Evelean William
OUTLINE What is Lean? 5S & Visual Controls Kaizen Value Streams Pull Manufacturing Mistake Proofing Quick Changeover Six Sigma Lean Accounting Theory of Constraints Human Factors
EIGHT SERVICE INDUSTRY WASTES Errors in documents Transport of documents Doing unnecessary work not requested Waiting for the next process step Process of getting approvals Unnecessary motions Backlog in work queues Underutilized employees
EXAMPLES OF OFFICE PROCESS WASTE  Too many signature levels Unclear job descriptions Obsolete databases/files/folders Purchase Orders not matching quotation Errors – typo’s, misspelling, wrong data Waiting – for information, at meetings, etc. Poor office layout Unnecessary E-mails
5S AND VISUAL CONTROL 5 Elements of 5S Why 5S? Waste Workplace observation S ort S traighten S hine S tandardize S ustain Visual Factory
WHAT IS KAIZEN? Kaizen (Ky’zen) “ Kai” means “change” “ zen” means “good (for the better)” Gradual, orderly, and continuous improvement Ongoing improvement involving everyone
OUTLINE What are Value Streams? Identifying the Value Streams Value Stream Mapping The Current State The Future State Implementing Change Roadblocks
PUSH VS. PULL SCHEDULING  Push Scheduling  •  traditional approach  •  “ move the job on when finished”  •  problems - creates excessive inventory  Pull scheduling  •  coordinated •  driven by demand (pulled through system)  •  extensive use of visual triggers  (production/withdrawal kanbans)
WHAT IS JUST-IN-TIME? Management philosophy of continuous and forced problem solving (forced by driving inventory out of the system) Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. Goal:  Achieve the minimal level of resources required to add the necessary value in the system.
KANBAN Japanese word for card Authorizes output from downstream operations based on physical consumption May be a card, flag, verbal signal, etc. Used often with fixed-size containers Kanban quantities are a function of lead-time and consumption rate of the item being replenished (min qty=(demand during lead-time + safety stock)/ container quantity)
A philosophy that rejects batch, lot or mass processing as wasteful. States that product should move (flow) from operation to operation, only when it is needed, in the smallest increment.  One piece is the ultimate (one-piece-flow) One Piece Flow
Standardized work consists of three elements: Takt time  Matches the time to produce an itemwith the rate of sales.  It is the basis for determining workforce size and work allocation. Standard in-process inventory  The minimum number of parts, including units in machines, required to keep a cell or process moving. Standard work sequence The order in which a worker performs tasks for various processes. Once a standard work is set, performance is measured and continuously improved Standardized Work
WHAT IS MISTAKE PROOFING? The use of process or design features to prevent errors or their negative impact. Also known as Poka yoke, Japanese slang for “avoiding inadvertent errors” which was formalized by Shigeo Shingo. Inexpensive. Very effective. Based on simplicity and ingenuity.
CHANGEOVER TIME DEFINED Changeover time is the total elapsed time between the last good unit of the previous run, at normal efficiency, to the first good unit of the succeeding run, at full efficiency.
WHAT IS SIX SIGMA? A Vision and Philosophical commitment to our consumers to offer the highest quality, lowest cost products A Metric that demonstrates quality levels at 99.9997% performance for products and processs A Benchmark of our product and process capability for comparison to ‘best in class’ A practical application of statistical Tools and Methods to help us measure, analyze, improve, and control our process
ACTIVITY-BASED COSTING Allocates overhead to multiple activity cost pools and assigns the activity cost pools to products by means of cost drivers An activity is any event, action, transaction, or work sequence that causes the incurrence of cost in producing a product or providing a service A cost driver is any factor or activity that has a direct cause-effect relationship with the resources consumed
LEAN ACCOUNTING Lean Accounting is intended to replace traditional accounting and measurement systems; it is not intended be an additional analysis. Lean Accounting is right for companies that are well on the path toward lean.  Lean Accounting is more than a set of tools relating to measurement, capacity usage, value, and continuous improvement. Together these tools become a lean business management system that is radically different from traditional management.
THEORY OF CONSTRAINTS Based on the concepts of drum, buffer and ropes Drum Output of the constraint is the drumbeat Sets the tempo for other operations Tells upstream operations what to produce Tells downstream operations what to expect
WHAT IS ERGONOMICS? - It is the practice of arranging the environment to fit the person working in it. - Ergonomic principles help reduce the risk of potential injuries from : * Overuse of muscles  * Bad Posture  * Repetitive motion - Objective of ergonomics is to accommodate workers through the design of: * Tasks  * Controls  * Tools * Work stations  * Displays  * Lighting & equipment
Why Knowledge Management? Knowledge is: Knowledge results in: Conclusion The cutting edge of organizational success  (Nonaka, 1991) The engine transforming global economies  (Bell, 1973, 1978) Leading us toward a new type of work with new types of workers  (Blackler, Reed and Whitaker, 1993) The element that will lead to the demise of private enterprise capitalism  (Heilbruner, 1976) The sum total of value-added in an enterprise  (Peters, 1993) The “mobile and heterogeneous [resource that will end the] hegemony of financial capital [and allow employees to] seize power”  (Sveiby & Lloyd, 1987) Knowledge is fast becoming a primary factor of production   (e.g., Handy, 1989, 1994; Peter, 1993; Drucker, 1992) The “learning organization”  (Mayo & Lank, 1995) The “brain-based organization”  (Harari, 1994) Intellectual capital”  (Stewart, 1994) “ Learning partnerships”  (Lorange, 1995) Obsolete capitalists economies and radically different societies  (Drucker, 1993)
COST OF ACCIDENTS Direct Costs Medical Costs (including worker’s comp) Indemnity Payments Indirect costs Time Lost (by worker and supervisor) Schedule delays Training new employees Cleanup time / equipment repairs Legal fees
CONDUCTING EFFECTIVE MEETINGS Preparing for the Meeting Set Objectives – problems to solve, issues to address, decisions to be made Select Participants Set a Time and Place Plan the Agenda Distribute the Agenda and Relevant Materials in Advance Consult with Participants Before the Meeting

More Related Content

PDF
Lean Value Stream Mapping (VSM) Training Module
PPT
Office Lean Overview
PPT
Lean Office Sample
PPT
The Complete Lean Enterprise
PPT
SBS - Basics of Lean
PPTX
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
PPT
What Is Lean Manufacturing
PPT
093 Productivity Measurement
Lean Value Stream Mapping (VSM) Training Module
Office Lean Overview
Lean Office Sample
The Complete Lean Enterprise
SBS - Basics of Lean
A Study On the Effectiveness Of Lean Manufacturing Practices In MSME.
What Is Lean Manufacturing
093 Productivity Measurement

What's hot (18)

PPTX
Value Steam Mapping
PPTX
Lean startup
PPT
Webinar On Lean In Non Manufacturing Environments
PPTX
Application of value stream mapping for reduction of cycle time in machining ...
PDF
Guidebook productivity measurement
PPTX
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
PPT
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
PPT
Mba 505 business_processes_operations_productivity_strategy
PPT
Lean Fundamentals And Line Design 06 04 01
PDF
Value stream mapping a case study of automotive
PDF
Reduction in production time via Value Stream Mapping in garment industry(1)
PDF
Value stream mapping to create value and eliminate muda
PDF
Materials And Information Flow Map
PPTX
Process planning SMED and VSM: Single minute exchange of die and Value stream...
PPTX
Process mapping session final-Lean Six Sigma
PPT
RDrew Six Sigma Overview
PPTX
Business process mapping
Value Steam Mapping
Lean startup
Webinar On Lean In Non Manufacturing Environments
Application of value stream mapping for reduction of cycle time in machining ...
Guidebook productivity measurement
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Value Stream Mapping Training - ADDVALUE - Nilesh Arora
Mba 505 business_processes_operations_productivity_strategy
Lean Fundamentals And Line Design 06 04 01
Value stream mapping a case study of automotive
Reduction in production time via Value Stream Mapping in garment industry(1)
Value stream mapping to create value and eliminate muda
Materials And Information Flow Map
Process planning SMED and VSM: Single minute exchange of die and Value stream...
Process mapping session final-Lean Six Sigma
RDrew Six Sigma Overview
Business process mapping
Ad

Similar to Office Lean Overview (20)

PPTX
Lean Manufacturing
PPTX
Smallbusiness Semina Rpresentation
PPTX
Lean 101 2 Hour 2011
PPTX
Small Business Seminar Presentation
PPT
Core Lean Tools
PPT
Lss pharma presentation2-2006
PPTX
Final 30 minute free overview
PDF
iNTRODUCTION TO LEAN
PDF
Introduction To Lean
PPTX
Lean In Manufacturing
PPT
Presentation on Lean Manufacturing and waste elimination
PPT
LeanKaizenTraining
PPTX
Revised lean
PPT
Hourly Lean Introduction
PPTX
PPTX
Transforming Business with Lean Six Sigma
PDF
EM Normandie - Operational Efficiency
PDF
EM Normandie - Operational efficiency
PPTX
Awareness To Lean & 7 Qc Tools
Lean Manufacturing
Smallbusiness Semina Rpresentation
Lean 101 2 Hour 2011
Small Business Seminar Presentation
Core Lean Tools
Lss pharma presentation2-2006
Final 30 minute free overview
iNTRODUCTION TO LEAN
Introduction To Lean
Lean In Manufacturing
Presentation on Lean Manufacturing and waste elimination
LeanKaizenTraining
Revised lean
Hourly Lean Introduction
Transforming Business with Lean Six Sigma
EM Normandie - Operational Efficiency
EM Normandie - Operational efficiency
Awareness To Lean & 7 Qc Tools
Ad

More from ahmad bassiouny (20)

PPTX
Work Study & Productivity
PPT
Work Study
PPT
Motion And Time Study
PPT
Motion Study
PPT
The Christmas Story
PPS
Turkey Photos
PPT
Mission Bo Kv3
PPT
PPT
Linearization
PPT
Kblmt B000 Intro Kaizen Based Lean Manufacturing
PPT
How To Survive
PPT
Ancient Hieroglyphics
PPS
Dubai In 2009
PPT
DesignPeopleSystem
PPT
Organizational Behavior
PPT
Work Study Workshop
PPT
Workstudy
PPT
Time And Motion Study
Work Study & Productivity
Work Study
Motion And Time Study
Motion Study
The Christmas Story
Turkey Photos
Mission Bo Kv3
Linearization
Kblmt B000 Intro Kaizen Based Lean Manufacturing
How To Survive
Ancient Hieroglyphics
Dubai In 2009
DesignPeopleSystem
Organizational Behavior
Work Study Workshop
Workstudy
Time And Motion Study

Recently uploaded (20)

PDF
Complications of Minimal Access Surgery at WLH
PDF
Microbial disease of the cardiovascular and lymphatic systems
PDF
Computing-Curriculum for Schools in Ghana
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Insiders guide to clinical Medicine.pdf
PDF
Pre independence Education in Inndia.pdf
PPTX
Pharma ospi slides which help in ospi learning
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
Classroom Observation Tools for Teachers
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
RMMM.pdf make it easy to upload and study
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Cell Structure & Organelles in detailed.
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
01-Introduction-to-Information-Management.pdf
Complications of Minimal Access Surgery at WLH
Microbial disease of the cardiovascular and lymphatic systems
Computing-Curriculum for Schools in Ghana
2.FourierTransform-ShortQuestionswithAnswers.pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Insiders guide to clinical Medicine.pdf
Pre independence Education in Inndia.pdf
Pharma ospi slides which help in ospi learning
O7-L3 Supply Chain Operations - ICLT Program
Classroom Observation Tools for Teachers
PPH.pptx obstetrics and gynecology in nursing
human mycosis Human fungal infections are called human mycosis..pptx
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Abdominal Access Techniques with Prof. Dr. R K Mishra
RMMM.pdf make it easy to upload and study
Final Presentation General Medicine 03-08-2024.pptx
Cell Structure & Organelles in detailed.
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
01-Introduction-to-Information-Management.pdf

Office Lean Overview

  • 2. OUTLINE What is Lean? 5S & Visual Controls Kaizen Value Streams Pull Manufacturing Mistake Proofing Quick Changeover Six Sigma Lean Accounting Theory of Constraints Human Factors
  • 3. EIGHT SERVICE INDUSTRY WASTES Errors in documents Transport of documents Doing unnecessary work not requested Waiting for the next process step Process of getting approvals Unnecessary motions Backlog in work queues Underutilized employees
  • 4. EXAMPLES OF OFFICE PROCESS WASTE Too many signature levels Unclear job descriptions Obsolete databases/files/folders Purchase Orders not matching quotation Errors – typo’s, misspelling, wrong data Waiting – for information, at meetings, etc. Poor office layout Unnecessary E-mails
  • 5. 5S AND VISUAL CONTROL 5 Elements of 5S Why 5S? Waste Workplace observation S ort S traighten S hine S tandardize S ustain Visual Factory
  • 6. WHAT IS KAIZEN? Kaizen (Ky’zen) “ Kai” means “change” “ zen” means “good (for the better)” Gradual, orderly, and continuous improvement Ongoing improvement involving everyone
  • 7. OUTLINE What are Value Streams? Identifying the Value Streams Value Stream Mapping The Current State The Future State Implementing Change Roadblocks
  • 8. PUSH VS. PULL SCHEDULING Push Scheduling • traditional approach • “ move the job on when finished” • problems - creates excessive inventory Pull scheduling • coordinated • driven by demand (pulled through system) • extensive use of visual triggers (production/withdrawal kanbans)
  • 9. WHAT IS JUST-IN-TIME? Management philosophy of continuous and forced problem solving (forced by driving inventory out of the system) Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. Goal: Achieve the minimal level of resources required to add the necessary value in the system.
  • 10. KANBAN Japanese word for card Authorizes output from downstream operations based on physical consumption May be a card, flag, verbal signal, etc. Used often with fixed-size containers Kanban quantities are a function of lead-time and consumption rate of the item being replenished (min qty=(demand during lead-time + safety stock)/ container quantity)
  • 11. A philosophy that rejects batch, lot or mass processing as wasteful. States that product should move (flow) from operation to operation, only when it is needed, in the smallest increment. One piece is the ultimate (one-piece-flow) One Piece Flow
  • 12. Standardized work consists of three elements: Takt time Matches the time to produce an itemwith the rate of sales. It is the basis for determining workforce size and work allocation. Standard in-process inventory The minimum number of parts, including units in machines, required to keep a cell or process moving. Standard work sequence The order in which a worker performs tasks for various processes. Once a standard work is set, performance is measured and continuously improved Standardized Work
  • 13. WHAT IS MISTAKE PROOFING? The use of process or design features to prevent errors or their negative impact. Also known as Poka yoke, Japanese slang for “avoiding inadvertent errors” which was formalized by Shigeo Shingo. Inexpensive. Very effective. Based on simplicity and ingenuity.
  • 14. CHANGEOVER TIME DEFINED Changeover time is the total elapsed time between the last good unit of the previous run, at normal efficiency, to the first good unit of the succeeding run, at full efficiency.
  • 15. WHAT IS SIX SIGMA? A Vision and Philosophical commitment to our consumers to offer the highest quality, lowest cost products A Metric that demonstrates quality levels at 99.9997% performance for products and processs A Benchmark of our product and process capability for comparison to ‘best in class’ A practical application of statistical Tools and Methods to help us measure, analyze, improve, and control our process
  • 16. ACTIVITY-BASED COSTING Allocates overhead to multiple activity cost pools and assigns the activity cost pools to products by means of cost drivers An activity is any event, action, transaction, or work sequence that causes the incurrence of cost in producing a product or providing a service A cost driver is any factor or activity that has a direct cause-effect relationship with the resources consumed
  • 17. LEAN ACCOUNTING Lean Accounting is intended to replace traditional accounting and measurement systems; it is not intended be an additional analysis. Lean Accounting is right for companies that are well on the path toward lean. Lean Accounting is more than a set of tools relating to measurement, capacity usage, value, and continuous improvement. Together these tools become a lean business management system that is radically different from traditional management.
  • 18. THEORY OF CONSTRAINTS Based on the concepts of drum, buffer and ropes Drum Output of the constraint is the drumbeat Sets the tempo for other operations Tells upstream operations what to produce Tells downstream operations what to expect
  • 19. WHAT IS ERGONOMICS? - It is the practice of arranging the environment to fit the person working in it. - Ergonomic principles help reduce the risk of potential injuries from : * Overuse of muscles * Bad Posture * Repetitive motion - Objective of ergonomics is to accommodate workers through the design of: * Tasks * Controls * Tools * Work stations * Displays * Lighting & equipment
  • 20. Why Knowledge Management? Knowledge is: Knowledge results in: Conclusion The cutting edge of organizational success (Nonaka, 1991) The engine transforming global economies (Bell, 1973, 1978) Leading us toward a new type of work with new types of workers (Blackler, Reed and Whitaker, 1993) The element that will lead to the demise of private enterprise capitalism (Heilbruner, 1976) The sum total of value-added in an enterprise (Peters, 1993) The “mobile and heterogeneous [resource that will end the] hegemony of financial capital [and allow employees to] seize power” (Sveiby & Lloyd, 1987) Knowledge is fast becoming a primary factor of production (e.g., Handy, 1989, 1994; Peter, 1993; Drucker, 1992) The “learning organization” (Mayo & Lank, 1995) The “brain-based organization” (Harari, 1994) Intellectual capital” (Stewart, 1994) “ Learning partnerships” (Lorange, 1995) Obsolete capitalists economies and radically different societies (Drucker, 1993)
  • 21. COST OF ACCIDENTS Direct Costs Medical Costs (including worker’s comp) Indemnity Payments Indirect costs Time Lost (by worker and supervisor) Schedule delays Training new employees Cleanup time / equipment repairs Legal fees
  • 22. CONDUCTING EFFECTIVE MEETINGS Preparing for the Meeting Set Objectives – problems to solve, issues to address, decisions to be made Select Participants Set a Time and Place Plan the Agenda Distribute the Agenda and Relevant Materials in Advance Consult with Participants Before the Meeting

Editor's Notes

  • #5: There are many more examples of waste. Can you think of some?
  • #10: It is good at this point to emphasize the notion that JIT is a philosophy not simply delivery of small lots at specific times. It is also helpful to emphasize that JIT requires an ongoing effort.
  • #14: Mistake-proofing is the use of process or design features to prevent errors or their negative impact. Mistake-proofing is also known as poka-yoke, which is Japanese slang for avoiding inadvertent errors. It was formalized by Shigeo Shingo, whose picture is up here in the corner, and comes out of the Toyota product system. I understand that there is a long way between the Toyota product system and medical operations, but I think there are also some worthwhile similarities. Mistake-proofing is inexpensive. Mistake-proofing is very effective for manufacturers that are aware of it. Not all manufacturers are aware of it. It is also based on simplicity and ingenuity. But let me be clear that simplicity, in its true sense, is rarely an easy thing to accomplish. Finally, mistake-proofing is something you probably already have in isolated instances in your organization. So, as you look around you will find examples.