 Planning and control – A set of tactical and
execution-level business activities that
includes master scheduling, material
requirements planning, and some form of
production activity control and vendor order
management.
Dept. of MBA, Sanjivani COE, Kopargaon
Top-Down Model of Manufacturing
Planning and Control Systems
Figure 12.1
Dept. of MBA, Sanjivani COE, Kopargaon
Master Scheduling
 Master Scheduling – A detailed planning process that
tracks production output and matches this output to
actual customer orders.
 Controls the timing and quantity of production for
products or product families.
 Serves as the primary interface point for actual customer
orders.
 Coordinates forecasted demand and actual orders with
production activity.
 Serves as a tool for agreement between marketing and
operations (but at a different level than S&OP).
Dept. of MBA, Sanjivani COE, Kopargaon
Link between S&OP
and MPS
Month: January February March
Output: 200 300 400
Push Mowers 25 25 25 25
Self-propelled 35 40
Riding 12 13
January (weeks) 1 2 3 4
S&OP
MPS
Dept. of MBA, Sanjivani COE, Kopargaon
Master Schedule Record
 Forecasted demand
 Booked orders
 Projected inventory levels
 Production quantities
 Units still available to meet customer needs
(Available to Promise)
Dept. of MBA, Sanjivani COE, Kopargaon
Forecasted Demand
vs. Booked Orders
 Forecasted demand – A company’s best
estimate of the demand in any period.
 Booked orders – Confirmed demand for
products
Projected Requirements =
Maximum (Forecasted demand, Booked orders)
Dept. of MBA, Sanjivani COE, Kopargaon
Master Production Schedule (MPS)
 Master Production Schedule (MPS) – The
amount of product that will be finished and
available for sale at the beginning of each
week.
 The MPS quantities drive more detailed planning
activities, such as material requirements
planning.
Dept. of MBA, Sanjivani COE, Kopargaon
Ending Inventory
• Projected Ending Inventory – Best estimate
of what inventory levels will look like at the
end of each week based on current
information.
)
,
max(
1 t
t
t
t
t OB
F
MPS
EI
EI 

 
Dept. of MBA, Sanjivani COE, Kopargaon
Available to Promise (ATP)
 Available to Promise – A field in the master schedule
record that indicates the number of units that are
available for sale each week, given those that have
already been promised to customers.
Dept. of MBA, Sanjivani COE, Kopargaon
Available to Promise (ATP)
• Calculating ATP for the first week of the master
schedule record:
Dept. of MBA, Sanjivani COE, Kopargaon
Available to Promise (ATP)
• Calculating ATP for any subsequent week in
which MPS > 0:
Dept. of MBA, Sanjivani COE, Kopargaon
Partial Master Schedule Record
(Snowblowers)
Dept. of MBA, Sanjivani COE, Kopargaon
Calculating ATP
Figure 12.5
Dept. of MBA, Sanjivani COE, Kopargaon
Calculating ATP
Figure 12.6
Dept. of MBA, Sanjivani COE, Kopargaon
Complete Master Schedule Record
(Snowblowers)
Figure 12.7
Dept. of MBA, Sanjivani COE, Kopargaon
MPS Example (Backpacks)
Now Calculate Projected Ending Inventory and Available to Promise
Figure 12.8
Dept. of MBA, Sanjivani COE, Kopargaon
Calculations (Backpacks)
 Calculating Ending Inventory:
 Calculating ATP:
Dept. of MBA, Sanjivani COE, Kopargaon
MPS Example (Backpacks)
with ATP
What are the implications of the Master Production Schedule?
Figure 12.9

More Related Content

DOCX
Anand_Kaulwar_Resume_V2[1]
PPTX
OPERATIONS MANAGEMENT Distribution Requirements Planning, MRP-II
PPTX
S2019302018 m saqib nawaz mps
DOC
Vinayak Prabhu
PDF
Master schedualing
DOCX
Resume Swapnil 2015
DOCX
Rajan_SG_CV (1)
PPSX
Quick erp education
Anand_Kaulwar_Resume_V2[1]
OPERATIONS MANAGEMENT Distribution Requirements Planning, MRP-II
S2019302018 m saqib nawaz mps
Vinayak Prabhu
Master schedualing
Resume Swapnil 2015
Rajan_SG_CV (1)
Quick erp education

Similar to OPERATIONS MANAGEMENT - Master Production Scheduling (20)

PPT
Mp cn3 sales & operations planning
DOCX
Ajit_02
DOCX
Resume 19-May
DOCX
CV-Vipin Verma.doc
PDF
CHARANYA MANIKANDAN
DOCX
Ganesh CV SAP
DOC
Resume -TARAK
PPTX
Apo scm overview
DOC
Poonam Shelke SAP PP QM Consultant
PPTX
Summer_intern_NTPC
DOCX
Ayan Sen Resume
DOC
Jacqueline Lebron Figuera Resume
DOCX
Gaurav J Resume
PPT
Presentation: "Put Your ERP Data to Work! Salesforce Best Practices for ERP I...
DOC
Praveen.Karabuja.PPIC
PPTX
Operations Management - Material Requirements Planning
DOCX
Suchendran H - P
PPTX
1. MPS.pptx
DOCX
Praveen Resume
PDF
What is master production schedule
Mp cn3 sales & operations planning
Ajit_02
Resume 19-May
CV-Vipin Verma.doc
CHARANYA MANIKANDAN
Ganesh CV SAP
Resume -TARAK
Apo scm overview
Poonam Shelke SAP PP QM Consultant
Summer_intern_NTPC
Ayan Sen Resume
Jacqueline Lebron Figuera Resume
Gaurav J Resume
Presentation: "Put Your ERP Data to Work! Salesforce Best Practices for ERP I...
Praveen.Karabuja.PPIC
Operations Management - Material Requirements Planning
Suchendran H - P
1. MPS.pptx
Praveen Resume
What is master production schedule
Ad

Recently uploaded (20)

PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Complications of Minimal Access-Surgery.pdf
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
My India Quiz Book_20210205121199924.pdf
PDF
IGGE1 Understanding the Self1234567891011
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
Computer Architecture Input Output Memory.pptx
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
advance database management system book.pdf
Weekly quiz Compilation Jan -July 25.pdf
Complications of Minimal Access-Surgery.pdf
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
TNA_Presentation-1-Final(SAVE)) (1).pptx
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
My India Quiz Book_20210205121199924.pdf
IGGE1 Understanding the Self1234567891011
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Computer Architecture Input Output Memory.pptx
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Hazard Identification & Risk Assessment .pdf
Chinmaya Tiranga quiz Grand Finale.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
advance database management system book.pdf
Ad

OPERATIONS MANAGEMENT - Master Production Scheduling

  • 1. Dept. of MBA, Sanjivani COE, Kopargaon OPERATIONS MANAGEMENT Master Production Scheduling Presented By: Dr. Sanjit Singh Sanjivani College of Engineering, Kopargaon Department of MBA
  • 2. Dept. of MBA, Sanjivani COE, Kopargaon Planning and Control  Planning and control – A set of tactical and execution-level business activities that includes master scheduling, material requirements planning, and some form of production activity control and vendor order management.
  • 3. Dept. of MBA, Sanjivani COE, Kopargaon Top-Down Model of Manufacturing Planning and Control Systems Figure 12.1
  • 4. Dept. of MBA, Sanjivani COE, Kopargaon Master Scheduling  Master Scheduling – A detailed planning process that tracks production output and matches this output to actual customer orders.  Controls the timing and quantity of production for products or product families.  Serves as the primary interface point for actual customer orders.  Coordinates forecasted demand and actual orders with production activity.  Serves as a tool for agreement between marketing and operations (but at a different level than S&OP).
  • 5. Dept. of MBA, Sanjivani COE, Kopargaon Link between S&OP and MPS Month: January February March Output: 200 300 400 Push Mowers 25 25 25 25 Self-propelled 35 40 Riding 12 13 January (weeks) 1 2 3 4 S&OP MPS
  • 6. Dept. of MBA, Sanjivani COE, Kopargaon Master Schedule Record  Forecasted demand  Booked orders  Projected inventory levels  Production quantities  Units still available to meet customer needs (Available to Promise)
  • 7. Dept. of MBA, Sanjivani COE, Kopargaon Forecasted Demand vs. Booked Orders  Forecasted demand – A company’s best estimate of the demand in any period.  Booked orders – Confirmed demand for products Projected Requirements = Maximum (Forecasted demand, Booked orders)
  • 8. Dept. of MBA, Sanjivani COE, Kopargaon Master Production Schedule (MPS)  Master Production Schedule (MPS) – The amount of product that will be finished and available for sale at the beginning of each week.  The MPS quantities drive more detailed planning activities, such as material requirements planning.
  • 9. Dept. of MBA, Sanjivani COE, Kopargaon Ending Inventory • Projected Ending Inventory – Best estimate of what inventory levels will look like at the end of each week based on current information. ) , max( 1 t t t t t OB F MPS EI EI    
  • 10. Dept. of MBA, Sanjivani COE, Kopargaon Available to Promise (ATP)  Available to Promise – A field in the master schedule record that indicates the number of units that are available for sale each week, given those that have already been promised to customers.
  • 11. Dept. of MBA, Sanjivani COE, Kopargaon Available to Promise (ATP) • Calculating ATP for the first week of the master schedule record:
  • 12. Dept. of MBA, Sanjivani COE, Kopargaon Available to Promise (ATP) • Calculating ATP for any subsequent week in which MPS > 0:
  • 13. Dept. of MBA, Sanjivani COE, Kopargaon Partial Master Schedule Record (Snowblowers)
  • 14. Dept. of MBA, Sanjivani COE, Kopargaon Calculating ATP Figure 12.5
  • 15. Dept. of MBA, Sanjivani COE, Kopargaon Calculating ATP Figure 12.6
  • 16. Dept. of MBA, Sanjivani COE, Kopargaon Complete Master Schedule Record (Snowblowers) Figure 12.7
  • 17. Dept. of MBA, Sanjivani COE, Kopargaon MPS Example (Backpacks) Now Calculate Projected Ending Inventory and Available to Promise Figure 12.8
  • 18. Dept. of MBA, Sanjivani COE, Kopargaon Calculations (Backpacks)  Calculating Ending Inventory:  Calculating ATP:
  • 19. Dept. of MBA, Sanjivani COE, Kopargaon MPS Example (Backpacks) with ATP What are the implications of the Master Production Schedule? Figure 12.9