Tendering and its Process
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Table of contents
- Tender ?
- Tender vs Contract
- Purpose of tender
- Invitation of tender/tender notice
- Types of tender
- Tendering Process
- Prequalification
- Administrative approval
- Technical sanctions
- Feature or element of Tender documents
-Award of Contract
-Letter of intent
-Letter of acceptance
-Notice to proceed
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Tender
• an offer to contractor to do the work for a certain amount
of money.
• incorporate time and other conditions.
• to carry out the contract requirements.
• main reason is to complete a project.
• based on bill of quantities (BOQ) & specifications.
• Incorporates the sum of money, time and other conditions
required to carry out the contract obligations in order to
complete a project or a part of it consisting of specified
works.
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Tender vs Contract
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
TENDER
The term tender formally
means an invitation to
trade/build/supply under
the terms of offer.
CONTRACT
A contract is the term
used when two parties
have reached
agreement.
Purpose of tender
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• To select a suitable contractor at a time
appropriate to the situation of the project.
• To obtain an acceptable tender or offer upon
which a contract can be let.
• To ensure the completion of project at scheduled
time.
• To protect the interest of all stakeholders.
Invitation of tender/tender notice
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
It is a brief description of the job being tendered
Published in Newspapers and on the Internet.
Internet is a very cost effective way of publishing the
tenders.
Tender wizard, e-Procurement of different states,
Central Public Procurement Portal (CPPP) of
Government of India, E-Tender Portal (AAI), ISRO e-
procurement, BSNL Tenders, e-Procurement System for
Organisations under MoD.
Invitation of tender/tender notice Contd...
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
1. Name of the Project.
2. Name & Address of the
organization offering the
tender.
3. Name of work, materials or
services.
4. Place of work location.
5. Approximate estimated cost of
work.
6. Earnest Money.
7. Period of completion.
8. Date on which the Tender
Document sale commences.
9. Date and time up to which
tender documents can be
obtained.
10. The cost of tender documents.
11. Due date of submission
12. Eligibility Criteria
Invitation of tender/tender notice Contd...
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Types of tender
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Open tender
 open to all qualified bidders
 published in the newspaper and internet
 chosen on the basis of price and quality.
 most effective way of obtaining many competitive rates.
• Close tender / Selective tender
 open to bidders in the category stated in the notice only
 contractor of known reputations.
 contractor who submit the lowest tender.
 chosen for their expertise and experiences.
• Negotiated tender
 only one contractor is approached.
 architect and other members of the design team.
 As per the wish of client the contractor or firm will be selected.
Tendering Process
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Stage 2:
APPROVAL TO
TENDER
Stage 1:
PREPARATION
Stage 3:
DOCUMENTATION
Stage 4:
INVITATION
Stage 5:
PROCESSING
Stage 6:
AWARD
CONTRACT
Tendering Process Contd...
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Preparation:
• Final completion of drawings, specification, measurement /
take-off process.
• Choose conditions of contract.
• Parties involved: architect, engineers, QS, client, project
manager.
Approval of tender:
• Discussion and decision on type of tender to be used.
• Selection of tender type: open, selective & negotiate
• Parties involved: Client, Consultant, Project Manager
Tendering Process Contd...
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Documentation:
Compilation of:
 Letter of invitation to tenderers
 Articles of agreement / conditions of contract
 Form of tender
 Form of tenderer’s details. i.e: contractor’s registration, organization background,
track record (past and present projects)
 Letter of acceptance
 Bank and insurance guarantee forms (performance bond)
 Bank and insurance guarantee forms (advance payments)
 Specifications
 Summary of tender
 Schedule of rates
 Relevant drawings
Tendering Process Contd...
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Invitation:
Based on selection of tendering methods
• Open / competitive / bid tender – produce tender notice.
• Selective – shot listed contractors will be invited to
tender if they wish.
• Negotiated – only one contractor is approached- direct
entry to project.
Prequalification
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Screening of potential contractors, suppliers, or vendors to
develop a list of qualified bidders who will receive the
invitation-to-bid (ITB)/ tender documents.
• Parameters: Financial position, Previous experience,
Technical expertise, Management ability, Equipments,
Management ability, Workmanship and ability, Litigation
history etc,.
• Document proof need to submit along with bid document.
• Two phase bidding system: Technical and Financial bidding.
Administrative approval
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Budgetary approval from Government.
• Formal acceptance by the department.
• An approximate estimate and preliminary plans are necessary to
explain the proposals.
• After receiving the administrative approval, detailed drawings,
design and the estimated cost etc. are prepared by the engineering
department and submitted to the administrative department for
sanction.
• Department secretary provides the administrative approval after
the consent of minister incharge.
Technical Sanction
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• After receipt of administrative approval and expenditure
sanction, a detailed estimate is further sanctioned by a
competent technical authority of the engineering department.
• Ensures that the proposals are structurally sound and the
estimate is accurately calculated.
• Technical Sanction should be taken before inviting tenders to
execute the work.
• Chief Engineer to Assistant Executive Engineer provide the
Technical Sanction based on the amount of work.
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
1. Tender Drawings
2. The specification
General requirements
Specification of workmanship and materials
3. Bill of Quantities
4. Conditions of Contract
5. Form of Tender
6. Form of Agreement
7. Form of bond
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Tender Drawings:
• Tender drawings describe the project detail.
• Help the contractor to arrive realistic price.
• Ensure no significant changes in the project cost.
The specification
• General Specification
 Includes relevant details of the site and information on items which do not form
part of the permanent works: Accommodation (offices, toilets), stores, workshops,
fencing, watchman, protection, temporary roads and lighting, insurance,
scaffolding, administration and office equipment, cost of staffs
Contd...
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Specification of workmanship and materials
• It deals with the detailed requirements of project. The type, the quality
and method of fixing (or fabrication) and testing of every item for
incorporation in permanent works is described.
• Typical contents of ‘specification of workmanship and materials’ are:
Demolitions excavations and earthwork, drainage and sewerage, piling
and ground anchors, mass reinforced concrete, brickwork, masonry,
waterproofing, metalwork, structural steelwork, type of cement to be
used, type of aggregate, type of water, type of mixer required, trial
mixes required, test results required, method of mixing, tests on mixing,
methods of transporting and placing, tests on concrete produced,
methods of curing, stripping times for formwork, etc,.
Contd...
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Bill of quantities (BOQ)
• It lists every work activity or component part necessary for the
execution of the (permanent) works.
• These quantities are generally prepared by the Engineer’s staff
/quantity surveyors.
• Essential to cost control.
• Arranged to same sections as specifications and prepared from
tender drawings.
Contd...
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Bill of quantities (BOQ)
Contd...
Item No. Particulars Quantity Unit Rate Amount
1 Earthwork in excavation 10,55,273 cft 7 73,86,911
2 PCC 1:4:8 for Footings 38,768 cft 85 32,95,280
3 Shuttering for Footing 23,423 sft 26 6,08,998
4 Footing concrete 1:2:3 85,168 cft 100 85,16,800
5 Pedestal 5,094 cft 100 5,09,400
6 Plinth beam shuttering 18,184 sft 26 4,72,784
7 Plinth beam concrete 5,338 cft 100 5,33,800
8 Refilling of Earth 18,76,700 cft 2 37,53,400
9 PCC 1:4:8 for Basement 38,768 cft 35 13,56,880
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Conditions of Contract
Contd...
• Defines the responsibilities and liabilities of the parties to
the contract.
• Describe the method of administration (by Engineer)
• Define the terms under which the work is to be carried out,
the relationship between the Employer and the Contractor,
the powers of the Engineer and the terms of payment.
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Form of Tender
Contd...
• Standard letter of offer by the Contractor to execute the
works.
• Prepared by the Engineer and signed by the contractor.
• Contains the main points of the offer: Starting date,
Duration, Project cost.
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Form of Agreement
Contd...
• Standard form of agreement is the legal contract between
the promoter and the contractor.
• Evidences the agreement of the Employer to pay the price
indicated in the contractor’s tender and the contractor’s
agreement to undertake the works in accordance with the
tender documents.
• Names of parties, list of contract documents, and signatures
of parties.
Features or element of Tender documents
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
Form of Bond
Contd...
• It is signed by both the contractor and client evidencing their agreement
to pay a sum of money to the Employer in the event of the contractor’s
default.
• Terms and conditions if the either party fail to perform the duties
• Guarantee in two ways.
• The amount of bond is 10% of the contract sum.
Award of Contract
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Notice to a bidder of the acceptance of the submitted bid.
• Written confirmation of an award of a contract by client to a
successful bidder.
• Stating the amount of the award, the award date, and when
the contract will be signed.
Letter of intent (LOI)
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Interim agreement that summarizes the main points of a
proposed deal.
• Does not constitute a definitive contract but signifies a
genuine interest in reaching the final agreement subject to
due diligence, additional information, or fulfilment of
certain conditions.
• The language used in writing a letter of intent is of vital
importance.
• Memorandum of understanding' or pre-contract.
Letter of acceptance
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Written communication by a successful bidder to client.
• Formal acceptance of the bided project.
• Confirms the details of the client's offer including the
project cost, perquisites, conditions and project duration.
Notice to proceed (NTP)
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• Letter from the client/ owner) to a contractor stating the
date that the contractor can begin work subject to the
conditions of the contract.
• The performance time of the contract starts from the NTP
date.
Reference
MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
• https://www.procurement.act.gov.au/prequalification/preq
ualification_q_and_as.
• https://www.academia.edu/5114663/LECT_2_-
_TENDER_and_CONTRACT?auto=download.
• http://www.ques10.com/p/5658/explain-detailed-
specifications-administrative-a-1/.
• http://staff.fit.ac.cy/eng.ls/Skevi/ACEC438/ACEC438%2
0Tender%20documents%20presentation.pdf.

More Related Content

PPTX
TENDER DOCUMENT
PPTX
Tender procedure slide
PPT
Lecture 2 tender process n documentation
PPTX
Tendering process, Bid Evaluation & Award Process
PPTX
Tendering Bidding & Award of Contract Final Draft
PPTX
Piston manufacturing process
PPTX
Contracts and-tenders
TENDER DOCUMENT
Tender procedure slide
Lecture 2 tender process n documentation
Tendering process, Bid Evaluation & Award Process
Tendering Bidding & Award of Contract Final Draft
Piston manufacturing process
Contracts and-tenders

What's hot (20)

PPTX
Tendering presenation
PPTX
Tenders and procedure of tendering
PPTX
Tendering
PPTX
The Basics of Tendering & Bidding
PPT
Estimating and Tendering methods for Construction Work
PPTX
Types of contract
PPTX
Rate analysis in civil engineering
PPTX
Chapter_2-Procurement and Contract management.pptx
PPTX
Types of Contract in Construction Management
PPTX
civil engineering-Contracts
PPTX
Tender & Tender Notice
PDF
Procurement in construction
PPTX
Preparation of boq
PPTX
Construction equipments
PPTX
Construction contract
PDF
Specifications, reports and tenders
PPT
Construction contracts docuements_08092008
PPTX
Construction Documents
PPTX
Contracts
Tendering presenation
Tenders and procedure of tendering
Tendering
The Basics of Tendering & Bidding
Estimating and Tendering methods for Construction Work
Types of contract
Rate analysis in civil engineering
Chapter_2-Procurement and Contract management.pptx
Types of Contract in Construction Management
civil engineering-Contracts
Tender & Tender Notice
Procurement in construction
Preparation of boq
Construction equipments
Construction contract
Specifications, reports and tenders
Construction contracts docuements_08092008
Construction Documents
Contracts
Ad

Similar to Module 4 lecture 1 (20)

PPTX
Contracts specialist
PDF
Chapter -Two (3).pdf
PPTX
Types of tender and their processing.
PPT
Procurement and Contract Managgement.ppt
PDF
PPT_B Project Procurement and Tendering.pdf
PPTX
Unit 5 Tendering
PPTX
Lecture slides4; Construction Project Planning
PDF
Chapter 2 [compatibility mode]
PDF
Chapter 2 [compatibility mode]
PPT
Tenders.ppt
PDF
Tender and tender document
PPTX
PPTX
Proj management of site work and locations .pptx
PPTX
Tendering & Pre Construction Operations in Construction
PPTX
Overview Presentation - Procurement Directive, December 2021.pptx
PPTX
Tender & its process.pptx
PDF
Chapter -Two (2).pdf
PPT
construction technology and management
PDF
Tendering documentation
PPTX
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Contracts specialist
Chapter -Two (3).pdf
Types of tender and their processing.
Procurement and Contract Managgement.ppt
PPT_B Project Procurement and Tendering.pdf
Unit 5 Tendering
Lecture slides4; Construction Project Planning
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
Tenders.ppt
Tender and tender document
Proj management of site work and locations .pptx
Tendering & Pre Construction Operations in Construction
Overview Presentation - Procurement Directive, December 2021.pptx
Tender & its process.pptx
Chapter -Two (2).pdf
construction technology and management
Tendering documentation
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Ad

Recently uploaded (20)

PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
RMMM.pdf make it easy to upload and study
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
Cell Structure & Organelles in detailed.
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PPTX
Pharma ospi slides which help in ospi learning
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
O7-L3 Supply Chain Operations - ICLT Program
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
2.FourierTransform-ShortQuestionswithAnswers.pdf
VCE English Exam - Section C Student Revision Booklet
Anesthesia in Laparoscopic Surgery in India
Abdominal Access Techniques with Prof. Dr. R K Mishra
RMMM.pdf make it easy to upload and study
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
human mycosis Human fungal infections are called human mycosis..pptx
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Cell Structure & Organelles in detailed.
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
Pharma ospi slides which help in ospi learning
Pharmacology of Heart Failure /Pharmacotherapy of CHF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Supply Chain Operations Speaking Notes -ICLT Program
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Microbial disease of the cardiovascular and lymphatic systems
O7-L3 Supply Chain Operations - ICLT Program

Module 4 lecture 1

  • 1. Tendering and its Process MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
  • 2. Table of contents - Tender ? - Tender vs Contract - Purpose of tender - Invitation of tender/tender notice - Types of tender - Tendering Process - Prequalification - Administrative approval - Technical sanctions - Feature or element of Tender documents -Award of Contract -Letter of intent -Letter of acceptance -Notice to proceed MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
  • 3. Tender • an offer to contractor to do the work for a certain amount of money. • incorporate time and other conditions. • to carry out the contract requirements. • main reason is to complete a project. • based on bill of quantities (BOQ) & specifications. • Incorporates the sum of money, time and other conditions required to carry out the contract obligations in order to complete a project or a part of it consisting of specified works. MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
  • 4. Tender vs Contract MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS TENDER The term tender formally means an invitation to trade/build/supply under the terms of offer. CONTRACT A contract is the term used when two parties have reached agreement.
  • 5. Purpose of tender MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • To select a suitable contractor at a time appropriate to the situation of the project. • To obtain an acceptable tender or offer upon which a contract can be let. • To ensure the completion of project at scheduled time. • To protect the interest of all stakeholders.
  • 6. Invitation of tender/tender notice MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS It is a brief description of the job being tendered Published in Newspapers and on the Internet. Internet is a very cost effective way of publishing the tenders. Tender wizard, e-Procurement of different states, Central Public Procurement Portal (CPPP) of Government of India, E-Tender Portal (AAI), ISRO e- procurement, BSNL Tenders, e-Procurement System for Organisations under MoD.
  • 7. Invitation of tender/tender notice Contd... MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS 1. Name of the Project. 2. Name & Address of the organization offering the tender. 3. Name of work, materials or services. 4. Place of work location. 5. Approximate estimated cost of work. 6. Earnest Money. 7. Period of completion. 8. Date on which the Tender Document sale commences. 9. Date and time up to which tender documents can be obtained. 10. The cost of tender documents. 11. Due date of submission 12. Eligibility Criteria
  • 8. Invitation of tender/tender notice Contd... MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS
  • 9. Types of tender MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Open tender  open to all qualified bidders  published in the newspaper and internet  chosen on the basis of price and quality.  most effective way of obtaining many competitive rates. • Close tender / Selective tender  open to bidders in the category stated in the notice only  contractor of known reputations.  contractor who submit the lowest tender.  chosen for their expertise and experiences. • Negotiated tender  only one contractor is approached.  architect and other members of the design team.  As per the wish of client the contractor or firm will be selected.
  • 10. Tendering Process MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Stage 2: APPROVAL TO TENDER Stage 1: PREPARATION Stage 3: DOCUMENTATION Stage 4: INVITATION Stage 5: PROCESSING Stage 6: AWARD CONTRACT
  • 11. Tendering Process Contd... MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Preparation: • Final completion of drawings, specification, measurement / take-off process. • Choose conditions of contract. • Parties involved: architect, engineers, QS, client, project manager. Approval of tender: • Discussion and decision on type of tender to be used. • Selection of tender type: open, selective & negotiate • Parties involved: Client, Consultant, Project Manager
  • 12. Tendering Process Contd... MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Documentation: Compilation of:  Letter of invitation to tenderers  Articles of agreement / conditions of contract  Form of tender  Form of tenderer’s details. i.e: contractor’s registration, organization background, track record (past and present projects)  Letter of acceptance  Bank and insurance guarantee forms (performance bond)  Bank and insurance guarantee forms (advance payments)  Specifications  Summary of tender  Schedule of rates  Relevant drawings
  • 13. Tendering Process Contd... MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Invitation: Based on selection of tendering methods • Open / competitive / bid tender – produce tender notice. • Selective – shot listed contractors will be invited to tender if they wish. • Negotiated – only one contractor is approached- direct entry to project.
  • 14. Prequalification MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Screening of potential contractors, suppliers, or vendors to develop a list of qualified bidders who will receive the invitation-to-bid (ITB)/ tender documents. • Parameters: Financial position, Previous experience, Technical expertise, Management ability, Equipments, Management ability, Workmanship and ability, Litigation history etc,. • Document proof need to submit along with bid document. • Two phase bidding system: Technical and Financial bidding.
  • 15. Administrative approval MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Budgetary approval from Government. • Formal acceptance by the department. • An approximate estimate and preliminary plans are necessary to explain the proposals. • After receiving the administrative approval, detailed drawings, design and the estimated cost etc. are prepared by the engineering department and submitted to the administrative department for sanction. • Department secretary provides the administrative approval after the consent of minister incharge.
  • 16. Technical Sanction MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • After receipt of administrative approval and expenditure sanction, a detailed estimate is further sanctioned by a competent technical authority of the engineering department. • Ensures that the proposals are structurally sound and the estimate is accurately calculated. • Technical Sanction should be taken before inviting tenders to execute the work. • Chief Engineer to Assistant Executive Engineer provide the Technical Sanction based on the amount of work.
  • 17. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS 1. Tender Drawings 2. The specification General requirements Specification of workmanship and materials 3. Bill of Quantities 4. Conditions of Contract 5. Form of Tender 6. Form of Agreement 7. Form of bond
  • 18. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Tender Drawings: • Tender drawings describe the project detail. • Help the contractor to arrive realistic price. • Ensure no significant changes in the project cost. The specification • General Specification  Includes relevant details of the site and information on items which do not form part of the permanent works: Accommodation (offices, toilets), stores, workshops, fencing, watchman, protection, temporary roads and lighting, insurance, scaffolding, administration and office equipment, cost of staffs Contd...
  • 19. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Specification of workmanship and materials • It deals with the detailed requirements of project. The type, the quality and method of fixing (or fabrication) and testing of every item for incorporation in permanent works is described. • Typical contents of ‘specification of workmanship and materials’ are: Demolitions excavations and earthwork, drainage and sewerage, piling and ground anchors, mass reinforced concrete, brickwork, masonry, waterproofing, metalwork, structural steelwork, type of cement to be used, type of aggregate, type of water, type of mixer required, trial mixes required, test results required, method of mixing, tests on mixing, methods of transporting and placing, tests on concrete produced, methods of curing, stripping times for formwork, etc,. Contd...
  • 20. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Bill of quantities (BOQ) • It lists every work activity or component part necessary for the execution of the (permanent) works. • These quantities are generally prepared by the Engineer’s staff /quantity surveyors. • Essential to cost control. • Arranged to same sections as specifications and prepared from tender drawings. Contd...
  • 21. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Bill of quantities (BOQ) Contd... Item No. Particulars Quantity Unit Rate Amount 1 Earthwork in excavation 10,55,273 cft 7 73,86,911 2 PCC 1:4:8 for Footings 38,768 cft 85 32,95,280 3 Shuttering for Footing 23,423 sft 26 6,08,998 4 Footing concrete 1:2:3 85,168 cft 100 85,16,800 5 Pedestal 5,094 cft 100 5,09,400 6 Plinth beam shuttering 18,184 sft 26 4,72,784 7 Plinth beam concrete 5,338 cft 100 5,33,800 8 Refilling of Earth 18,76,700 cft 2 37,53,400 9 PCC 1:4:8 for Basement 38,768 cft 35 13,56,880
  • 22. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Conditions of Contract Contd... • Defines the responsibilities and liabilities of the parties to the contract. • Describe the method of administration (by Engineer) • Define the terms under which the work is to be carried out, the relationship between the Employer and the Contractor, the powers of the Engineer and the terms of payment.
  • 23. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Form of Tender Contd... • Standard letter of offer by the Contractor to execute the works. • Prepared by the Engineer and signed by the contractor. • Contains the main points of the offer: Starting date, Duration, Project cost.
  • 24. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Form of Agreement Contd... • Standard form of agreement is the legal contract between the promoter and the contractor. • Evidences the agreement of the Employer to pay the price indicated in the contractor’s tender and the contractor’s agreement to undertake the works in accordance with the tender documents. • Names of parties, list of contract documents, and signatures of parties.
  • 25. Features or element of Tender documents MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS Form of Bond Contd... • It is signed by both the contractor and client evidencing their agreement to pay a sum of money to the Employer in the event of the contractor’s default. • Terms and conditions if the either party fail to perform the duties • Guarantee in two ways. • The amount of bond is 10% of the contract sum.
  • 26. Award of Contract MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Notice to a bidder of the acceptance of the submitted bid. • Written confirmation of an award of a contract by client to a successful bidder. • Stating the amount of the award, the award date, and when the contract will be signed.
  • 27. Letter of intent (LOI) MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Interim agreement that summarizes the main points of a proposed deal. • Does not constitute a definitive contract but signifies a genuine interest in reaching the final agreement subject to due diligence, additional information, or fulfilment of certain conditions. • The language used in writing a letter of intent is of vital importance. • Memorandum of understanding' or pre-contract.
  • 28. Letter of acceptance MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Written communication by a successful bidder to client. • Formal acceptance of the bided project. • Confirms the details of the client's offer including the project cost, perquisites, conditions and project duration.
  • 29. Notice to proceed (NTP) MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • Letter from the client/ owner) to a contractor stating the date that the contractor can begin work subject to the conditions of the contract. • The performance time of the contract starts from the NTP date.
  • 30. Reference MODULE 4 CONTRACT MANAGEMENT -TENDER AND ITS PROCESS • https://www.procurement.act.gov.au/prequalification/preq ualification_q_and_as. • https://www.academia.edu/5114663/LECT_2_- _TENDER_and_CONTRACT?auto=download. • http://www.ques10.com/p/5658/explain-detailed- specifications-administrative-a-1/. • http://staff.fit.ac.cy/eng.ls/Skevi/ACEC438/ACEC438%2 0Tender%20documents%20presentation.pdf.