SlideShare a Scribd company logo
Copyright © Naps Systems Oy 2012

Libya pipeline electrification
Wafa-Mellitah Pipeline, Libya
Copyright © Naps Systems Oy 2012

• Large stand-alone solar electric systems for gas pipeline
cathodic protection, telecommunications, monitoring,
valve control and area lighting
• Project completed in autumn 2004
Wafa-Mellitah Pipeline, Libya
Site Specific Issues
Copyright © Naps Systems Oy 2012

• All sites located in uninhabited
areas
• Electricity grid far and too
expensive to extend
• Temperatures above +55 C
• Often strong sand storms
Wafa-Mellitah Pipeline, Libya
Objectives for the Project
Copyright © Naps Systems Oy 2012

• Commercially most competitive
solution
• High availability of the pipeline
• Energy for the pipeline
monitoring, control system and
lighting in order to secure safety
• Flexibility for locating the sites
• Short construction time
• Minimised need for maintenance
and no need for fuel supply
Wafa-Mellitah Pipeline, Libya
Professional Design
Copyright © Naps Systems Oy 2012

• Combined load of 300-3000W per
site
• Total of 27 solar electric systems
along the pipeline
• Special system control units for each
site with Scada remote monitoring
capabilities
• Naps power solutions operating with
the other site equipment in MODBUS
protocol
• Autonomy time secured in case of
emergency
Wafa-Mellitah Pipeline, Libya
System Components
Copyright © Naps Systems Oy 2012

• 24-300 pcs of Naps 100-watt
modules per site
• Battery bank for 4 days
autonomy
• System management by
custom-made Naps NSCi
professional control unit
• Rectifiers for battery charging
• Other equipment:
structures, panel
centres, cables, battery main
fuses and accessories
Implementation
Copyright © Naps Systems Oy 2012

• Installation time 1-4 days with circa
10 persons
• Locally supplied
foundation, equipment shelter and
complete installation
• Site supervision and start-up
provided by Naps
• Customer is pleased about Naps
intensive service and the high level
of technology.
Wafa-Mellitah Pipeline, Libya
Conclusions
Copyright © Naps Systems Oy 2012

• The initial investment was low
compared with any other from of
energy supply
• The implementation was done
rapidly in 8 weeks
• Operational costs are very low

• Maintenance: one 1-2 hrs visit per
site per year
• Very reliable power supply
• New orders under processing as
a result of good implementation
Copyright © Naps Systems Oy 2012

Naps Systems Ltd
Ruosilankuja 4, FI-00390 Helsinki, Finland
group@napssystems.com
Tel. +358 20 7545 666, Fax +358 20 7545 660
www.napssystems.com

More Related Content

PDF
Naps telecom references
PDF
Fuel cells - the opportunities
PPTX
Coanda Power Systems - Elgin Equipment Group
PDF
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
PPTX
Preliminary Site Survey , PFR and basic design of SHP plant
PPTX
Performance paramter and suggestion to optizing the performnce of grid connec...
PDF
Rooftop Solar Benefits: Net Metering
PPTX
Wind turbine retrofit
Naps telecom references
Fuel cells - the opportunities
Coanda Power Systems - Elgin Equipment Group
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
Preliminary Site Survey , PFR and basic design of SHP plant
Performance paramter and suggestion to optizing the performnce of grid connec...
Rooftop Solar Benefits: Net Metering
Wind turbine retrofit

What's hot (20)

PDF
Project solar
PDF
Vsquare Automation & Controls, Pune, Finolex Cables
PDF
SolarEdge Company Presentation for North America
PDF
Type of Solar power systems - ORIANA SOLAR & ELECTRICALS pdf
PDF
Rebecca mills-securing-the-n ts-energy-future
PPTX
Final presentation
PPTX
Solar pv – balance of systems
PDF
Keeping things on track at Greenbushes
PPT
Silicon CPV Plc
PPTX
Sustainable Energy for All – A multidisciplinary educational approach.
PDF
Renewable energy integration and energy storage
PDF
Case for rooftop solar for self consumption
PDF
Micro Pump Presentation -public
PPTX
CUF vs PR
PDF
Session 3A - Solar Electricity: Basics and Hands On Demonstration
PPT
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
PDF
Introduction to energy storage
PPTX
Econoseek
PPTX
BESCOM Solar Rooftop Project Guidelines
PDF
The Vanadium Redox Flow Battery and South Africa's Export Opportunity
Project solar
Vsquare Automation & Controls, Pune, Finolex Cables
SolarEdge Company Presentation for North America
Type of Solar power systems - ORIANA SOLAR & ELECTRICALS pdf
Rebecca mills-securing-the-n ts-energy-future
Final presentation
Solar pv – balance of systems
Keeping things on track at Greenbushes
Silicon CPV Plc
Sustainable Energy for All – A multidisciplinary educational approach.
Renewable energy integration and energy storage
Case for rooftop solar for self consumption
Micro Pump Presentation -public
CUF vs PR
Session 3A - Solar Electricity: Basics and Hands On Demonstration
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
Introduction to energy storage
Econoseek
BESCOM Solar Rooftop Project Guidelines
The Vanadium Redox Flow Battery and South Africa's Export Opportunity
Ad

Viewers also liked (8)

PPTX
Lab1 hylbar program
PPT
тоон логик 6 7 l триггер
PPTX
7salaalsan
PDF
Lec4 хereglegchiinpunkts
PPT
тоон логик 8 l нийлбэрлэгч
PPT
карбон хүчил
PDF
C cons
Lab1 hylbar program
тоон логик 6 7 l триггер
7salaalsan
Lec4 хereglegchiinpunkts
тоон логик 8 l нийлбэрлэгч
карбон хүчил
C cons
Ad

Recently uploaded (20)

PDF
Electronic commerce courselecture one. Pdf
PDF
Encapsulation_ Review paper, used for researhc scholars
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Approach and Philosophy of On baking technology
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
Empathic Computing: Creating Shared Understanding
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Electronic commerce courselecture one. Pdf
Encapsulation_ Review paper, used for researhc scholars
The AUB Centre for AI in Media Proposal.docx
Mobile App Security Testing_ A Comprehensive Guide.pdf
20250228 LYD VKU AI Blended-Learning.pptx
Programs and apps: productivity, graphics, security and other tools
Approach and Philosophy of On baking technology
“AI and Expert System Decision Support & Business Intelligence Systems”
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Empathic Computing: Creating Shared Understanding
Review of recent advances in non-invasive hemoglobin estimation
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Building Integrated photovoltaic BIPV_UPV.pdf
Digital-Transformation-Roadmap-for-Companies.pptx
Diabetes mellitus diagnosis method based random forest with bat algorithm
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
Build a system with the filesystem maintained by OSTree @ COSCUP 2025

Naps Solar Systems: Libya pipeline electrification

  • 1. Copyright © Naps Systems Oy 2012 Libya pipeline electrification
  • 2. Wafa-Mellitah Pipeline, Libya Copyright © Naps Systems Oy 2012 • Large stand-alone solar electric systems for gas pipeline cathodic protection, telecommunications, monitoring, valve control and area lighting • Project completed in autumn 2004
  • 3. Wafa-Mellitah Pipeline, Libya Site Specific Issues Copyright © Naps Systems Oy 2012 • All sites located in uninhabited areas • Electricity grid far and too expensive to extend • Temperatures above +55 C • Often strong sand storms
  • 4. Wafa-Mellitah Pipeline, Libya Objectives for the Project Copyright © Naps Systems Oy 2012 • Commercially most competitive solution • High availability of the pipeline • Energy for the pipeline monitoring, control system and lighting in order to secure safety • Flexibility for locating the sites • Short construction time • Minimised need for maintenance and no need for fuel supply
  • 5. Wafa-Mellitah Pipeline, Libya Professional Design Copyright © Naps Systems Oy 2012 • Combined load of 300-3000W per site • Total of 27 solar electric systems along the pipeline • Special system control units for each site with Scada remote monitoring capabilities • Naps power solutions operating with the other site equipment in MODBUS protocol • Autonomy time secured in case of emergency
  • 6. Wafa-Mellitah Pipeline, Libya System Components Copyright © Naps Systems Oy 2012 • 24-300 pcs of Naps 100-watt modules per site • Battery bank for 4 days autonomy • System management by custom-made Naps NSCi professional control unit • Rectifiers for battery charging • Other equipment: structures, panel centres, cables, battery main fuses and accessories
  • 7. Implementation Copyright © Naps Systems Oy 2012 • Installation time 1-4 days with circa 10 persons • Locally supplied foundation, equipment shelter and complete installation • Site supervision and start-up provided by Naps • Customer is pleased about Naps intensive service and the high level of technology.
  • 8. Wafa-Mellitah Pipeline, Libya Conclusions Copyright © Naps Systems Oy 2012 • The initial investment was low compared with any other from of energy supply • The implementation was done rapidly in 8 weeks • Operational costs are very low • Maintenance: one 1-2 hrs visit per site per year • Very reliable power supply • New orders under processing as a result of good implementation
  • 9. Copyright © Naps Systems Oy 2012 Naps Systems Ltd Ruosilankuja 4, FI-00390 Helsinki, Finland group@napssystems.com Tel. +358 20 7545 666, Fax +358 20 7545 660 www.napssystems.com