Dr. Naveed Anwar
Performance Based Design, Value
Engineering and Peer Review
Design of Tall Buildings: Trends and Advancements for
Structural Performance
Bangkok-Thailand
November 7-11, 2016
Naveed Anwar, PhD
Dr. Naveed Anwar
2
Is this acceptable?
(For the people who purchased apartment and lived here)
Dr. Naveed Anwar
3
Who are the stakeholders
Developers
(Rely on designers and
contractors to make
profit)
Designers
(Satisfying building codes and
regulations and developer)
Owners
(Ultimate Stakeholder
Pays/owns and uses)
Building Officials
(enforce the building codes and responsible for public safety)
BuildingCodes
(Provideminimumrequiremsfor
publicsafet)
Contractors
(Carry out the construction based instructions of Designers
and developers and work for a profit)
Residents
and Public
(Uses the space)
Dr. Naveed Anwar
4
Make buildings as primary
business
Care about reputation, brand
and continued business
Main focus on profit
Own/use the building for living
or making living
Care about livability, safety,
comfort
Focus on value for money
Developers Buyers/Residents
Willing to spend more to
increase profit and
reputation
Willing to pay more for
higher value
Dr. Naveed Anwar
5
How can we increase the value so
the buyers are willing to pay more
And the developer gets higher profit
Public gets a better building
Everyone wins!
Dr. Naveed Anwar
6
What “Value” are we considering
• Structural Safety is of prime concern and has a high value
• Other value may be in location, brand, finishes, design quality etc.
• Additional value may be “Green” and sustainability
Dr. Naveed Anwar
7
• A safer and high performance building is more environmentally
sustainable
• People pay more for higher sustainability so should pay more for
higher and performance
Dr. Naveed Anwar
8
• Compare Value Engineering and PBD
• What the developers want
• Increase profit
• Reputation/ branding
• Reducing cost is one way > Value Engineering
• PBD - increasing safety, value, selling price and branding is another
• Give example of cost /Sq m and cost of review, PBD etc
• How PBD Works
Dr. Naveed Anwar
9
• Explicit confirmation of higher or
expected performance level
Performance
Based Design
• Get the best “value” for resourcesValue Engineering
• Provide an independent view and
confirmation
Peer Review
Dr. Naveed Anwar
Ensuring Explicit Safety
Performance
(Specially for extreme events)
Dr. Naveed Anwar
11
How does CTBUH look at Tall Buildings
11
Relatively Tall.
Both for public and the professions who design
and construct
Proportion
Slenderness, in plan and in elevations
Systems and Technologies
Uses something “different” than ordinary
buildings
Dr. Naveed Anwar
12
How modern codes intent to ensure “Safety”
• Define appropriate/estimated hazard or load levels
• Prescribe limits on structural systems, members, materials
• Define procedures for analysis and design
• Provide rules for detailing
• Provide specifications for construction and monitoring
• Hope that all of this will lead to safe structures …
Dr. Naveed Anwar
The Modern Codes – With “intent” to make buildings safe for public
13
(ACI 318 – 11)
Extremely Detailed
prescriptions and
equations using
seemingly arbitrary,
rounded limits with
implicit meaning
(IS 456-2000)
Dr. Naveed Anwar
The General Code Families
14
UBC, IBC
ACI, PCI, CRSI,
ASCE, AISI,
AASHTO
British, CP and
BS
Euro-codes
China, USSR,
Japan
Dr. Naveed Anwar
15
Are All Buildings Codes Correct ?
• If they differ, can all of them be correct ?
• Did we inform the structures to follow which code when earthquake or hurricane
strikes ?
• Codes change every 3 or years, should we upgrade our structures every 3 or 5
years to conform ?
Dr. Naveed Anwar
16
Concerns
• Public
 Will the building be safe?
• Owner
 Will the building collapse/ will it be damaged ?
 Can I use the building after a given earthquake? (blast,
hurricane..)
 How much will repair cost?
 How long will it take to repair?
 Can I make building that will not be damaged and will not
collapse
• Public Officials
 Who is responsible if loss of life occurs
Who should have all the answers?
Dr. Naveed Anwar
17
Structural Engineer’s Dilemma
• Can not answer most of the these questions explicitly
• Answers are always qualified
• There is no warranty for the structure
• There are too many unknowns
• Public understanding and engineers understanding of safety is
different
• Has to hide behind the design codes
Dr. Naveed Anwar
18
Prescriptive Codes – A Shelter
• Public:
• Is my structure safe ?
• Structural Engineer:
• Not sure, but I did follow the “Code”
As long as engineers follow the code, they
can be sheltered by its provisions
Dr. Naveed Anwar
19
Shortcomings of Code Based Design for Tall Buildings
• Traditional codes govern design of general, normal buildings
 Over 95% buildings are covered, which are less than about 50 m
• Not specifically developed for tall buildings > 50 m tall
• Prescriptive in nature, no explicit check on outcome
• Permit a limited number of structural systems
• Do not include framing systems appropriate for high-rise
• Based on elastic methods of analysis
• Enforce uniform detailing rules on all members
• Enforce unreasonable demand distribution rules
• Do not take advantage of recent computing tools
Dr. Naveed Anwar
20
Motivation for PBD
• Lack of explicit performance in design codes is primary motivation
for performance based design
• Performance based methods require the designer to assess how a
building is likely perform under earthquake shaking and other
extreme events and their correct application will help to identify
unsafe designs.
• At the same time this approach enables arbitrary restrictions to be
lifted and provides scope for the development of safer and more
cost-effective structural solutions
Dr. Naveed Anwar
21
Performance Based Design (PBD)
• An approach in which structural design criteria are expressed
in terms of achieving a set of performance objectives or
levels.
• Ensures structures reaches specified demands level in both
service and strength design levels.
• Why it was needed?
• Traditional codes not suitable/adequate
• Explicit verification not specified or required in most codes
• Public does not care about the code, or theories or procedures, they
care about “safety” and ‘performance”
Dr. Naveed Anwar
22
Performance based design
can be applied to any type
of loads, but is typically
suitable and targeted for
earthquake loads
Dr. Naveed Anwar
23
Explicit Performance Objective in PBD
Performance based design investigates at least two
performance objectives explicitly
Service-level
Assessment
Negligible damage with
frequent hazards
(Earthquake having a return
period of about 50)
Collapse-level
Assessment
Collapse prevention under
extreme hazards
(the largest earthquake with a
return period of 2500 years)
Codes arbitrary
“Design Level”
Dr. Naveed Anwar
24
Performance Level Definitions
Owner
Will the building be safe?
Can I use the building
after the hazard?
How much will repair cost
in case of damage?
How long will it take to
repair?
Engineer
amount of yielding, buckling,
cracking, permanent deformation,
acceleration, that structure,
members and materials
experiences
Need a third party to ensure public safety
and realistic Performance
Guidelines
Peer Review
Dr. Naveed Anwar
25
Typical Review Objectives
Enhance Structural
Performance
• Improved
serviceability, safety
and reliability
• Explicit check on
various performance
indicators
Improve Cost
Effectiveness
• Achieve efficient use
of materials,
resources and time
• Direct reduction cost
through reduction of
structural material
quantities
Objectives to be
achieved through
• Better structural
system selection and
its proportions
• Use of advanced
design
methodologies and
tools
Dr. Naveed Anwar
26
Typical Review Objectives
Enhancement of Performance
• Dynamic response parameters
• Lateral load response
• Vertical load response
• Demand and capacity ratios
• Response irregularity,
discontinuity
• Explicit Performance Evaluation
at Service, DBE and MCE
Cost Effectiveness
• Capacity utilization ratio
• Reinforcement ratios
• Reinforcement volume ratios
• Concrete strength and quantity
• Rebar quantity
• Constructability, time and
accommodation of other
constraints
Dr. Naveed Anwar
27
Performance Objectives
Level of Earthquake Seismic Performance Objective
Frequent/Service (SLE): 50% probability of
exceedance in 30 years (43-year return
period)
Serviceability: Structure to remain
essentially elastic with minor damage to
structural and non-structural elements
Design Basis Earthquake (DBE): 10%
probability of exceedance in 50 years
(475-year return period)
Code Level: Moderate structural
damage; extensive repairs may be
required
Maximum Considered Earthquake (MCE):
2% probability of exceedance in 50 years
(2475-year return period)
Collapse Prevention: Extensive structural
damage; repairs are required and may
not be economically feasible
Dr. Naveed Anwar
28
Site Specific Ground Motions
Dr. Naveed Anwar
29
Seismic Hazard Spectrum, SLE, DBE. MCE
MCE Level
Service Level
Dr. Naveed Anwar
30
Standard Structural Performance Levels
Restaurant Restaurant
Restaurant
Operational Immediate
Occupancy
Life Safety Collapse
Prevention
0 % Damage or Loss 99 %
Ref: FEMA 451 B
Dr. Naveed Anwar
31
Judging Performance Acceptability
• Acceptance criteria are indicators of whether the predicted
performance is adequate for
• Local (component based)
 Example: Drift ratio, structural component deformation
• Global (overall structure-based)
 Example: Roof drift , base shear
Dr. Naveed Anwar
32
Performance Based Design Process
Acceptance Criteria for Primary Components
Dr. Naveed Anwar
33
Performance Based Design Process
Acceptance Criteria for Secondary Components
Dr. Naveed Anwar
34
Classification of Actions
Element Action Type Classification Expected
Behavior
RC column Axial-flexure
Shear
Ductile
Brittle
Linear
Linear
RC shear wall Flexure
Shear
Ductile
Brittle
Nonlinear
Linear
RC coupling beams
(Deep beam, ln/d<4.0)
Shear Ductile Nonlinear
RC coupling beams
(slender beam, ln/d≥4.0
Flexure
Shear
Ductile
Brittle
Nonlinear
Linear
Dr. Naveed Anwar
35
How to Work with PBD
Architect
Structural Engineer
PBD Specialist
PBD Peer Reviewer
Site Specific Consultant
Performance Based Design
Client
Dr. Naveed Anwar
Value Engineering
Balancing Cost and Performance
Dr. Naveed Anwar
37
Cost and Performance
PCC
Cost Effective
Design
Can be done
PC
General Belief
Easy to do !
PC
Highly Innovative
Design
Hard to do!
PC
High
Performance
Design
Can be done
Dr. Naveed Anwar
38
What is the Cost of a Project?
• Cost may include
– Financial Cost (loan, interest, etc)
– Planning and Design Cost
– Direct Construction Cost
– Maintenance Cost
– Incidental Cost
– Liquidated Cost (lost profit etc)
– Opportunistic Cost
– Environmental Cost
– Emotional Cost
– Non-determinist Resources
Cost may be:
“Consumption of
Particular Resources, at
Particular Time”
Sustainability may be:
<Consumption of all
resources, and their impacts
through throughout the life
cycle>
Dr. Naveed Anwar
39
Cost and Performance
• Enhancement of Performance
• Dynamic response parameters
• Lateral load response
• Vertical load response
• Demand and capacity ratios
• Response irregularity,
discontinuity
• Explicit Performance Evaluation at
Service, DBE and MCE
• Cost Effectiveness
• Capacity utilization ratio
• Reinforcement ratios
• Reinforcement volume ratios
• Concrete strength and quantity
• Rebar quantity
• Constructability, time and
accommodation of other
constraints
39
Dr. Naveed Anwar
40
Optimization
• Need to define What to optimize?
And what are the parameters that
can be changes?
• Optimizing one or two items may
“un-optimize” others
• Optimizing everything is a “Holy
Grail”
– …. and “Holy Grail” doesn't exist
• Tools
– Genetic Algorithms (GA)
– Artificial Neural Networks (ANN)
– Linear and Nonlinear programing
Dr. Naveed Anwar
41
Levels of Optimization
Levels of Optimization
Micro-Micro Level
One part of a component,
“Steel”
Micro Level
One Component,
“Column”
Local
One part or aspect
Global
Entire Problem, Project
Universal
Entire System
Dr. Naveed Anwar
42
• Simple Example of a Column
Stack – What and how can
we optimize ?
• Concrete Strength
• Steel Strength
• Column Size
• Rebar Amount
• Composite Section
• Material Cost, Labor Cost,
Formwork Cost,
Management and operations
Cost, Time ??
Local Vs Global Optimization
Dr. Naveed Anwar
43
Cost and Performance
(Base Cost and
Performance)
(Increased Performance,
Same Cost)
(Base Cost and
Performance)
(Reduced Cost for Same
Performance)
P
M
P
M
Dr. Naveed Anwar
44
Demand Capacity (DC Ratio)
• Definition of D/C: It is an index that gives an overall relationship
between affects of load and ability of member to resists those
affects.
• This is a normalized factor that means D/C ratio value of 1 indicates
that the capacity (strength, deformation etc) member is just
enough to fulfill the load demand.
• Two types of D/C ratio
 Members with brittle behavior D/C is checked by Strength (Elastic)
 Members with ductile behavior D/C is checked by deformation (Inelastic)
• Total D/C ratio of the member is combined of these two.
Dr. Naveed Anwar
45
Cost Effectiveness > Utilization Ratio
• Utilization Ratio
• Compare, What is
Needed against
What is Required
• One measure
• The Demand/
Capacity Ratio (D/C)
Demand/ Capacity
Columns
No. %
D/C<0.5 178 16%
0.5<D/C<0.7 534 49%
0.7<D/C<1 346 31%
1<D/C<1.5 30 3%
1.5<D/C<2.5 12 1%
D/C>2.5 0 0%
Total 1100 100.00%
Ideal
Not Cost
Effective
Not Safe
Dr. Naveed Anwar
46
Focus should be
“Maximum Value for Resources”
Cost effective, not Low Cost
Dr. Naveed Anwar
Peer Review
To ensure Basic Design the Performance Evaluation
and Value Enginering are done right
Dr. Naveed Anwar
48
The Responsibility
Building Officials
Structural Designer
Architect Structural Design Codes
General Building Codes
Legal and Justice System
Public/ Users/ Occupants
Client/Owner
Law Makers
Builder/Contractor
Peer Reviewer
Geotech Consultants
Dr. Naveed Anwar
49
Peer Review
• What exactly is design peer review?
• It is a process whereby a design project (or aspect of) is reviewed and
evaluated by a person, or team, not directly involved with the project, but
appropriately qualified to provide input that will either reinforce a design
solution, or provide a route to an improved alternative.
• Why is it so important?
• Very few can claim to be all-encompassing experts. The invaluable input from
broad base and independent experience at each stage of a design project will
often result in technical improvements, lower costs, avoidance of sourcing
issues, and improved performance.
Dr. Naveed Anwar
50
When is Peer Review needed
• Structural Peer Review is required for:
• Buildings included in Structural Occupancy Category
IV as defined in the Building Code.
• Buildings with aspect ratios of seven or greater.
• Buildings greater than 500 feet (160 m) in height or
more than 1,000,000 square feet (100,000 Sqm) in
gross floor area.
• Buildings taller than seven stories where any
element supports in aggregate more than 15
percent of the building area.
• Buildings designed using nonlinear time history
analysis, pushover analysis or progressive loading
techniques.
New York Building Code, adopted by many cities
Important
Slender
Tall or large
Critical
Use NLA
Dr. Naveed Anwar
51
Responsibility
• Structural Engineer of Record (SER).
• The structural engineer of record shall retain
sole responsibility for the structural design. The
activities and reports of the Reviewing Engineer
shall not relieve the structural engineer of
record of this responsibility.
• Reviewing Engineer.
• The Reviewing Engineer’s report states his or her
opinion regarding the design by the engineer of
record.
• The standard of care to which the Reviewing
Engineer shall be consistent with Structural Peer
Review services performed by professional
engineers licensed/approved
Retains
Responsibility
Evaluates, and
gives opinion that
may or may not
be accepted by
Client or SER
Dr. Naveed Anwar
52
Typical Scope of Work for Review
• Check structural engineering concepts
• Potential behavioral or value improvement suggestions
• Constructability review
• Presentation of peer review findings and peer review report writing
• Review and confirmation of the owner’s seismic performance objectives
• Meeting(s) with the design team to review the project assumptions and the project approach
• Review structural design criteria and analysis/design methodology
• Review available geotechnical and site seismicity reports
• Review all available relevant documents as the design progresses, including drawings, and
specifications
• Review of analysis results. This may require implementation of one or more parallel verification
models for comparison purposes
• Technical review of the design and details of the proposed structural system
• Preparation of peer review report and comment list
• Meeting(s) with the design team to review and reconcile the peer review comment
Dr. Naveed Anwar
53
Client
PBD
Value
Engineering
Peer
Review
Basic Design
Public Officials
Design Codes and Guidelines
High performance,
Higher safety
higher value,
cost effective
Sustainable
Dr. Naveed Anwar
54
View publication statsView publication stats

More Related Content

PPTX
CE 72.32 (January 2016 Semester) Lecture 2 - Design Philosophy
PDF
Progression of Structural Design Approaches by Dr. Naveed Anwar
PDF
Conceptual Design in Structural System Development
PDF
CE 72.32 (January 2016 Semester): Lecture 1b: Analysis and Design of Tall Bui...
PDF
CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria
PDF
Structural Engineering Solutions to Architectural (and other) Challenges by D...
PDF
Advances and recent trends in Modeling and Analysis of Bridges
PPTX
CE 72.32 (January 2016 Semester) Lecture 8 - Structural Analysis for Lateral ...
CE 72.32 (January 2016 Semester) Lecture 2 - Design Philosophy
Progression of Structural Design Approaches by Dr. Naveed Anwar
Conceptual Design in Structural System Development
CE 72.32 (January 2016 Semester): Lecture 1b: Analysis and Design of Tall Bui...
CE 72.32 (January 2016 Semester) Lecture 3 - Design Criteria
Structural Engineering Solutions to Architectural (and other) Challenges by D...
Advances and recent trends in Modeling and Analysis of Bridges
CE 72.32 (January 2016 Semester) Lecture 8 - Structural Analysis for Lateral ...

What's hot (20)

PDF
Dynamic Response
PDF
Modeling and Design of Bridge Super Structure and Sub Structure
PPTX
CE 72.32 (January 2016 Semester) Lecture 6 - Overview of Finite Element Analysis
PDF
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed Anwar
PDF
Aitc step by-step procedure for pbd of 40-story rc building_overall (20141105)
PPTX
CE72.52 - Lecture 3a - Section Behavior - Flexure
PPTX
CE72.52 - Lecture1 - Introduction
PDF
Introduction to Capacity-based Seismic Design
PDF
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
PPSX
CE 72.52 - Lecture 8a - Retrofitting of RC Members
PPTX
CE72.52 - Lecture 2 - Material Behavior
PDF
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
PPTX
CE 72.32 (January 2016 Semester): Lecture 1a - Overview of Tall Buildings
PPTX
AITC Shear Wall Design Procedure (20151106)
PPTX
CE 72.52 Lecture 4 - Ductility of Cross-sections
PPTX
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
PPTX
CE 72.52 - Lecture 5 - Column Design
PPTX
CE 72.32 (January 2016 Semester) Lecture 7 - Structural Analysis for Gravity ...
PPTX
Slides Earthquake Resistant design part1
PDF
Integrated Performance Based Design of Tall Buildings for Wind and Earthquake...
Dynamic Response
Modeling and Design of Bridge Super Structure and Sub Structure
CE 72.32 (January 2016 Semester) Lecture 6 - Overview of Finite Element Analysis
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed Anwar
Aitc step by-step procedure for pbd of 40-story rc building_overall (20141105)
CE72.52 - Lecture 3a - Section Behavior - Flexure
CE72.52 - Lecture1 - Introduction
Introduction to Capacity-based Seismic Design
Structural Engineering Solutions for Architecture Challenges by Dr. Naveed
CE 72.52 - Lecture 8a - Retrofitting of RC Members
CE72.52 - Lecture 2 - Material Behavior
Cost Effective Structural Configurations For Tall Buildings by Dr. Naveed Anwar
CE 72.32 (January 2016 Semester): Lecture 1a - Overview of Tall Buildings
AITC Shear Wall Design Procedure (20151106)
CE 72.52 Lecture 4 - Ductility of Cross-sections
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.52 - Lecture 5 - Column Design
CE 72.32 (January 2016 Semester) Lecture 7 - Structural Analysis for Gravity ...
Slides Earthquake Resistant design part1
Integrated Performance Based Design of Tall Buildings for Wind and Earthquake...
Ad

Similar to Performance Based Design, Value Engineering, and Peer Review (20)

PPTX
Presentation_PBD.pptx
PDF
Progression of Structural Design Approaches
PDF
Catalyzing Innovation in Performance-Based Design for Disaster Resilient Buil...
PDF
Catalyzing Innovation in Performance Based Design for Disaster Resilient Hous...
PDF
International Bridge Design Standards and Approaches
PDF
From Performance to Resilience – A Recent Account of Seismic Design Philosoph...
PDF
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
PDF
What and How the Future Engineers will Continue to Learn Civil and Structural...
PDF
Sbai value of commissioning
PPTX
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
PPT
Safety by design
PDF
Recent Trends and Advancement in Performance Assessment of RC High-Rise Build...
PDF
Overview of Performance Based Design and AIT Experience
PPTX
High Performance Building Design Workshop
PDF
PDF
LNV Brochure Post
PDF
Microdeployments for microservices dev ops nashville
PDF
Trends and Advancements for Structural Performance
PPT
Architectural Professional Practice - Design
PDF
Structural Engineering Solutions to Architectural Challenges
Presentation_PBD.pptx
Progression of Structural Design Approaches
Catalyzing Innovation in Performance-Based Design for Disaster Resilient Buil...
Catalyzing Innovation in Performance Based Design for Disaster Resilient Hous...
International Bridge Design Standards and Approaches
From Performance to Resilience – A Recent Account of Seismic Design Philosoph...
Innovative Design Approaches to Improve Disaster Resilience and Reduced Cost ...
What and How the Future Engineers will Continue to Learn Civil and Structural...
Sbai value of commissioning
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
Safety by design
Recent Trends and Advancement in Performance Assessment of RC High-Rise Build...
Overview of Performance Based Design and AIT Experience
High Performance Building Design Workshop
LNV Brochure Post
Microdeployments for microservices dev ops nashville
Trends and Advancements for Structural Performance
Architectural Professional Practice - Design
Structural Engineering Solutions to Architectural Challenges
Ad

More from AIT Solutions (13)

PDF
Structural Design of Bridges
PDF
Strategies and Techniques for Seismic Risk Reduction of School Buildings in D...
PDF
The Need for Affordable Housing
PDF
Importance of Ductility in Structural Performance Analysis
PDF
Smart Systems for Structural Response Control
PDF
Innovation and Startup Opportunities
PDF
Catalyzing Innovation by Performance-Based Design and Material Specifications
PDF
Delving into the Application of Precast Prestressed Concrete buildings in Hig...
PDF
Integrating Computing and Visualization into Structural Design Process by Dr....
PDF
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
PDF
An Overview of Analysis and Design of a Single-Layer Reticulated Inverted Mon...
PDF
Increasing Resistance to Hazards Using Enhanced Structural Design and Disaste...
PDF
Development of New Building Systems in Concrete by Naveed Anwar
Structural Design of Bridges
Strategies and Techniques for Seismic Risk Reduction of School Buildings in D...
The Need for Affordable Housing
Importance of Ductility in Structural Performance Analysis
Smart Systems for Structural Response Control
Innovation and Startup Opportunities
Catalyzing Innovation by Performance-Based Design and Material Specifications
Delving into the Application of Precast Prestressed Concrete buildings in Hig...
Integrating Computing and Visualization into Structural Design Process by Dr....
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
An Overview of Analysis and Design of a Single-Layer Reticulated Inverted Mon...
Increasing Resistance to Hazards Using Enhanced Structural Design and Disaste...
Development of New Building Systems in Concrete by Naveed Anwar

Recently uploaded (20)

PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
additive manufacturing of ss316l using mig welding
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
Geodesy 1.pptx...............................................
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
DOCX
573137875-Attendance-Management-System-original
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
Construction Project Organization Group 2.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
web development for engineering and engineering
PDF
Digital Logic Computer Design lecture notes
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PPT
Project quality management in manufacturing
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Foundation to blockchain - A guide to Blockchain Tech
additive manufacturing of ss316l using mig welding
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
Geodesy 1.pptx...............................................
Lecture Notes Electrical Wiring System Components
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
573137875-Attendance-Management-System-original
CH1 Production IntroductoryConcepts.pptx
Internet of Things (IOT) - A guide to understanding
Construction Project Organization Group 2.pptx
OOP with Java - Java Introduction (Basics)
web development for engineering and engineering
Digital Logic Computer Design lecture notes
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Project quality management in manufacturing
UNIT 4 Total Quality Management .pptx
Model Code of Practice - Construction Work - 21102022 .pdf
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...

Performance Based Design, Value Engineering, and Peer Review

  • 1. Dr. Naveed Anwar Performance Based Design, Value Engineering and Peer Review Design of Tall Buildings: Trends and Advancements for Structural Performance Bangkok-Thailand November 7-11, 2016 Naveed Anwar, PhD
  • 2. Dr. Naveed Anwar 2 Is this acceptable? (For the people who purchased apartment and lived here)
  • 3. Dr. Naveed Anwar 3 Who are the stakeholders Developers (Rely on designers and contractors to make profit) Designers (Satisfying building codes and regulations and developer) Owners (Ultimate Stakeholder Pays/owns and uses) Building Officials (enforce the building codes and responsible for public safety) BuildingCodes (Provideminimumrequiremsfor publicsafet) Contractors (Carry out the construction based instructions of Designers and developers and work for a profit) Residents and Public (Uses the space)
  • 4. Dr. Naveed Anwar 4 Make buildings as primary business Care about reputation, brand and continued business Main focus on profit Own/use the building for living or making living Care about livability, safety, comfort Focus on value for money Developers Buyers/Residents Willing to spend more to increase profit and reputation Willing to pay more for higher value
  • 5. Dr. Naveed Anwar 5 How can we increase the value so the buyers are willing to pay more And the developer gets higher profit Public gets a better building Everyone wins!
  • 6. Dr. Naveed Anwar 6 What “Value” are we considering • Structural Safety is of prime concern and has a high value • Other value may be in location, brand, finishes, design quality etc. • Additional value may be “Green” and sustainability
  • 7. Dr. Naveed Anwar 7 • A safer and high performance building is more environmentally sustainable • People pay more for higher sustainability so should pay more for higher and performance
  • 8. Dr. Naveed Anwar 8 • Compare Value Engineering and PBD • What the developers want • Increase profit • Reputation/ branding • Reducing cost is one way > Value Engineering • PBD - increasing safety, value, selling price and branding is another • Give example of cost /Sq m and cost of review, PBD etc • How PBD Works
  • 9. Dr. Naveed Anwar 9 • Explicit confirmation of higher or expected performance level Performance Based Design • Get the best “value” for resourcesValue Engineering • Provide an independent view and confirmation Peer Review
  • 10. Dr. Naveed Anwar Ensuring Explicit Safety Performance (Specially for extreme events)
  • 11. Dr. Naveed Anwar 11 How does CTBUH look at Tall Buildings 11 Relatively Tall. Both for public and the professions who design and construct Proportion Slenderness, in plan and in elevations Systems and Technologies Uses something “different” than ordinary buildings
  • 12. Dr. Naveed Anwar 12 How modern codes intent to ensure “Safety” • Define appropriate/estimated hazard or load levels • Prescribe limits on structural systems, members, materials • Define procedures for analysis and design • Provide rules for detailing • Provide specifications for construction and monitoring • Hope that all of this will lead to safe structures …
  • 13. Dr. Naveed Anwar The Modern Codes – With “intent” to make buildings safe for public 13 (ACI 318 – 11) Extremely Detailed prescriptions and equations using seemingly arbitrary, rounded limits with implicit meaning (IS 456-2000)
  • 14. Dr. Naveed Anwar The General Code Families 14 UBC, IBC ACI, PCI, CRSI, ASCE, AISI, AASHTO British, CP and BS Euro-codes China, USSR, Japan
  • 15. Dr. Naveed Anwar 15 Are All Buildings Codes Correct ? • If they differ, can all of them be correct ? • Did we inform the structures to follow which code when earthquake or hurricane strikes ? • Codes change every 3 or years, should we upgrade our structures every 3 or 5 years to conform ?
  • 16. Dr. Naveed Anwar 16 Concerns • Public  Will the building be safe? • Owner  Will the building collapse/ will it be damaged ?  Can I use the building after a given earthquake? (blast, hurricane..)  How much will repair cost?  How long will it take to repair?  Can I make building that will not be damaged and will not collapse • Public Officials  Who is responsible if loss of life occurs Who should have all the answers?
  • 17. Dr. Naveed Anwar 17 Structural Engineer’s Dilemma • Can not answer most of the these questions explicitly • Answers are always qualified • There is no warranty for the structure • There are too many unknowns • Public understanding and engineers understanding of safety is different • Has to hide behind the design codes
  • 18. Dr. Naveed Anwar 18 Prescriptive Codes – A Shelter • Public: • Is my structure safe ? • Structural Engineer: • Not sure, but I did follow the “Code” As long as engineers follow the code, they can be sheltered by its provisions
  • 19. Dr. Naveed Anwar 19 Shortcomings of Code Based Design for Tall Buildings • Traditional codes govern design of general, normal buildings  Over 95% buildings are covered, which are less than about 50 m • Not specifically developed for tall buildings > 50 m tall • Prescriptive in nature, no explicit check on outcome • Permit a limited number of structural systems • Do not include framing systems appropriate for high-rise • Based on elastic methods of analysis • Enforce uniform detailing rules on all members • Enforce unreasonable demand distribution rules • Do not take advantage of recent computing tools
  • 20. Dr. Naveed Anwar 20 Motivation for PBD • Lack of explicit performance in design codes is primary motivation for performance based design • Performance based methods require the designer to assess how a building is likely perform under earthquake shaking and other extreme events and their correct application will help to identify unsafe designs. • At the same time this approach enables arbitrary restrictions to be lifted and provides scope for the development of safer and more cost-effective structural solutions
  • 21. Dr. Naveed Anwar 21 Performance Based Design (PBD) • An approach in which structural design criteria are expressed in terms of achieving a set of performance objectives or levels. • Ensures structures reaches specified demands level in both service and strength design levels. • Why it was needed? • Traditional codes not suitable/adequate • Explicit verification not specified or required in most codes • Public does not care about the code, or theories or procedures, they care about “safety” and ‘performance”
  • 22. Dr. Naveed Anwar 22 Performance based design can be applied to any type of loads, but is typically suitable and targeted for earthquake loads
  • 23. Dr. Naveed Anwar 23 Explicit Performance Objective in PBD Performance based design investigates at least two performance objectives explicitly Service-level Assessment Negligible damage with frequent hazards (Earthquake having a return period of about 50) Collapse-level Assessment Collapse prevention under extreme hazards (the largest earthquake with a return period of 2500 years) Codes arbitrary “Design Level”
  • 24. Dr. Naveed Anwar 24 Performance Level Definitions Owner Will the building be safe? Can I use the building after the hazard? How much will repair cost in case of damage? How long will it take to repair? Engineer amount of yielding, buckling, cracking, permanent deformation, acceleration, that structure, members and materials experiences Need a third party to ensure public safety and realistic Performance Guidelines Peer Review
  • 25. Dr. Naveed Anwar 25 Typical Review Objectives Enhance Structural Performance • Improved serviceability, safety and reliability • Explicit check on various performance indicators Improve Cost Effectiveness • Achieve efficient use of materials, resources and time • Direct reduction cost through reduction of structural material quantities Objectives to be achieved through • Better structural system selection and its proportions • Use of advanced design methodologies and tools
  • 26. Dr. Naveed Anwar 26 Typical Review Objectives Enhancement of Performance • Dynamic response parameters • Lateral load response • Vertical load response • Demand and capacity ratios • Response irregularity, discontinuity • Explicit Performance Evaluation at Service, DBE and MCE Cost Effectiveness • Capacity utilization ratio • Reinforcement ratios • Reinforcement volume ratios • Concrete strength and quantity • Rebar quantity • Constructability, time and accommodation of other constraints
  • 27. Dr. Naveed Anwar 27 Performance Objectives Level of Earthquake Seismic Performance Objective Frequent/Service (SLE): 50% probability of exceedance in 30 years (43-year return period) Serviceability: Structure to remain essentially elastic with minor damage to structural and non-structural elements Design Basis Earthquake (DBE): 10% probability of exceedance in 50 years (475-year return period) Code Level: Moderate structural damage; extensive repairs may be required Maximum Considered Earthquake (MCE): 2% probability of exceedance in 50 years (2475-year return period) Collapse Prevention: Extensive structural damage; repairs are required and may not be economically feasible
  • 28. Dr. Naveed Anwar 28 Site Specific Ground Motions
  • 29. Dr. Naveed Anwar 29 Seismic Hazard Spectrum, SLE, DBE. MCE MCE Level Service Level
  • 30. Dr. Naveed Anwar 30 Standard Structural Performance Levels Restaurant Restaurant Restaurant Operational Immediate Occupancy Life Safety Collapse Prevention 0 % Damage or Loss 99 % Ref: FEMA 451 B
  • 31. Dr. Naveed Anwar 31 Judging Performance Acceptability • Acceptance criteria are indicators of whether the predicted performance is adequate for • Local (component based)  Example: Drift ratio, structural component deformation • Global (overall structure-based)  Example: Roof drift , base shear
  • 32. Dr. Naveed Anwar 32 Performance Based Design Process Acceptance Criteria for Primary Components
  • 33. Dr. Naveed Anwar 33 Performance Based Design Process Acceptance Criteria for Secondary Components
  • 34. Dr. Naveed Anwar 34 Classification of Actions Element Action Type Classification Expected Behavior RC column Axial-flexure Shear Ductile Brittle Linear Linear RC shear wall Flexure Shear Ductile Brittle Nonlinear Linear RC coupling beams (Deep beam, ln/d<4.0) Shear Ductile Nonlinear RC coupling beams (slender beam, ln/d≥4.0 Flexure Shear Ductile Brittle Nonlinear Linear
  • 35. Dr. Naveed Anwar 35 How to Work with PBD Architect Structural Engineer PBD Specialist PBD Peer Reviewer Site Specific Consultant Performance Based Design Client
  • 36. Dr. Naveed Anwar Value Engineering Balancing Cost and Performance
  • 37. Dr. Naveed Anwar 37 Cost and Performance PCC Cost Effective Design Can be done PC General Belief Easy to do ! PC Highly Innovative Design Hard to do! PC High Performance Design Can be done
  • 38. Dr. Naveed Anwar 38 What is the Cost of a Project? • Cost may include – Financial Cost (loan, interest, etc) – Planning and Design Cost – Direct Construction Cost – Maintenance Cost – Incidental Cost – Liquidated Cost (lost profit etc) – Opportunistic Cost – Environmental Cost – Emotional Cost – Non-determinist Resources Cost may be: “Consumption of Particular Resources, at Particular Time” Sustainability may be: <Consumption of all resources, and their impacts through throughout the life cycle>
  • 39. Dr. Naveed Anwar 39 Cost and Performance • Enhancement of Performance • Dynamic response parameters • Lateral load response • Vertical load response • Demand and capacity ratios • Response irregularity, discontinuity • Explicit Performance Evaluation at Service, DBE and MCE • Cost Effectiveness • Capacity utilization ratio • Reinforcement ratios • Reinforcement volume ratios • Concrete strength and quantity • Rebar quantity • Constructability, time and accommodation of other constraints 39
  • 40. Dr. Naveed Anwar 40 Optimization • Need to define What to optimize? And what are the parameters that can be changes? • Optimizing one or two items may “un-optimize” others • Optimizing everything is a “Holy Grail” – …. and “Holy Grail” doesn't exist • Tools – Genetic Algorithms (GA) – Artificial Neural Networks (ANN) – Linear and Nonlinear programing
  • 41. Dr. Naveed Anwar 41 Levels of Optimization Levels of Optimization Micro-Micro Level One part of a component, “Steel” Micro Level One Component, “Column” Local One part or aspect Global Entire Problem, Project Universal Entire System
  • 42. Dr. Naveed Anwar 42 • Simple Example of a Column Stack – What and how can we optimize ? • Concrete Strength • Steel Strength • Column Size • Rebar Amount • Composite Section • Material Cost, Labor Cost, Formwork Cost, Management and operations Cost, Time ?? Local Vs Global Optimization
  • 43. Dr. Naveed Anwar 43 Cost and Performance (Base Cost and Performance) (Increased Performance, Same Cost) (Base Cost and Performance) (Reduced Cost for Same Performance) P M P M
  • 44. Dr. Naveed Anwar 44 Demand Capacity (DC Ratio) • Definition of D/C: It is an index that gives an overall relationship between affects of load and ability of member to resists those affects. • This is a normalized factor that means D/C ratio value of 1 indicates that the capacity (strength, deformation etc) member is just enough to fulfill the load demand. • Two types of D/C ratio  Members with brittle behavior D/C is checked by Strength (Elastic)  Members with ductile behavior D/C is checked by deformation (Inelastic) • Total D/C ratio of the member is combined of these two.
  • 45. Dr. Naveed Anwar 45 Cost Effectiveness > Utilization Ratio • Utilization Ratio • Compare, What is Needed against What is Required • One measure • The Demand/ Capacity Ratio (D/C) Demand/ Capacity Columns No. % D/C<0.5 178 16% 0.5<D/C<0.7 534 49% 0.7<D/C<1 346 31% 1<D/C<1.5 30 3% 1.5<D/C<2.5 12 1% D/C>2.5 0 0% Total 1100 100.00% Ideal Not Cost Effective Not Safe
  • 46. Dr. Naveed Anwar 46 Focus should be “Maximum Value for Resources” Cost effective, not Low Cost
  • 47. Dr. Naveed Anwar Peer Review To ensure Basic Design the Performance Evaluation and Value Enginering are done right
  • 48. Dr. Naveed Anwar 48 The Responsibility Building Officials Structural Designer Architect Structural Design Codes General Building Codes Legal and Justice System Public/ Users/ Occupants Client/Owner Law Makers Builder/Contractor Peer Reviewer Geotech Consultants
  • 49. Dr. Naveed Anwar 49 Peer Review • What exactly is design peer review? • It is a process whereby a design project (or aspect of) is reviewed and evaluated by a person, or team, not directly involved with the project, but appropriately qualified to provide input that will either reinforce a design solution, or provide a route to an improved alternative. • Why is it so important? • Very few can claim to be all-encompassing experts. The invaluable input from broad base and independent experience at each stage of a design project will often result in technical improvements, lower costs, avoidance of sourcing issues, and improved performance.
  • 50. Dr. Naveed Anwar 50 When is Peer Review needed • Structural Peer Review is required for: • Buildings included in Structural Occupancy Category IV as defined in the Building Code. • Buildings with aspect ratios of seven or greater. • Buildings greater than 500 feet (160 m) in height or more than 1,000,000 square feet (100,000 Sqm) in gross floor area. • Buildings taller than seven stories where any element supports in aggregate more than 15 percent of the building area. • Buildings designed using nonlinear time history analysis, pushover analysis or progressive loading techniques. New York Building Code, adopted by many cities Important Slender Tall or large Critical Use NLA
  • 51. Dr. Naveed Anwar 51 Responsibility • Structural Engineer of Record (SER). • The structural engineer of record shall retain sole responsibility for the structural design. The activities and reports of the Reviewing Engineer shall not relieve the structural engineer of record of this responsibility. • Reviewing Engineer. • The Reviewing Engineer’s report states his or her opinion regarding the design by the engineer of record. • The standard of care to which the Reviewing Engineer shall be consistent with Structural Peer Review services performed by professional engineers licensed/approved Retains Responsibility Evaluates, and gives opinion that may or may not be accepted by Client or SER
  • 52. Dr. Naveed Anwar 52 Typical Scope of Work for Review • Check structural engineering concepts • Potential behavioral or value improvement suggestions • Constructability review • Presentation of peer review findings and peer review report writing • Review and confirmation of the owner’s seismic performance objectives • Meeting(s) with the design team to review the project assumptions and the project approach • Review structural design criteria and analysis/design methodology • Review available geotechnical and site seismicity reports • Review all available relevant documents as the design progresses, including drawings, and specifications • Review of analysis results. This may require implementation of one or more parallel verification models for comparison purposes • Technical review of the design and details of the proposed structural system • Preparation of peer review report and comment list • Meeting(s) with the design team to review and reconcile the peer review comment
  • 53. Dr. Naveed Anwar 53 Client PBD Value Engineering Peer Review Basic Design Public Officials Design Codes and Guidelines High performance, Higher safety higher value, cost effective Sustainable
  • 54. Dr. Naveed Anwar 54 View publication statsView publication stats