This document provides an overview of the process for casting a flyover pile in situ. It begins with surveying the location and excavating the soil until bedrock is reached. A temporary steel case is placed and bentonite is used to prevent soil collapse. Reinforcing steel is assembled into a circular cage that is lowered into the excavation. The steel case is filled with concrete in stages. A load test is performed to ensure the pile can support the intended loads. Finally, a pile cap is constructed by placing concrete over gravel fill to connect multiple piles.