Work study :–
(A)method study
(B) work
measurement
presented by :
vishal kanathia
Work study
• Work Study is the systematic examination of the
methods of carrying out activities such as to
improve the effective use of resources and to set up
standards of performance for the activities carried
out.
• it is a management tool to achieve higher
productive efficiency of the organisation .
Work study is also define as that body of knowledge
concerned with the analysis of the work methods
and equipments used performing a job.
Objectives of work study
 Simplifying or modifying the methods
of operation
 Reduces unnecessary or excess work
 Stops wasteful use of resources
 Contributes to industrial safety by
identifying hazardous work and
developing safer methods
 Cuts down the time of performing a
certain activity.
Benefits of work study
 It help us in increase productivity.
 Reduce manufacturing cost.
 Improve place layout.
 Better man power and planning.
METHODS
 Method study
 Work measurement
METHOD STUDY
 Method-study concerned with “the way in which
work is done (i.e., method)”. It is used to simplify
the way to accomplish a work and to improve the
method of production. Method-study results in a
more effective use of material, plant, equipment
and manpower. Method study is essentially
concerned with finding better ways of doing things.
It adds value and increase the efficiency by
eliminating unnecessary operations, avoidable
delays and other forms of waste.
 The improvement of efficiency is achieved
through: 1.Present and analysis true facts
concerning the situation.
 2.To examination those facts critically
 3.To develop the best answer possible under
given circumstances based on critical examination
of facts.
Procedure of method study
Procedure to accomplish method study, called
"SREDIM" shall be as follow:
1. Select: the job or operation that needs
improvement,
2. Record: all facts, how work is done by chart
methods,
3. Examine: every aspect of the job by asking;
what, why, where, when, who and how
4. Develop: review ideas, eliminate, simplify,
combine, re-arrange, make new method
which more safe, chart new method, submit
for approval,
5. Install: the new method, consider best time
to introduce, convince all, train users,
6. Maintain: check frequently, match results,
correct deviations.
Process charts in method study
:)
 Outline process chart :> it records overall pictures
of the process and record only main events sequence
wise.
 Operation process chart :> The operation process
chart shows the chronological sequence of all
operations, inspections, time allowances, and materials
used in a manufacturing or business process, from the
arrival of raw material to the packaging of the finished
product.
Flow process chart (man-type, material-type and
equipment-type): This is the use of symbols and
description to chart the sequence of work. The process,
then, show what is happening at different stages. The
distances and time may be given. A flow process chart
is a chart of all the activities involved in a process.
 Two handed process chart :> in this chart
activities of a workers or operators both hands are
recorded chronologically.
 Multiple activities chart :> This technique is
used to solve problems where a number of items
are dependent on each other. The aim is to reduce
idle times by using the optimum number of each
item.
 Flow diagram :> It depicts the probable
movement or position of materials and equipments
in the floor plant. The movement is represented by
a line in the plant drawing.
Work measurement
 Work measurement is the application of techniques
designed to establish the time for a qualified worker to
carry out specified jobs at a defined level of performance
or at a defined rate of working.
 A qualified worker is one who has acquired the skill,
knowledge and other attributes to carry out the work in
hand to satisfactory standards of quantity, quality and
safety.
 Defined rate of working is the amount of work that can be
produced by a qualified worker/employee when working at
normal space and effectively utilizing his time and where
work is not restricted by process limitation.
Purpose of work
measurement
 To reveal the nature and extent of ineffective
time, from whatever cause,
 So that action can be taken to eliminate it; and
then,
 To set standards of performance that are
attainable only if all avoidable ineffective time
is eliminated and work is performed by the best
method available.
Uses of work measurement:
 To compare the efficiency of alternative methods.
 Cost estimation
 Pricing of products and services
 Incentive pay systems
 Capacity planning
 Production scheduling
 To provide information on which estimates for
tenders, selling prices and delivery promises can
be based.
 To reduce the waste of production delay.
 To maximize the manpower utilization by minimize
the idle time of the operation .
 Thank you 

More Related Content

PDF
Work study method study-work measurement
PPTX
Line balancing
PPT
Work study - production and operations management
PPT
Work Study
PPT
work measurement_operation management
PPT
PPTX
Work study work measurement
Work study method study-work measurement
Line balancing
Work study - production and operations management
Work Study
work measurement_operation management
Work study work measurement

What's hot (20)

PPTX
Work study
PPTX
Time study
PPT
Layout and its types.
PPTX
Production and operations management
PPT
Classification and Purpose of Production and Operations Management
PPTX
Work measurement
PPT
Work study
PPTX
AGGREGATE PRODUCTION PLANNING
PDF
Work Study, Method Study
PPTX
Productivity
PPT
Method Study
PPTX
Production capacity – planning and control
PPTX
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PPTX
Method study
PPT
Work measurement
PPTX
Line balancing
PPTX
TIME STUDY
PPT
Method study
Work study
Time study
Layout and its types.
Production and operations management
Classification and Purpose of Production and Operations Management
Work measurement
Work study
AGGREGATE PRODUCTION PLANNING
Work Study, Method Study
Productivity
Method Study
Production capacity – planning and control
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
Method study
Work measurement
Line balancing
TIME STUDY
Method study
Ad

Viewers also liked (20)

PPT
Work Study: Method Study & Work Measurement
PPTX
Aggregate planning and mps om
PPTX
concepto de planeacion total, entorno de la planeación, estrategias de planea...
PPT
Methods of Production : Job, Batch & Mass Productiion
PPT
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
PPTX
JOB DESIGN, REENGINEERING and WORK MEASUREMENT
PPT
79971255 assembly-line-balancing
PDF
Production Planning & Control
PPTX
Capacity Planning with reference to McDonlds
PPTX
Work measurement (1)
PPT
Recording techniques used in method study ppt
PPT
Work sample
PPSX
Aggregate planning
PPTX
7. work study and method measurement
PDF
Work measurement
PPT
scheduling
PPTX
Basic of work study, work measurement & job design om
PPTX
assembly line balancing
PPT
Work Study- Methods Study
PPTX
Production Planning and Control
Work Study: Method Study & Work Measurement
Aggregate planning and mps om
concepto de planeacion total, entorno de la planeación, estrategias de planea...
Methods of Production : Job, Batch & Mass Productiion
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
JOB DESIGN, REENGINEERING and WORK MEASUREMENT
79971255 assembly-line-balancing
Production Planning & Control
Capacity Planning with reference to McDonlds
Work measurement (1)
Recording techniques used in method study ppt
Work sample
Aggregate planning
7. work study and method measurement
Work measurement
scheduling
Basic of work study, work measurement & job design om
assembly line balancing
Work Study- Methods Study
Production Planning and Control
Ad

Similar to Work study ......operational management presentation (20)

DOC
195846452 work-study-layout
PPTX
Jivan work study
PPTX
PRODUCTION PLANNING AND CONTROL-WORK STUDY
PPT
Work Study
PPTX
Work Study & Productivity
PPTX
Work Study & Productivity
PPT
P roduction ppt
PPTX
Improving the productivity_and_introducing_the_work_study
PPT
Work study-1223702337445335-9
PDF
Work study-1223702337445335-9
PDF
Work Study
PPTX
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
PPTX
dr. ibrahima abdi hassan this is the 535472485-Productivity-1.pptx
PDF
02 Work study -Part_1.pdf
PPTX
Work-study.pptx
PPTX
Work-study1.pptx
PDF
WORK STUDY -method study & time study all in one.pdf
PPTX
Industrial Engineering - Method Study
PDF
Methods_Engineering_and_Operations_Analysis.pdf
195846452 work-study-layout
Jivan work study
PRODUCTION PLANNING AND CONTROL-WORK STUDY
Work Study
Work Study & Productivity
Work Study & Productivity
P roduction ppt
Improving the productivity_and_introducing_the_work_study
Work study-1223702337445335-9
Work study-1223702337445335-9
Work Study
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
dr. ibrahima abdi hassan this is the 535472485-Productivity-1.pptx
02 Work study -Part_1.pdf
Work-study.pptx
Work-study1.pptx
WORK STUDY -method study & time study all in one.pdf
Industrial Engineering - Method Study
Methods_Engineering_and_Operations_Analysis.pdf

More from vish0110 (15)

DOCX
Training and development
DOCX
Learning
DOCX
Developing an effective training strategy
DOCX
Introduction to bluetooth
DOCX
Cellular concept
DOCX
Call flow in gsm
PDF
Chapter8,,,,,,,multiple access
PPT
Analog modulation
PPT
Cellular concept
DOC
Market research question_bank
DOCX
Assignment of wireless c ommunication
DOCX
4 types of consumer buying behavior
PPTX
Career planning,,,,,,,,,,,,,vvvvvvv
PPTX
I,me and myself
PPTX
dabur ppt
Training and development
Learning
Developing an effective training strategy
Introduction to bluetooth
Cellular concept
Call flow in gsm
Chapter8,,,,,,,multiple access
Analog modulation
Cellular concept
Market research question_bank
Assignment of wireless c ommunication
4 types of consumer buying behavior
Career planning,,,,,,,,,,,,,vvvvvvv
I,me and myself
dabur ppt

Recently uploaded (20)

PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Basic Mud Logging Guide for educational purpose
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
master seminar digital applications in india
PDF
Insiders guide to clinical Medicine.pdf
PDF
RMMM.pdf make it easy to upload and study
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
Cell Structure & Organelles in detailed.
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Business Ethics Teaching Materials for college
Renaissance Architecture: A Journey from Faith to Humanism
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Final Presentation General Medicine 03-08-2024.pptx
Basic Mud Logging Guide for educational purpose
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Microbial disease of the cardiovascular and lymphatic systems
Supply Chain Operations Speaking Notes -ICLT Program
master seminar digital applications in india
Insiders guide to clinical Medicine.pdf
RMMM.pdf make it easy to upload and study
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Cell Structure & Organelles in detailed.
Anesthesia in Laparoscopic Surgery in India
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Business Ethics Teaching Materials for college

Work study ......operational management presentation

  • 1. Presentation on Work study :– (A)method study (B) work measurement presented by : vishal kanathia
  • 2. Work study • Work Study is the systematic examination of the methods of carrying out activities such as to improve the effective use of resources and to set up standards of performance for the activities carried out. • it is a management tool to achieve higher productive efficiency of the organisation . Work study is also define as that body of knowledge concerned with the analysis of the work methods and equipments used performing a job.
  • 3. Objectives of work study  Simplifying or modifying the methods of operation  Reduces unnecessary or excess work  Stops wasteful use of resources  Contributes to industrial safety by identifying hazardous work and developing safer methods  Cuts down the time of performing a certain activity.
  • 4. Benefits of work study  It help us in increase productivity.  Reduce manufacturing cost.  Improve place layout.  Better man power and planning.
  • 5. METHODS  Method study  Work measurement
  • 6. METHOD STUDY  Method-study concerned with “the way in which work is done (i.e., method)”. It is used to simplify the way to accomplish a work and to improve the method of production. Method-study results in a more effective use of material, plant, equipment and manpower. Method study is essentially concerned with finding better ways of doing things. It adds value and increase the efficiency by eliminating unnecessary operations, avoidable delays and other forms of waste.  The improvement of efficiency is achieved through: 1.Present and analysis true facts concerning the situation.  2.To examination those facts critically  3.To develop the best answer possible under given circumstances based on critical examination of facts.
  • 7. Procedure of method study Procedure to accomplish method study, called "SREDIM" shall be as follow: 1. Select: the job or operation that needs improvement, 2. Record: all facts, how work is done by chart methods, 3. Examine: every aspect of the job by asking; what, why, where, when, who and how 4. Develop: review ideas, eliminate, simplify, combine, re-arrange, make new method which more safe, chart new method, submit for approval, 5. Install: the new method, consider best time to introduce, convince all, train users, 6. Maintain: check frequently, match results, correct deviations.
  • 8. Process charts in method study :)  Outline process chart :> it records overall pictures of the process and record only main events sequence wise.  Operation process chart :> The operation process chart shows the chronological sequence of all operations, inspections, time allowances, and materials used in a manufacturing or business process, from the arrival of raw material to the packaging of the finished product. Flow process chart (man-type, material-type and equipment-type): This is the use of symbols and description to chart the sequence of work. The process, then, show what is happening at different stages. The distances and time may be given. A flow process chart is a chart of all the activities involved in a process.
  • 9.  Two handed process chart :> in this chart activities of a workers or operators both hands are recorded chronologically.  Multiple activities chart :> This technique is used to solve problems where a number of items are dependent on each other. The aim is to reduce idle times by using the optimum number of each item.  Flow diagram :> It depicts the probable movement or position of materials and equipments in the floor plant. The movement is represented by a line in the plant drawing.
  • 10. Work measurement  Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out specified jobs at a defined level of performance or at a defined rate of working.  A qualified worker is one who has acquired the skill, knowledge and other attributes to carry out the work in hand to satisfactory standards of quantity, quality and safety.  Defined rate of working is the amount of work that can be produced by a qualified worker/employee when working at normal space and effectively utilizing his time and where work is not restricted by process limitation.
  • 11. Purpose of work measurement  To reveal the nature and extent of ineffective time, from whatever cause,  So that action can be taken to eliminate it; and then,  To set standards of performance that are attainable only if all avoidable ineffective time is eliminated and work is performed by the best method available.
  • 12. Uses of work measurement:  To compare the efficiency of alternative methods.  Cost estimation  Pricing of products and services  Incentive pay systems  Capacity planning  Production scheduling  To provide information on which estimates for tenders, selling prices and delivery promises can be based.  To reduce the waste of production delay.  To maximize the manpower utilization by minimize the idle time of the operation .