the Course Titled.pptx
PPTX
Project Management Methods PERT-and-CPM.pptx
PDF
Contemporary management and it's content
PPTX
INTELLECTUAL PROPERTY LAW IN UGANDA.pptx
PPTX
Chapter Three for international political
PDF
1_Corporate Goverance presentation topic
PPTX
Concluding Session_Wrapup-India Jun 5 2024-Oct 5 2025 ZS.pptx
PDF
Organisational Behaviour And it's concepts
PPTX
Five S Training Program - Principles of 5S
PDF
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
PDF
CHAPTER 15- Manageement of Nursing Educational Institutions- Staffing and st...
PPTX
Improved_Leadership_in_Total_Quality_Lesson.pptx
PPTX
Empowering Project Management Through Servant Leadership - PMI UK.pptx
PDF
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
PDF
Maintaining a Quality Culture - Performance Metrics, Best Practices and QMS E...
PPTX
_ISO_Presentation_ISO 9001 and 45001.pptx
PPTX
Mangeroal Finance for Strategic Management
Strategic Plan 2023-2024 Presentation.pptx
The Cyber SwarmShield by Stéphane Nappo
Phillips model training for evaluation pdf
Course Overview of the Course Titled.pptx
Project Management Methods PERT-and-CPM.pptx
Contemporary management and it's content
INTELLECTUAL PROPERTY LAW IN UGANDA.pptx
Chapter Three for international political
1_Corporate Goverance presentation topic
Concluding Session_Wrapup-India Jun 5 2024-Oct 5 2025 ZS.pptx
Organisational Behaviour And it's concepts
Five S Training Program - Principles of 5S
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
CHAPTER 15- Manageement of Nursing Educational Institutions- Staffing and st...
Improved_Leadership_in_Total_Quality_Lesson.pptx
Empowering Project Management Through Servant Leadership - PMI UK.pptx
CHAPTER 14 Manageement of Nursing Educational Institutions- planing and orga...
Maintaining a Quality Culture - Performance Metrics, Best Practices and QMS E...
_ISO_Presentation_ISO 9001 and 45001.pptx
Mangeroal Finance for Strategic Management

Work study method-and_time_study-final

  • 1. WORK STUDY-WORK STUDY- METHOD,TIME STUDYMETHOD,TIME STUDY Hareesh.MHareesh.M I.D.NO:2014600120I.D.NO:2014600120
  • 2. Work Study  Work study is an area of knowledge that addresses the problem of work simplification with the basic objectives of PRODUCTIVITYPRODUCTIVITY ENHANCEMENT, HUMAN COMFORT & SAFETYENHANCEMENT, HUMAN COMFORT & SAFETY
  • 3. Method Study Systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing cost The main purpose of method study is to eliminate the unnecessary operations and to achieve the best method of performing the operation
  • 5. Method Study ( Steps)  Select job/process to be examined & observe current performance • high process cost, bottlenecks, tortuous route, low productivity, erratic quality  Record & document facts • activities performed • operators involved - how etc • equipment and tools used • materials processed or moved  Apply critical examination - challenge job components & necessity (purpose, place, sequence, method).  Develop alternative methods & present proposals  Document as base for new work system  Install, monitor (slippage) & maintain
  • 6. Method Study (Objectives) Improvement in use of all inputs Economy in human effort Layout improvement Improvement in design of plant and machinery Improvement in safety standards and procedures
  • 7. Work measurement- Introduction Work measurement (WM) is concerned with investigating, reducing and eliminating ineffective time, whatever may be the cause. WM is the means of measuring the time taken in the performance of an operation or series of operations in such a way that the ineffective time is shown up and can be separated out.
  • 8. Purpose of WM To reveal the nature and extent of ineffective time, from whatever cause, So that action can be taken to eliminate it; and then, To set standards of performance that are attainable only if all avoidable ineffective time is eliminated and work is performed by the best method available.
  • 9. Uses of WM To compare the efficiency of alternative methods. Other conditions being equal, the method which takes the least time will be the best method. To balance the work of members of teams, in association with the multiple activity charts, so that, as far as possible, each member has tasks taking an equal time. To determine, in association with man and machine multiple activity charts, the number of machines an worker can run.
  • 10. Work Study (Benefits) Increased productivity and increased efficiency Reduced manufacturing costs Improved work place layout Better manpower planning and capacity planning Improved work flow Provides better job satisfaction to employees
  • 11. Work Measurement (Techniques) Stop – watch time study Work sampling Predetermined times standards Standard data
  • 12. Time Study One of the most common types of work measurement is time study For example - Purpose An international coffee shop chain may want to find out how long a barista should take to make a specific coffee drink. Some of the stated condition may include using cold milk that needs to be steamed, rather than already steamed milk.
  • 13. Time Study Observations A qualified practitioner should observe the employee using a time measurement device. The observer should also assess the quality of work Observed Person The observed person in the time study must be fully trained in the measured task
  • 14. Time StudiesTime Studies 1.1. Define the task to be studiedDefine the task to be studied 2.2. Divide the task into precise elementsDivide the task into precise elements 3.3. Decide how many times to measure the taskDecide how many times to measure the task 4.4. Time and record element times and rating ofTime and record element times and rating of performanceperformance
  • 15. Time StudiesTime Studies 5.5. Compute average observed timeCompute average observed time AverageAverage observed timeobserved time Sum of the times recorded to performSum of the times recorded to perform each elementeach element Number of observationsNumber of observations== 6.6. Determine performance rating andDetermine performance rating and normal timenormal time Normal time =Normal time = Average observedAverage observed time Xtime X Performance ratingPerformance rating factorfactor
  • 16. 7.7. Add the normal times for each element to develop theAdd the normal times for each element to develop the total normal time for the tasktotal normal time for the task 8.8. Compute the standard timeCompute the standard time  Standard time= total normal time/1-allowance factor
  • 17. Time Study ExampleTime Study Example Average observed time = 4.0 minutesAverage observed time = 4.0 minutes Worker rating = 85%Worker rating = 85% Allowance factor = 13%Allowance factor = 13% Normal time = (Average observed time) x (Rating factor)Normal time = (Average observed time) x (Rating factor) = (4.0)(.85)= (4.0)(.85) = 3.4 minutes= 3.4 minutes Standard time = = =Standard time = = = Normal timeNormal time 1 - Allowance factor1 - Allowance factor 3.43.4 1 - .131 - .13 3.43.4 .87.87 = 3.9 minutes= 3.9 minutes
  • 18. Time Study Example -1Time Study Example -1 Allowance factor = 15%Allowance factor = 15% PerformancePerformance Job ElementJob Element 11 22 33 44 55 RatingRating (A)(A) Compose and type letterCompose and type letter 88 1010 99 21*21* 1111 120%120% (B)(B) Type envelope addressType envelope address 22 33 22 11 33 105%105% (C)(C) Stuff, stamp, seal, andStuff, stamp, seal, and 22 11 5*5* 22 11 110%110% sort envelopessort envelopes Cycle Observed (in minutes)Cycle Observed (in minutes) 1.1. Delete unusual or nonrecurring observations (marked with *)Delete unusual or nonrecurring observations (marked with *) 2.2. Compute average times for each elementCompute average times for each element Average time for A = (8 + 10 + 9 + 11)/4 = 9.5 minutesAverage time for A = (8 + 10 + 9 + 11)/4 = 9.5 minutes Average time for B = (2 + 3 + 2 + 1 + 3)/5 = 2.2 minutesAverage time for B = (2 + 3 + 2 + 1 + 3)/5 = 2.2 minutes Average time for C = (2 + 1 + 2 + 1)/4 = 1.5 minutesAverage time for C = (2 + 1 + 2 + 1)/4 = 1.5 minutes
  • 19. Time Study Example -2Time Study Example -2 3.3. Compute the normal time for each elementCompute the normal time for each element Normal time for A = (9.5)(1.2) = 11.4 minutesNormal time for A = (9.5)(1.2) = 11.4 minutes Normal time for B = (2.2)(1.05) = 2.31 minutesNormal time for B = (2.2)(1.05) = 2.31 minutes Normal time for C = (1.5)(1.10) = 1.65 minutesNormal time for C = (1.5)(1.10) = 1.65 minutes Normal time = (Average observed time) x (Rating)Normal time = (Average observed time) x (Rating) 4.4. Add the normal times to find the total normal timeAdd the normal times to find the total normal time Total normal time = 11.40 + 2.31 + 1.65 = 15.36 minutesTotal normal time = 11.40 + 2.31 + 1.65 = 15.36 minutes
  • 20. Time Study Example S2Time Study Example S2 5.5. Compute the standard time for the jobCompute the standard time for the job Standard time =Standard time = Total normal timeTotal normal time 1 - Allowance factor1 - Allowance factor = = 18.07 minutes= = 18.07 minutes 15.3615.36 1 - .151 - .15

Editor's Notes

  • #7: Inputs: Man, machine, material, capital and information.
  • #11: Nomethetic – philosophical Idiographic – clinical science – describes pecularity The human factor is very important for WS Good relations is a key factor for success Eductaional qualification
  • #13: Assumes: set sequence, routine work cycle (all workers), little discretion, 100% effort rating - trained/qualified, motivated/committed, working at normal pace & not fatigued .Fix standard time and enter into measured work manual/database. Time study determine how long a qualified worker under stated conditions can reasonably be expected to complete a task. time Study: establish standard times - management knowledge rate operator performance - criteria for appraisal gather information to calculate production capabilities & data for capacity planning. define/cost work content of finished goods and services e.g. for charging & estimating
  • #14: Observations: For instance, the manager in the example would be an ideal observer in conducting a time study of coffer making work. Observed Person: A person making coffee, for example, must be fully trained and familiar with the process of coffee making if the time study wishes to determine how long it takes to make the coffee.