INTERIOR DESIGN
Building Construction
Submitted to Submitted By
Dezyne E’cole College,Ajmer Neha Assudani
www.dezyneecole.com B.Sc-Interior Design
II Sem.
NTERIORI Building Construction
Topic:- Technical terms of Building
A change in usage of building or a
structural change, such as an
addition to the area or height, or
the removal of a part of a building,
or any change to the structure,
such as construction of, cutting into
or removal of any wall, partition,
column, beam, floor joist or other
support or a change to or closing of
any required means of ingress or
egress or a change to the fixtures
or equipment.
1. Alteration
A horizontal cantilevered
projection including a
hand rail or balustrade to
serve as passage or sitting
out place.
2. Balcony
Habitable room/ rooms on the
roof of building with or without
toilets/ kitchen.
3. Barsati
The lower storey of a
building below or
partly below ground
level.
4. Basement or cellar
NTERIORI
Building Construction
Topic:- Technical terms of Building
The vertical height of the building
measured above the average
level of the ground to the end of
the roof. Building height can be
measured:-
In case of Flat roofs
In case of Pitched roofs
In case of gable end of sloped
roof facing the road
5.Building height
The line upto which the
plinth of a building
adjoining a street or
extension of a street or on
a future street may
lawfully extend.
6.Building Line
A room constructed with non
load bearing partition/
partitions with adequate
provision of light and
ventilation.
7.Cabin
A sloping or horizontal
structural overhang
usually provided over
openings on external
walls for protection from
sun and rain.
8.Chhajja or Sunshade
NTERIORI
Building Construction
Topic:- Technical terms of Building
A line of pipes including
all fittings and
equipment such as
manholes, inspection
chambers, traps, gullies
and floor traps used for
the drainage of a
building, or a number of
buildings. Drain shall also
include open channels
used for carriage of
surface water.
12. Drain
A course consisting of some
some appropriate water
proofing material provided to
prevent penetration of
dampness or moisture.
11. Damp Proof Course
A space permanently open
to sky, enclosed fully or
partially by building and
may be at ground level or
any other level within or
adjacent to a building.
9.Courtyard
Ground area covered by the
building immediately above
the plinth level. It does not
include the spaces covered
by canopy, chhajja, or alike
projections; uncovered
staircase, compound wall,
gate, well, tank, fountain,
garden etc.
10.Covered Area
NTERIORI
Building Construction
Topic:- Technical terms of Building
One of the lifts
specially designed for
use by fire service
personnel in the event
of fire.
16. Fire lift
An outer wall of a building not
being a party wall even
though adjoining to a wall of
another building also means a
wall abutting on an interior
open space of any building.
15. External Wall
The removal of any
liquid(storm water, waste
water, sewage) by a system
constructed for this purpose.
13. Drainage
A passage, channel or
means of egress from any
building, storey or floor
area to a street or the
other open space of
safety.
14. Exit
NTERIORI
Building Construction
Topic:- Technical terms of Building
A foundation unit
constructed in brick work ,
masonry or concrete under
the base of a wall or column
for the purpose of
distributing the load over a
large area.
20. Footing
The quotient obtained by dividing
the total covered area on all floors
multiplied by 100 by the area of
the plot.
FAR = TOTAL COVERED AREA X 100
PLOT AREA
19. Floor Area Ratio (FAR)
A door or shutter fitted to a
wall opening, and
constructed and erected with
the requirement to check the
transmission of heat and fire
for a specific period.
17. Fire proof Door
The lower surface in a
storey on which one
normally walks in a
building. The general term
floor unless otherwise
specifically mentioned, shall
not refer to mezzanine
floor.
18. Floor
NTERIORI
Building Construction
Topic:- Technical terms of Building
A building or portion
therefore used for
shelter , storage or
parking of vehicles
24. Garage
An intermediate floor or platform
projecting from a wall of an
auditorium or a hall providing
extra floor area , additional
seating accommodation etc.
23. Gallery
That part of a
structure which is in
direct contact with
soil with transmitting
loads to the ground
21. Foundation
As applied to a building
means the potion facing
the street from which it
has its access
22. Front
NTERIORI
Building Construction
Topic:- Technical terms of Building
Means the storey of the
building which has its floor
surface nearest to the
ground around the
building.
25. Ground Floor
A room occupied or
designed for occupancy
by one or more person
for study , sleeping ,
living , eating , kitchen
etc. it didn’t include
bathroom.
26. Habitable room
A structure with
covering of roof over a
staircase and its landing
, built to enclose only
the stairs for the
purpose of providing
protection from
weather.
28. Mumti or Stair cover
An intermediary floor
space created by the
introduction of a slab
between floor and ceiling
of a room , passage or
wherever it is provided
with maximum clear
height of 15 meter for
storage purpose only.
27. Loft
NTERIORI
Building Construction
Topic:- Technical terms of Building
An intermediate floor
between two floor
levels above ground
and at least one side of
it should form an
integral part of it .
29. Mezzanine Floor
An area, forming an
integral part of the plot,
left open to the sky.
30. Open Space
An interior non load bearing
wall, one storey or part storey
in height.
32. Partition
A low wall or railing built
along the edge of a roof
or a floor.
31. Parapet
NTERIORI
Building Construction
Topic:- Technical terms of Building
The vertical distance
measured from the
finished floor surface
to the finished ceiling
surface.
36. Room Height
A covered surface supported
on pillars or otherwise for the
purpose of pedestrian or
vehicular approach to a
building.
35. Porch
The built up covered
area measured at the
floor level of the
basement or of any
storey.
34. Plinth area
The position of a structure
between the surface of the
surrounding ground and surface
of the floor, immediately above
the ground.
33. Plinth
NTERIORI
Building Construction
Topic:- Technical terms of Building
A road/lane provide at the
rear or side of a plot for
service purpose.
37. Service Road
A line usually parallel to the
plot boundaries and laid
down in each case by the
municipal bodies beyond
which nothing can be
constructed.
38. Set back line
The portion of a building
included between the
surface of any floor and
the surface of the floor
next above it, or if there is
no floor above it, then the
space between any floor
and ceiling next above it.
40. Storey
A piece of land enclosed by
definite boundaries.
39. Site (plot)
NTERIORI
Building Construction
Topic:- Technical terms of Building
The distance from the
remotest point on a floor of a
building to a place of safety
be it a vertical exit, horizontal
exit or an outside exit
measured along the line of
travel.
43. Travel distance
A privy with arrangement for
flushing the pan with water. It
does not include a bathroom.
44. Water Closet (WC)
Any means or access i.e.
highway road, street, lane,
pathway etc. over which
public have a right to
passage.
41. Street
Means a load bearing wall or
a wall that carries load in
addition to its own weight.
42. Structural Wall

More Related Content

PDF
Neha Assudani B.Sc.Interior Design ( Building Construction Assignment)
PDF
Components of a building kritika heda
PDF
Bhavika Goyal B.Sc. Interior Design Building Construction Assignment( compone...
PPTX
002 ADG I: Building Components and Materials
PPTX
Centre Georges Pomidou, Renzo Piano
PDF
Farnsworth house Construction Details
PPT
Pompidou centre,metz
PDF
Hearst Tower
Neha Assudani B.Sc.Interior Design ( Building Construction Assignment)
Components of a building kritika heda
Bhavika Goyal B.Sc. Interior Design Building Construction Assignment( compone...
002 ADG I: Building Components and Materials
Centre Georges Pomidou, Renzo Piano
Farnsworth house Construction Details
Pompidou centre,metz
Hearst Tower

What's hot (20)

PPT
Norman foster
PPTX
Sir Norman foster and Top 5 World Architects
PPT
Richard rogers-lloyds-london
PPT
FCSarch 38 Mies van der Rohe
PPTX
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
PPTX
Mr.Foster
PDF
Fahad Al Tamimi Presents London's Best Architecture
PDF
The Gherkin: Case Study
PDF
Functionalism- Louis sullivan by awder omer
PPTX
Hsbc building by raf
PPT
Presentation1
PPTX
Sainsbury center - truss structure
PPTX
ARCH417FrankGehry
PDF
Norman Foster
PDF
The fundamentals of interior architecture book
PDF
Door and window fenestration system
PDF
High Rise Building Research Document
PDF
High Rise Structures case study - The Gherkin & Shanghai financial center.
PDF
Elements of culture the wind tower
Norman foster
Sir Norman foster and Top 5 World Architects
Richard rogers-lloyds-london
FCSarch 38 Mies van der Rohe
Farnsworth house and S.R Crown hall by Mies Van der Rohe- Case study
Mr.Foster
Fahad Al Tamimi Presents London's Best Architecture
The Gherkin: Case Study
Functionalism- Louis sullivan by awder omer
Hsbc building by raf
Presentation1
Sainsbury center - truss structure
ARCH417FrankGehry
Norman Foster
The fundamentals of interior architecture book
Door and window fenestration system
High Rise Building Research Document
High Rise Structures case study - The Gherkin & Shanghai financial center.
Elements of culture the wind tower
Ad

Viewers also liked (20)

PPT
Principles of design
PDF
ARCHITECHTURAL DESIGN
PPTX
d&s designs interiors profile
PPTX
Interior architecture
PPT
telecommunication Towers
PDF
Architectural Design
PPT
PPTX
Construction of flexible pavement
PPTX
Cost Effective Construction Techniques By Stephen Rayment
PPT
LOW COST HOUSING
PPTX
Plastic roads
PPTX
Road Construction
PPTX
Interior Designer PowerPoint
PPT
Interior Design ppt.
KEY
Interior design seminar presentation
PDF
Elements of interior design
PPTX
Interior design
PPTX
Interior Design Portfolio
PPT
Road construction
PPTX
plastic roads
Principles of design
ARCHITECHTURAL DESIGN
d&s designs interiors profile
Interior architecture
telecommunication Towers
Architectural Design
Construction of flexible pavement
Cost Effective Construction Techniques By Stephen Rayment
LOW COST HOUSING
Plastic roads
Road Construction
Interior Designer PowerPoint
Interior Design ppt.
Interior design seminar presentation
Elements of interior design
Interior design
Interior Design Portfolio
Road construction
plastic roads
Ad

Similar to Neha Assudani B.Sc.Interior Design ( Building Construction Assignment) (20)

PPTX
An introduction of building contruction
PPTX
UNIT 1 C1 PPT.pptx Building Construction and Services
PPTX
General Development Control Regulations (GDCR).pptx
PPTX
Building Bye laws
PPT
Construction Dictionary
PPT
Construction Dictionary
PPTX
Introduction to buildings
PPT
Visual Dictionary - Loadbearing
PPTX
120222 - Seminar on Superstructure.pptx
PPT
Visual Dictionary - Scaffold
DOCX
F trabalho 2
PPTX
7. building components
PPT
Visual Dictionary - Soffit
PPT
Visual Dictionary-Permeance
PPTX
Visual Dictionary Half 1- course/downspout
PDF
reseach notes on architectural servicezones
PPT
HVAC
PDF
Visual Dictionary- Baluster
PPTX
Visual dictionary- Sp10door
PPTX
Visual dictionary- Sp10door
An introduction of building contruction
UNIT 1 C1 PPT.pptx Building Construction and Services
General Development Control Regulations (GDCR).pptx
Building Bye laws
Construction Dictionary
Construction Dictionary
Introduction to buildings
Visual Dictionary - Loadbearing
120222 - Seminar on Superstructure.pptx
Visual Dictionary - Scaffold
F trabalho 2
7. building components
Visual Dictionary - Soffit
Visual Dictionary-Permeance
Visual Dictionary Half 1- course/downspout
reseach notes on architectural servicezones
HVAC
Visual Dictionary- Baluster
Visual dictionary- Sp10door
Visual dictionary- Sp10door

More from dezyneecole (20)

PDF
Gracika Benjamin , Diploma Fashion Design Second Year
PDF
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year
PDF
Harsha Chhaparwal, Diploma Fashion Design Second Year
PDF
Harsha Chhaparwal, Diploma Fashion Design Second Year
PDF
Harsha Chhaparwal, Diploma Fashion Design Second Year
PDF
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year
PDF
Sushmita Bhati, Diploma Fashion Design Second Year
PDF
Sushmita Bhati, Diploma Fashion Design Second Year
PDF
Sushmita Bhati, Diploma Fashion Design Second Year, (How to Design for Fashio...
PDF
Somya Jain, Diploma Fashion Design Second Year, (How to Design for Fashion In...
PDF
Gitesh Chhatwani , BCA -3 Year
PDF
Anurag Yadav , B.Voc Interior Design 1st Year ( Residential Portfolio)
PDF
Namita Bakoliya, Diploma Fashion Design First Year, (Corel Draw Project)
PPTX
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year, (Pattern Engineer...
PPTX
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year, (Draping Project)
PDF
Gouri Ramchandani, Diploma Fashion Design First Year, (Embroidery Project)
PDF
Gouri Ramchandani, Diploma Fashion Design First Year, (Corel DrawProject)
PDF
Dimple Mordani, Diploma Fashion Design First Year, (illustration for Fashion ...
PDF
Dimple Mordani, Diploma Fashion Design First Year, (Design Basics Project)
PDF
Dimple Mordani, Diploma Fashion Design First Year, (Corel Draw Project)
Gracika Benjamin , Diploma Fashion Design Second Year
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year
Harsha Chhaparwal, Diploma Fashion Design Second Year
Harsha Chhaparwal, Diploma Fashion Design Second Year
Harsha Chhaparwal, Diploma Fashion Design Second Year
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year
Sushmita Bhati, Diploma Fashion Design Second Year
Sushmita Bhati, Diploma Fashion Design Second Year
Sushmita Bhati, Diploma Fashion Design Second Year, (How to Design for Fashio...
Somya Jain, Diploma Fashion Design Second Year, (How to Design for Fashion In...
Gitesh Chhatwani , BCA -3 Year
Anurag Yadav , B.Voc Interior Design 1st Year ( Residential Portfolio)
Namita Bakoliya, Diploma Fashion Design First Year, (Corel Draw Project)
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year, (Pattern Engineer...
Sheikh Anjum Firdoush , Diploma Fashion Design Second Year, (Draping Project)
Gouri Ramchandani, Diploma Fashion Design First Year, (Embroidery Project)
Gouri Ramchandani, Diploma Fashion Design First Year, (Corel DrawProject)
Dimple Mordani, Diploma Fashion Design First Year, (illustration for Fashion ...
Dimple Mordani, Diploma Fashion Design First Year, (Design Basics Project)
Dimple Mordani, Diploma Fashion Design First Year, (Corel Draw Project)

Recently uploaded (20)

PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
HVAC Specification 2024 according to central public works department
PDF
IGGE1 Understanding the Self1234567891011
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PPTX
Computer Architecture Input Output Memory.pptx
PDF
My India Quiz Book_20210205121199924.pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
A powerpoint presentation on the Revised K-10 Science Shaping Paper
TNA_Presentation-1-Final(SAVE)) (1).pptx
Uderstanding digital marketing and marketing stratergie for engaging the digi...
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
HVAC Specification 2024 according to central public works department
IGGE1 Understanding the Self1234567891011
Unit 4 Computer Architecture Multicore Processor.pptx
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
B.Sc. DS Unit 2 Software Engineering.pptx
Computer Architecture Input Output Memory.pptx
My India Quiz Book_20210205121199924.pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين

Neha Assudani B.Sc.Interior Design ( Building Construction Assignment)

  • 1. INTERIOR DESIGN Building Construction Submitted to Submitted By Dezyne E’cole College,Ajmer Neha Assudani www.dezyneecole.com B.Sc-Interior Design II Sem.
  • 2. NTERIORI Building Construction Topic:- Technical terms of Building A change in usage of building or a structural change, such as an addition to the area or height, or the removal of a part of a building, or any change to the structure, such as construction of, cutting into or removal of any wall, partition, column, beam, floor joist or other support or a change to or closing of any required means of ingress or egress or a change to the fixtures or equipment. 1. Alteration A horizontal cantilevered projection including a hand rail or balustrade to serve as passage or sitting out place. 2. Balcony Habitable room/ rooms on the roof of building with or without toilets/ kitchen. 3. Barsati The lower storey of a building below or partly below ground level. 4. Basement or cellar
  • 3. NTERIORI Building Construction Topic:- Technical terms of Building The vertical height of the building measured above the average level of the ground to the end of the roof. Building height can be measured:- In case of Flat roofs In case of Pitched roofs In case of gable end of sloped roof facing the road 5.Building height The line upto which the plinth of a building adjoining a street or extension of a street or on a future street may lawfully extend. 6.Building Line A room constructed with non load bearing partition/ partitions with adequate provision of light and ventilation. 7.Cabin A sloping or horizontal structural overhang usually provided over openings on external walls for protection from sun and rain. 8.Chhajja or Sunshade
  • 4. NTERIORI Building Construction Topic:- Technical terms of Building A line of pipes including all fittings and equipment such as manholes, inspection chambers, traps, gullies and floor traps used for the drainage of a building, or a number of buildings. Drain shall also include open channels used for carriage of surface water. 12. Drain A course consisting of some some appropriate water proofing material provided to prevent penetration of dampness or moisture. 11. Damp Proof Course A space permanently open to sky, enclosed fully or partially by building and may be at ground level or any other level within or adjacent to a building. 9.Courtyard Ground area covered by the building immediately above the plinth level. It does not include the spaces covered by canopy, chhajja, or alike projections; uncovered staircase, compound wall, gate, well, tank, fountain, garden etc. 10.Covered Area
  • 5. NTERIORI Building Construction Topic:- Technical terms of Building One of the lifts specially designed for use by fire service personnel in the event of fire. 16. Fire lift An outer wall of a building not being a party wall even though adjoining to a wall of another building also means a wall abutting on an interior open space of any building. 15. External Wall The removal of any liquid(storm water, waste water, sewage) by a system constructed for this purpose. 13. Drainage A passage, channel or means of egress from any building, storey or floor area to a street or the other open space of safety. 14. Exit
  • 6. NTERIORI Building Construction Topic:- Technical terms of Building A foundation unit constructed in brick work , masonry or concrete under the base of a wall or column for the purpose of distributing the load over a large area. 20. Footing The quotient obtained by dividing the total covered area on all floors multiplied by 100 by the area of the plot. FAR = TOTAL COVERED AREA X 100 PLOT AREA 19. Floor Area Ratio (FAR) A door or shutter fitted to a wall opening, and constructed and erected with the requirement to check the transmission of heat and fire for a specific period. 17. Fire proof Door The lower surface in a storey on which one normally walks in a building. The general term floor unless otherwise specifically mentioned, shall not refer to mezzanine floor. 18. Floor
  • 7. NTERIORI Building Construction Topic:- Technical terms of Building A building or portion therefore used for shelter , storage or parking of vehicles 24. Garage An intermediate floor or platform projecting from a wall of an auditorium or a hall providing extra floor area , additional seating accommodation etc. 23. Gallery That part of a structure which is in direct contact with soil with transmitting loads to the ground 21. Foundation As applied to a building means the potion facing the street from which it has its access 22. Front
  • 8. NTERIORI Building Construction Topic:- Technical terms of Building Means the storey of the building which has its floor surface nearest to the ground around the building. 25. Ground Floor A room occupied or designed for occupancy by one or more person for study , sleeping , living , eating , kitchen etc. it didn’t include bathroom. 26. Habitable room A structure with covering of roof over a staircase and its landing , built to enclose only the stairs for the purpose of providing protection from weather. 28. Mumti or Stair cover An intermediary floor space created by the introduction of a slab between floor and ceiling of a room , passage or wherever it is provided with maximum clear height of 15 meter for storage purpose only. 27. Loft
  • 9. NTERIORI Building Construction Topic:- Technical terms of Building An intermediate floor between two floor levels above ground and at least one side of it should form an integral part of it . 29. Mezzanine Floor An area, forming an integral part of the plot, left open to the sky. 30. Open Space An interior non load bearing wall, one storey or part storey in height. 32. Partition A low wall or railing built along the edge of a roof or a floor. 31. Parapet
  • 10. NTERIORI Building Construction Topic:- Technical terms of Building The vertical distance measured from the finished floor surface to the finished ceiling surface. 36. Room Height A covered surface supported on pillars or otherwise for the purpose of pedestrian or vehicular approach to a building. 35. Porch The built up covered area measured at the floor level of the basement or of any storey. 34. Plinth area The position of a structure between the surface of the surrounding ground and surface of the floor, immediately above the ground. 33. Plinth
  • 11. NTERIORI Building Construction Topic:- Technical terms of Building A road/lane provide at the rear or side of a plot for service purpose. 37. Service Road A line usually parallel to the plot boundaries and laid down in each case by the municipal bodies beyond which nothing can be constructed. 38. Set back line The portion of a building included between the surface of any floor and the surface of the floor next above it, or if there is no floor above it, then the space between any floor and ceiling next above it. 40. Storey A piece of land enclosed by definite boundaries. 39. Site (plot)
  • 12. NTERIORI Building Construction Topic:- Technical terms of Building The distance from the remotest point on a floor of a building to a place of safety be it a vertical exit, horizontal exit or an outside exit measured along the line of travel. 43. Travel distance A privy with arrangement for flushing the pan with water. It does not include a bathroom. 44. Water Closet (WC) Any means or access i.e. highway road, street, lane, pathway etc. over which public have a right to passage. 41. Street Means a load bearing wall or a wall that carries load in addition to its own weight. 42. Structural Wall