Monitor Drilling performance
based on
(Time – Depth – Cost) Curve
Operation Geologist
Practical use and reference
PROPOSED WELL
0
10
20
30
40
50
60
70
80
90
100
0
20
40
60
80
100
120
140
160
1/Jan/89
1/Jan/90
1/Jan/91
1/Jan/92
1/Jan/93
1/Jan/94
1/Jan/95
1/Jan/96
1/Jan/97
1/Jan/98
1/Jan/99
1/Jan/00
1/Jan/01
1/Jan/02
1/Jan/03
1/Jan/04
1/Jan/05
1/Jan/06
1/Jan/07
1/Jan/08
1/Jan/09
wc(%)
Gross/OilRate(bblper/day)
Date
Gross (BFPD) Oil Rate (BOPD)
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
1 2 3 4 5 6 7
Daily oil per
well
(bbl/day)
Water Cut (%)
0
13-3/8" 20 Meter
100 9 5/8" 100 Meter
200
300
400
5.1/2"
TD 440 Meter
500
Well ABC
MBLB
z z
Well ABC
Well ABC Forecast
Example inWellABCDrilling
DRILLING WELL OPERATION
7 Nov 2012 Day 1
Prepare to Spud-In and Pree Job Safety Meeting. SPUD-IN
WELL ABC At 07:00 hours on 07 november 2012 Drill out
form 12 1/4" Hole to 58 M. stop drill Doe To problem on
shale shaker . Repair shale shaker. Continue drill out
formation from 58 M to 122 M.
8 Nov 2012 Day 2
Continued drill out formation from 122 M to 135 M.
Circulated for cleaning hole (GPM: 400, SPP: 240 psi. POOH
12-1/4" TCB + BHA Assembly from 135 M to surface (found
balling on 12-1/4" bit and 6-1/2" DC. RIH back 12-1/4" TCB
+ BHA Assembly from surface to 135 M. Circulated for
cleaning hole (GPM: 390, SPP: 210 psi. POOH 12-1/4" TCB
+ BHA Assembly from 135 M to surface. Prepared for RIH
csg 9-5/8". PJSM prior to run 9-5/8 "csg. RIH 9-5/8" casing
(11 jts # 40 ppf, K-55, BTC-R3) to 132 M (set shoe 9-5/8"
csg). RIH stinger + DP 5" to 132 M for Cementing 9-5/8" csg.
Circulated prior to cementing job. No Cementing engineer
stand by at location Well ABC. Wait on cementing engineer
while break circulated (GPM: 425, SPP: 180 psi).
9 Nov 2012 Day 3
Continue wait on cementing engineer while break circulated
(GPM: 425, SPP: 180 psi). R/U Cementing line and presure
test to 2000 psi, Hold 5 min - ok. Hold safety meeting prior
cementing job;- Pump preplush as water ahead, 0,5 m3 @ rate
0.8 m3/min; Mix and pump slurry 15.8 ppg, 6.62 m3 @ rate
0.8 m3/min; Displace w/ water 1.16 m3 @ rate 0.8 m3/min.
Cip (cement in place) @ 08:25 hours. WOC
10 Nov 2012 Day 4
Continue WOC. Break off landing joint and L/D same.
Moved 44 jts 5-1/2 casing F/Yard to KM#606 location (RIG
SITE); Moved 10 big saxs of bentonite F/Yard to Well ABC
location
Example inWellABCDrilling
DRILLING WELL OPERATION
11 Nov 20xx Day 5
Continue rolling crane from KME base camp to XJ-450 rig
site. N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS
"OK". Press test annular, pipe rams and blind rams to 1000 psi
each for 5 minutes "OK". RIH W/8-1/2 PDC BIT TO TAC
SHOE (132). Drill out shoe and CMT to 134 M. /134 M to
175 M."
12 Nov 20xx Day 6
Continue drill out formation with 8-1/2" PDC + BHA from
175 m to 222 m (WOB/RPM/SPP/GPM/Last ROP/ROP
Ave.= 1- klbs/58/480 psi/404 GPM/10.2 mph/19.6 mph).
Founded mud loss 12 bbls/mnt @ interval 220 m - 222 m with
lithologi: coal. Circulate while mixing mud in active tank.
/RPM/SPP/GPM/Last ROP/ROP Ave.= 1-5 klbs/58/500
psi/448 GPM/47,20 mph/17.9 mph). Stop drilling formation
due to founded loss total @ interval 374 m - 378 m. total mud
loss = 280 bbls. Continue drill out formation with 8-1/2" PDC
+ BHA from 222 m to 378. Stop drilling formation due to
founded loss total @ interval 374 m - 378 m. total mud loss =
280 bbls. Last lithologi: sandstone (80%), Claystone(20%).
POOH 8-1/2" PDC + BHA from 378 m to 250 m while
mixing mud to active tank. Mixing mud to active tank.
13 Nov 20xx Day 7
Continue mixing mud to active tank. RIH Back 8-1/2" PDC
+BHA from 250 m to 378 m. Circulate (GPM: 444, SPP: 400
psi). Blind drill with 8-1/2" PDC + BHA from 378 m to 380
m. founded loss totally. Total mud loss: 390 bbls. POOH 8-
1/2" PDC + BHA FROM 378 M TO 318 M while mixing mud
to active tank. wait on water for fill active tank and mixing
mud. circulate f/check annulus and still founded loss. pull out
bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe)
while mixing mud + LCM to active tank. Break circulate
(GPM: 444, SPP: 400 psi). At shoe no loss (OK). run back
from 132 m (casing shoe) to 241 m (6 stand). Break circulate
(GPM: 444, SPP: 400 psi). Good return. run back from 241 m
to 378 m (botton). drill out formation f/378 to 436 m
(WOB/RPM/MFI/SPP/Last ROP/ROP Ave = 1-9 klbs/40-
60/430 GPM/480 psi/25,76 mph/25,21 mph). Founded partial
loss 2 - 4 bpm.
Example inWellABCDrilling
DRILLING WELL OPERATION
14 Nov 2012 Day 8
Continue drill out formation f/ 436 m to 456 m (Total Depth).
Circulate for clening hole (GPM: 391, SPP: 460 psi). POOH
8-1/2" PDC + BHA from 456 m to surface for run electrical
logging. R/u DQWL and prepare Tools. Run wireline logging.
1.MSFL - DLL - DT - GR - SP - CAL. 2.HRL - GR, R/D
DQWL Unit. RIH 8-1/2" Bit PDC + BHA to botton (456).
Circulate for cleaning hole (GPM: 391, SPP: 460 psi). /2".
LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC. POOH
8-1/2" PDC + BHA from 456 m to surface for running casing
5-1/2". LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC.
N/D BOP S 11-5/8" x 5K psi
15 Nov 2012 Day 9
Continue N/D BOP S 11-5/8" x 5K psi. /surface to bottom
casing at shoe 447 Mkb , FC at 436.42 m . Prepare and RIH 5-
1/2" caing (# 17 ppf, L-80, BTC-R3) f/surface to bottom
casing at shoe 447 Mkb , FC at 436.42 m . P/up kelly for
circulate clean hole. R/U cementing line and pressure test to
2000 psi, hold 5 min - OK. Hold safety meeting prior
cementing job. Pump preflush as water ahead 0.5 m3/min @
rate 0.8 m3/min. Displace w/water 1.16 m3 @ rate 0.8
m3/min. Bumped to 500 psi no cement return to surface. CIP
(cement In Place) @ 16:00 Hrs. WOC
16 Nov 2012 Day 10
Lay down 40 jts 5" DP and Kelly. Clean up mud tank.
prepare to Rig down
17 Nov 2012 Day 11
Continue WOC for 48 hrs - Lower mast. Clean up
subtruckture. 40 % Rig Down
18 Nov 2012 Day 12
Continue Rig Down to 60 %. Modify mouse Hole pipe to
make longer in progress. While waiting on road condition to
move out Rig equipment. Wait on day
Example inWellABCDrilling
COST CONTROLER
From To Elapsed
6:00 7:00 1:00 1 1 214.05$ Prepare to Spud-In and Pree Job Safety Meeting
7:00 15:00 8:00 8.00 8 2,854.00$
SPUD-IN WEEL ABC At 07:00 hours on 07 november 20xx Drill out
form 12 1/4" Hole to 58 M. stop drill Doe To problem on shale shaker
15:00 17:00 2:00 2 2 570.80$ Repair shale shaker
17:00 0:00 7:00 7.00 7 2,497.25$ Cont'd drill out formation from 58 M to 122 M
0:00 2:30 2:30 2.5 2.5 891.88$ Continued drill out formation from 122 M to 135 M
2:30 3:00 0:30 0.5 0.5 178.38$ Circulated for cleaning hole (GPM: 400, SPP: 240 psi
3:00 6:00 3:00 3.0 3 1,070.25$
POOH 12-1/4" TCB + BHA Assembly from 135 M to surface (found
balling on 12-1/4" bit and 6-1/2" DC
6:00 8:00 2:00 2.0 2 713.50$ RIH back 12-1/4" TCB + BHA Assembly from surface to 135 M
8:00 8:30 0:30 0.5 0.5 178.38$ Circulated for cleaning hole (GPM: 390, SPP: 210 psi
8:30 11:00 2:30 2.5 2.5 891.88$ POOH 12-1/4" TCB + BHA Assembly from 135 M to surface
11:00 15:00 4:00 4 4 1,141.60$ Prepared for RIH csg 9-5/8". PJSM prior to run 9-5/8 "csg
15:00 16:30 1:30 1.5 1.5 535.13$
RIH 9-5/8" casing (11 jts # 40 ppf, K-55, BTC-R3) to 132 M (set shoe 9-
5/8" csg)
16:30 19:30 3:00 3.0 3 1,070.25$ RIH stinger + DP 5" to 132 M for Cementing 9-5/8" csg
19:30 20:00 0:30 0.5 0.5 178.38$
Circulated prior to cementing job. No Cementing engineer stand by at
location ABC
20:00 0:00 4:00 4 4 856.20$
Wait on cementing engineer while break circulated (GPM: 425, SPP:
180 psi)
0:00 7:00 7:00 7 7 1,498.35$
Cont'd wait on cementing engineer while break circulated (GPM: 425,
SPP: 180 psi)
7:00 8:30 1:30 1.5 1.5 535.13$
R/U Cementing line and presure test to 2000 psi, Hold 5 min - ok, '-
Hold safety meeting prior cementing job, Pump preplush as water
ahead, 0,5 m3 @ rate 0.8 m3/min, Mix and pump slurry 15.8 ppg, 6.62
m3 @ rate 0.8 m3/min, Displace w/ water 1.16 m3 @ rate 0.8 m3/min.
Cip (cement in place) @ 08:25 hours.
8:30 15:00 6:30 6.5 6.5 2,318.88$ Pull Out out DP 5" + stringer and L/D same
15:00 0:00 9:00 9 9 1,926.45$ WOC
0:00 9:00 9:00 9 9 1,926.45$ Cont'd WOC
9:00 0:00 15:00 15.0 15 5,351.25$
Break off landing joint and L/D same '- Instaled 9-5/8" x 2000 well head
and prepare to N/U 11" x 5 K BOPS, Moved 44 jts 5-1/2 casing F/Yard to
ABC location (RIG SITE), Moved 10 big saxs of bentonite F/Yard to ABC
6 location
0:00 7:00 7:00 7 7 1,997.80$ Continue rolling crane from ABC base camp to XJ-450 rig site.
N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS "OK". Press
4 ABC
2 ABC
3 ABC
1 ABC
STAND BY
W/O CREW
TOTAL
HOURS
TOTAL COST OPERATIONDAY WELL
TIME
OPERATING MOVING
STAND BY
W/CREW
Example inWellABCDrilling
8:30 15:00 6:30 6.5 6.5 2,318.88$ Pull Out out DP 5" + stringer and L/D same
15:00 0:00 9:00 9 9 1,926.45$ WOC
0:00 9:00 9:00 9 9 1,926.45$ Cont'd WOC
9:00 0:00 15:00 15.0 15 5,351.25$
Break off landing joint and L/D same '- Instaled 9-5/8" x 2000 well head
and prepare to N/U 11" x 5 K BOPS, Moved 44 jts 5-1/2 casing F/Yard to
ABC location (RIG SITE), Moved 10 big saxs of bentonite F/Yard to ABC
6 location
0:00 7:00 7:00 7 7 1,997.80$ Continue rolling crane from ABC base camp to XJ-450 rig site.
7:00 18:00 11:00 11 11 3,924.25$
N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS "OK". Press
test annular, pipe rams and blind rams to 1000 psi each for 5
minutes "OK".
18:00 20:30 2:30 2.5 2.5 891.88$ RIH W/8-1/2 PDC BIT TO TAC SHOE (132).
20:30 21:30 1:00 1 1 356.75$ Drill out shoe and CMT to 134 M.
21:30 0:00 2:30 2.5 2.5 891.88$ Continue Drill formation 8-1/2" Hole F/134 M to 175 M.
0:00 5:00 5:00 5 5 1,783.75$
Continue drill out formation with 8-1/2" PDC + BHA from 175 m
to 222 m (WOB/RPM/SPP/GPM/Last ROP/ROP Ave.= 1-
klbs/58/480 psi/404 GPM/10.2 mph/19.6 mph), Founded mud
loss 12 bbls/mnt @ interval 220 m - 222 m with lithologi: coal
5:00 6:00 1:00 1 1 356.75$ Circulate while mixing mud in active tank
6:00 23:00 17:00 17 17 6,064.75$
Continue drill out formation with 8-1/2" PDC + BHA from 222 m
to 378 (WOB/RPM/SPP/GPM/Last ROP/ROP Ave.= 1-5
klbs/58/500 psi/448 GPM/47,20 mph/17.9 mph). Stop drilling
formation due to founded loss total @ interval 374 m - 378 m.
total mud loss = 280 bbls. Last lithologi: sandstone (80%),
Claystone(20%)
23:00 23:30 0:30 0.5 0.5 178.38$
POOH 8-1/2" PDC + BHA from 378 m to 250 m while mixing mud
to active tank
23:30 0:00 0:30 0.5 0.5 107.03$ Mixing mud to active tank
0:00 2:30 2:30 2.5 2.5 535.13$ Continue mixing mud to active tank
2:30 3:30 1:00 1 1 356.75$ RIH Back 8-1/2" PDC +BHA from 250 m to 378 m
3:30 4:00 0:30 0.5 0.5 178.38$
Circulate (GPM: 444, SPP: 400 psi). Blind drill with 8-1/2" PDC +
BHA from 378 m to 380 m. founded loss totally. Total mud loss:
390 bbls
4:00 5:00 1:00 1 1 356.75$
POOH 8-1/2" PDC + BHA FROM 378 M TO 318 M while mixing
mud to active tank
5:00 10:00 5:00 5 5 1,070.25$ wait on water for fill active tank and mixing mud
10:00 11:00 1:00 1 1 356.75$ circulate f/check annulus and still founded loss
11:00 13:00 2:00 2 2 713.50$
pull out bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe)
while mixing mud + LCM to active tank
13:00 13:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). At shoe no loss (OK)
13:30 15:00 1:30 1.5 1.5 535.13$ run back from 132 m (casing shoe) to 241 m (6 stand)
15:00 15:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). Good return
15:30 17:30 2:00 2 2 713.50$ run back from 241 m to 378 m (botton)
17:30 0:00 6:30 6.5 6.5 2,318.88$
drill out formation f/378 to 436 m (WOB/RPM/MFI/SPP/Last
ROP/ROP Ave = 1-9 klbs/40-60/430 GPM/480 psi/25,76
mph/25,21 mph). Founded partial loss 2 - 4 bpm
0:00 1:30 1:30 1.5 1.5 535.13$ Continue drill out formation f/ 436 m to 456 m (Total Depth)
1:30 3:00 1:30 1.5 1.5 535.13$ Circulate for clening hole (GPM: 391, SPP: 460 psi)
3:00 7:00 4:00 4 4 1,427.00$
POOH 8-1/2" PDC + BHA from 456 m to surface for run electrical
4 ABC
5 ABC
ABC
7 ABC
6
COST CONTROLER
Example inWellABCDrilling
10:00 11:00 1:00 1 1 356.75$ circulate f/check annulus and still founded loss
11:00 13:00 2:00 2 2 713.50$
pull out bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe)
while mixing mud + LCMto active tank
13:00 13:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). At shoe no loss (OK)
13:30 15:00 1:30 1.5 1.5 535.13$ run back from 132 m (casing shoe) to 241 m (6 stand)
15:00 15:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). Good return
15:30 17:30 2:00 2 2 713.50$ run back from 241 m to 378 m (botton)
17:30 0:00 6:30 6.5 6.5 2,318.88$
drill out formation f/378 to 436 m (WOB/RPM/MFI/SPP/Last
ROP/ROP Ave = 1-9 klbs/40-60/430 GPM/480 psi/25,76
mph/25,21 mph). Founded partial loss 2 - 4 bpm
0:00 1:30 1:30 1.5 1.5 535.13$ Continue drill out formation f/ 436 m to 456 m (Total Depth)
1:30 3:00 1:30 1.5 1.5 535.13$ Circulate for clening hole (GPM: 391, SPP: 460 psi)
3:00 7:00 4:00 4 4 1,427.00$
POOH 8-1/2" PDC + BHA from 456 m to surface for run electrical
logging
7:00 10:00 3:00 3 3 642.15$ R/u DQWL and prepare Tools
10:00 15:30 5:30 5.5 5.5 1,962.13$
Run wireline logging 1. MSFL - DLL - DT - GR - SP - CAL 2. HRL -
GR, R/D DQWL Unit
15:30 18:30 3:00 3 3 1,070.25$ RIH 8-1/2" Bit PDC + BHA to botton (456)
18:30 19:00 0:30 0.5 0.5 178.38$ Circulate for cleaning hole (GPM: 391, SPP: 460 psi)
19:00 23:00 4:00 4 4 1,427.00$
POOH 8-1/2" PDC + BHA from 456 m to surface for running
casing 5-1/2". LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC
23:00 0:00 1:00 1 1 356.75$ N/D BOP S 11-5/8" x 5K psi
0:00 7:00 7:00 7 7 2,497.25$ Continue N/D BOP S 11-5/8" x 5K psi
7:00 14:30 7:30 7.5 7.5 2,675.63$
Prepare and RIH 5-1/2" caing (# 17 ppf, L-80, BTC-R3) f/surface
to bottom casing at shoe 447 Mkb , FC at 436.42 m .
14:30 15:00 0:30 0.5 0.5 178.38$ P/up kelly for circulate clean hole
15:00 16:00 1:00 1 1 356.75$
R/U cementing line and pressure test to 2000 psi, hold 5 min -
OK '- Hold safety meeting prior cementing job '- Pump preflush
as water ahead 0.5 m3/min @ rate 0.8 m3/min '- Displace
w/water 1.16 m3 @ rate 0.8 m3/min. Bumped to 500 psi no
cement return to surface. CIP (cement In Place) @ 16:00 Hrs
16:00 0:00 8:00 8 8 1,712.40$ WOC
10 ABC 0:00 0:00 0:00 24 24 5,137.20$
Continue WOC for 48 hrs '- Lay down 40 jts 5" DP and Kelly, '-
Clean up mud tank, '- prepare to Rig down
0:00 18:00 18:00 18 18 3,852.90$ - Continue WOC for 48 hrs - Lower mast
18:00 0:00 6:00 6 6 1,712.40$ - Clean up subtruckture, '- 40 % Rig Down
6:00 18:00 12:00 18 18 3,852.90$
- Continue Rig Down to 70 %, '- Modify mouse Hole pipe to
make longer in progress, '- While waiting on road condition to
move out Rig equipment
18:00 0:00 6:00 6 6 1,712.40$ Wait on day
148.00 7.00 18.00 109.00 282
52,799.00 1,997.80 5,137.20 23,331.45 11.75
Total Hours
83,265.45$
8 ABC
7 ABC
12 ABC
9 ABC
11 ABC
COST CONTROLER
Example inWellABCDrilling
Plan Vs. Actual
• Multi engineers,
geosciences, & finance
together discuss
scenario for the
completion of the well.
• Finally the (Time –
Depth – Cost) curve
been generated to
monitor Drilling
performance.
• TDC curve usually used
to presenting Drilling
performance
WELL SCHEMATIC PAGE 1 of 1 Job CODE
FIELD : SE Asia WELL NO: ABC CHARGE TO : AFE 12-1234 DATE : 8/8/20xx
RECOMMENDATION : Swab Test & Isolate High WC Zone(s) Well Kill Fluid Density : 8.4 ppg
CURRENT STATUS : Production Est. Pump : 415
LATEST TEST : 5 BOPD %WC (7/31/14) SFL / WFL / FAP : - m/ - m/ - m
RIG DAYS : 11.0 ( all cash ) EST. GAIN : 30 BOPD
RT - GL - KB : 4.7 / 79 / 86.7 PBTD/TD : 455m / 455m WELL TYPE : SOW LOG DATE : 7/11/2012
Important Note:
* Do not kill, equalize well w/FFW as necessary
PROCEDURE:
11 JTS 9 5/8" K-55, 1 Spud in Drill formation to 122 m with 12-1/4” RB, (Nov.7, 2012)
40PPF, R-3 2 Cont’ drilling from 122 m to 134 m, with 12-1/4” RB, Circulate, POOH
BTC CASING, 12¼" TCB + BHA 134 m to surface. RIH back 12¼" TCB + BHA from
SHOE @132m surface to 134 m. Circulate. POOH 12¼" TCB + BHA from 134 m to
surface. RIH 9-5/8" casing (# 40 ppf, K-55, BTC-R3) to 132 M(set shoe
9-5/8" csg). RIH stinger + DP 5" to 132. Circulated. (Nov.8, 2012)
3 Cont’ R/U cementing line and pressure test to 2000 psi, pump flush,
mix and pump slurry 15.8 ppg, 6.62 m3 @ rate 0.8 m3/min, displace
with water. CIP (cement in place) @ 08:25 hrs. Pull out DP 5" + stringer
and L/D same. WOC (Nov.9, 2012)
4 Cont’ WOC. Break out L/D joint and same. Install Well Head 9-
5/8" X 5K psi and Prepare to N/U BOP 11" X 5K psi. (Nov.10, 2012)
S4 5 BOP S 11-5/8" X 5K. M/U and RIH 8-1/2" PDC + BHA to 132 m (Top of
Cement) Drilling & FS w/ 8-1/2" PDC + BHA from 132 m to 134 m with
284.0 - 285.0 m 8-1/2" PDC + BHA from 134 m to 175 m WOB/RPM/SPP/GPM/Last
S5 (05 Jul 20xx) ROP/ROP) (Nov.11, 2012)
6 Cont’ drilling with 8-1/2" PDC + BHA from 175 m to 222 m. Circulate
304.4 - 305.4 m Continue drilling out formation with 8-1/2" PDC + BHA from 222 m to
S6 (12-19 Sep 20xx) 378 m. mud loss = 280 bbls. POOH 8-1/2" PDC + BHA from 378 m to
250 m Nov.(12, 2012)
324.4 - 326.0 m 7 RIH back 8-1/2" PDC + BHA from 250 m to 378 m. Circulate. Pull out bit
8-1/2" PDC + BHA from 318 m to 125 m( casing shoe). Circulate Run
327.0 - 327.6 m back from 132 m ( casing shoe ) to 241 m (6 stand). Circulate . Run
back from 241 m to 378 m (bottom). Drilling formation from378 m to
Pump set (PSN) @340m 329.0 - 329.6 m 436 m (Nov.13, 2012)
S7B 8 Cont’ drill out formation f/ 436 m to 455 m. Circulate. POOH 8-1/2"
PDC + BHA from 455 m to surface for run logging. Run logging 1. MSFL
375.0 - 376.0 m - DLL - DT -GR - SP – CAL 2. HRL – GR RIH 8 1/2" Bit PDC + BHA to
Bottom (455 m). Circulate POOH 8-1/2" PDC + BHA from 455 m to
379.0 - 381.0 m surface for running casing 5 1/2". (Nov.14, 2012)
S7C 9 RIH 5-1/2" casing (# 17 ppf, L-80, BTC-R3) from surface to 447 m (set
csg shoe). Circulate clean hole Cementing job 5-1/2" csg. Pump
392.6 - 393.6 m preflush. CIP (cement in place) at 16:00 WIB hrs. WOC, MLU released
R/D all equipments (Nov.15, 2012)
395.0 - 396.0 m
PBTD @425m (CBL)
Shoe @ 447m
Surface Casing 11 JTS 9-5/8", 40.00ppf, K-55, R3, BTC Casing, shoe @132m
Prod Casing 38 JTS 5-1/2", 17.00 PPF, L-80, R-3,BTC CASING. FLOAT SHOE @447.0m & F.C @436.42m.
PLAN ACTUAL
70.9 BFPD 93
COST US$ : 771,219
TD @ 455m TD @ 455m
RECOMENDATION:
The well wasdrilledtoTD @455m on (07-15 Nov 20xx). The well wasIC on
(02-07 Jul 20xx) by perforatingS4sand (284.0-285.0m). The well wasPOPon
07 Jul 20xx at 11:00am. Recompletionwasdone on(12-19 Sep20xx) to
perforate S5sand (304.4-305.4m), S6 sand (324.4-326.0m, 327.0-327.6m,
329.0-329.6m), S7B sand(375.0-376.0m, 379-381m) andS7C (392.6-393.6m,
395.0-396.0m). Afterloweringthe pumpandsetPSN @375m on 27 Sep
2013, the well wasPOPwithinitial productionat 122BFPD/36BOPD/70%
WC.
Currentproduction: 70.88BFPD/5.25BOPD/93%WC
Example inWellABCDrilling
20m 12m
100m 134m
440m 447m
TD @440m TD @455m
TECHNICAL DATA
WELL NAME ABC
LOCATION SE ASIA A -> B Drill hole 12 1/4" until 100 m 0.1 1.0
TARGET X: 123456 B -> C Put & cemen the casing 9 5/8", Prepare to drill hole 8 1/2" 2.4 2.0
Y: 7654321 C -> D Drill hole 8-1/2" until + 440m 2.3 4.0
Elevation 74 D -> E Put & cement the casing 5 1/2" and put wellhead 1.2 1.2
Drilling type Vertical E -> F perforation and POP 2.5 3.5
Well Class Development
TD 440 meter
Rig 450 hp A -> F Total 8.5 11.7
Rig Floor 4.8m
AFE 12-1234
TIME - DEPTH - COST CURVE
CODE DESCRIPTION
PLAN & ACTUAL
PLAN & ACTUAL
DAYS
$-
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
$80,000
$90,000
-750
-650
-550
-450
-350
-250
-150
-50
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00
Depth(M)
Days
PLAN & ACTUAL DRILLINGWELL-ABC
(DRILLING DESIGN)
C
A
B
C
B
D
E F
Rollingcrane fromABC
base camp & Drill out shoe
POOHDue to losses
C
B
D
E F

More Related Content

PPTX
STIMULATION HUFF & PUFF AND CONTINUES INJECTION USING FORMULATED SURFACTANT
PDF
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
PDF
SUBSURFACE EVALUATION FULL SCALE EOR WATER FLOODING A - M FAULT ANTICLINE SHA...
DOCX
Service Operator Surface Well Testing
PDF
GT360 - KOLD-DRAFT Commercial Ice Machines
PDF
Hyster k019 (h230 48 hd2) forklift service repair manual
PDF
Hvac Solution Hospital 1
PDF
Cartridge valve
STIMULATION HUFF & PUFF AND CONTINUES INJECTION USING FORMULATED SURFACTANT
PRODUCTION OPTIMIZATION USING SURFACTANT STIMULATION HUFF & PUFF AND CONTINUE...
SUBSURFACE EVALUATION FULL SCALE EOR WATER FLOODING A - M FAULT ANTICLINE SHA...
Service Operator Surface Well Testing
GT360 - KOLD-DRAFT Commercial Ice Machines
Hyster k019 (h230 48 hd2) forklift service repair manual
Hvac Solution Hospital 1
Cartridge valve

What's hot (17)

PDF
Axial Thrust Failure investigation
DOCX
CV_Myster slickline supervisor
PDF
Pump out tests in alluvial sands – a case study
PDF
POX O2 Spargers- Report Summary2 Next STEP
PPTX
Operations ETI-DLH
PDF
Sequence of well completion part 1
PDF
Prvs 2. asme section i fired vessel rev4
PDF
2018 pumster english catalog
PPTX
Schlumberger - Drilling and Measurement Segment - Internship Presentation
DOCX
OMNI SOLARIS ON DRY DOCK LIST ENGINE
PDF
Bomba Stanadyne DB2635-5681 Plano de teste e explodido de peças
PPT
NCDOT_Croatan_Sound
PDF
Db4429 5514 plano de teste stanadyne
PDF
TA-2015 GE Frame-V Field Instrumentation Overhaul
PDF
Stage presentation v07
PDF
2008 saturn vue service repair manual
Axial Thrust Failure investigation
CV_Myster slickline supervisor
Pump out tests in alluvial sands – a case study
POX O2 Spargers- Report Summary2 Next STEP
Operations ETI-DLH
Sequence of well completion part 1
Prvs 2. asme section i fired vessel rev4
2018 pumster english catalog
Schlumberger - Drilling and Measurement Segment - Internship Presentation
OMNI SOLARIS ON DRY DOCK LIST ENGINE
Bomba Stanadyne DB2635-5681 Plano de teste e explodido de peças
NCDOT_Croatan_Sound
Db4429 5514 plano de teste stanadyne
TA-2015 GE Frame-V Field Instrumentation Overhaul
Stage presentation v07
2008 saturn vue service repair manual
Ad

Viewers also liked (8)

PPT
Petrophysic cont
PPTX
EOR (feasibility to execution)
PPTX
Production Recapitulation Template
PDF
Structural geology application in Petroleum industry
PPTX
Petrophysic interpretation
PPT
Quick look log analyses
PPT
Petrophysic
PPTX
Sedimentology application in petroleum industry
Petrophysic cont
EOR (feasibility to execution)
Production Recapitulation Template
Structural geology application in Petroleum industry
Petrophysic interpretation
Quick look log analyses
Petrophysic
Sedimentology application in petroleum industry
Ad

Similar to Monitor drilling performance (20)

PDF
E2008erwrey68t64tdghfjhgjgzdsfsanmhgklfxg.pdf
PPTX
BU-31 ESP Replacement Opertaion_Final PPT.pptx
PDF
E2708dsdfhgdjhdfjfhbadfnxhfjgkfyretweuyzsdgaeksh.pdf
PPT
CASING HEAD PRESSURE FINE TUNING in Dual String Gas Lift Well With Injection ...
PDF
E1808fgghdhfgjfjghryertwerwetrwteyhfgjhjhgjg.pdf
PPTX
FQCS-50H_ESP Workover Operation_Final PPT.pptx
PPTX
CE Confr Presentation 08 Oct 2022.pptx
PPTX
FMS Layout for Manufacturing of Marine Gears
PPTX
Field Development Project of E11 drilling dept.ppt
DOC
Professional WORK EXPERIENCE
PDF
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
PPTX
Fishing Job Guideline- Well IBC#05 Rev 0.pptx
PPT
Best practices day 3 new
DOC
Bj news cement squeeze job - vlc-1433
PDF
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
PPTX
Equipment Arrival Status.pptx
PPTX
Plant under construction at new greenfield
PPTX
Spe yp monthly session hydraulic fracturing technology - april 2021
PPT
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME
E2008erwrey68t64tdghfjhgjgzdsfsanmhgklfxg.pdf
BU-31 ESP Replacement Opertaion_Final PPT.pptx
E2708dsdfhgdjhdfjfhbadfnxhfjgkfyretweuyzsdgaeksh.pdf
CASING HEAD PRESSURE FINE TUNING in Dual String Gas Lift Well With Injection ...
E1808fgghdhfgjfjghryertwerwetrwteyhfgjhjhgjg.pdf
FQCS-50H_ESP Workover Operation_Final PPT.pptx
CE Confr Presentation 08 Oct 2022.pptx
FMS Layout for Manufacturing of Marine Gears
Field Development Project of E11 drilling dept.ppt
Professional WORK EXPERIENCE
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
Fishing Job Guideline- Well IBC#05 Rev 0.pptx
Best practices day 3 new
Bj news cement squeeze job - vlc-1433
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Equipment Arrival Status.pptx
Plant under construction at new greenfield
Spe yp monthly session hydraulic fracturing technology - april 2021
Use of Integrated Modeling on Niger Delta Field - MICHAEL OWARUME

More from Andi Anriansyah (20)

PPSX
Garmin BaseCamp & Google Earth (From Tracking to Monitoring)
PPTX
Rock Mass Classification
PDF
Petroleum Operations Geology - An Outline
PDF
30 Best drone 2019 on geekbuying overview
PPTX
Seismic interpretation - Fluvial Deltaic System
PDF
Petroleum Appraisal & Development Overview
PDF
Petroleum Artificial Lift Overview
PDF
Petroleum Drilling Overview
PDF
Petroleum Exploration Overview
PDF
Petroleum Formation Evaluation Overview
PDF
Petroleum reservoir performance overview
PDF
Petroleum well completion overview
PDF
Introduction - Artificial lift
PDF
Introduction - Well completion
DOCX
Summary subsurface mapping
DOCX
Petroleum economics
DOCX
An introduction to oil and gas production
DOCX
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
DOCX
Drilling operations
DOCX
Simres matbal-dca
Garmin BaseCamp & Google Earth (From Tracking to Monitoring)
Rock Mass Classification
Petroleum Operations Geology - An Outline
30 Best drone 2019 on geekbuying overview
Seismic interpretation - Fluvial Deltaic System
Petroleum Appraisal & Development Overview
Petroleum Artificial Lift Overview
Petroleum Drilling Overview
Petroleum Exploration Overview
Petroleum Formation Evaluation Overview
Petroleum reservoir performance overview
Petroleum well completion overview
Introduction - Artificial lift
Introduction - Well completion
Summary subsurface mapping
Petroleum economics
An introduction to oil and gas production
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
Drilling operations
Simres matbal-dca

Recently uploaded (20)

PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Feature types and data preprocessing steps
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPTX
communication and presentation skills 01
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
Software Engineering and software moduleing
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
Current and future trends in Computer Vision.pptx
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Feature types and data preprocessing steps
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
communication and presentation skills 01
Visual Aids for Exploratory Data Analysis.pdf
Software Engineering and software moduleing
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Soil Improvement Techniques Note - Rabbi
Current and future trends in Computer Vision.pptx
Fundamentals of Mechanical Engineering.pptx
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
Automation-in-Manufacturing-Chapter-Introduction.pdf
Fundamentals of safety and accident prevention -final (1).pptx
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Information Storage and Retrieval Techniques Unit III

Monitor drilling performance

  • 1. Monitor Drilling performance based on (Time – Depth – Cost) Curve Operation Geologist Practical use and reference
  • 2. PROPOSED WELL 0 10 20 30 40 50 60 70 80 90 100 0 20 40 60 80 100 120 140 160 1/Jan/89 1/Jan/90 1/Jan/91 1/Jan/92 1/Jan/93 1/Jan/94 1/Jan/95 1/Jan/96 1/Jan/97 1/Jan/98 1/Jan/99 1/Jan/00 1/Jan/01 1/Jan/02 1/Jan/03 1/Jan/04 1/Jan/05 1/Jan/06 1/Jan/07 1/Jan/08 1/Jan/09 wc(%) Gross/OilRate(bblper/day) Date Gross (BFPD) Oil Rate (BOPD) 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 1 2 3 4 5 6 7 Daily oil per well (bbl/day) Water Cut (%) 0 13-3/8" 20 Meter 100 9 5/8" 100 Meter 200 300 400 5.1/2" TD 440 Meter 500 Well ABC MBLB z z Well ABC Well ABC Forecast Example inWellABCDrilling
  • 3. DRILLING WELL OPERATION 7 Nov 2012 Day 1 Prepare to Spud-In and Pree Job Safety Meeting. SPUD-IN WELL ABC At 07:00 hours on 07 november 2012 Drill out form 12 1/4" Hole to 58 M. stop drill Doe To problem on shale shaker . Repair shale shaker. Continue drill out formation from 58 M to 122 M. 8 Nov 2012 Day 2 Continued drill out formation from 122 M to 135 M. Circulated for cleaning hole (GPM: 400, SPP: 240 psi. POOH 12-1/4" TCB + BHA Assembly from 135 M to surface (found balling on 12-1/4" bit and 6-1/2" DC. RIH back 12-1/4" TCB + BHA Assembly from surface to 135 M. Circulated for cleaning hole (GPM: 390, SPP: 210 psi. POOH 12-1/4" TCB + BHA Assembly from 135 M to surface. Prepared for RIH csg 9-5/8". PJSM prior to run 9-5/8 "csg. RIH 9-5/8" casing (11 jts # 40 ppf, K-55, BTC-R3) to 132 M (set shoe 9-5/8" csg). RIH stinger + DP 5" to 132 M for Cementing 9-5/8" csg. Circulated prior to cementing job. No Cementing engineer stand by at location Well ABC. Wait on cementing engineer while break circulated (GPM: 425, SPP: 180 psi). 9 Nov 2012 Day 3 Continue wait on cementing engineer while break circulated (GPM: 425, SPP: 180 psi). R/U Cementing line and presure test to 2000 psi, Hold 5 min - ok. Hold safety meeting prior cementing job;- Pump preplush as water ahead, 0,5 m3 @ rate 0.8 m3/min; Mix and pump slurry 15.8 ppg, 6.62 m3 @ rate 0.8 m3/min; Displace w/ water 1.16 m3 @ rate 0.8 m3/min. Cip (cement in place) @ 08:25 hours. WOC 10 Nov 2012 Day 4 Continue WOC. Break off landing joint and L/D same. Moved 44 jts 5-1/2 casing F/Yard to KM#606 location (RIG SITE); Moved 10 big saxs of bentonite F/Yard to Well ABC location Example inWellABCDrilling
  • 4. DRILLING WELL OPERATION 11 Nov 20xx Day 5 Continue rolling crane from KME base camp to XJ-450 rig site. N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS "OK". Press test annular, pipe rams and blind rams to 1000 psi each for 5 minutes "OK". RIH W/8-1/2 PDC BIT TO TAC SHOE (132). Drill out shoe and CMT to 134 M. /134 M to 175 M." 12 Nov 20xx Day 6 Continue drill out formation with 8-1/2" PDC + BHA from 175 m to 222 m (WOB/RPM/SPP/GPM/Last ROP/ROP Ave.= 1- klbs/58/480 psi/404 GPM/10.2 mph/19.6 mph). Founded mud loss 12 bbls/mnt @ interval 220 m - 222 m with lithologi: coal. Circulate while mixing mud in active tank. /RPM/SPP/GPM/Last ROP/ROP Ave.= 1-5 klbs/58/500 psi/448 GPM/47,20 mph/17.9 mph). Stop drilling formation due to founded loss total @ interval 374 m - 378 m. total mud loss = 280 bbls. Continue drill out formation with 8-1/2" PDC + BHA from 222 m to 378. Stop drilling formation due to founded loss total @ interval 374 m - 378 m. total mud loss = 280 bbls. Last lithologi: sandstone (80%), Claystone(20%). POOH 8-1/2" PDC + BHA from 378 m to 250 m while mixing mud to active tank. Mixing mud to active tank. 13 Nov 20xx Day 7 Continue mixing mud to active tank. RIH Back 8-1/2" PDC +BHA from 250 m to 378 m. Circulate (GPM: 444, SPP: 400 psi). Blind drill with 8-1/2" PDC + BHA from 378 m to 380 m. founded loss totally. Total mud loss: 390 bbls. POOH 8- 1/2" PDC + BHA FROM 378 M TO 318 M while mixing mud to active tank. wait on water for fill active tank and mixing mud. circulate f/check annulus and still founded loss. pull out bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe) while mixing mud + LCM to active tank. Break circulate (GPM: 444, SPP: 400 psi). At shoe no loss (OK). run back from 132 m (casing shoe) to 241 m (6 stand). Break circulate (GPM: 444, SPP: 400 psi). Good return. run back from 241 m to 378 m (botton). drill out formation f/378 to 436 m (WOB/RPM/MFI/SPP/Last ROP/ROP Ave = 1-9 klbs/40- 60/430 GPM/480 psi/25,76 mph/25,21 mph). Founded partial loss 2 - 4 bpm. Example inWellABCDrilling
  • 5. DRILLING WELL OPERATION 14 Nov 2012 Day 8 Continue drill out formation f/ 436 m to 456 m (Total Depth). Circulate for clening hole (GPM: 391, SPP: 460 psi). POOH 8-1/2" PDC + BHA from 456 m to surface for run electrical logging. R/u DQWL and prepare Tools. Run wireline logging. 1.MSFL - DLL - DT - GR - SP - CAL. 2.HRL - GR, R/D DQWL Unit. RIH 8-1/2" Bit PDC + BHA to botton (456). Circulate for cleaning hole (GPM: 391, SPP: 460 psi). /2". LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC. POOH 8-1/2" PDC + BHA from 456 m to surface for running casing 5-1/2". LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC. N/D BOP S 11-5/8" x 5K psi 15 Nov 2012 Day 9 Continue N/D BOP S 11-5/8" x 5K psi. /surface to bottom casing at shoe 447 Mkb , FC at 436.42 m . Prepare and RIH 5- 1/2" caing (# 17 ppf, L-80, BTC-R3) f/surface to bottom casing at shoe 447 Mkb , FC at 436.42 m . P/up kelly for circulate clean hole. R/U cementing line and pressure test to 2000 psi, hold 5 min - OK. Hold safety meeting prior cementing job. Pump preflush as water ahead 0.5 m3/min @ rate 0.8 m3/min. Displace w/water 1.16 m3 @ rate 0.8 m3/min. Bumped to 500 psi no cement return to surface. CIP (cement In Place) @ 16:00 Hrs. WOC 16 Nov 2012 Day 10 Lay down 40 jts 5" DP and Kelly. Clean up mud tank. prepare to Rig down 17 Nov 2012 Day 11 Continue WOC for 48 hrs - Lower mast. Clean up subtruckture. 40 % Rig Down 18 Nov 2012 Day 12 Continue Rig Down to 60 %. Modify mouse Hole pipe to make longer in progress. While waiting on road condition to move out Rig equipment. Wait on day Example inWellABCDrilling
  • 6. COST CONTROLER From To Elapsed 6:00 7:00 1:00 1 1 214.05$ Prepare to Spud-In and Pree Job Safety Meeting 7:00 15:00 8:00 8.00 8 2,854.00$ SPUD-IN WEEL ABC At 07:00 hours on 07 november 20xx Drill out form 12 1/4" Hole to 58 M. stop drill Doe To problem on shale shaker 15:00 17:00 2:00 2 2 570.80$ Repair shale shaker 17:00 0:00 7:00 7.00 7 2,497.25$ Cont'd drill out formation from 58 M to 122 M 0:00 2:30 2:30 2.5 2.5 891.88$ Continued drill out formation from 122 M to 135 M 2:30 3:00 0:30 0.5 0.5 178.38$ Circulated for cleaning hole (GPM: 400, SPP: 240 psi 3:00 6:00 3:00 3.0 3 1,070.25$ POOH 12-1/4" TCB + BHA Assembly from 135 M to surface (found balling on 12-1/4" bit and 6-1/2" DC 6:00 8:00 2:00 2.0 2 713.50$ RIH back 12-1/4" TCB + BHA Assembly from surface to 135 M 8:00 8:30 0:30 0.5 0.5 178.38$ Circulated for cleaning hole (GPM: 390, SPP: 210 psi 8:30 11:00 2:30 2.5 2.5 891.88$ POOH 12-1/4" TCB + BHA Assembly from 135 M to surface 11:00 15:00 4:00 4 4 1,141.60$ Prepared for RIH csg 9-5/8". PJSM prior to run 9-5/8 "csg 15:00 16:30 1:30 1.5 1.5 535.13$ RIH 9-5/8" casing (11 jts # 40 ppf, K-55, BTC-R3) to 132 M (set shoe 9- 5/8" csg) 16:30 19:30 3:00 3.0 3 1,070.25$ RIH stinger + DP 5" to 132 M for Cementing 9-5/8" csg 19:30 20:00 0:30 0.5 0.5 178.38$ Circulated prior to cementing job. No Cementing engineer stand by at location ABC 20:00 0:00 4:00 4 4 856.20$ Wait on cementing engineer while break circulated (GPM: 425, SPP: 180 psi) 0:00 7:00 7:00 7 7 1,498.35$ Cont'd wait on cementing engineer while break circulated (GPM: 425, SPP: 180 psi) 7:00 8:30 1:30 1.5 1.5 535.13$ R/U Cementing line and presure test to 2000 psi, Hold 5 min - ok, '- Hold safety meeting prior cementing job, Pump preplush as water ahead, 0,5 m3 @ rate 0.8 m3/min, Mix and pump slurry 15.8 ppg, 6.62 m3 @ rate 0.8 m3/min, Displace w/ water 1.16 m3 @ rate 0.8 m3/min. Cip (cement in place) @ 08:25 hours. 8:30 15:00 6:30 6.5 6.5 2,318.88$ Pull Out out DP 5" + stringer and L/D same 15:00 0:00 9:00 9 9 1,926.45$ WOC 0:00 9:00 9:00 9 9 1,926.45$ Cont'd WOC 9:00 0:00 15:00 15.0 15 5,351.25$ Break off landing joint and L/D same '- Instaled 9-5/8" x 2000 well head and prepare to N/U 11" x 5 K BOPS, Moved 44 jts 5-1/2 casing F/Yard to ABC location (RIG SITE), Moved 10 big saxs of bentonite F/Yard to ABC 6 location 0:00 7:00 7:00 7 7 1,997.80$ Continue rolling crane from ABC base camp to XJ-450 rig site. N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS "OK". Press 4 ABC 2 ABC 3 ABC 1 ABC STAND BY W/O CREW TOTAL HOURS TOTAL COST OPERATIONDAY WELL TIME OPERATING MOVING STAND BY W/CREW Example inWellABCDrilling
  • 7. 8:30 15:00 6:30 6.5 6.5 2,318.88$ Pull Out out DP 5" + stringer and L/D same 15:00 0:00 9:00 9 9 1,926.45$ WOC 0:00 9:00 9:00 9 9 1,926.45$ Cont'd WOC 9:00 0:00 15:00 15.0 15 5,351.25$ Break off landing joint and L/D same '- Instaled 9-5/8" x 2000 well head and prepare to N/U 11" x 5 K BOPS, Moved 44 jts 5-1/2 casing F/Yard to ABC location (RIG SITE), Moved 10 big saxs of bentonite F/Yard to ABC 6 location 0:00 7:00 7:00 7 7 1,997.80$ Continue rolling crane from ABC base camp to XJ-450 rig site. 7:00 18:00 11:00 11 11 3,924.25$ N/U BOP 11-5/8" X 5 K & relate, fungtion test BOPS "OK". Press test annular, pipe rams and blind rams to 1000 psi each for 5 minutes "OK". 18:00 20:30 2:30 2.5 2.5 891.88$ RIH W/8-1/2 PDC BIT TO TAC SHOE (132). 20:30 21:30 1:00 1 1 356.75$ Drill out shoe and CMT to 134 M. 21:30 0:00 2:30 2.5 2.5 891.88$ Continue Drill formation 8-1/2" Hole F/134 M to 175 M. 0:00 5:00 5:00 5 5 1,783.75$ Continue drill out formation with 8-1/2" PDC + BHA from 175 m to 222 m (WOB/RPM/SPP/GPM/Last ROP/ROP Ave.= 1- klbs/58/480 psi/404 GPM/10.2 mph/19.6 mph), Founded mud loss 12 bbls/mnt @ interval 220 m - 222 m with lithologi: coal 5:00 6:00 1:00 1 1 356.75$ Circulate while mixing mud in active tank 6:00 23:00 17:00 17 17 6,064.75$ Continue drill out formation with 8-1/2" PDC + BHA from 222 m to 378 (WOB/RPM/SPP/GPM/Last ROP/ROP Ave.= 1-5 klbs/58/500 psi/448 GPM/47,20 mph/17.9 mph). Stop drilling formation due to founded loss total @ interval 374 m - 378 m. total mud loss = 280 bbls. Last lithologi: sandstone (80%), Claystone(20%) 23:00 23:30 0:30 0.5 0.5 178.38$ POOH 8-1/2" PDC + BHA from 378 m to 250 m while mixing mud to active tank 23:30 0:00 0:30 0.5 0.5 107.03$ Mixing mud to active tank 0:00 2:30 2:30 2.5 2.5 535.13$ Continue mixing mud to active tank 2:30 3:30 1:00 1 1 356.75$ RIH Back 8-1/2" PDC +BHA from 250 m to 378 m 3:30 4:00 0:30 0.5 0.5 178.38$ Circulate (GPM: 444, SPP: 400 psi). Blind drill with 8-1/2" PDC + BHA from 378 m to 380 m. founded loss totally. Total mud loss: 390 bbls 4:00 5:00 1:00 1 1 356.75$ POOH 8-1/2" PDC + BHA FROM 378 M TO 318 M while mixing mud to active tank 5:00 10:00 5:00 5 5 1,070.25$ wait on water for fill active tank and mixing mud 10:00 11:00 1:00 1 1 356.75$ circulate f/check annulus and still founded loss 11:00 13:00 2:00 2 2 713.50$ pull out bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe) while mixing mud + LCM to active tank 13:00 13:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). At shoe no loss (OK) 13:30 15:00 1:30 1.5 1.5 535.13$ run back from 132 m (casing shoe) to 241 m (6 stand) 15:00 15:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). Good return 15:30 17:30 2:00 2 2 713.50$ run back from 241 m to 378 m (botton) 17:30 0:00 6:30 6.5 6.5 2,318.88$ drill out formation f/378 to 436 m (WOB/RPM/MFI/SPP/Last ROP/ROP Ave = 1-9 klbs/40-60/430 GPM/480 psi/25,76 mph/25,21 mph). Founded partial loss 2 - 4 bpm 0:00 1:30 1:30 1.5 1.5 535.13$ Continue drill out formation f/ 436 m to 456 m (Total Depth) 1:30 3:00 1:30 1.5 1.5 535.13$ Circulate for clening hole (GPM: 391, SPP: 460 psi) 3:00 7:00 4:00 4 4 1,427.00$ POOH 8-1/2" PDC + BHA from 456 m to surface for run electrical 4 ABC 5 ABC ABC 7 ABC 6 COST CONTROLER Example inWellABCDrilling
  • 8. 10:00 11:00 1:00 1 1 356.75$ circulate f/check annulus and still founded loss 11:00 13:00 2:00 2 2 713.50$ pull out bit 8-1/2" PDC + BHA from 318 m to 125 m (casing shoe) while mixing mud + LCMto active tank 13:00 13:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). At shoe no loss (OK) 13:30 15:00 1:30 1.5 1.5 535.13$ run back from 132 m (casing shoe) to 241 m (6 stand) 15:00 15:30 0:30 0.5 0.5 178.38$ Break circulate (GPM: 444, SPP: 400 psi). Good return 15:30 17:30 2:00 2 2 713.50$ run back from 241 m to 378 m (botton) 17:30 0:00 6:30 6.5 6.5 2,318.88$ drill out formation f/378 to 436 m (WOB/RPM/MFI/SPP/Last ROP/ROP Ave = 1-9 klbs/40-60/430 GPM/480 psi/25,76 mph/25,21 mph). Founded partial loss 2 - 4 bpm 0:00 1:30 1:30 1.5 1.5 535.13$ Continue drill out formation f/ 436 m to 456 m (Total Depth) 1:30 3:00 1:30 1.5 1.5 535.13$ Circulate for clening hole (GPM: 391, SPP: 460 psi) 3:00 7:00 4:00 4 4 1,427.00$ POOH 8-1/2" PDC + BHA from 456 m to surface for run electrical logging 7:00 10:00 3:00 3 3 642.15$ R/u DQWL and prepare Tools 10:00 15:30 5:30 5.5 5.5 1,962.13$ Run wireline logging 1. MSFL - DLL - DT - GR - SP - CAL 2. HRL - GR, R/D DQWL Unit 15:30 18:30 3:00 3 3 1,070.25$ RIH 8-1/2" Bit PDC + BHA to botton (456) 18:30 19:00 0:30 0.5 0.5 178.38$ Circulate for cleaning hole (GPM: 391, SPP: 460 psi) 19:00 23:00 4:00 4 4 1,427.00$ POOH 8-1/2" PDC + BHA from 456 m to surface for running casing 5-1/2". LTD 5 jts DC 6-1/2", 1 jts DC7", Bit Sub, 8-1/2" PDC 23:00 0:00 1:00 1 1 356.75$ N/D BOP S 11-5/8" x 5K psi 0:00 7:00 7:00 7 7 2,497.25$ Continue N/D BOP S 11-5/8" x 5K psi 7:00 14:30 7:30 7.5 7.5 2,675.63$ Prepare and RIH 5-1/2" caing (# 17 ppf, L-80, BTC-R3) f/surface to bottom casing at shoe 447 Mkb , FC at 436.42 m . 14:30 15:00 0:30 0.5 0.5 178.38$ P/up kelly for circulate clean hole 15:00 16:00 1:00 1 1 356.75$ R/U cementing line and pressure test to 2000 psi, hold 5 min - OK '- Hold safety meeting prior cementing job '- Pump preflush as water ahead 0.5 m3/min @ rate 0.8 m3/min '- Displace w/water 1.16 m3 @ rate 0.8 m3/min. Bumped to 500 psi no cement return to surface. CIP (cement In Place) @ 16:00 Hrs 16:00 0:00 8:00 8 8 1,712.40$ WOC 10 ABC 0:00 0:00 0:00 24 24 5,137.20$ Continue WOC for 48 hrs '- Lay down 40 jts 5" DP and Kelly, '- Clean up mud tank, '- prepare to Rig down 0:00 18:00 18:00 18 18 3,852.90$ - Continue WOC for 48 hrs - Lower mast 18:00 0:00 6:00 6 6 1,712.40$ - Clean up subtruckture, '- 40 % Rig Down 6:00 18:00 12:00 18 18 3,852.90$ - Continue Rig Down to 70 %, '- Modify mouse Hole pipe to make longer in progress, '- While waiting on road condition to move out Rig equipment 18:00 0:00 6:00 6 6 1,712.40$ Wait on day 148.00 7.00 18.00 109.00 282 52,799.00 1,997.80 5,137.20 23,331.45 11.75 Total Hours 83,265.45$ 8 ABC 7 ABC 12 ABC 9 ABC 11 ABC COST CONTROLER Example inWellABCDrilling
  • 9. Plan Vs. Actual • Multi engineers, geosciences, & finance together discuss scenario for the completion of the well. • Finally the (Time – Depth – Cost) curve been generated to monitor Drilling performance. • TDC curve usually used to presenting Drilling performance WELL SCHEMATIC PAGE 1 of 1 Job CODE FIELD : SE Asia WELL NO: ABC CHARGE TO : AFE 12-1234 DATE : 8/8/20xx RECOMMENDATION : Swab Test & Isolate High WC Zone(s) Well Kill Fluid Density : 8.4 ppg CURRENT STATUS : Production Est. Pump : 415 LATEST TEST : 5 BOPD %WC (7/31/14) SFL / WFL / FAP : - m/ - m/ - m RIG DAYS : 11.0 ( all cash ) EST. GAIN : 30 BOPD RT - GL - KB : 4.7 / 79 / 86.7 PBTD/TD : 455m / 455m WELL TYPE : SOW LOG DATE : 7/11/2012 Important Note: * Do not kill, equalize well w/FFW as necessary PROCEDURE: 11 JTS 9 5/8" K-55, 1 Spud in Drill formation to 122 m with 12-1/4” RB, (Nov.7, 2012) 40PPF, R-3 2 Cont’ drilling from 122 m to 134 m, with 12-1/4” RB, Circulate, POOH BTC CASING, 12¼" TCB + BHA 134 m to surface. RIH back 12¼" TCB + BHA from SHOE @132m surface to 134 m. Circulate. POOH 12¼" TCB + BHA from 134 m to surface. RIH 9-5/8" casing (# 40 ppf, K-55, BTC-R3) to 132 M(set shoe 9-5/8" csg). RIH stinger + DP 5" to 132. Circulated. (Nov.8, 2012) 3 Cont’ R/U cementing line and pressure test to 2000 psi, pump flush, mix and pump slurry 15.8 ppg, 6.62 m3 @ rate 0.8 m3/min, displace with water. CIP (cement in place) @ 08:25 hrs. Pull out DP 5" + stringer and L/D same. WOC (Nov.9, 2012) 4 Cont’ WOC. Break out L/D joint and same. Install Well Head 9- 5/8" X 5K psi and Prepare to N/U BOP 11" X 5K psi. (Nov.10, 2012) S4 5 BOP S 11-5/8" X 5K. M/U and RIH 8-1/2" PDC + BHA to 132 m (Top of Cement) Drilling & FS w/ 8-1/2" PDC + BHA from 132 m to 134 m with 284.0 - 285.0 m 8-1/2" PDC + BHA from 134 m to 175 m WOB/RPM/SPP/GPM/Last S5 (05 Jul 20xx) ROP/ROP) (Nov.11, 2012) 6 Cont’ drilling with 8-1/2" PDC + BHA from 175 m to 222 m. Circulate 304.4 - 305.4 m Continue drilling out formation with 8-1/2" PDC + BHA from 222 m to S6 (12-19 Sep 20xx) 378 m. mud loss = 280 bbls. POOH 8-1/2" PDC + BHA from 378 m to 250 m Nov.(12, 2012) 324.4 - 326.0 m 7 RIH back 8-1/2" PDC + BHA from 250 m to 378 m. Circulate. Pull out bit 8-1/2" PDC + BHA from 318 m to 125 m( casing shoe). Circulate Run 327.0 - 327.6 m back from 132 m ( casing shoe ) to 241 m (6 stand). Circulate . Run back from 241 m to 378 m (bottom). Drilling formation from378 m to Pump set (PSN) @340m 329.0 - 329.6 m 436 m (Nov.13, 2012) S7B 8 Cont’ drill out formation f/ 436 m to 455 m. Circulate. POOH 8-1/2" PDC + BHA from 455 m to surface for run logging. Run logging 1. MSFL 375.0 - 376.0 m - DLL - DT -GR - SP – CAL 2. HRL – GR RIH 8 1/2" Bit PDC + BHA to Bottom (455 m). Circulate POOH 8-1/2" PDC + BHA from 455 m to 379.0 - 381.0 m surface for running casing 5 1/2". (Nov.14, 2012) S7C 9 RIH 5-1/2" casing (# 17 ppf, L-80, BTC-R3) from surface to 447 m (set csg shoe). Circulate clean hole Cementing job 5-1/2" csg. Pump 392.6 - 393.6 m preflush. CIP (cement in place) at 16:00 WIB hrs. WOC, MLU released R/D all equipments (Nov.15, 2012) 395.0 - 396.0 m PBTD @425m (CBL) Shoe @ 447m Surface Casing 11 JTS 9-5/8", 40.00ppf, K-55, R3, BTC Casing, shoe @132m Prod Casing 38 JTS 5-1/2", 17.00 PPF, L-80, R-3,BTC CASING. FLOAT SHOE @447.0m & F.C @436.42m. PLAN ACTUAL 70.9 BFPD 93 COST US$ : 771,219 TD @ 455m TD @ 455m RECOMENDATION: The well wasdrilledtoTD @455m on (07-15 Nov 20xx). The well wasIC on (02-07 Jul 20xx) by perforatingS4sand (284.0-285.0m). The well wasPOPon 07 Jul 20xx at 11:00am. Recompletionwasdone on(12-19 Sep20xx) to perforate S5sand (304.4-305.4m), S6 sand (324.4-326.0m, 327.0-327.6m, 329.0-329.6m), S7B sand(375.0-376.0m, 379-381m) andS7C (392.6-393.6m, 395.0-396.0m). Afterloweringthe pumpandsetPSN @375m on 27 Sep 2013, the well wasPOPwithinitial productionat 122BFPD/36BOPD/70% WC. Currentproduction: 70.88BFPD/5.25BOPD/93%WC Example inWellABCDrilling
  • 10. 20m 12m 100m 134m 440m 447m TD @440m TD @455m TECHNICAL DATA WELL NAME ABC LOCATION SE ASIA A -> B Drill hole 12 1/4" until 100 m 0.1 1.0 TARGET X: 123456 B -> C Put & cemen the casing 9 5/8", Prepare to drill hole 8 1/2" 2.4 2.0 Y: 7654321 C -> D Drill hole 8-1/2" until + 440m 2.3 4.0 Elevation 74 D -> E Put & cement the casing 5 1/2" and put wellhead 1.2 1.2 Drilling type Vertical E -> F perforation and POP 2.5 3.5 Well Class Development TD 440 meter Rig 450 hp A -> F Total 8.5 11.7 Rig Floor 4.8m AFE 12-1234 TIME - DEPTH - COST CURVE CODE DESCRIPTION PLAN & ACTUAL PLAN & ACTUAL DAYS $- $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000 $80,000 $90,000 -750 -650 -550 -450 -350 -250 -150 -50 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 Depth(M) Days PLAN & ACTUAL DRILLINGWELL-ABC (DRILLING DESIGN) C A B C B D E F Rollingcrane fromABC base camp & Drill out shoe POOHDue to losses C B D E F