• Facility Management with BIM
• Why use BIM for FM?
• Common workflow
• STEP-by-STEP example
• BIM with Facility Management
FM with BIM – Overview of Available Solutions
“a BIM model could be gainfully used for FM, since it was able to capture so
much of the building information that could be re-used for its operation and
maintenance rather than have to re-create it”
Lachmi Khemlani – founder AECBytes
AECBytes Feature Article “BIM for Facilities Management” 30.09.2011
Using BIM as a database for Facility Management
Two main types of BIM-implementation in FM-suites:
1. Incorporated within a larger AEC-software portfolio (FM adopted by BIM-providers):
• Autodesk: Building OPS
• Graphisoft: ArchiFM
• Bentley: Bentley Facilities
2. FM-Software, providing exchange with BIM
• FM Systems
• Planon
All of them use the as-built BIM (delivered at hand-over) as a starting point for ‘filling up’ the FM-
database.
Bi-directional exchange is (sometimes) possible, but almost always requires a type of
modelling-software to be used to keep the model up to date.
Motivation for using BIM in FM
“According to a 2004 report by the National Institute of Standards and
Technology (NIST), 71 percent of design and engineering documentation
maintained by facility executives is still recorded on paper. […]
A NIST report on inadequate data interoperability estimated the cost at
$15.8 billion in 2002.”
Brandon Lorenz, Senior Editor at facilitiesnet
“The Case For Data Interoperability” - March 2006
Common motivations for using BIM as a basis for FM
BIM-data is perceived as more reliable than CAD-derived information
A Virtual Building Model provides a more extensive database than traditional As-Built
There is less data-drop when using BIM for building up FM-inventory
Reliability is determined not (mainly) by the data-type, but by modelling-expertise,
consistency in modelling, defining LOD and (signed) protocols
An extensive unreliable database is less usable than a smaller, but complete set of plans
This is only true when the exchange-format is fully supported on both ends
BIM has the possibility of providing for a better FM-database if FM as a goal is agreed upon
within the BIM-protocol and OpenBIM and IFC/COBie are incorporated in the process
Common workflow
“The biggest hurdle, however, is the lack of good data for FM i
n the BIM model.”
Lachmi Khemlani – founder AECBytes
AECBytes Feature Article “BIM for Facilities Management” 30.09.2011
BIM
Objects
Building
Elements &
Materials
Spaces
Facility
Management*
Asset
Management
Maintenance
Management
Space
Management
Project
Management
Safety
Management
*: generalistion based on common grounds of various definitions of Facility Management by IFMA, CEN and ISO
Adding IFC-data
(IFC or COBie) (IFC or COBie) (IFC or COBie)
Step-by-step example
“Before BIM, if a truck backed into a curtain wall, and you were looking for materials to repair it,
the answer was often bound in files, not searchable, not indexed.
BIM is well-populated, searchable, and easy to query. It is a better source of information about
make, model, and potentially the serial number so that the owner understands what’s in the
building and can make repairs.”
Michael Schley, founder and CEO of FM:Systems
Business Advice Article by Jeff Link on lineshapespace.com
“BIM for Facilities Management: 4 Tips to Improve Lifecycle Performance and Reduce Costs” – 24.08.2015
STEP 1: modelling towards a FM-usable BIM
Adding building assets to the
model (e.g. Fire-Extinguishers)
STEP 2: adding usefull IFC-data
(not randomly placing furniture…)
STEP 3a: preparing work orders in Model Checking (or FM)-software
STEP 3b: visualising assets when IFC-viewing is supported
STEP 4: maximizing available information through IFC-categories
Adding FM-approved materials to BIM-libraries
Consistent use of IFC-categories and/or adding (more) FM-specific IFC-categories to standards
Collaborating with FM-specialists in determining which Building Associated Data (BAD) is good
for preparing a BIM to be (more) useful in FM-phase
Ideas for improving the workflow
Creating more useful models for FM (enabling FM-score calculation?)
Standardisation of as-built BIM at hand-over (COBie?) – FM-specific data format? (FM-dot)
Determining what LOD400/500 models should exactly contain and in which format
STEP 5: Calculating and optimizing travel distances using model software
Using techniques for
escape routes in
studying travel
distances
BIM with FM – Opportunities for Life-Cycle Management
“That is why we – Howest University – as building-owners and the department
of Applied Architecture as BIM-educators, are convinced that all (valid)
BIM-data should be used during the entire life-cycle of a building, and
FM-data should be within reach of any designer.”
Howest AA – Position Statement “Beyond BIM”
“Possibilities of adding Facility Management specific data into BIM in early Design Phases” 09.12.2015
How FM-knowledge can be useful when using BIM in the Life-Cycle
Facility Management is more than managing an as-built situation:
1. Change Management
2. Cost Management
3. Sustainability Management
Throughout the
whole Life-Cycle
© www.areadevelopment.com
Change Management
Managing a building = managing it’s Life-Cycle = managing future refurbishments
Design decisions of the initial building can have an important influence in future building costs.
Lessons learned in FM can help BIM in visualising numerous refurbishing scenarios for
designers and owners, thus enhancing flexibility(=durability) in design
“The most difficult part in adjusting a building’s interior, while
remaining operative during construction phase, lies in the rerouting of
MEP-elements, no longer matching the positions of demolished walls.
Providing wholes at fixed (modular) distances was a simple but
essential design decision in creating a flexible and future-proof hospital
”
Bert Van Boxelaere – senior project architect (osararchitects)
execution phase of AZG Hospital Kortrijk
STEP 6: Using parametric modelling and BIM to roll-out design scenarios
Cost Management
Total Building Cost = focus on operation and maintenance cost > construction cost
Although the rule-of-thumb 1:5:200 isn’t as valid as often presumed2, integrating operating and
maintenance costs is clearly a logical step in using BIM+FM in Life-Cycle Management.
Integrating Life-Cycle Cost Analysis-data into BIM should help Facility Managers working out
complex scenarios in these matters.
“When managers were asked why they don't use LCCA,
two responses dominated: It's too complicated, and
we're not exactly sure how to calculate it.”
Andrew Gager, principal consultant with Life Cycle Eningeering an editor
at facilitiesnet
“Embracing a Life-Cycle Cost Analysis” - August 2012
2 Will Hughes ea, ‘Exposing the Myth of the 1:5:200 Ratio’, School of Construction Management and Engineering, University of Reading
BIM
Objects
Building
Elements &
Materials
Spaces
Adding IFC-data
Adding LCCA-data
STEP 7: adding LCA-data
Sustainability Management
FM-approved materials = easy and cost-effective maintenance, demolition and re-use
Managing a Building through it’s entire Life-Cycle takes in account it’s refurbishment(s), and
ultimately it’s demolition.
A building is a vast resource-mine. ‘Mining’ will be more effective when a database provides
Facility Managers and Designers with a reliable and detailed inventory of all used materials.
An extensive, all-inclusive definition of digital building materials and their parameters and
properties is necessary to make this possible
“The aims of BAMB (Buildings as Material Banks) are the prevention of construction and demolition waste,
the reduction of virgin resource consumption and the development towards a circular economy through
industrial symbiosis”
Objective of the CORDIS-project by IBGE
“Buildings as Material Banks” 01.09.2015-01.09.2018
STEP 8: digital building materials – lack of properties from LCA-Point of View
Available data-fields for
digital building materials
are rather limited
Any questions…?

More Related Content

PPT
BIM from an FM perspective
PDF
BIM and FM: Bridging the divide between AEC and owner
PDF
Facilities Management in BIM
PDF
BIM and FM
PDF
Building Information Modelling (BIM) for Handover and Facilities Management
PDF
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...
PDF
BIMStorm BIG BIM BANG introductory overview
PDF
Bim and project management
BIM from an FM perspective
BIM and FM: Bridging the divide between AEC and owner
Facilities Management in BIM
BIM and FM
Building Information Modelling (BIM) for Handover and Facilities Management
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...
BIMStorm BIG BIM BANG introductory overview
Bim and project management

What's hot (20)

PDF
Facility Management & Smarter Buildings - PCTY 2011
PDF
Wider applications of BIM to enhance sustainability
PPT
BIM: an overview
PDF
Cobie Challenge ONUMA, Inc.
PDF
EcoDomus presentation to Chicago BIM/IPD Community
PDF
Richard Archer
PPTX
CodeBook BIM Data Workflow
PDF
Totten presidio presentation feb 20 2015 pdf
PDF
The use of BIM to analyse the energy performance of a retrofitted educational...
PPT
From email to BIM: 20 years of construction collaboration technologies
PDF
CSCM Bim implementation in malaysia 2
PPTX
Building Information Modeling
PPT
BarcampBrighton3 - Bim Presentation
PDF
Building information modelling - redefining the role of the project manager: ...
PDF
Building Information Modeling : What, Why, How
PDF
BIM Show Live 2015: Link between BIM and Energy Simulation
PPT
BIG BIM little bim for Estimators - 50 Slides
PPTX
5 things about BIM you did not know
PDF
The Manchester experience - John Lorimer
Facility Management & Smarter Buildings - PCTY 2011
Wider applications of BIM to enhance sustainability
BIM: an overview
Cobie Challenge ONUMA, Inc.
EcoDomus presentation to Chicago BIM/IPD Community
Richard Archer
CodeBook BIM Data Workflow
Totten presidio presentation feb 20 2015 pdf
The use of BIM to analyse the energy performance of a retrofitted educational...
From email to BIM: 20 years of construction collaboration technologies
CSCM Bim implementation in malaysia 2
Building Information Modeling
BarcampBrighton3 - Bim Presentation
Building information modelling - redefining the role of the project manager: ...
Building Information Modeling : What, Why, How
BIM Show Live 2015: Link between BIM and Energy Simulation
BIG BIM little bim for Estimators - 50 Slides
5 things about BIM you did not know
The Manchester experience - John Lorimer
Ad

Viewers also liked (14)

PPTX
Sjors Donkers - Automatic generation of CityGML LoD3 building models from IFC...
PDF
BIM LOD (Level of Definition)
PPTX
The NBS BIM Toolkit and Digital Plan of Work
PPTX
UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
PDF
Shaping the Future of Construction - World Economic Forum Report 2016
PPTX
The role of commissioning in closing the gap
PPSX
Fm180 bim 2014 powerpoint show
PDF
Soft landings - A persuasive case
PPTX
How to Easily Read and Write CityGML Data Using FME
PDF
The Bim Process Explained
PPTX
Supporting the digital construction industry | Empowering you in a BIM World
PPTX
The Future of BIM
PDF
Soft Landings Conference Keynote - Hampshire Soft Landings
PPTX
Building Information Modeling (BIM)
Sjors Donkers - Automatic generation of CityGML LoD3 building models from IFC...
BIM LOD (Level of Definition)
The NBS BIM Toolkit and Digital Plan of Work
UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Shaping the Future of Construction - World Economic Forum Report 2016
The role of commissioning in closing the gap
Fm180 bim 2014 powerpoint show
Soft landings - A persuasive case
How to Easily Read and Write CityGML Data Using FME
The Bim Process Explained
Supporting the digital construction industry | Empowering you in a BIM World
The Future of BIM
Soft Landings Conference Keynote - Hampshire Soft Landings
Building Information Modeling (BIM)
Ad

Similar to Possibilities of adding FM-specific data into BIM in early Design Phases (20)

PDF
ApplicationAreasandDataRequirementsforBIM-EnabledFacilitiesManagement (1).pdf
PPTX
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
PDF
The FM Contribution to BIM
PPTX
How BIM is Facilitating Facility Management Process
PDF
Data Drives Data: Importance of BIM in Facilities Management
PDF
Bim and its integration with fm systems
PPTX
Bim cafm presentation 23 june2014
PPTX
Bridging the Gap: BIM For Facility Management
PDF
How is BIM Facilitating Facility Management Process 2024?
PDF
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
PDF
Bim For Existing Federal Facilities
PPTX
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
PDF
Bim for facility management
PDF
Building information modeling and fm is the way forward
PDF
Mark Whittaker Presentation to Think BIM Seminar, May 2014
PPTX
BIM for Lifecycle Asset Management
PDF
BIM - Operational readiness
PPT
Corporate member event September 2015, BIM and Soft Landings
PPTX
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
PDF
lifecycle-bim-gis-user-group-april-2017
ApplicationAreasandDataRequirementsforBIM-EnabledFacilitiesManagement (1).pdf
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
The FM Contribution to BIM
How BIM is Facilitating Facility Management Process
Data Drives Data: Importance of BIM in Facilities Management
Bim and its integration with fm systems
Bim cafm presentation 23 june2014
Bridging the Gap: BIM For Facility Management
How is BIM Facilitating Facility Management Process 2024?
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
Bim For Existing Federal Facilities
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
Bim for facility management
Building information modeling and fm is the way forward
Mark Whittaker Presentation to Think BIM Seminar, May 2014
BIM for Lifecycle Asset Management
BIM - Operational readiness
Corporate member event September 2015, BIM and Soft Landings
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
lifecycle-bim-gis-user-group-april-2017

Recently uploaded (20)

PDF
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
PPTX
The Effect of Human Resource Management Practice on Organizational Performanc...
PPTX
Self management and self evaluation presentation
PPTX
Project and change Managment: short video sequences for IBA
PPTX
Effective_Handling_Information_Presentation.pptx
PPTX
Tour Presentation Educational Activity.pptx
PPTX
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
DOC
学位双硕士UTAS毕业证,墨尔本理工学院毕业证留学硕士毕业证
PPTX
Emphasizing It's Not The End 08 06 2025.pptx
PPTX
Primary and secondary sources, and history
PPTX
Human Mind & its character Characteristics
PPTX
Relationship Management Presentation In Banking.pptx
PPTX
Sustainable Forest Management ..SFM.pptx
PDF
natwest.pdf company description and business model
PPTX
Intro to ISO 9001 2015.pptx wareness raising
PPTX
MERISTEMATIC TISSUES (MERISTEMS) PPT PUBLIC
PPTX
Impressionism_PostImpressionism_Presentation.pptx
PPTX
worship songs, in any order, compilation
PDF
Instagram's Product Secrets Unveiled with this PPT
PDF
Nykaa-Strategy-Case-Fixing-Retention-UX-and-D2C-Engagement (1).pdf
Tunisia's Founding Father(s) Pitch-Deck 2022.pdf
The Effect of Human Resource Management Practice on Organizational Performanc...
Self management and self evaluation presentation
Project and change Managment: short video sequences for IBA
Effective_Handling_Information_Presentation.pptx
Tour Presentation Educational Activity.pptx
BIOLOGY TISSUE PPT CLASS 9 PROJECT PUBLIC
学位双硕士UTAS毕业证,墨尔本理工学院毕业证留学硕士毕业证
Emphasizing It's Not The End 08 06 2025.pptx
Primary and secondary sources, and history
Human Mind & its character Characteristics
Relationship Management Presentation In Banking.pptx
Sustainable Forest Management ..SFM.pptx
natwest.pdf company description and business model
Intro to ISO 9001 2015.pptx wareness raising
MERISTEMATIC TISSUES (MERISTEMS) PPT PUBLIC
Impressionism_PostImpressionism_Presentation.pptx
worship songs, in any order, compilation
Instagram's Product Secrets Unveiled with this PPT
Nykaa-Strategy-Case-Fixing-Retention-UX-and-D2C-Engagement (1).pdf

Possibilities of adding FM-specific data into BIM in early Design Phases

  • 1. Possibilities of adding FM-specific data into BIM in early Design Phases UGent – Beyond BIM – 09.12.2015 ir-arch. Ruben Van de Walle lecturer CAAD.BIM coordinator Bachelor Papers Howest University of Applied Sciences - Bruges Department of Applied Architecture
  • 2. Possibilities of adding FM-specific data into BIM in early Design Phases UGent – Beyond BIM – 09.12.2015 • Facility Management with BIM • Why use BIM for FM? • Common workflow • STEP-by-STEP example • BIM with Facility Management
  • 3. FM with BIM – Overview of Available Solutions “a BIM model could be gainfully used for FM, since it was able to capture so much of the building information that could be re-used for its operation and maintenance rather than have to re-create it” Lachmi Khemlani – founder AECBytes AECBytes Feature Article “BIM for Facilities Management” 30.09.2011
  • 4. Using BIM as a database for Facility Management Two main types of BIM-implementation in FM-suites: 1. Incorporated within a larger AEC-software portfolio (FM adopted by BIM-providers): • Autodesk: Building OPS • Graphisoft: ArchiFM • Bentley: Bentley Facilities 2. FM-Software, providing exchange with BIM • FM Systems • Planon All of them use the as-built BIM (delivered at hand-over) as a starting point for ‘filling up’ the FM- database. Bi-directional exchange is (sometimes) possible, but almost always requires a type of modelling-software to be used to keep the model up to date.
  • 5. Motivation for using BIM in FM “According to a 2004 report by the National Institute of Standards and Technology (NIST), 71 percent of design and engineering documentation maintained by facility executives is still recorded on paper. […] A NIST report on inadequate data interoperability estimated the cost at $15.8 billion in 2002.” Brandon Lorenz, Senior Editor at facilitiesnet “The Case For Data Interoperability” - March 2006
  • 6. Common motivations for using BIM as a basis for FM BIM-data is perceived as more reliable than CAD-derived information A Virtual Building Model provides a more extensive database than traditional As-Built There is less data-drop when using BIM for building up FM-inventory Reliability is determined not (mainly) by the data-type, but by modelling-expertise, consistency in modelling, defining LOD and (signed) protocols An extensive unreliable database is less usable than a smaller, but complete set of plans This is only true when the exchange-format is fully supported on both ends BIM has the possibility of providing for a better FM-database if FM as a goal is agreed upon within the BIM-protocol and OpenBIM and IFC/COBie are incorporated in the process
  • 7. Common workflow “The biggest hurdle, however, is the lack of good data for FM i n the BIM model.” Lachmi Khemlani – founder AECBytes AECBytes Feature Article “BIM for Facilities Management” 30.09.2011
  • 8. BIM Objects Building Elements & Materials Spaces Facility Management* Asset Management Maintenance Management Space Management Project Management Safety Management *: generalistion based on common grounds of various definitions of Facility Management by IFMA, CEN and ISO Adding IFC-data (IFC or COBie) (IFC or COBie) (IFC or COBie)
  • 9. Step-by-step example “Before BIM, if a truck backed into a curtain wall, and you were looking for materials to repair it, the answer was often bound in files, not searchable, not indexed. BIM is well-populated, searchable, and easy to query. It is a better source of information about make, model, and potentially the serial number so that the owner understands what’s in the building and can make repairs.” Michael Schley, founder and CEO of FM:Systems Business Advice Article by Jeff Link on lineshapespace.com “BIM for Facilities Management: 4 Tips to Improve Lifecycle Performance and Reduce Costs” – 24.08.2015
  • 10. STEP 1: modelling towards a FM-usable BIM Adding building assets to the model (e.g. Fire-Extinguishers)
  • 11. STEP 2: adding usefull IFC-data (not randomly placing furniture…)
  • 12. STEP 3a: preparing work orders in Model Checking (or FM)-software
  • 13. STEP 3b: visualising assets when IFC-viewing is supported
  • 14. STEP 4: maximizing available information through IFC-categories
  • 15. Adding FM-approved materials to BIM-libraries Consistent use of IFC-categories and/or adding (more) FM-specific IFC-categories to standards Collaborating with FM-specialists in determining which Building Associated Data (BAD) is good for preparing a BIM to be (more) useful in FM-phase Ideas for improving the workflow Creating more useful models for FM (enabling FM-score calculation?) Standardisation of as-built BIM at hand-over (COBie?) – FM-specific data format? (FM-dot) Determining what LOD400/500 models should exactly contain and in which format
  • 16. STEP 5: Calculating and optimizing travel distances using model software Using techniques for escape routes in studying travel distances
  • 17. BIM with FM – Opportunities for Life-Cycle Management “That is why we – Howest University – as building-owners and the department of Applied Architecture as BIM-educators, are convinced that all (valid) BIM-data should be used during the entire life-cycle of a building, and FM-data should be within reach of any designer.” Howest AA – Position Statement “Beyond BIM” “Possibilities of adding Facility Management specific data into BIM in early Design Phases” 09.12.2015
  • 18. How FM-knowledge can be useful when using BIM in the Life-Cycle Facility Management is more than managing an as-built situation: 1. Change Management 2. Cost Management 3. Sustainability Management Throughout the whole Life-Cycle © www.areadevelopment.com
  • 19. Change Management Managing a building = managing it’s Life-Cycle = managing future refurbishments Design decisions of the initial building can have an important influence in future building costs. Lessons learned in FM can help BIM in visualising numerous refurbishing scenarios for designers and owners, thus enhancing flexibility(=durability) in design “The most difficult part in adjusting a building’s interior, while remaining operative during construction phase, lies in the rerouting of MEP-elements, no longer matching the positions of demolished walls. Providing wholes at fixed (modular) distances was a simple but essential design decision in creating a flexible and future-proof hospital ” Bert Van Boxelaere – senior project architect (osararchitects) execution phase of AZG Hospital Kortrijk
  • 20. STEP 6: Using parametric modelling and BIM to roll-out design scenarios
  • 21. Cost Management Total Building Cost = focus on operation and maintenance cost > construction cost Although the rule-of-thumb 1:5:200 isn’t as valid as often presumed2, integrating operating and maintenance costs is clearly a logical step in using BIM+FM in Life-Cycle Management. Integrating Life-Cycle Cost Analysis-data into BIM should help Facility Managers working out complex scenarios in these matters. “When managers were asked why they don't use LCCA, two responses dominated: It's too complicated, and we're not exactly sure how to calculate it.” Andrew Gager, principal consultant with Life Cycle Eningeering an editor at facilitiesnet “Embracing a Life-Cycle Cost Analysis” - August 2012 2 Will Hughes ea, ‘Exposing the Myth of the 1:5:200 Ratio’, School of Construction Management and Engineering, University of Reading BIM Objects Building Elements & Materials Spaces Adding IFC-data Adding LCCA-data
  • 22. STEP 7: adding LCA-data
  • 23. Sustainability Management FM-approved materials = easy and cost-effective maintenance, demolition and re-use Managing a Building through it’s entire Life-Cycle takes in account it’s refurbishment(s), and ultimately it’s demolition. A building is a vast resource-mine. ‘Mining’ will be more effective when a database provides Facility Managers and Designers with a reliable and detailed inventory of all used materials. An extensive, all-inclusive definition of digital building materials and their parameters and properties is necessary to make this possible “The aims of BAMB (Buildings as Material Banks) are the prevention of construction and demolition waste, the reduction of virgin resource consumption and the development towards a circular economy through industrial symbiosis” Objective of the CORDIS-project by IBGE “Buildings as Material Banks” 01.09.2015-01.09.2018
  • 24. STEP 8: digital building materials – lack of properties from LCA-Point of View Available data-fields for digital building materials are rather limited