Solved Problem 1 
LLTT == 11 
LLTT == 22 LLTT == 33 
D (1) E (2) F (1) D (1) 
LLTT == 33 
A 
B (3) C (1) 
LLTT == 11 
G (1) 
LLTT == 33 LLTT == 66 
LLTT == 33 
If there is no existing 
inventory, how many 
units of items G, E, and 
D must be purchased to 
produce five units of end 
item A? 
5 units of item G 
30 units of item E 
20 units of item D 
LT = Lead time
Solved Problem 2 
A 
LLTT == 22 
B (1) C (2) 
LLTT == 11 LLTT == 22 
D (1) 
LLTT == 33 
The MPS for product A calls for the assembly 
department to begin final assembly according 
to the following schedule: 100 units in week 2; 
200 units in week 4; 120 units in week 6; 180 
units in week 7; and 60 units in week 8. 
Develop a material requirements plan for the 
next eight weeks for items B, C, and D. 
ITEM 
DATA CATEGORY B C D 
Lot-sizing rule POQ (P=3) L4L FOQ = 500 units 
Lead time 1 week 2 weeks 3 weeks 
Scheduled receipts None 200 (week 1) None 
Beginning (on-hand) 20 0 425 
inventory
Item: B Lot size: POQ (P = 3) 
Description: Lead time: 1 week 
Gross 
requirements 110000 
© 2007 Pearson Education 
1 
2200 
2 3 4 5 6 7 8 
Scheduled 
receipts 
Projected 
on-hand 
inventory 
Planned 
receipts 
Planned 
order 
releases 
20 
Week 
220000 220000 
200 
0 0 240 60 0 
280 
9 10 
120 180 60 
0 0 
360 
280 360 
Solved 
Problem 2 
The MPS for product A : 100 units in week 2; 
200 units in week 4; 120 units in week 6; 180 
units in week 7; and 60 units in week 8.
The MPS for product A : 100 units in week 2; 
200 units in week 4; 120 units in week 6; 180 
units in week 7; and 60 units in week 8. 
Item: C Lot size: L4L 
Description: Lead time: 2 weeks 
Gross 
requirements 220000 
© 2007 Pearson Education 
1 
220000 
2 3 4 5 6 7 8 
Scheduled 
receipts 
Projected 
on-hand 
inventory 
Planned 
receipts 
Planned 
order 
releases 
0 
Week 
00 00 
400 
200 
0 0 0 0 0 
400 
9 10 
240 360 120 
0 0 
240 360 120 
400 240 360 120
The MPS for product A : 100 units in week 2; 
200 units in week 4; 120 units in week 6; 180 
units in week 7; and 60 units in week 8. 
Item: D Lot size: FOQ = 500 units 
Description: Lead time: 3 weeks 
1 
Gross 
requirements 440000 
442255 
2 3 4 5 6 7 8 
Scheduled 
receipts 
Projected 
on-hand 
inventory 
Planned 
receipts 
Planned 
order 
releases 
425 
Week 
2255 2255 
240 
285 425 305 
500 
9 10 
360 120 
500 
305 305 360 305 
500 500
Solved Problem 3 
Given the following information, construct a product tree diagram 
and develop a material requirements plan that will yield 400 units of 
product P at the start of week 7.
Mrp task 1

More Related Content

PDF
105學測國文科定稿
PDF
Strength of material CE8395
PDF
Phase transformation in welding.pdf
PDF
IMPACT TEST REPORT ...
PPTX
Cracking phenomena in welding
PDF
Press fit force calculation
PDF
Coamtra S.A. es la empresa líder en Argentina en Ingeniería en Movimiento
105學測國文科定稿
Strength of material CE8395
Phase transformation in welding.pdf
IMPACT TEST REPORT ...
Cracking phenomena in welding
Press fit force calculation
Coamtra S.A. es la empresa líder en Argentina en Ingeniería en Movimiento

Similar to Mrp task 1 (20)

PDF
Material requirement planning Q&A
PDF
Lecture 12_Enterprise Resourse Planning.pdf
PPTX
MRP exercises
PPT
MRP in English
PPTX
Assignment on MRP Calculation
PPTX
Operations Management Classroom Presentation
PDF
Mrpexercise 150427045220-conversion-gate01
PPT
Chapter 5_OM
PPT
Session 5
PPT
14.hr_om11_ch14_GE_Material Requirements Planning (MRP).ppt
PPT
Ch16 mrp
PPTX
Mrp exercise nº7
DOC
heizer jay operations management Ch14pp
PPTX
MRP
PPTX
Pom presentation
PDF
PDF
PPTX
Materials requirements planning
PDF
5. Chapter 15 - MRP.pdf
Material requirement planning Q&A
Lecture 12_Enterprise Resourse Planning.pdf
MRP exercises
MRP in English
Assignment on MRP Calculation
Operations Management Classroom Presentation
Mrpexercise 150427045220-conversion-gate01
Chapter 5_OM
Session 5
14.hr_om11_ch14_GE_Material Requirements Planning (MRP).ppt
Ch16 mrp
Mrp exercise nº7
heizer jay operations management Ch14pp
MRP
Pom presentation
Materials requirements planning
5. Chapter 15 - MRP.pdf
Ad

Recently uploaded (20)

PDF
Chalkpiece Annual Report from 2019 To 2025
PDF
ART & DESIGN HISTORY OF VEDIC CIVILISATION.pdf
PDF
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
PDF
Quality Control Management for RMG, Level- 4, Certificate
PDF
GSH-Vicky1-Complete-Plans on Housing.pdf
PDF
Facade & Landscape Lighting Techniques and Trends.pptx.pdf
PPT
pump pump is a mechanism that is used to transfer a liquid from one place to ...
PPTX
rapid fire quiz in your house is your india.pptx
PPTX
LITERATURE CASE STUDY DESIGN SEMESTER 5.pptx
PDF
Urban Design Final Project-Context
PPTX
Causes of Flooding by Slidesgo sdnl;asnjdl;asj.pptx
PDF
Introduction-to-World-Schools-format-guide.pdf
PDF
intro_to_rust.pptx_123456789012446789.pdf
PPTX
2. Competency Based Interviewing - September'16.pptx
PPTX
Complete Guide to Microsoft PowerPoint 2019 – Features, Tools, and Tips"
PDF
Skskkxiixijsjsnwkwkaksixindndndjdjdjsjjssk
PDF
YOW2022-BNE-MinimalViableArchitecture.pdf
PPTX
Special finishes, classification and types, explanation
PDF
Test slideshare presentation for blog post
PPTX
YV PROFILE PROJECTS PROFILE PRES. DESIGN
Chalkpiece Annual Report from 2019 To 2025
ART & DESIGN HISTORY OF VEDIC CIVILISATION.pdf
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
Quality Control Management for RMG, Level- 4, Certificate
GSH-Vicky1-Complete-Plans on Housing.pdf
Facade & Landscape Lighting Techniques and Trends.pptx.pdf
pump pump is a mechanism that is used to transfer a liquid from one place to ...
rapid fire quiz in your house is your india.pptx
LITERATURE CASE STUDY DESIGN SEMESTER 5.pptx
Urban Design Final Project-Context
Causes of Flooding by Slidesgo sdnl;asnjdl;asj.pptx
Introduction-to-World-Schools-format-guide.pdf
intro_to_rust.pptx_123456789012446789.pdf
2. Competency Based Interviewing - September'16.pptx
Complete Guide to Microsoft PowerPoint 2019 – Features, Tools, and Tips"
Skskkxiixijsjsnwkwkaksixindndndjdjdjsjjssk
YOW2022-BNE-MinimalViableArchitecture.pdf
Special finishes, classification and types, explanation
Test slideshare presentation for blog post
YV PROFILE PROJECTS PROFILE PRES. DESIGN
Ad

Mrp task 1

  • 1. Solved Problem 1 LLTT == 11 LLTT == 22 LLTT == 33 D (1) E (2) F (1) D (1) LLTT == 33 A B (3) C (1) LLTT == 11 G (1) LLTT == 33 LLTT == 66 LLTT == 33 If there is no existing inventory, how many units of items G, E, and D must be purchased to produce five units of end item A? 5 units of item G 30 units of item E 20 units of item D LT = Lead time
  • 2. Solved Problem 2 A LLTT == 22 B (1) C (2) LLTT == 11 LLTT == 22 D (1) LLTT == 33 The MPS for product A calls for the assembly department to begin final assembly according to the following schedule: 100 units in week 2; 200 units in week 4; 120 units in week 6; 180 units in week 7; and 60 units in week 8. Develop a material requirements plan for the next eight weeks for items B, C, and D. ITEM DATA CATEGORY B C D Lot-sizing rule POQ (P=3) L4L FOQ = 500 units Lead time 1 week 2 weeks 3 weeks Scheduled receipts None 200 (week 1) None Beginning (on-hand) 20 0 425 inventory
  • 3. Item: B Lot size: POQ (P = 3) Description: Lead time: 1 week Gross requirements 110000 © 2007 Pearson Education 1 2200 2 3 4 5 6 7 8 Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 20 Week 220000 220000 200 0 0 240 60 0 280 9 10 120 180 60 0 0 360 280 360 Solved Problem 2 The MPS for product A : 100 units in week 2; 200 units in week 4; 120 units in week 6; 180 units in week 7; and 60 units in week 8.
  • 4. The MPS for product A : 100 units in week 2; 200 units in week 4; 120 units in week 6; 180 units in week 7; and 60 units in week 8. Item: C Lot size: L4L Description: Lead time: 2 weeks Gross requirements 220000 © 2007 Pearson Education 1 220000 2 3 4 5 6 7 8 Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 0 Week 00 00 400 200 0 0 0 0 0 400 9 10 240 360 120 0 0 240 360 120 400 240 360 120
  • 5. The MPS for product A : 100 units in week 2; 200 units in week 4; 120 units in week 6; 180 units in week 7; and 60 units in week 8. Item: D Lot size: FOQ = 500 units Description: Lead time: 3 weeks 1 Gross requirements 440000 442255 2 3 4 5 6 7 8 Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 425 Week 2255 2255 240 285 425 305 500 9 10 360 120 500 305 305 360 305 500 500
  • 6. Solved Problem 3 Given the following information, construct a product tree diagram and develop a material requirements plan that will yield 400 units of product P at the start of week 7.