POC to Product
8 Aspect Thinking In Designing Product
Brief of David Peng
• David Peng
• Title : SlingX Corp. / CEO
• Education : Bachelor of Electrical Engineer Dept. of National Central Univ.
• Experience :
• 1 year at HiTech Energy Inc as director in charge of BMS project management
• 2 years at Jabil Corp. as director in charge of STB project management at Jabil Circuit Taiwan branch
STB Div.
• 6 Years at LiteOn Group as senior manager in charge of Wireless Dept. , DQA dept. & Product Marketing
at NABU & IABU
• 6 Years at Foxconn as senior manager in charge of R&D dept. & project management at CNSBG &
CMMSG
• Major at : RF Circuit & Embedded system Design
Product technology analysis, development and integration
Product Management
Product marketing plan and promotion
ASSUMPTIONS
1. Conceptual Idea has been approved and feasibility
study has been done
2. Out-side-In design processes
PLM PROCESS
Test ItUnique Idea Proof Concept Ship ItProduce It
CONCEPT & PROOF OF
CONCEPT
DESIGN, ENGINEERING, MANUFACTURING &
PRODUCTION
Design It
EVTPOCConcept DVT PVT MP
1. Tooling making
2. Reliability & Stress Test
3. Certification Test
4. Design MFG flow and test station
5. Draft test plan and Test MFG test code
6. Setup test station and smooth the test
procedure
1. UI / ME Design
2. Housing/PCBA interference check
3. Thermal simulation / solution
4. Mock-up Making
5. E/E design
6. Board Function Test
7. EMI/EMC/ESD pre-test
8. FW design
9. APP design
10. Server construction
1,800 Tesla Model x
US$ 240 M
8 Aspect Thinking In Designing Product
1. System Block Diagram
2. Usage Environment ( Environment / Reliability Test )
3. Certification
4. Manufacturing Test Requirement
5. Considerations in Mechanical Design
6. Layout Strategy
7. Status Transition Diagram
8. APP & Cloud
System Block Diagram
“A block diagram is a diagram of a system in which the principal parts or functions are represented by blocks
connected by lines that show the relationships of the blocks”
-------------- “ Wiki”
What do you read from it ?
System Block Diagram
1. Function :
1. Power, Memory, Display, Sensor, I/O……
2. Chip part number
2. Interface :
1. Signal between blocks : I2C, SPI, UART, HDMI, MII, LVDS, GPIO…..
2. I/O to User : USB, SD, Touch panel, Audio Jack, RJ-45, LED, Power Jack, AC
Plug……
 Also relate to ID & Mechanical design
3. Voltage : Color of each block indicates what voltage of chip uses
4. Power Budget :
1. List the input voltage and maximum current of each block
2. Accumulate power budget of each block to get system power consumption
5. Cost : For an experienced designer can estimate 70% ~ 80% BOM cost
System Block Diagram
Power Budget
System Block Diagram
Power Budget
15V AC/0.8A
Adapter
Bridge
Rectifier
Regulator
7812
110V AC
19V DC
5 V Line Driver
DC-DC
Converter
34063
2.5 V
3.3 V BCM6348, BCM5325E,
SDRAM, Flash, WLAN
BCM6348
2SB1188 (PNP)
controlled by 6348
DC-DC
Converter
34063
1.2 V
1.8 V BCM5325E
BCM6348
2SB1188 (PNP)
controlled by 6348
Regulator
7805 100 mA
707 mA
286 mA
670 mA
15.84V AC
900 mA
910 mA
193 mA
624 mA
Usage Environment ( Environment / Accelerated Life Test )
Product marketing has to list the possible user scenario, especially for some extreme conditions to
designer. And these scenarios should make designer to take some reliability tests into
consideration. Those tests can be categorized into two parts:
1. Environment Test
1. Temperature & Humidity Test ( Aging Test )
Purpose : to ensure that the DUT works as intended during and after long time exposure to high
temperature and humidity including condensation. The intention of the test is to reveal failure
modes that depend on ageing of materials and components.
Reference Standard :
Test method :
Temperature: Temp 1: 65 ± 3°C Temp 2: 40 ± 3°C
Humidity: Humidity 1: 70 ± 3% RH Humidity 2: 95 ± 3% RH
Hold time 1: 400 minutes
Hold time 2: 60 minutes
Transition times: 10 minutes
Duration: 126 cycles at 8 hours each. In total 42 days
Usage Environment ( Environment / Accelerated Life Test )
The temperature range of product category :
1. Commerce Grade : 0~70℃
2. Industry Grade : -40~+85℃
3. Car Grade : -40~+125℃
4. Military Grade : -55~+150℃
Usage Environment ( Environment / Accelerated Life Test )
2. Salt Spray Test :
Purpose : Salt spray testing is an accelerated corrosion test that produces a corrosive attack
to coated samples in order to evaluate (mostly comparatively) the suitability of the coating
for use as a protective finish
Standard : ISO 9227.
3. Waterpoof & dustproof :
Purpose : To classify and rate the degree of protection provided against intrusion (body
parts such as hands and fingers), dust, accidental contact, and water by mechanical casings
and electrical enclosures.
Standard : IEC 60529.
IP rating : IPXY X : Degree of solid object protection, ranks from 0 ~ 6
Y : Degree of water protection, ranks from 0 ~ 8
Usage Environment ( Environment / Accelerated Life Test )
Usage Environment ( Environment / Reliability Test )
5. Drop Test
Purpose: This test is carried out to confirm that the DUT can withstand the end user
dropping it accidentally during intended use or during transport, respectively.
Reference standard: IEC 60068-2-32 Test Ed
Test method : Drop DUT from 1.5 M height to ground for 6 faces and 8 corners
6. Vibration Test
Purpose: To determine whether the packaging and the product will resist the vibration
it may be exposed to during transport. Normally we use vibration test to check if
components solder well on PCB, especially for DIP components.
Reference Standard :
Usage Environment ( Environment / Reliability Test )
2. HALT/HASS Test
Highly Accelerated Life Testing (HALT) is a kind of stress test to find out the weak links of a
new product. These discovery tests rapidly find weaknesses using accelerated stress
conditions. The goal of HALT is to proactively find weaknesses and fix them thereby
increasing product reliability.
HALT test major focuses on those test items:
• vibration,
• high/ low temperature,
• rapid temperature cycling,
• combined stress,
• on/ off cycling,
• voltage limits and frequency limits.
Certification
Terminology :
1. FCC : Federal Communications Commission
Audit authority which is in charge of management of computers, peripheral and
communications products sold in the United States
Any digital technology of electronic devices or systems, devices or systems generate pulse
frequency of more than 10KHz of equipment shall get FCC certification before they can be
sold in the US market
2. UL :
UL is an accredited standards developer in the US and Canada. In extending its global public
safety mission, UL Standards partners with national standards bodies in countries around the
world to build a safer, more sustainable world.
3. CE : Derived from the European Community abbreviation
Audit authority which is in charge of the basic safety requirements set by the European
Union for the protection of people's safety and health and environmental protection benefits.
Certification
CE = EMC + Safety ( LVD)
( FCC ) ( UL )
EMC = EMI + EMS
Certification – EMI & EMC
1. EMI
Electromagnetic interference (EMI) is radio frequency energy that interferes with the operation of an
electronic device. This radio frequency energy can be produced by the device itself or by other devices
nearby.
Certification – EMI & EMC
1. EMC
Electromagnetic compatibility (EMC) is the ability of an electronic product to operate without
causing EMI that would interfere with other equipment and without being affected by EMI from
other equipment or the environment. The goal is to reduce EMI to meet the requirements requested by
governments of the whole world.
• CE EN55011/13/32/24
• ETSI EN 301489-1/-3/-7/-17/-24
• Australia AS/NZS CISPR11/13/22/32/24
• FCC Part15B/18
• ISED ICES-003
• BSMI CNS13438/CNS13439/CNS13803
• Japan VCCI-3
• Korea KN32/35
966 Chamber
10m Chamber
Certification – Safety
1. Safety Scope
1. Electrical shock damage
1. To prevent the current flows through the human body. As long as there are several milli-ampere that will
cause health effects on the human body, of course, more larger current will produce
2. To test device immunity capability to high voltage shock
2. Energy damage
High-current supply or high-capacitance lines between the adjacent two terminals, short circuit case, may produce
arc discharge or burning in the combustion of molten metal, even low voltage lines, may also cause energy hazard
3. Fire
In the event of overload, parts failure, insulation collapse, high impedance or loose connector, resulting in
abnormal temperature, there may be a fire hazard. Therefore; safety test requests once fire in the
equipment, it can not distribute to the adjacent areas of the fire or the danger outside the equipment area
4. Mechanical and thermal damage
5. Radiation damage
6. Chemical damage
Certification – Safety
2. Safety Test Standard
• UL 60950-1/EN 60950-1/IEC 60950-1, Information Technology Equipment
• UL 62368-1/EN 62368-1/IEC 62368-1, Audio/Video, Information and
communication technology equipment
• UL 60065 / EN 60065 / IEC 60065, Standard for Audio, Video and Similar Electronic
Apparatus - Safety Requirements
• UL 60335-1 / EN 60335-1 / IEC 60335-1, Safety of Household and Similar Appliances,
Part 1: General Requirements
• BSMI –CNS14336
Certification – RF Test
1. RF Test
RF Test is in response to meet domestic and international electronic the wireless
communications industry product certification services such as 80.11ac, 802.11ad, BLE and
LTE, etc). This tests majorly at “Frequency deviation”, “Power” and “Timing”, etc.
BLE Hopping Chart ( Mid Freq)
Certification – RF Test
2. RF Test Standard
FCC 15.247, 15.407, including DFS, FCC part 22/24/27…...
ISED Canada RSS-247,RSS-130, RSS-132
RSS-133,RSS-139,RSS-192,RSS-195…
ETSI EN 300 328, ETSI EN 301 893, including DFS, EN300 220,EN300 440…..
EN301 511, EN301 908-1….
Japan MIC Article 2, Para 1, Item 19
Korea RRA Notice 2012-12 Taiwan NCC LP0002
Australia / New Zealand AS/NZS 4268
1
5
°
FCC CE IC ACA NCC India Japan
Limit 1.6w /kg-
1g
2.0w/kg-
10g
1.6w/kg-
1g
2.0w/kg-
10g
2.0w/kg-
10g
1.6w/kg-
1g
2.0w/kg-
10g
Mobil
Phone
Head/
Body
Head/
Body
Head/
Body
Head/
Body
Head Head/
Body
Head
NB Body Body Body Body n/a n/a n/a
Tablet Body Body Body Body n/a n/a n/a
AP Body Body Body Body n/a n/a n/a
Certification – SAR Test
1. SAR Test
SAR test is mainly to simulate the body to absorb the intensity of
electromagnetic waves to protect the human body from radio
frequency transmission beyond the value of wireless devices caused
by human damage
Manufacturing Test Requirement
1. Purpose :
1. Guarantee product quality
2. Less manufacturing cost
2. Items :
1. Manufacture Test Plan ( SOP )
2. Test points & Test Tooling Design
3. Manufacture Test Program
Manufacturing & Test Requirement
1. SOP :
SOP plans the following items :
1. Board level functions to be tested
2. Test stations and test flow
3. Test Criteria ( Pass Or Fail)
Manufacturing & Test Requirement
2. Test points & Test Tooling Design
3. Manufacture Test Program (Mfg program)
Extracted from shipping firmware to only test board hardware functions. After all hardware
functions tested then mfg program will be erased and replaced by shipping image code.
Considerations in Mechanical Design
1. 3D interference Checking
2. Thermal consideration
3. Mockup
4. Antenna placement criteria
5. Waterproof
Considerations in Mechanical Design
1. 3D interference Checking
To check any interference between housing, electrical components and mechanical components
Max. OD = 16.0 mm
Max. ID = 14.0 mm
Min. OD = 10.0 mm
Min. ID = 8.0 mm
Considerations in Mechanical Design
2. Thermal consideration
Thermal shall impact on system once system does not have good heat dissipation system.
1. System Power Efficiency
2. Noise
1. Temperature noise
According to Johnson-Nyquist noise formula, P/B = KBT, the noise temperature goes high, the more power
system needs
2. S/N ratio decrease
System
Temp. rises
System power
efficiency decrease
Current increase
to raise power
W=I2R
Generate more heat
Considerations in Mechanical Design
2. Thermal consideration
Solution :
1. Conduction
Convention is the transfer of heat between two bodies. The rate at which energy is conducted as
heat between two bodies is a function of the temperature difference (temperature gradient)
between the two bodies and the properties of the conductive medium through which the heat is
transferred.
Heatsink is the most popular way to adopt to solve thermal issue.
2. Radiation
Radiation is electromagnetic radiation generated by the thermal motion of charged particles in
matter. All matter with a temperature greater than absolute zero emits thermal radiation. In
general, the radiation includes visible light and infrared light.
The more surface for thermal dissipation, the more thermal radiation. ( Fins )
3. Convention
Convention is the transfer of heat from one place to another by the movement of fluids. The fluid
can be air, water or any liquid.
Considerations in Mechanical Design
3. Thermal consideration
4. Thermal simulation
Fins
Fin integrates the 3 solutions with
Conduction, radiation and convention
Fins increase the surface area to
have more heat can be dissipated by
radiation and convention with air.
In general, we like to do thermal simulation to have
more system thermal information then apply the
solution.
Air flow track
T ambient =40 ℃
Considerations in Mechanical Design
3. Mockup
1. Verify the interference of solid bodies
2. Verify the color plan , real visual effect and feeling
3. Verify if any issue occurs in real operations
4. Tips
If you want to have more than 2 mockup samples then please adopt soft-tooling to make
mockup samples to lower your cost.
4. Antenna placement criteria
5. Waterproof
Layout Strategy
1. Power & Ground
Power and Ground is the most important item that designer must take into consideration when you engage in PCB layout.
Good management of power & ground enables PCB with good performance, less noise and less EMI. Some principles
1. A complete ground preferred, no scattered ground
2. Analog, RF and Digital ground separated to avoid noise coupled
3. Every ground plane must have its own path to the common ground to reduce noise
4. The impedance of return path
All the return current will take the shortest return path to common ground based on the impedance of the return path. With DC, the return
current takes the way back with the lowest resistance (Figure a). With a higher frequency, the return current flows along the lowest
impedance (Figure b).
Figure a Figure b
Layout Strategy
1. Safety Requirement
To have good space between power, signal and ground to meet the safety requirement.
2. Placement
1. Place components based on function blocks. Create a diagram with the functional groups of the system – e.g.,
transmitter path, receiver path, analog signals, digital signals, etc.
2. To have layout path as short as possible unless any requirement s listed in the layout guide ( for example, the
address and data signals of DRAM or Flash)
3. List the critical signals that may have higher radiation.
Status Transition Diagram
• Talk to you about where things
should go, what colors to use.
• UI is responsible for the creative
and visual pieces .
• UX focuses on the interactive side.
• UX handles the architecture of the content and the site
map.
Usability
Functionality
Information
Architecture
Validation
Requirements
Design
APP & CLOUD
Validation
Requirements
Design
Usability
Functionality
Information
Architecture
Communication MQTT,
WebSockets, HTTP
Platform Android, iOS, Windows
Phone.
Platform Local server, AWS,
Google cloud. Azure
Key Features
 Communication server
 Web API
 Database
 Push Notification server
Key Features
 Home/daily-life devices
 Business and Public
infrastructure
 Health-care
Key Features
 Data Transmission and Management
 IoT device connect and control
 Integrations with other web services
Mobile
Internet of ThingsBackend Server
Mobile Application Development
APP & CLOUD
Mobile Application Development
Types of Mobile App Dev
Native Mobile Apps Web-based Mobile Apps Hybrid Mobile Apps
Native mobile apps are
developed in a programming
language native to the device
and operating system
 Native apps typically run and
“feel” better.
 Suited for any type of Apps.
 More expensive to develop
on multiple OS platforms.
Typically built with the
combination of languages,
including CSS 3, HTML and
JavaScript.
Hybrid apps don’t need
separate efforts for each
mobile platform.
 Developed once and can be
made available in all major
platforms.
 Saving a lot of development
time.
 Not Suited for complex Apps.
 The operation is not smooth.
 Performance and
development time are
between Native and Web-
based Apps.
 Not suited for complex Apps.
 High cost of maintenance
and updates.
APP & CLOUD
Mobile Application Development
• Apps Front-end development
• UI UX design
• Cross-device accommodations
• Apps Back-end development
• User authentication-authorization
• Data services
• Reusable business logic
• Apps Deployment
• App Store Google Play
• In-house (ipa / apk)
APP & CLOUD
Special Thanks To
Gary Hus : CEO, 京艷設計有限公司
Mobile: +886 988-079-803
E-mail: garyhsu240465@gmail.com
Simon Chen: Senior Manager, Bay Area Compliance Laboratories Corp.
Mobile : +886 935-166-791
E-mail : simon.chen@baclcorp.com
Angus Cheng: General Manager, Foxcat Inc.
Mobile : +886 983-267-700
E-mail : angus@foxcat.co
SlingX Corp. / David Peng
Tel : +886 2 2541-3113
Mobile : +886 939-266-600
E-mail : ap626421@gmail.com
THANK YOU

More Related Content

PDF
Product Safety Testing Reduces the Risk of Shock, Fire, Explosions
PDF
Wafer probe technology & application overview ira feldman 101108
PDF
4 david schepers certification process safety relay modules for machinery app...
PDF
Ideal 3D Stacked Die Test - IEEE Semiconductor Wafer Test Workshop SWTW 2013
PDF
Cacade Microtech Investors Presentation
PDF
IEEE Semiconductor Wafer Test Workshop SWTW 2014 - International Technology R...
PDF
Remote real time process and production
PDF
Ambala Electronics Instruments, Ambala, Power Supplies
Product Safety Testing Reduces the Risk of Shock, Fire, Explosions
Wafer probe technology & application overview ira feldman 101108
4 david schepers certification process safety relay modules for machinery app...
Ideal 3D Stacked Die Test - IEEE Semiconductor Wafer Test Workshop SWTW 2013
Cacade Microtech Investors Presentation
IEEE Semiconductor Wafer Test Workshop SWTW 2014 - International Technology R...
Remote real time process and production
Ambala Electronics Instruments, Ambala, Power Supplies

What's hot (14)

PDF
Ieee std-1313-2-1999
PDF
Ansi c37-61-1973-ieee-std-321-1973-pdf
PPSX
Contract Manufacturing Location India -ECDS
PDF
Arc flash practical solution guide to arc flash hazards-1
PDF
Mitigating Risks of Battery Testing in Environmental Chambers
PDF
Lithium Ion Abuse Test Methods Improvement [Presentation Slides]
DOCX
Pathogen Detection with Brewster's Angle Straddle Interferometry
PDF
Accredited laboratory and testing services
PPTX
Power point presentation linkedin
PDF
Guide for the implementation of the RoHS Directive by manufacturers of electr...
PDF
Manufacturability & reliability challenges with qfn
PDF
The Restriction of Hazardous Substances (RoHS) Manual for SMEs
PPT
IGERTSummary
PDF
Effect Of Wire Edm Process Parameters On Surface Roughness Of Aisi-4140 (Carb...
Ieee std-1313-2-1999
Ansi c37-61-1973-ieee-std-321-1973-pdf
Contract Manufacturing Location India -ECDS
Arc flash practical solution guide to arc flash hazards-1
Mitigating Risks of Battery Testing in Environmental Chambers
Lithium Ion Abuse Test Methods Improvement [Presentation Slides]
Pathogen Detection with Brewster's Angle Straddle Interferometry
Accredited laboratory and testing services
Power point presentation linkedin
Guide for the implementation of the RoHS Directive by manufacturers of electr...
Manufacturability & reliability challenges with qfn
The Restriction of Hazardous Substances (RoHS) Manual for SMEs
IGERTSummary
Effect Of Wire Edm Process Parameters On Surface Roughness Of Aisi-4140 (Carb...
Ad

Similar to POC To Product: 8 Key Processes in Design Path (20)

PPTX
Data and Power Isolation (Design Conference 2013)
ODT
CV of Rosanna Ester Navarro Acosta Feb 2016
DOCX
Universal Cables Ltd
PDF
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
PDF
The Board Designer s Guide to Testable Logic Circuits Electronic Systems Engi...
DOC
Rathinasabapathy
PDF
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
PDF
UL's guide to differentiate your wearables from competition
PDF
SP Denmark brochure
PDF
MichaelEmblincv
PDF
Chakresh Tiwari Philips report
PDF
Design of Low Cost Line Impedance Stabilization Network Using RLC Components ...
PDF
Realise the Value in modern Data Center Infrastructure
PDF
The Board Designer s Guide to Testable Logic Circuits Electronic Systems Engi...
PDF
Basic electronic components insbehwjbebsjejbe
PPTX
Team 2 Final Presentation 12-7 download
RTF
mark.walker.resume.revision2
PDF
FCC CE IC regulatory testing of IOT products
PPT
Regulatory Best Practices
PDF
Daniel Hall - How to mitigate flash hazards in a main switchroom
Data and Power Isolation (Design Conference 2013)
CV of Rosanna Ester Navarro Acosta Feb 2016
Universal Cables Ltd
Brosur Fluke Insulation Resistance Testing. Hubungi PT. Siwali Swantika 021-4...
The Board Designer s Guide to Testable Logic Circuits Electronic Systems Engi...
Rathinasabapathy
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
UL's guide to differentiate your wearables from competition
SP Denmark brochure
MichaelEmblincv
Chakresh Tiwari Philips report
Design of Low Cost Line Impedance Stabilization Network Using RLC Components ...
Realise the Value in modern Data Center Infrastructure
The Board Designer s Guide to Testable Logic Circuits Electronic Systems Engi...
Basic electronic components insbehwjbebsjejbe
Team 2 Final Presentation 12-7 download
mark.walker.resume.revision2
FCC CE IC regulatory testing of IOT products
Regulatory Best Practices
Daniel Hall - How to mitigate flash hazards in a main switchroom
Ad

More from futurewardcentral (12)

PPTX
Perspectives on Foreigner Employability in Taiwan
PDF
Zero Waste Fashion: The Journey of Story Wear
PDF
Quantitative Trading
PDF
The Right Way To Talk To Users
PDF
Managing Distribution for Hardware Startups
PDF
The Secrets Behind Million Dollar Indiegogo Launches
PPTX
Experiences of a Foreign Entrepreneur in Taiwan
PDF
Supply Chain Management For Hardware Startups
PPTX
Managing Your Hardware Project, Something You should Know: From Concept, Desi...
PDF
Totes & Tees: The Social Entrepreneurship Journey
PDF
How To Start A Business In Taiwan
PPTX
Recruiting For Your Startup: Unconventional Thinking, Smart Ideas and Amazing...
Perspectives on Foreigner Employability in Taiwan
Zero Waste Fashion: The Journey of Story Wear
Quantitative Trading
The Right Way To Talk To Users
Managing Distribution for Hardware Startups
The Secrets Behind Million Dollar Indiegogo Launches
Experiences of a Foreign Entrepreneur in Taiwan
Supply Chain Management For Hardware Startups
Managing Your Hardware Project, Something You should Know: From Concept, Desi...
Totes & Tees: The Social Entrepreneurship Journey
How To Start A Business In Taiwan
Recruiting For Your Startup: Unconventional Thinking, Smart Ideas and Amazing...

Recently uploaded (20)

PPTX
unit1d-communitypharmacy-240815170017-d032dce8.pptx
PDF
ISS2022 present sdabhsa hsdhdfahasda ssdsd
PDF
2_STM32&SecureElements2_STM32&SecureElements
PPTX
vortex flow measurement in instrumentation
PDF
Printing Presentation to show beginners.
PDF
ICT grade for 8. MATATAG curriculum .P2.pdf
PDF
20A LG INR18650HJ2 3.6V 2900mAh Battery cells for Power Tools Vacuum Cleaner
PDF
SAHIL PROdhdjejss yo yo pdf TOCOL PPT.pdf
PPTX
Growth Capital Investment - Espresso Capital.pptx
PDF
Presented by ATHUL KRISHNA.S_20250813_191657_0000.pdf
PPTX
Unit-1.pptxgeyeuueueu7r7r7r77r7r7r7uriruru
PDF
Topic-1-Main-Features-of-Data-Processing.pdf
PDF
PakistanCoinageAct-906.pdfdbnsshsjjsbsbb
PPTX
AI_ML_Internship_WReport_Template_v2.pptx
PDF
CAB UNIT 1 with computer details details
PDF
Tcl Scripting for EDA.pdf
PPTX
dDifference Beetween Saving slides And Investment Slides.pptx
PPTX
Pin configuration and project related to
PPTX
Computer Hardware - Technology and Livelihood Education
PPTX
RTS MASTER DECK_Household Convergence Scorecards. Use this file copy.pptx
unit1d-communitypharmacy-240815170017-d032dce8.pptx
ISS2022 present sdabhsa hsdhdfahasda ssdsd
2_STM32&SecureElements2_STM32&SecureElements
vortex flow measurement in instrumentation
Printing Presentation to show beginners.
ICT grade for 8. MATATAG curriculum .P2.pdf
20A LG INR18650HJ2 3.6V 2900mAh Battery cells for Power Tools Vacuum Cleaner
SAHIL PROdhdjejss yo yo pdf TOCOL PPT.pdf
Growth Capital Investment - Espresso Capital.pptx
Presented by ATHUL KRISHNA.S_20250813_191657_0000.pdf
Unit-1.pptxgeyeuueueu7r7r7r77r7r7r7uriruru
Topic-1-Main-Features-of-Data-Processing.pdf
PakistanCoinageAct-906.pdfdbnsshsjjsbsbb
AI_ML_Internship_WReport_Template_v2.pptx
CAB UNIT 1 with computer details details
Tcl Scripting for EDA.pdf
dDifference Beetween Saving slides And Investment Slides.pptx
Pin configuration and project related to
Computer Hardware - Technology and Livelihood Education
RTS MASTER DECK_Household Convergence Scorecards. Use this file copy.pptx

POC To Product: 8 Key Processes in Design Path

  • 1. By : SlingX Corp. / David Peng Date : March 17th, 2017 POC to Product 8 Aspect Thinking In Designing Product
  • 2. Brief of David Peng • David Peng • Title : SlingX Corp. / CEO • Education : Bachelor of Electrical Engineer Dept. of National Central Univ. • Experience : • 1 year at HiTech Energy Inc as director in charge of BMS project management • 2 years at Jabil Corp. as director in charge of STB project management at Jabil Circuit Taiwan branch STB Div. • 6 Years at LiteOn Group as senior manager in charge of Wireless Dept. , DQA dept. & Product Marketing at NABU & IABU • 6 Years at Foxconn as senior manager in charge of R&D dept. & project management at CNSBG & CMMSG • Major at : RF Circuit & Embedded system Design Product technology analysis, development and integration Product Management Product marketing plan and promotion
  • 3. ASSUMPTIONS 1. Conceptual Idea has been approved and feasibility study has been done 2. Out-side-In design processes
  • 4. PLM PROCESS Test ItUnique Idea Proof Concept Ship ItProduce It CONCEPT & PROOF OF CONCEPT DESIGN, ENGINEERING, MANUFACTURING & PRODUCTION Design It EVTPOCConcept DVT PVT MP 1. Tooling making 2. Reliability & Stress Test 3. Certification Test 4. Design MFG flow and test station 5. Draft test plan and Test MFG test code 6. Setup test station and smooth the test procedure 1. UI / ME Design 2. Housing/PCBA interference check 3. Thermal simulation / solution 4. Mock-up Making 5. E/E design 6. Board Function Test 7. EMI/EMC/ESD pre-test 8. FW design 9. APP design 10. Server construction
  • 5. 1,800 Tesla Model x US$ 240 M
  • 6. 8 Aspect Thinking In Designing Product 1. System Block Diagram 2. Usage Environment ( Environment / Reliability Test ) 3. Certification 4. Manufacturing Test Requirement 5. Considerations in Mechanical Design 6. Layout Strategy 7. Status Transition Diagram 8. APP & Cloud
  • 7. System Block Diagram “A block diagram is a diagram of a system in which the principal parts or functions are represented by blocks connected by lines that show the relationships of the blocks” -------------- “ Wiki” What do you read from it ?
  • 8. System Block Diagram 1. Function : 1. Power, Memory, Display, Sensor, I/O…… 2. Chip part number 2. Interface : 1. Signal between blocks : I2C, SPI, UART, HDMI, MII, LVDS, GPIO….. 2. I/O to User : USB, SD, Touch panel, Audio Jack, RJ-45, LED, Power Jack, AC Plug……  Also relate to ID & Mechanical design 3. Voltage : Color of each block indicates what voltage of chip uses 4. Power Budget : 1. List the input voltage and maximum current of each block 2. Accumulate power budget of each block to get system power consumption 5. Cost : For an experienced designer can estimate 70% ~ 80% BOM cost
  • 10. System Block Diagram Power Budget 15V AC/0.8A Adapter Bridge Rectifier Regulator 7812 110V AC 19V DC 5 V Line Driver DC-DC Converter 34063 2.5 V 3.3 V BCM6348, BCM5325E, SDRAM, Flash, WLAN BCM6348 2SB1188 (PNP) controlled by 6348 DC-DC Converter 34063 1.2 V 1.8 V BCM5325E BCM6348 2SB1188 (PNP) controlled by 6348 Regulator 7805 100 mA 707 mA 286 mA 670 mA 15.84V AC 900 mA 910 mA 193 mA 624 mA
  • 11. Usage Environment ( Environment / Accelerated Life Test ) Product marketing has to list the possible user scenario, especially for some extreme conditions to designer. And these scenarios should make designer to take some reliability tests into consideration. Those tests can be categorized into two parts: 1. Environment Test 1. Temperature & Humidity Test ( Aging Test ) Purpose : to ensure that the DUT works as intended during and after long time exposure to high temperature and humidity including condensation. The intention of the test is to reveal failure modes that depend on ageing of materials and components. Reference Standard : Test method : Temperature: Temp 1: 65 ± 3°C Temp 2: 40 ± 3°C Humidity: Humidity 1: 70 ± 3% RH Humidity 2: 95 ± 3% RH Hold time 1: 400 minutes Hold time 2: 60 minutes Transition times: 10 minutes Duration: 126 cycles at 8 hours each. In total 42 days
  • 12. Usage Environment ( Environment / Accelerated Life Test ) The temperature range of product category : 1. Commerce Grade : 0~70℃ 2. Industry Grade : -40~+85℃ 3. Car Grade : -40~+125℃ 4. Military Grade : -55~+150℃
  • 13. Usage Environment ( Environment / Accelerated Life Test ) 2. Salt Spray Test : Purpose : Salt spray testing is an accelerated corrosion test that produces a corrosive attack to coated samples in order to evaluate (mostly comparatively) the suitability of the coating for use as a protective finish Standard : ISO 9227. 3. Waterpoof & dustproof : Purpose : To classify and rate the degree of protection provided against intrusion (body parts such as hands and fingers), dust, accidental contact, and water by mechanical casings and electrical enclosures. Standard : IEC 60529. IP rating : IPXY X : Degree of solid object protection, ranks from 0 ~ 6 Y : Degree of water protection, ranks from 0 ~ 8
  • 14. Usage Environment ( Environment / Accelerated Life Test )
  • 15. Usage Environment ( Environment / Reliability Test ) 5. Drop Test Purpose: This test is carried out to confirm that the DUT can withstand the end user dropping it accidentally during intended use or during transport, respectively. Reference standard: IEC 60068-2-32 Test Ed Test method : Drop DUT from 1.5 M height to ground for 6 faces and 8 corners 6. Vibration Test Purpose: To determine whether the packaging and the product will resist the vibration it may be exposed to during transport. Normally we use vibration test to check if components solder well on PCB, especially for DIP components. Reference Standard :
  • 16. Usage Environment ( Environment / Reliability Test ) 2. HALT/HASS Test Highly Accelerated Life Testing (HALT) is a kind of stress test to find out the weak links of a new product. These discovery tests rapidly find weaknesses using accelerated stress conditions. The goal of HALT is to proactively find weaknesses and fix them thereby increasing product reliability. HALT test major focuses on those test items: • vibration, • high/ low temperature, • rapid temperature cycling, • combined stress, • on/ off cycling, • voltage limits and frequency limits.
  • 17. Certification Terminology : 1. FCC : Federal Communications Commission Audit authority which is in charge of management of computers, peripheral and communications products sold in the United States Any digital technology of electronic devices or systems, devices or systems generate pulse frequency of more than 10KHz of equipment shall get FCC certification before they can be sold in the US market 2. UL : UL is an accredited standards developer in the US and Canada. In extending its global public safety mission, UL Standards partners with national standards bodies in countries around the world to build a safer, more sustainable world. 3. CE : Derived from the European Community abbreviation Audit authority which is in charge of the basic safety requirements set by the European Union for the protection of people's safety and health and environmental protection benefits.
  • 18. Certification CE = EMC + Safety ( LVD) ( FCC ) ( UL ) EMC = EMI + EMS
  • 19. Certification – EMI & EMC 1. EMI Electromagnetic interference (EMI) is radio frequency energy that interferes with the operation of an electronic device. This radio frequency energy can be produced by the device itself or by other devices nearby.
  • 20. Certification – EMI & EMC 1. EMC Electromagnetic compatibility (EMC) is the ability of an electronic product to operate without causing EMI that would interfere with other equipment and without being affected by EMI from other equipment or the environment. The goal is to reduce EMI to meet the requirements requested by governments of the whole world. • CE EN55011/13/32/24 • ETSI EN 301489-1/-3/-7/-17/-24 • Australia AS/NZS CISPR11/13/22/32/24 • FCC Part15B/18 • ISED ICES-003 • BSMI CNS13438/CNS13439/CNS13803 • Japan VCCI-3 • Korea KN32/35 966 Chamber 10m Chamber
  • 21. Certification – Safety 1. Safety Scope 1. Electrical shock damage 1. To prevent the current flows through the human body. As long as there are several milli-ampere that will cause health effects on the human body, of course, more larger current will produce 2. To test device immunity capability to high voltage shock 2. Energy damage High-current supply or high-capacitance lines between the adjacent two terminals, short circuit case, may produce arc discharge or burning in the combustion of molten metal, even low voltage lines, may also cause energy hazard 3. Fire In the event of overload, parts failure, insulation collapse, high impedance or loose connector, resulting in abnormal temperature, there may be a fire hazard. Therefore; safety test requests once fire in the equipment, it can not distribute to the adjacent areas of the fire or the danger outside the equipment area 4. Mechanical and thermal damage 5. Radiation damage 6. Chemical damage
  • 22. Certification – Safety 2. Safety Test Standard • UL 60950-1/EN 60950-1/IEC 60950-1, Information Technology Equipment • UL 62368-1/EN 62368-1/IEC 62368-1, Audio/Video, Information and communication technology equipment • UL 60065 / EN 60065 / IEC 60065, Standard for Audio, Video and Similar Electronic Apparatus - Safety Requirements • UL 60335-1 / EN 60335-1 / IEC 60335-1, Safety of Household and Similar Appliances, Part 1: General Requirements • BSMI –CNS14336
  • 23. Certification – RF Test 1. RF Test RF Test is in response to meet domestic and international electronic the wireless communications industry product certification services such as 80.11ac, 802.11ad, BLE and LTE, etc). This tests majorly at “Frequency deviation”, “Power” and “Timing”, etc. BLE Hopping Chart ( Mid Freq)
  • 24. Certification – RF Test 2. RF Test Standard FCC 15.247, 15.407, including DFS, FCC part 22/24/27…... ISED Canada RSS-247,RSS-130, RSS-132 RSS-133,RSS-139,RSS-192,RSS-195… ETSI EN 300 328, ETSI EN 301 893, including DFS, EN300 220,EN300 440….. EN301 511, EN301 908-1…. Japan MIC Article 2, Para 1, Item 19 Korea RRA Notice 2012-12 Taiwan NCC LP0002 Australia / New Zealand AS/NZS 4268
  • 25. 1 5 ° FCC CE IC ACA NCC India Japan Limit 1.6w /kg- 1g 2.0w/kg- 10g 1.6w/kg- 1g 2.0w/kg- 10g 2.0w/kg- 10g 1.6w/kg- 1g 2.0w/kg- 10g Mobil Phone Head/ Body Head/ Body Head/ Body Head/ Body Head Head/ Body Head NB Body Body Body Body n/a n/a n/a Tablet Body Body Body Body n/a n/a n/a AP Body Body Body Body n/a n/a n/a Certification – SAR Test 1. SAR Test SAR test is mainly to simulate the body to absorb the intensity of electromagnetic waves to protect the human body from radio frequency transmission beyond the value of wireless devices caused by human damage
  • 26. Manufacturing Test Requirement 1. Purpose : 1. Guarantee product quality 2. Less manufacturing cost 2. Items : 1. Manufacture Test Plan ( SOP ) 2. Test points & Test Tooling Design 3. Manufacture Test Program
  • 27. Manufacturing & Test Requirement 1. SOP : SOP plans the following items : 1. Board level functions to be tested 2. Test stations and test flow 3. Test Criteria ( Pass Or Fail)
  • 28. Manufacturing & Test Requirement 2. Test points & Test Tooling Design 3. Manufacture Test Program (Mfg program) Extracted from shipping firmware to only test board hardware functions. After all hardware functions tested then mfg program will be erased and replaced by shipping image code.
  • 29. Considerations in Mechanical Design 1. 3D interference Checking 2. Thermal consideration 3. Mockup 4. Antenna placement criteria 5. Waterproof
  • 30. Considerations in Mechanical Design 1. 3D interference Checking To check any interference between housing, electrical components and mechanical components Max. OD = 16.0 mm Max. ID = 14.0 mm Min. OD = 10.0 mm Min. ID = 8.0 mm
  • 31. Considerations in Mechanical Design 2. Thermal consideration Thermal shall impact on system once system does not have good heat dissipation system. 1. System Power Efficiency 2. Noise 1. Temperature noise According to Johnson-Nyquist noise formula, P/B = KBT, the noise temperature goes high, the more power system needs 2. S/N ratio decrease System Temp. rises System power efficiency decrease Current increase to raise power W=I2R Generate more heat
  • 32. Considerations in Mechanical Design 2. Thermal consideration Solution : 1. Conduction Convention is the transfer of heat between two bodies. The rate at which energy is conducted as heat between two bodies is a function of the temperature difference (temperature gradient) between the two bodies and the properties of the conductive medium through which the heat is transferred. Heatsink is the most popular way to adopt to solve thermal issue. 2. Radiation Radiation is electromagnetic radiation generated by the thermal motion of charged particles in matter. All matter with a temperature greater than absolute zero emits thermal radiation. In general, the radiation includes visible light and infrared light. The more surface for thermal dissipation, the more thermal radiation. ( Fins ) 3. Convention Convention is the transfer of heat from one place to another by the movement of fluids. The fluid can be air, water or any liquid.
  • 33. Considerations in Mechanical Design 3. Thermal consideration 4. Thermal simulation Fins Fin integrates the 3 solutions with Conduction, radiation and convention Fins increase the surface area to have more heat can be dissipated by radiation and convention with air. In general, we like to do thermal simulation to have more system thermal information then apply the solution. Air flow track T ambient =40 ℃
  • 34. Considerations in Mechanical Design 3. Mockup 1. Verify the interference of solid bodies 2. Verify the color plan , real visual effect and feeling 3. Verify if any issue occurs in real operations 4. Tips If you want to have more than 2 mockup samples then please adopt soft-tooling to make mockup samples to lower your cost. 4. Antenna placement criteria 5. Waterproof
  • 35. Layout Strategy 1. Power & Ground Power and Ground is the most important item that designer must take into consideration when you engage in PCB layout. Good management of power & ground enables PCB with good performance, less noise and less EMI. Some principles 1. A complete ground preferred, no scattered ground 2. Analog, RF and Digital ground separated to avoid noise coupled 3. Every ground plane must have its own path to the common ground to reduce noise 4. The impedance of return path All the return current will take the shortest return path to common ground based on the impedance of the return path. With DC, the return current takes the way back with the lowest resistance (Figure a). With a higher frequency, the return current flows along the lowest impedance (Figure b). Figure a Figure b
  • 36. Layout Strategy 1. Safety Requirement To have good space between power, signal and ground to meet the safety requirement. 2. Placement 1. Place components based on function blocks. Create a diagram with the functional groups of the system – e.g., transmitter path, receiver path, analog signals, digital signals, etc. 2. To have layout path as short as possible unless any requirement s listed in the layout guide ( for example, the address and data signals of DRAM or Flash) 3. List the critical signals that may have higher radiation.
  • 38. • Talk to you about where things should go, what colors to use. • UI is responsible for the creative and visual pieces . • UX focuses on the interactive side. • UX handles the architecture of the content and the site map. Usability Functionality Information Architecture Validation Requirements Design APP & CLOUD Validation Requirements Design Usability Functionality Information Architecture
  • 39. Communication MQTT, WebSockets, HTTP Platform Android, iOS, Windows Phone. Platform Local server, AWS, Google cloud. Azure Key Features  Communication server  Web API  Database  Push Notification server Key Features  Home/daily-life devices  Business and Public infrastructure  Health-care Key Features  Data Transmission and Management  IoT device connect and control  Integrations with other web services Mobile Internet of ThingsBackend Server Mobile Application Development APP & CLOUD
  • 40. Mobile Application Development Types of Mobile App Dev Native Mobile Apps Web-based Mobile Apps Hybrid Mobile Apps Native mobile apps are developed in a programming language native to the device and operating system  Native apps typically run and “feel” better.  Suited for any type of Apps.  More expensive to develop on multiple OS platforms. Typically built with the combination of languages, including CSS 3, HTML and JavaScript. Hybrid apps don’t need separate efforts for each mobile platform.  Developed once and can be made available in all major platforms.  Saving a lot of development time.  Not Suited for complex Apps.  The operation is not smooth.  Performance and development time are between Native and Web- based Apps.  Not suited for complex Apps.  High cost of maintenance and updates. APP & CLOUD
  • 41. Mobile Application Development • Apps Front-end development • UI UX design • Cross-device accommodations • Apps Back-end development • User authentication-authorization • Data services • Reusable business logic • Apps Deployment • App Store Google Play • In-house (ipa / apk) APP & CLOUD
  • 42. Special Thanks To Gary Hus : CEO, 京艷設計有限公司 Mobile: +886 988-079-803 E-mail: garyhsu240465@gmail.com Simon Chen: Senior Manager, Bay Area Compliance Laboratories Corp. Mobile : +886 935-166-791 E-mail : simon.chen@baclcorp.com Angus Cheng: General Manager, Foxcat Inc. Mobile : +886 983-267-700 E-mail : angus@foxcat.co
  • 43. SlingX Corp. / David Peng Tel : +886 2 2541-3113 Mobile : +886 939-266-600 E-mail : ap626421@gmail.com THANK YOU

Editor's Notes

  • #22: We generally have the following two method to test. ESD - Electrostatic Discharge Surge test For ESD test , we have 4KV/ 8KV contact an 8Kv/ 12KV Air test methods, it depends on customer’s declaration For Surge, according to IEC61051-2, 6KV/3KA ,10 Times (POS/NEG), 1 minutes period
  • #23: We generally have the following two method to test. ESD - Electrostatic Discharge Surge test For ESD test , we have 4KV/ 8KV contact an 8Kv/ 12KV Air test methods, it depends on customer’s declaration For Surge, according to IEC61051-2, 6KV/3KA ,10 Times (POS/NEG), 1 minutes period