Master of Business Administration - MBA Semester 3
PM0011-Project Planning and Scheduling
(Book ID: B1937)
Assignment (60 Marks)
Note: Answers for 10 marks questions should be approximately of 400 words. Each question is
followed by evaluation scheme. Each Question carries 10 marks 6 X 10=60.
Q1. Write short note on:
 Project deliverables
 Project Rating Index(PRI)
 Scope change control
 Partnering
Answer. Project Deliverables:
In project management, a deliverable is a product or service that is given to your client. A
deliverable usually has a due date and is tangible, measurable and specific. A deliverable can be
given to either an external or internal customer and satisfies a milestone or due date that is
created and produced in the project plan. A deliverable can be a software product, a design
Q2. Budget Estimation of ABC Company Ltd.
ABC Company Ltd., established in 1985, is engaged in the manufacturing of leatheraccessories.
Over the years, the company, which started out as a local firm, has made its mark as an
international corporation. However, the company is still working as a traditional set up.
The high quality and durability of products have increased the demand of the products in the
market. As the production of the organisation is being increased tomeet the demand, the
traditional set up is creating hurdles in the production process.
Organisation conflicts have arisen among the team members because of the unorganized
hierarchical structure of the company, which is affecting the output of the organisation. Now
that the management has decided to expand the business and opened up branches abroad, the
company is facing two more problems. The first problem is in budgeting as the company is
unfamiliar with international market conditions, strategy, and business policy while the second
problem is conflicts at the time of team formation due to lack of experience of and exposure to
multinational work culture, which has further affected the output of the company.
The company can estimate the budget through two methods, the bottom - up approach and the
top - down approach. The bottom -up approach is generally followed by the MNCs as it is more
accurate and reliable.
Mr.Parag has been appointed as the country head of the company and he has also been
assigned the responsibility of incorporating the advanced project set up in the organisation.
Questions:
1. Which project estimation approach should be used by the company and why?
2. What type of project organisation structure should be used by the company and why?
Answer. 1. Bottom-up estimating (also called detail orresource-driven estimating)
The estimator breaks a project into distinct line items, and then breaks those line items into
smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level
– the level of detail at which the price of the components is relatively consistent across projects.
Q3. What is the importance of operational feasibility? Explain the factors that affect operational
feasibility.
Answer. Operational feasibility is as important as technical feasibility (or any other kind of
feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The
conversation changes and that ‘intelligent system’ everyone was discussing is transformed back
into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make
it happen; if we can weave it into departments and hearts as successfully as we can plug it into
software platforms.
Q4. Write short notes on
 Monte Carlo analysis
 Work break down structure
 Resource loading
 Definitive estimate (a method to estimate cost of a project).
Answer. Monte Carlo analysis:
Monte Carlo simulation is a method for exploring the sensitivity of a complex systemby varying
parameters within statistical constraints. These systems can include financial, physical, and
mathematical models that are simulated in a loop, with statistical uncertainty between
simulations. The results from the simulation are analyzed to determine the characteristics of the
system.
Q5. What do you understand by cost of quality? Elaborate on various types of costs of quality
associated with a project.
Answer. Cost of Quality:
The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT
creating a quality product or service.
Every time work is redone, the cost of quality increases. Obvious examples include:
 The reworking of a manufactured item.
 The retesting of an assembly
 The rebuilding of a tool
 The correction of a bank statement
Q6. Explain some of ISO standards that should be considered by the project manager during
project execution.
List the advantages of project management software.
Answer. Some of ISO’s most well-known standards are management systemstandards. They
provide a model to follow when setting up and operating a management system. Like all ISO
standards, they are the result of international, expert consensus. Therefore, by implementing a
management system standard, organizations can benefit from global management experience
and good practice.
Winter-2015
Get solved assignments at nominal price of Rs.125 each.
Mail us at: subjects4u@gmail.com or contact at
09882243490

More Related Content

DOCX
Pm0010 – interduction to project management
DOCX
Mb0047 – management information systems
DOCX
Mb0049 project management
DOCX
Mb0048 operations research
DOCX
Smu mba sem 3 pm spring 2015 assignments
PPTX
Project Management: Business Case
DOC
CMMI Implementation Guide
DOCX
Pm0011 project planning and scheduling
Pm0010 – interduction to project management
Mb0047 – management information systems
Mb0049 project management
Mb0048 operations research
Smu mba sem 3 pm spring 2015 assignments
Project Management: Business Case
CMMI Implementation Guide
Pm0011 project planning and scheduling

What's hot (20)

PDF
Anju drolia
DOCX
Mb0049 project management
PPTX
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
PDF
Final chakradhar purohith proposal milieu analysis (without account data un...
DOCX
Presentation by vignesh swamidurai
PDF
Integrating Organisational Change within IT Transition and Transformation
DOCX
Smu mba sem 3 pm summer 2015 assignments
DOCX
Smu mba sem 3 pm spring 2016 assignments
DOCX
Mb0044 production and operation management..
PPTX
Key Result Areas and KPIs (Key Performance Indicators)
PDF
Day 0 Introduction to PM
PDF
Function Points for Estimation - Getting Developers on Board
PPT
Chap 2 Organization Strategy
PDF
Day 1 revision
DOCX
Smu mba sem 3 om spring 2016 assignments
DOCX
Mu0018 – change management
DOCX
Mb0049 project management
PPT
*Strategic Facility Planning, IFMA World Workplace
PPTX
SPM Evaluation
PPT
Value Engineering
Anju drolia
Mb0049 project management
Day 1 1620 - 1705 - pearl 1 - deep kamal singh
Final chakradhar purohith proposal milieu analysis (without account data un...
Presentation by vignesh swamidurai
Integrating Organisational Change within IT Transition and Transformation
Smu mba sem 3 pm summer 2015 assignments
Smu mba sem 3 pm spring 2016 assignments
Mb0044 production and operation management..
Key Result Areas and KPIs (Key Performance Indicators)
Day 0 Introduction to PM
Function Points for Estimation - Getting Developers on Board
Chap 2 Organization Strategy
Day 1 revision
Smu mba sem 3 om spring 2016 assignments
Mu0018 – change management
Mb0049 project management
*Strategic Facility Planning, IFMA World Workplace
SPM Evaluation
Value Engineering
Ad

Viewers also liked (20)

PPTX
Mediat2
PPTX
Big data
PDF
Visually Stunning Content Marketing Strategies
PDF
20161212-PLEDGE-Milowski-CT
PPTX
LCDS Community Partnership 2017-18
DOCX
Pm0017 project quality management
PDF
Cornerstone Whitepaper: Executive Coaching Revealed
PDF
Nathalie Nasser_Curriculum Vitae
PDF
Vision
PPSX
Using Animation in Education
DOCX
Ib0011 international marketing
DOCX
Mu0011–management and organisational development
DOCX
PPTX
Présentation IceFire pour Aos Canada français
PPTX
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
PPSX
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
PPTX
Ambar lópez etapas_administración
DOCX
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
DOCX
armaduras mecanica estatica
PDF
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Mediat2
Big data
Visually Stunning Content Marketing Strategies
20161212-PLEDGE-Milowski-CT
LCDS Community Partnership 2017-18
Pm0017 project quality management
Cornerstone Whitepaper: Executive Coaching Revealed
Nathalie Nasser_Curriculum Vitae
Vision
Using Animation in Education
Ib0011 international marketing
Mu0011–management and organisational development
Présentation IceFire pour Aos Canada français
How Shree Krishna Builders got 50+ leads in less than ₹5,000? - Social Media ...
Influence of Subsurface Heterogeneity on Detection of Landfill Leakage
Ambar lópez etapas_administración
Bài giảng Lập trình cơ bản - truongkinhtethucpham.com
armaduras mecanica estatica
Cuaderno de trabajo: EXPERIENCIAS DE FE Y CUIDO EN LAS MIGRACIONES FORZADAS
Ad

Similar to Pm0011 project planning and scheduling (20)

DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 project planning and scheduling
DOCX
Pm0011 project planning and scheduling
DOCX
Project management 3rd sem - smu mba solved assignments
DOCX
Pm0011 project planning and scheduling
DOCX
Ms 05 management of machines and materials
DOCX
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
PDF
How to Reach Peak Performance With the Product Management Organizational Heal...
DOCX
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
PDF
Responses to Questions on the Webinar World class EA - Governor's Approach to...
DOCX
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
DOCX
Om0017 advanced production planning and control
DOC
Chandrashekhar resume
DOCX
Om0017 advanced production planning and control
DOCX
Om0017 advanced production planning and control
DOCX
Bt0092, software project management
DOCX
Various National Agencies Directly Involved in the Issuance of Public Fiscal
Pm0011 project planning and scheduling
Pm0011 project planning and scheduling
Pm0011 project planning and scheduling
Pm0011 project planning and scheduling
Pm0011 project planning and scheduling
Pm0011 project planning and scheduling
Project management 3rd sem - smu mba solved assignments
Pm0011 project planning and scheduling
Ms 05 management of machines and materials
BUSN350Week 3 Business Problem and RequirementsBusiness.docx
How to Reach Peak Performance With the Product Management Organizational Heal...
Assignment 1 LASA 2—Company Analysis ReportReview the following.docx
Responses to Questions on the Webinar World class EA - Governor's Approach to...
[Insert project title, e.g. Cosmo Inc.”] Project Scope State.docx
Om0017 advanced production planning and control
Chandrashekhar resume
Om0017 advanced production planning and control
Om0017 advanced production planning and control
Bt0092, software project management
Various National Agencies Directly Involved in the Issuance of Public Fiscal

Recently uploaded (20)

PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
Empowerment Technology for Senior High School Guide
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Trump Administration's workforce development strategy
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Virtual and Augmented Reality in Current Scenario
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Unit 4 Computer Architecture Multicore Processor.pptx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Introduction to pro and eukaryotes and differences.pptx
Paper A Mock Exam 9_ Attempt review.pdf.
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
B.Sc. DS Unit 2 Software Engineering.pptx
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Empowerment Technology for Senior High School Guide
Environmental Education MCQ BD2EE - Share Source.pdf
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Computer Architecture Input Output Memory.pptx
Trump Administration's workforce development strategy
Practical Manual AGRO-233 Principles and Practices of Natural Farming
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Virtual and Augmented Reality in Current Scenario
History, Philosophy and sociology of education (1).pptx
AI-driven educational solutions for real-life interventions in the Philippine...

Pm0011 project planning and scheduling

  • 1. Winter-2015 Get solved assignments at nominal price of Rs.125 each. Mail us at: subjects4u@gmail.com or contact at 09882243490 Master of Business Administration - MBA Semester 3 PM0011-Project Planning and Scheduling (Book ID: B1937) Assignment (60 Marks) Note: Answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Each Question carries 10 marks 6 X 10=60. Q1. Write short note on:  Project deliverables  Project Rating Index(PRI)  Scope change control  Partnering Answer. Project Deliverables: In project management, a deliverable is a product or service that is given to your client. A deliverable usually has a due date and is tangible, measurable and specific. A deliverable can be given to either an external or internal customer and satisfies a milestone or due date that is created and produced in the project plan. A deliverable can be a software product, a design Q2. Budget Estimation of ABC Company Ltd. ABC Company Ltd., established in 1985, is engaged in the manufacturing of leatheraccessories. Over the years, the company, which started out as a local firm, has made its mark as an international corporation. However, the company is still working as a traditional set up. The high quality and durability of products have increased the demand of the products in the market. As the production of the organisation is being increased tomeet the demand, the traditional set up is creating hurdles in the production process. Organisation conflicts have arisen among the team members because of the unorganized hierarchical structure of the company, which is affecting the output of the organisation. Now that the management has decided to expand the business and opened up branches abroad, the company is facing two more problems. The first problem is in budgeting as the company is
  • 2. unfamiliar with international market conditions, strategy, and business policy while the second problem is conflicts at the time of team formation due to lack of experience of and exposure to multinational work culture, which has further affected the output of the company. The company can estimate the budget through two methods, the bottom - up approach and the top - down approach. The bottom -up approach is generally followed by the MNCs as it is more accurate and reliable. Mr.Parag has been appointed as the country head of the company and he has also been assigned the responsibility of incorporating the advanced project set up in the organisation. Questions: 1. Which project estimation approach should be used by the company and why? 2. What type of project organisation structure should be used by the company and why? Answer. 1. Bottom-up estimating (also called detail orresource-driven estimating) The estimator breaks a project into distinct line items, and then breaks those line items into smaller, distinct line items, and so on, until he or she arrives at the component (or resource) level – the level of detail at which the price of the components is relatively consistent across projects. Q3. What is the importance of operational feasibility? Explain the factors that affect operational feasibility. Answer. Operational feasibility is as important as technical feasibility (or any other kind of feasibility for that matter), and yet it can be the first thing to get brushed under the carpet. The conversation changes and that ‘intelligent system’ everyone was discussing is transformed back into a mere ‘thing’: a deliverable to drop into the organisation. We’ll find out later if we can make it happen; if we can weave it into departments and hearts as successfully as we can plug it into software platforms. Q4. Write short notes on  Monte Carlo analysis  Work break down structure  Resource loading  Definitive estimate (a method to estimate cost of a project). Answer. Monte Carlo analysis: Monte Carlo simulation is a method for exploring the sensitivity of a complex systemby varying parameters within statistical constraints. These systems can include financial, physical, and mathematical models that are simulated in a loop, with statistical uncertainty between
  • 3. simulations. The results from the simulation are analyzed to determine the characteristics of the system. Q5. What do you understand by cost of quality? Elaborate on various types of costs of quality associated with a project. Answer. Cost of Quality: The “cost of quality” isn’t the price of creating a quality product or service. It’s the cost of NOT creating a quality product or service. Every time work is redone, the cost of quality increases. Obvious examples include:  The reworking of a manufactured item.  The retesting of an assembly  The rebuilding of a tool  The correction of a bank statement Q6. Explain some of ISO standards that should be considered by the project manager during project execution. List the advantages of project management software. Answer. Some of ISO’s most well-known standards are management systemstandards. They provide a model to follow when setting up and operating a management system. Like all ISO standards, they are the result of international, expert consensus. Therefore, by implementing a management system standard, organizations can benefit from global management experience and good practice. Winter-2015 Get solved assignments at nominal price of Rs.125 each. Mail us at: subjects4u@gmail.com or contact at 09882243490