The two most-used measures for evaluating projects are
the net present value and the internal rate of return!
Agenda

2
Net Present Value
•

The difference between the present value of the future cash flows from
an investment and the amount of investment. Present value of the
expected cash flows is computed by discounting them at the required rate
of return.

Where,
N=total number of periods
T= the time of the cash flow
i= the discount rate (the rate of return that could be earned on an
investment)
Rt = the net cash flow i.e. cash inflow – cash outflow at time t (R0: it is
subtracted from the whole as any initial investments during first year is
not discounted for NPV purpose)

3
The NPV Decision Rules

4
Example
An Investment of $1,000 in year 1
 The discount rate is 10%
 In Year 2, we receive $110 in year 2
 You expect to receive $1,200 in year 3
1

2

3

Investment

($ 1,000)

Cash Inflows

$0

$ 110

$ 1200

Discounting
Factor

1

1.10

1.21

Discounted
Cash Inflow

0

$ 100

$ 991.74

Therefore, NPV= ($ 1,000) + $ 100 + $ 991.74= $ 91.74
Hence, we can do this investment.

5
Internal Rate of Return
• The internal rate of return of a project is
known as the rate of return where the
particular project’s net present value
equals to zero.

• Formula:

– CF: Cash Flow
– r: Internal Rate of Return
6
Internal Rate of Return Rules
In IRR decisions, if we have only one project, most
of the time we need the basic rule «independent
project»:
IRR > Cost of capital (should be accepted)
IRR = Cost of capital (provides the minimum return)
IRR < Cost of capital (shouldn’t be accepted)

In addition, we need to take other situations into
account too. Especially, eventhough NPV and IRR
will generally give us the same decision, there are
some exceptions:
•Nonconventional cash flows – cash flow signs
change more than once
•Mutually exclusive projects
7
Example: Independent Project

If we want to decide on to accept the project or not, we
should consider the comparison of IRR & cost of capital
for an individual project.
In this example;
•when the cost of capital is 15%, then the NPV is
-227,53 (don’t accept)
• Alternative: IRR < Cost of capital
•when the cost of capital is 10%, then the NPV is 34,27
(accept)
• Alternative: IRR > Cost of capital
8
Example: Mutual Projects

9
Key differences:

NPV versus IRR

• NPV Method is preferred over other methods since it calculates additional wealth and
the IRR Method does not
• The IRR Method is more used in evaluating short-term projects and NPV is more used
in evaluating long-term projects.
• one significant advantage of IRR -- managers tend to better understand the concept of
returns stated in percentages and find it easy to compare to the required cost of capital
• Applying NPV using different discount rates will result in different recommendations.
The IRR method always gives the same recommendation.
Project A
Invest

compare two mutually
exclusive projects

Project B

-10.000

-25.000

Return

+25.000

+50.000

IRR

IRR 150%

IRR 100%

NPV by i=8%

13.148

21.296
10
Link to Project Management
NPV and IRR in the decision taking process
Methods to evaluate a project
 estimate the value of the project
 choosing which project gets priority

By applying
 NPV as time value of money (money figure)
 IRR calculate the investments profitability as an interest rate
(percentage figure)

included in a business case prepared by the
controlling department
11
Contact
Ujjwal Kumar Joshi
ujjwaljoshi1990@gmail.com

12

More Related Content

PPTX
Net Present Value - NPV
PPT
Internal Rate of Return
PPT
Development project appraisal and sd(L6)1
PPTX
Internal rate of return
PPTX
Project cash flow
PDF
Net Present Value, IRR and Profitability Index
PPTX
Comparison of npv with irr
PPTX
Internal rate of return
Net Present Value - NPV
Internal Rate of Return
Development project appraisal and sd(L6)1
Internal rate of return
Project cash flow
Net Present Value, IRR and Profitability Index
Comparison of npv with irr
Internal rate of return

What's hot (20)

PPT
Project evalaution techniques
PPT
Project appraisal and Analysis
PPTX
NET PRESENT VALUE (NPV)
PPTX
Presentation on project appraisal
PPT
Project appraisal
PPTX
Internal rate of return(IRR)
PPT
Payback period by harikrishnanan
PPTX
Project financing methods
PDF
Financial appraisal
PPTX
Accounting rate of return
PPTX
project appraisal
PPTX
Analytical comparision of BOT,BOOT and PPP models
PPT
Financial appraisal techniques
PPTX
Cost management
PPTX
Radr and certainty equivalent techniques
ODP
Project financing and sources of funding
PPTX
Project management & Network analysis
PPT
Chapter8 investmentcriteria
Project evalaution techniques
Project appraisal and Analysis
NET PRESENT VALUE (NPV)
Presentation on project appraisal
Project appraisal
Internal rate of return(IRR)
Payback period by harikrishnanan
Project financing methods
Financial appraisal
Accounting rate of return
project appraisal
Analytical comparision of BOT,BOOT and PPP models
Financial appraisal techniques
Cost management
Radr and certainty equivalent techniques
Project financing and sources of funding
Project management & Network analysis
Chapter8 investmentcriteria
Ad

Similar to Npv and IRR, a link to Project Management (20)

PPTX
U3_Capital Budgeting.pptx Project Financing including NPV, IRR, PI, PB, DP...
PDF
Comparison of NPV IRR and Profitability Index.pdf
PPTX
Capital Budgeting : capital budgeting decision
PPT
CAPITAL BUDGETING DECISIONS.ppt
PPT
13. NPV rule, cash flow calculations, discount rates in Capital budgeting.ppt
PPTX
Capital budgeting techniques For Analysis.......
PPTX
capital budgeting process investment rules.pptx
PPTX
Capital budgeting i
PPTX
Capital budgeting decisions
PPT
Discounted measures
PPTX
OL_06-07_IPE 4111_ Capital Budgeting.pptx
PPTX
Capital Budgeting
PPTX
Capital budgeting
PDF
5) capital_budgeting_(1)_-(2)[1].ppt.pdf
PPT
Capital budgeting
PPTX
financial management Presentation .pptx
PPT
Chapter 09 Capital Budgeting
PPT
Cooperate finance
PPTX
Investment slideppt.pptx
U3_Capital Budgeting.pptx Project Financing including NPV, IRR, PI, PB, DP...
Comparison of NPV IRR and Profitability Index.pdf
Capital Budgeting : capital budgeting decision
CAPITAL BUDGETING DECISIONS.ppt
13. NPV rule, cash flow calculations, discount rates in Capital budgeting.ppt
Capital budgeting techniques For Analysis.......
capital budgeting process investment rules.pptx
Capital budgeting i
Capital budgeting decisions
Discounted measures
OL_06-07_IPE 4111_ Capital Budgeting.pptx
Capital Budgeting
Capital budgeting
5) capital_budgeting_(1)_-(2)[1].ppt.pdf
Capital budgeting
financial management Presentation .pptx
Chapter 09 Capital Budgeting
Cooperate finance
Investment slideppt.pptx
Ad

More from Ujjwal Joshi (20)

PDF
Client Service Executive - Junior Event Manager
PPT
Understanding france- Brief overview of Marseille
PPTX
Melamchi Drinking Water Project
PDF
Namibia- Project Hope
PDF
Supply chain
PDF
Implementation of SAP BI in Coca Cola
PPT
Micro patterns in agile software
PPT
KANBAN
PPT
Project Types and their importance
PPT
ICB Competence, Project Standards
PDF
Biogas project report
PPTX
PMBOK Risk Management and Safety Health and Environment
PDF
Report on Kotter's Change Model
PPT
Chad cameroon pipeline project
PPT
Kotter’s 8 step change model
PPT
Knowledge Management- Ernst & Young
DOC
Communication 1
PDF
Code of conduct_2011
DOC
Niccolo machiavelli
PPT
Knowledge Management in NASA
Client Service Executive - Junior Event Manager
Understanding france- Brief overview of Marseille
Melamchi Drinking Water Project
Namibia- Project Hope
Supply chain
Implementation of SAP BI in Coca Cola
Micro patterns in agile software
KANBAN
Project Types and their importance
ICB Competence, Project Standards
Biogas project report
PMBOK Risk Management and Safety Health and Environment
Report on Kotter's Change Model
Chad cameroon pipeline project
Kotter’s 8 step change model
Knowledge Management- Ernst & Young
Communication 1
Code of conduct_2011
Niccolo machiavelli
Knowledge Management in NASA

Recently uploaded (20)

PPTX
The discussion on the Economic in transportation .pptx
PDF
5a An Age-Based, Three-Dimensional Distribution Model Incorporating Sequence ...
PPT
KPMG FA Benefits Report_FINAL_Jan 27_2010.ppt
PPTX
FL INTRODUCTION TO AGRIBUSINESS CHAPTER 1
PPTX
Unilever_Financial_Analysis_Presentation.pptx
PDF
how_to_earn_50k_monthly_investment_guide.pdf
PPTX
Maths science sst hindi english cucumber
PDF
Lecture1.pdf buss1040 uses economics introduction
PPT
E commerce busin and some important issues
PDF
Chapter 9 IFRS Ed-Ed4_2020 Intermediate Accounting
PPTX
OAT_ORI_Fed Independence_August 2025.pptx
PPTX
How best to drive Metrics, Ratios, and Key Performance Indicators
DOCX
BUSINESS PERFORMANCE SITUATION AND PERFORMANCE EVALUATION OF FELIX HOTEL IN H...
PDF
Pitch Deck.pdf .pdf all about finance in
PDF
Q2 2025 :Lundin Gold Conference Call Presentation_Final.pdf
PDF
Predicting Customer Bankruptcy Using Machine Learning Algorithm research pape...
PDF
financing insitute rbi nabard adb imf world bank insurance and credit gurantee
PDF
Why Ignoring Passive Income for Retirees Could Cost You Big.pdf
PPTX
4.5.1 Financial Governance_Appropriation & Finance.pptx
PDF
CLIMATE CHANGE AS A THREAT MULTIPLIER: ASSESSING ITS IMPACT ON RESOURCE SCARC...
The discussion on the Economic in transportation .pptx
5a An Age-Based, Three-Dimensional Distribution Model Incorporating Sequence ...
KPMG FA Benefits Report_FINAL_Jan 27_2010.ppt
FL INTRODUCTION TO AGRIBUSINESS CHAPTER 1
Unilever_Financial_Analysis_Presentation.pptx
how_to_earn_50k_monthly_investment_guide.pdf
Maths science sst hindi english cucumber
Lecture1.pdf buss1040 uses economics introduction
E commerce busin and some important issues
Chapter 9 IFRS Ed-Ed4_2020 Intermediate Accounting
OAT_ORI_Fed Independence_August 2025.pptx
How best to drive Metrics, Ratios, and Key Performance Indicators
BUSINESS PERFORMANCE SITUATION AND PERFORMANCE EVALUATION OF FELIX HOTEL IN H...
Pitch Deck.pdf .pdf all about finance in
Q2 2025 :Lundin Gold Conference Call Presentation_Final.pdf
Predicting Customer Bankruptcy Using Machine Learning Algorithm research pape...
financing insitute rbi nabard adb imf world bank insurance and credit gurantee
Why Ignoring Passive Income for Retirees Could Cost You Big.pdf
4.5.1 Financial Governance_Appropriation & Finance.pptx
CLIMATE CHANGE AS A THREAT MULTIPLIER: ASSESSING ITS IMPACT ON RESOURCE SCARC...

Npv and IRR, a link to Project Management

  • 1.  Net Present Value Decision Rules  IRR (Internal Rate of Return)  in Project Management The two most-used measures for evaluating projects are the net present value and the internal rate of return!
  • 3. Net Present Value • The difference between the present value of the future cash flows from an investment and the amount of investment. Present value of the expected cash flows is computed by discounting them at the required rate of return. Where, N=total number of periods T= the time of the cash flow i= the discount rate (the rate of return that could be earned on an investment) Rt = the net cash flow i.e. cash inflow – cash outflow at time t (R0: it is subtracted from the whole as any initial investments during first year is not discounted for NPV purpose) 3
  • 5. Example An Investment of $1,000 in year 1  The discount rate is 10%  In Year 2, we receive $110 in year 2  You expect to receive $1,200 in year 3 1 2 3 Investment ($ 1,000) Cash Inflows $0 $ 110 $ 1200 Discounting Factor 1 1.10 1.21 Discounted Cash Inflow 0 $ 100 $ 991.74 Therefore, NPV= ($ 1,000) + $ 100 + $ 991.74= $ 91.74 Hence, we can do this investment. 5
  • 6. Internal Rate of Return • The internal rate of return of a project is known as the rate of return where the particular project’s net present value equals to zero. • Formula: – CF: Cash Flow – r: Internal Rate of Return 6
  • 7. Internal Rate of Return Rules In IRR decisions, if we have only one project, most of the time we need the basic rule «independent project»: IRR > Cost of capital (should be accepted) IRR = Cost of capital (provides the minimum return) IRR < Cost of capital (shouldn’t be accepted) In addition, we need to take other situations into account too. Especially, eventhough NPV and IRR will generally give us the same decision, there are some exceptions: •Nonconventional cash flows – cash flow signs change more than once •Mutually exclusive projects 7
  • 8. Example: Independent Project If we want to decide on to accept the project or not, we should consider the comparison of IRR & cost of capital for an individual project. In this example; •when the cost of capital is 15%, then the NPV is -227,53 (don’t accept) • Alternative: IRR < Cost of capital •when the cost of capital is 10%, then the NPV is 34,27 (accept) • Alternative: IRR > Cost of capital 8
  • 10. Key differences: NPV versus IRR • NPV Method is preferred over other methods since it calculates additional wealth and the IRR Method does not • The IRR Method is more used in evaluating short-term projects and NPV is more used in evaluating long-term projects. • one significant advantage of IRR -- managers tend to better understand the concept of returns stated in percentages and find it easy to compare to the required cost of capital • Applying NPV using different discount rates will result in different recommendations. The IRR method always gives the same recommendation. Project A Invest compare two mutually exclusive projects Project B -10.000 -25.000 Return +25.000 +50.000 IRR IRR 150% IRR 100% NPV by i=8% 13.148 21.296 10
  • 11. Link to Project Management NPV and IRR in the decision taking process Methods to evaluate a project  estimate the value of the project  choosing which project gets priority By applying  NPV as time value of money (money figure)  IRR calculate the investments profitability as an interest rate (percentage figure) included in a business case prepared by the controlling department 11

Editor's Notes

  • #8: NPV &lt; 0IRR &lt; Cost of CapitalReject the investment from the cash flow perspective. Other factors could be important. NPV = 0IRR = Cost of CapitalProvides the minimum return. Probably reject from the cash flow perspective. Others factors could be important. NPV &gt; 0IRR &gt; Cost of CapitalScreen in for further analysis. Other investments may provide better returns and capital should be rationed, i.e., go to the most profitable projects. Others factors could be important.
  • #9: On the example, at first we calculated with NPV to see if the value is negative, the there is no need to accept the prokect. If the value is positive then you can accept it. When we decide to see the rules with IRR, then we can summarize the calculation with the formula: IRR &gt; Cost of capital (should be accepted) IRR = Cost of capital (provides the minimum return) IRR &lt; Cost of capital (shouldn’t be accepted)
  • #10: IRR: 7,2% is where NPV A = NPV B Untill 7,2 the prject which should be chosen is B, whereas below 7,2 A is better. Therefore, there are some exceptions in IRR that in mutual project we always need to consider NPV and cost of capital to see where the balance changes. One way to understand the preference of NPV over IRR, more generally, is to recognize that NPV uses the “correct” rate, i.e., the cost of capital, to discount the cash flows, rather than an “arbitrary” rate, i.e., the IRR, that makes NPV =0. Another way to understand the superiority of the NPV rule is that the discounting process inherent in both the IRR and NPV techniques implicitly assumes the reinvestment of the cash flows at whatever discount rate is used, either IRR or the cost of capital. When the IRR is very high relative to the cost of capital it is unrealistic to assume reinvestment at that high rate. This is especially damaging when comparing two investments with very different timing of cash flows. We will revisit this reinvestment assumption later, under our discussion of yield to maturity on coupon bonds, where its meaning will become clearer.
  • #11: From a comparison of NPV and IRR, it can be seen that NPV is actually a better measure than IRR, especially, in long term projects, not only because NPV considers different discount rates but also takes into account the cost of capital