BIM + FM
Marty Chobot
                      Bridging the Divide
VP, BIM Initiatives   between AEC & O
BIM and FM: Bridging the divide between AEC and owner
What do owners really need?


                                             Graphics
                      Graphics


   Graphics
               Data                Data      Attribute
                       Attribute               Data
                         Data
   Attribute                         Owners need BIM data
     Data                            more than graphics
   Design             Construct              Operate
There’s a lot of BIM data out there…
There’s a lot of BIM data out there…




                    Integrating BIM & FM helps you
                    provide the data owners need,
                    the way they need it!
BIM + FM Case Studies
FM:BIM Working Group Case Study
Xavier University

   • A Jesuit, Catholic
     university in Cincinnati
   • Founded 1831
   • 7,019 total students
   • 70 buildings – over 2
     million GSF (186K m2)
Xavier’s Hoff Academic Quad and
Residence Hall Project
• $117M (£76M),
  Largest capital
  projects in schools                                                    Residence Hall


  history
• Added 25% to
                                                                                          College of Business
  campus                                        Learning Commons


• 4 new buildings
• BIM used to           Physical Plant Office
                                                 Central Utility Plant

  facilitate design
  and construction
Xavier’s Objective
• Produce 10 Year Comprehensive Facilities Plan for
  entire campus
• Forecast facilities capital costs and obtain proper
  funding to reduce deferred maintenance
Xavier’s Challenges


                                    “
• Facility information time-
                                        I collected the data
  consuming or costly to gather
                                        for 1.5M SF on
• 2 person years to gather              campus by walking
  information for facilities plan       and typing the
                                        information into the
                                        system, I don’t want



                                                             ”
                                        to do that again!

                                         Greg Meyer,
                                         Xavier Facilities
Xavier’s BIM Vision


               “      The designers and the contractors
                      already have the information that I
                      need to maintain and manage the
                      buildings why should I have to recreate
                      what has already been accomplished?

                      Greg Meyer,
                      Xavier Facilities
                                                            ”
Room finish information
    from design and
 construction phases….
Is linked to lifecycle
 data (expected life,
replacement cost) in
       the facility
management system
Xavier’s Results

• Integration of BIM and
  FM data avoided 4-6
  person months of data
  gathering and entry
• Established BIM
  deliverable guidelines
  to further streamline the
  flow of data for future
  projects
Xavier’s Lessons Learned

•   Project started in 2009 and
    modeled for design and
    construction not FM
•    Subcontractor’s models
     developed in various CAD-
     based tools
    – Costly to redo sub’s
        models to meet Xavier’s
        needs
•   Need to plan LOD and model
    quality early to effectively
    integrate with space and
    maintenance systems
FM:BIM Working Group Case Study
MathWorks
• “Accelerating the pace
  of engineering and
  science”
• Global software
  company headquartered
  in Natick, MA
   – In business since
     1984
   – Privately Held
• Over 2,100 staff
  worldwide
MathWork’s Apple Hill 4 Project

• 4 story 180,000 sf (17K m2) corporate facility
• 460 offices, 300 person cafeteria, monumental
  stair atrium and various support spaces
• Anticipated Delivery date: December 2012
MathWork’s Challenges

• Maintenance management system
  not fully implemented
• Difficult to find time to properly
  catalog and inventory building
  assets
• Highly technical building comes with
  a lot of information
MathWork’s BIM Vision

• Require BIM
  deliverables for
  project
• Leverage the data
  and information in
  the models to
  populate space and
  asset system
Mathwork’s BIM Process

• Created detailed BIM deliverable guide
• Made BIM data management and quality a topic
  in coordination meetings
• Actively involved in the project – throughout the
  various phases
Rooms Modeled for Design
Can Be Used for Space Management
Detailed BIM Deliverable Requirements
Detailed BIM Data
Ready for Maintenance Planning
MathWork’s Lessons Learned

• Room numbers matter! Communicate your
  numbering and naming conventions early.
• BIM/Data savvy project leads (AEC and owner)
  are key
• The owner/FM needs to be involved to help
  resolve issues and keep the project moving
• Look for BIM-Savvy subs if possible – they may
  be the creators of much of the asset data
Summary: Moving to Lifecycle BIM

• Decide what you need to track: BIM Deliverable
  Guidelines
• Address legal/contractual challenges
• Know your team and various players BIM
  maturity
• Create BIM templates
Thank you! Questions?
  http://www.fmbim.com/
  Twitter: @LifecycleBIM


Marty Chobot
VP, BIM Initiatives   mchobot@fmsystems.com

More Related Content

PDF
BIM and FM
PPT
BIM from an FM perspective
PDF
Building Information Modelling (BIM) for Handover and Facilities Management
PDF
Government soft landings and the benefits of BIM to FM
PDF
Facilities Management in BIM
PDF
Pr kfa structuring_bi_msforifcandcobie_20120223
PDF
Facility Management & Smarter Buildings - PCTY 2011
PDF
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...
BIM and FM
BIM from an FM perspective
Building Information Modelling (BIM) for Handover and Facilities Management
Government soft landings and the benefits of BIM to FM
Facilities Management in BIM
Pr kfa structuring_bi_msforifcandcobie_20120223
Facility Management & Smarter Buildings - PCTY 2011
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...

What's hot (20)

PDF
EcoDomus presentation to Chicago BIM/IPD Community
PDF
Cobie Challenge ONUMA, Inc.
PDF
Richard Archer
PPTX
CodeBook BIM Data Workflow
PDF
Bim for facility management
PPTX
Possibilities of adding FM-specific data into BIM in early Design Phases
PDF
CSCM Bim implementation in malaysia 2
PDF
MEP BIM design
PDF
BIFM North Region Key Learning Event - BIM & Soft Landings
PDF
Totten presidio presentation feb 20 2015 pdf
PPTX
Building Information Modeling
PDF
MOSAIC BIM- Innovative Design & Construction Solutions
PDF
BIFM Merseyside Networking Group - BIM & Facilities Management
PPTX
MEP Coordination Shop Drawing Service USA - MEPF, Mechanical, Electrical & Pl...
PDF
2D to 3D modeling and why you need BIM
PPT
BarcampBrighton3 - Bim Presentation
PDF
BIMStorm BIG BIM BANG introductory overview
PDF
c01_rmp_2021.pdf
PDF
Recent developments in BIM in geotechnics
EcoDomus presentation to Chicago BIM/IPD Community
Cobie Challenge ONUMA, Inc.
Richard Archer
CodeBook BIM Data Workflow
Bim for facility management
Possibilities of adding FM-specific data into BIM in early Design Phases
CSCM Bim implementation in malaysia 2
MEP BIM design
BIFM North Region Key Learning Event - BIM & Soft Landings
Totten presidio presentation feb 20 2015 pdf
Building Information Modeling
MOSAIC BIM- Innovative Design & Construction Solutions
BIFM Merseyside Networking Group - BIM & Facilities Management
MEP Coordination Shop Drawing Service USA - MEPF, Mechanical, Electrical & Pl...
2D to 3D modeling and why you need BIM
BarcampBrighton3 - Bim Presentation
BIMStorm BIG BIM BANG introductory overview
c01_rmp_2021.pdf
Recent developments in BIM in geotechnics
Ad

Viewers also liked (11)

PDF
BIM - Operational readiness
PPTX
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
PDF
Wider applications of BIM to enhance sustainability
PDF
Fm roundtable presentations
PPT
Masterclass Kwaliteitsnetwerk Bouw: "BIM in relatie tot kwaliteitsmanagement"
PPTX
Presentatie Bouw Informatie Model (BIM)
 
PPTX
Bim and building life cycle
PDF
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
PPTX
BIM for Lifecycle Asset Management
PDF
EcoDomus recent Use Cases in US and Middle East
PPT
Pragmatism and Realism
BIM - Operational readiness
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
Wider applications of BIM to enhance sustainability
Fm roundtable presentations
Masterclass Kwaliteitsnetwerk Bouw: "BIM in relatie tot kwaliteitsmanagement"
Presentatie Bouw Informatie Model (BIM)
 
Bim and building life cycle
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
BIM for Lifecycle Asset Management
EcoDomus recent Use Cases in US and Middle East
Pragmatism and Realism
Ad

Similar to BIM and FM: Bridging the divide between AEC and owner (20)

PDF
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
PPTX
Building information modeling BIM
PPTX
BIM Bringing A Real Change in Construction
PDF
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
PDF
NW BIM 2018 3 Mabey
PDF
Building Information Modelling M.arch.pdf
PPTX
PLS 2016: How does the BIM process fit with street lighting design and mainte...
PDF
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
PPTX
What is bim, building information modeling
PPTX
Bim presentation km 21-10-2011
PDF
AAM Group GIS - BIM Integration
PDF
Digital Facilities (2017)
PDF
Spar2010murphy
PPTX
Innovation in practice presentation 10 06-15
PDF
NW BIM 2018 2 MGF
PPTX
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
PDF
Paul Nunn v2
PDF
Alastair Gardner: BIM Overview
PPTX
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
PPTX
Revit and Building Information Modeling (BIM) Presentation
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building information modeling BIM
BIM Bringing A Real Change in Construction
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
NW BIM 2018 3 Mabey
Building Information Modelling M.arch.pdf
PLS 2016: How does the BIM process fit with street lighting design and mainte...
Digital Facilities by Enstoa: Mine new and old as-builds to plan and manage y...
What is bim, building information modeling
Bim presentation km 21-10-2011
AAM Group GIS - BIM Integration
Digital Facilities (2017)
Spar2010murphy
Innovation in practice presentation 10 06-15
NW BIM 2018 2 MGF
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
Paul Nunn v2
Alastair Gardner: BIM Overview
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Revit and Building Information Modeling (BIM) Presentation

More from Be2camp Admin (20)

PDF
ThinkBIM - Rachel Park (Mace)
PDF
BIM - a BIM Technologies overveiw
PDF
BIM - a Faithful & Gould perspective from Adrian Malone
PDF
BIM and PPP
PDF
Leveraging BIM throughout the construction process
PDF
David Philp - BIM: an update from the UK Government BIM Task Group
PPT
Be2Awards and Be2Talks 2013 - event slides
PDF
The future of BIM is open - or - Is proprietary BIM unsustainable
PPTX
Sharing BIM data through social media
PPT
The third BIM: the social built environment model
PPTX
Ckm mjm uk phipps presentation
PPT
Green Buildings Delivered
PPT
Green Towns
PPTX
A planet and its people under pressure: why cities matter
PPTX
Green Deal powered by Social Media
PPT
Bottle Alley Glass - Pecha Kucha by Philippa Ashbee
PPTX
Responsible Sourcing of building materials
PPT
Web-enabling sustainability events
PPT
Using social media in sustainability education
PPT
Be2camp and the Be2Awards
ThinkBIM - Rachel Park (Mace)
BIM - a BIM Technologies overveiw
BIM - a Faithful & Gould perspective from Adrian Malone
BIM and PPP
Leveraging BIM throughout the construction process
David Philp - BIM: an update from the UK Government BIM Task Group
Be2Awards and Be2Talks 2013 - event slides
The future of BIM is open - or - Is proprietary BIM unsustainable
Sharing BIM data through social media
The third BIM: the social built environment model
Ckm mjm uk phipps presentation
Green Buildings Delivered
Green Towns
A planet and its people under pressure: why cities matter
Green Deal powered by Social Media
Bottle Alley Glass - Pecha Kucha by Philippa Ashbee
Responsible Sourcing of building materials
Web-enabling sustainability events
Using social media in sustainability education
Be2camp and the Be2Awards

Recently uploaded (20)

PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Chapter 5_Foreign Exchange Market in .pdf
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPT
Data mining for business intelligence ch04 sharda
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
Probability Distribution, binomial distribution, poisson distribution
DOCX
Business Management - unit 1 and 2
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
How to Get Funding for Your Trucking Business
PDF
IFRS Notes in your pocket for study all the time
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
DOCX
Euro SEO Services 1st 3 General Updates.docx
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Principles of Marketing, Industrial, Consumers,
MSPs in 10 Words - Created by US MSP Network
Chapter 5_Foreign Exchange Market in .pdf
unit 1 COST ACCOUNTING AND COST SHEET
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
Data mining for business intelligence ch04 sharda
Ôn tập tiếng anh trong kinh doanh nâng cao
Belch_12e_PPT_Ch18_Accessible_university.pptx
Lecture (1)-Introduction.pptx business communication
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Reconciliation AND MEMORANDUM RECONCILATION
Probability Distribution, binomial distribution, poisson distribution
Business Management - unit 1 and 2
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
How to Get Funding for Your Trucking Business
IFRS Notes in your pocket for study all the time
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Euro SEO Services 1st 3 General Updates.docx

BIM and FM: Bridging the divide between AEC and owner

  • 1. BIM + FM Marty Chobot Bridging the Divide VP, BIM Initiatives between AEC & O
  • 3. What do owners really need? Graphics Graphics Graphics Data Data Attribute Attribute Data Data Attribute Owners need BIM data Data more than graphics Design Construct Operate
  • 4. There’s a lot of BIM data out there…
  • 5. There’s a lot of BIM data out there… Integrating BIM & FM helps you provide the data owners need, the way they need it!
  • 6. BIM + FM Case Studies
  • 7. FM:BIM Working Group Case Study Xavier University • A Jesuit, Catholic university in Cincinnati • Founded 1831 • 7,019 total students • 70 buildings – over 2 million GSF (186K m2)
  • 8. Xavier’s Hoff Academic Quad and Residence Hall Project • $117M (£76M), Largest capital projects in schools Residence Hall history • Added 25% to College of Business campus Learning Commons • 4 new buildings • BIM used to Physical Plant Office Central Utility Plant facilitate design and construction
  • 9. Xavier’s Objective • Produce 10 Year Comprehensive Facilities Plan for entire campus • Forecast facilities capital costs and obtain proper funding to reduce deferred maintenance
  • 10. Xavier’s Challenges “ • Facility information time- I collected the data consuming or costly to gather for 1.5M SF on • 2 person years to gather campus by walking information for facilities plan and typing the information into the system, I don’t want ” to do that again! Greg Meyer, Xavier Facilities
  • 11. Xavier’s BIM Vision “ The designers and the contractors already have the information that I need to maintain and manage the buildings why should I have to recreate what has already been accomplished? Greg Meyer, Xavier Facilities ”
  • 12. Room finish information from design and construction phases….
  • 13. Is linked to lifecycle data (expected life, replacement cost) in the facility management system
  • 14. Xavier’s Results • Integration of BIM and FM data avoided 4-6 person months of data gathering and entry • Established BIM deliverable guidelines to further streamline the flow of data for future projects
  • 15. Xavier’s Lessons Learned • Project started in 2009 and modeled for design and construction not FM • Subcontractor’s models developed in various CAD- based tools – Costly to redo sub’s models to meet Xavier’s needs • Need to plan LOD and model quality early to effectively integrate with space and maintenance systems
  • 16. FM:BIM Working Group Case Study MathWorks • “Accelerating the pace of engineering and science” • Global software company headquartered in Natick, MA – In business since 1984 – Privately Held • Over 2,100 staff worldwide
  • 17. MathWork’s Apple Hill 4 Project • 4 story 180,000 sf (17K m2) corporate facility • 460 offices, 300 person cafeteria, monumental stair atrium and various support spaces • Anticipated Delivery date: December 2012
  • 18. MathWork’s Challenges • Maintenance management system not fully implemented • Difficult to find time to properly catalog and inventory building assets • Highly technical building comes with a lot of information
  • 19. MathWork’s BIM Vision • Require BIM deliverables for project • Leverage the data and information in the models to populate space and asset system
  • 20. Mathwork’s BIM Process • Created detailed BIM deliverable guide • Made BIM data management and quality a topic in coordination meetings • Actively involved in the project – throughout the various phases
  • 22. Can Be Used for Space Management
  • 23. Detailed BIM Deliverable Requirements
  • 26. MathWork’s Lessons Learned • Room numbers matter! Communicate your numbering and naming conventions early. • BIM/Data savvy project leads (AEC and owner) are key • The owner/FM needs to be involved to help resolve issues and keep the project moving • Look for BIM-Savvy subs if possible – they may be the creators of much of the asset data
  • 27. Summary: Moving to Lifecycle BIM • Decide what you need to track: BIM Deliverable Guidelines • Address legal/contractual challenges • Know your team and various players BIM maturity • Create BIM templates
  • 28. Thank you! Questions? http://www.fmbim.com/ Twitter: @LifecycleBIM Marty Chobot VP, BIM Initiatives mchobot@fmsystems.com