BIM and lifecycle management 
BIM Academy 
Edwin Bartlett - Kykloud
Why is Asset Management 
Relevant to BIM?
6 dimensions 
But also… 
12 edges 
8 corners 
Many teams of 
people beyond design 
& construction 
FM & Asset Management 
- a tough one to crack?
6 dimensions
What does Asset Management Require from BIM 
BIM FM Services 
Potential 
• Portfolio planning (buy, sell, 
rent etc.), rationalisation 
programmes/ management of 
surplus property, transaction 
services 
 in Part 
• Condition surveys, life-cycle 
costing, capex/opex balance 
and investment planning, 
procurement, performance 
monitoring, space optimisation 
Potential 
• Energy procurement, bill 
validation, legislation 
consultancy, workforce 
education, energy audit and 
advice 
 
• Installation/ maintenance of 
BMS, equipment optimisation/ 
re-configuration, metering 
 
• M&E (including HVAC), 
building fabric maintenance, 
grounds maintenance 
? • Catering, cleaning, security 
FM delivery Energy services Management services 
Property 
strategy 
Asset / 
property 
management 
Energy 
management/ 
consultancy 
Energy 
services 
delivery 
Hard FM 
Soft FM 
 FM focus on managing rising FM and 
energy costs, carbon pressures, 
legislation, capital constraints, cost 
efficiency targets NOT the 
technology 
 BIM is lifecycle facility management 
supported by digital technology 
 BIM is not only 3D visualization 
tools: central data storage 
area/portals for extracting relevant 
FM information 
 “Make BIM useful to a wider 
community” 
http://www.wbdg.org/bim/nibs_bim.php 
 property managers, appraisers, brokers, 
mortgage bankers, facility assessors, facility 
managers, maintenance and operations 
engineers, safety and security personnel as 
incident responders, landscape architects, 
infrastructure engineers and operators etc 
Real demand for BIM in FM but only if 
its collaborative
BIM into FM – proven early benefits 
• Intelligent lifecycle replacement planning 
– e.g. lifecycle capital replacement models and plans linked to design models 
(2D or 3D) 
• Reduced Energy & Carbon impacts 
– e.g. linking to real-time building submeter and sensor data on electricity and 
occupancy (Autodesk Project Dasher) 
• Affordable risk based preventive maintenance 
– e.g. linking maintenance to risks, criticality and quality of assets of 
specification 
• Delivering cost effective refurbishment 
– e.g. existing buildings surveyed using point cloud surveys, feed into condition 
surveys and new capital work cost planning 
• Efficient space management 
– e.g. people/HR data, utilisation and FF&E management 
• Integrated real time condition assessment 
– e.g. in-field condition surveys apps linking to asset database and lifecycle plans
FM to BIM: A workable model 
• Focused activities at each stage of design: 
1. Option Appraisal i.e. specification choice 
2. Service Cost Analysis i.e. cleaning or maintenance by asset 
3. Whole Buildings Cost analysis i.e. annual budget 
4. Handover and commissioning i.e. operational efficiency and 
adequacy of O&M 
• Data requirements: which systems/assets/elements and what data 
properties from model 
• Data flow: from who and where to 
• Data drop timings: 2-3 required 
• How will the data be updated operationally?
Title COBie 
Status IFC2x3 
Purpose 
This spreadsheet supports the exchange of building, system and 
product information through the life of the project. 
Outline Individual worksheets are organized by project phase as shown below 
All Phases Sheet Contents 
kykloud "light" 
Contact People and Companies Contacts 
Early Design 
Worksheets Sheet Contents Site 
Facility Buildings 
Floor Vertical levels and exterior areas Floor 
Space Spaces Space 
Zone Sets of spaces sharing a specific attribute Zone 
Type Types of equipment, products, and materials 
Detailed Design 
Worksheets Sheet Contents 
Component Individually named or schedule items 
System Sets of components providing a service 
Assembly Constituents for Types, Components and others 
Connection Logical connections between components 
Impact 
Economic, Environmental and Social Impacts at various stages in the life 
cycle 
Operations and 
Maintenance 
Worksheets Sheet Contents 
Spare Onsite and replacement parts 
Resource Required materials, tools, and training 
Job PM, Safety, and other job plans 
All Phases Sheet Contents 
Document All applicable document references 
Attribute Properties of referenced item 
Coordinate Spatial locations in box, line, or point format 
Issue Other issues remaining at handover. 
Legend 
text required required 
text if specified as required 
Assets (hierarchy) 
Activities 
Client / Site
Title COBie 
Status IFC2x3 
Purpose 
This spreadsheet supports the exchange of building, system and 
product information through the life of the project. 
Outline Individual worksheets are organized by project phase as shown below 
All Phases Sheet Contents 
kykloud "light" 
Contact People and Companies Contacts 
Early Design 
Worksheets Sheet Contents Site 
Facility Buildings 
Floor Vertical levels and exterior areas Floor 
Space Spaces Space 
Zone Sets of spaces sharing a specific attribute Zone 
Type Types of equipment, products, and materials 
Detailed Design 
Worksheets Sheet Contents 
Component Individually named or schedule items 
System Sets of components providing a service 
Assembly Constituents for Types, Components and others 
Connection Logical connections between components 
Impact 
Economic, Environmental and Social Impacts at various stages in the life 
cycle 
Operations and 
Maintenance 
Worksheets Sheet Contents 
Spare Onsite and replacement parts 
Resource Required materials, tools, and training 
Job PM, Safety, and other job plans 
All Phases Sheet Contents 
Document All applicable document references 
Attribute Properties of referenced item 
Coordinate Spatial locations in box, line, or point format 
Issue Other issues remaining at handover. 
Legend 
text required required 
text if specified as required 
Assets (hierarchy) 
Activities 
Client / Site
BB (before BIM) c.2000 
Dimensions FM 
Documents 
Lifecycle 
model 
O&M 
Manuals 
Spec 
£ BoQ 
Life 
cycles 
Spaces 
& 
2D Design 
Data 
input
Emerging Data Flows – design stage BIM to FM 
Documents 
Lifecycle Model 
O&M 
Manuals 
£ Cost Spec 
BoQ 
Life 
cycles 
Spaces 
& 
Dimensions 
Quants 
Spec 
FM 
Model 
3D Design Model Data 
Web Services 
API 
data structure 
filter e.g. 
IFC / COBie / 
own 
Portfolio 
& Site 
data 
Economic 
data e.g. 
inflation
Emerging Data Flows – BIM in refurb 
Asset 
Register 
(Spec) 
Documents 
Activity 
Life 
cycles 
Condition 
Spec 
Spaces 
& 
Dimensions 
Quants 
FM 
Model 
3D Design 
Model 
Field Data 
Collection 
Survey 
via 
Web Services 
API 
data structure 
filter e.g. 
IFC / COBie / 
own 
Portfolio 
& Site 
data 
Dimensions 
Photos data import 
e.g. 
IFC / COBie / 
own 
Refurb 
Design 
Model 
+ 
Field Data 
Collection 
via 
Point Cloud 
Survey 
Point Cloud
BIM for Lifecycle Asset Management
BIM for Lifecycle Asset Management
BIM for Lifecycle Asset Management
Revit - elemental or asset attribute data
Example Component level WLC 
KyKloud
BIM for Lifecycle Asset Management
BIM for Lifecycle Asset Management
BIM for Lifecycle Asset Management
COBie – A few observations from an FM 
• COBie is a spreadsheet: “we use asset management databases” 
• Doesn’t handle “portfolio” or multiple facility level asset data 
• Service life data fields exist but don’t get used at design stage 
• Asset Classifications - FM operators have their own asset codes and don’t 
use Uniclass, typically driven by client contract models 
• Latest version contains the concept of “impacts” to cover cost and carbon 
– Cost impacts are rarely in the 3D model so a COBie export from a 
model will not populate this data 
– Costs have to come from elsewhere! 
• Macro economic and risk assumptions missing – just as critical as asset 
data 
• FM and lifecycle standards not yet full bedded in
FM will keep the data alive
Conclusion 
• BIM = lifecycle management supported by digital technology 
– 3D visualisation design tools support & improve the 
process 
• FM BIM alive and kicking 
– Business benefits are visible and achievable 
– Push and support the supply chain 
• Asset owners more interested in: 
– Data and not just the design model 
– Real usable outputs e.g. lifecycle investment plans 
– FM will keep the model alive
BIM for Lifecycle Asset Management

More Related Content

PDF
Bim for facility management
PPSX
BIM Introduction
PPTX
BIM for FACILITY MANAGEMENT:It is useful for construction?
PDF
Lean construction & BIM
PPTX
Use of BIM in planning and construction and implementation in real project
PPTX
BIM Execution Plan
PPTX
BIM for Construction, BPMs and Owners
PDF
BIM & Sustainability
Bim for facility management
BIM Introduction
BIM for FACILITY MANAGEMENT:It is useful for construction?
Lean construction & BIM
Use of BIM in planning and construction and implementation in real project
BIM Execution Plan
BIM for Construction, BPMs and Owners
BIM & Sustainability

What's hot (20)

PPTX
Building information modelling
PPTX
Introduction to Building Information Modeling
PPT
What does BIM mean for Civil Engineers?
PPTX
what is BIM
PPTX
Building Information Modeling (BIM)
PDF
MTECH BIM project case study
PDF
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
PPTX
What is BIM?
PPTX
Revit and Building Information Modeling (BIM) Presentation
PDF
BIM Execution plan
PPTX
SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)
PPTX
Revit presentation
PPT
Revit introduction class
PDF
BIM project execution
PDF
Bim implementation
PPTX
BIM Presentation
PDF
BIM and FM
PDF
Facilities Management in BIM
Building information modelling
Introduction to Building Information Modeling
What does BIM mean for Civil Engineers?
what is BIM
Building Information Modeling (BIM)
MTECH BIM project case study
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
What is BIM?
Revit and Building Information Modeling (BIM) Presentation
BIM Execution plan
SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)
Revit presentation
Revit introduction class
BIM project execution
Bim implementation
BIM Presentation
BIM and FM
Facilities Management in BIM
Ad

Viewers also liked (20)

PDF
New solutions of bim
PDF
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
PDF
Forex Daily Report
PPT
Whole life performance lecture south bank university
PPT
Masterclass Kwaliteitsnetwerk Bouw: "BIM in relatie tot kwaliteitsmanagement"
PPTX
Presentatie Bouw Informatie Model (BIM)
 
PPT
Public Sector Life Cycle Costing for Asset Management
PPTX
Application of life cycle analysis in the capital 07 17 14
PDF
3D and bim technology for construction safety morning section final version...
PDF
BIM and FM: Bridging the divide between AEC and owner
PDF
I Rmag Guide Sept09
PDF
Bio-IT for Core Facility Managers
PDF
BIM - Operational readiness
PPT
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
PPTX
Bim and building life cycle
PDF
BIM for Health & Safety: Virtually Sorted
PPTX
How Sweco creates operationally high performance buildings and reduce client...
PPT
The Expansive Hospital Game
PDF
Presentation to BIM Lancashire Conference 2013 @uclan
PDF
8. eBook #8 time theft
New solutions of bim
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
Forex Daily Report
Whole life performance lecture south bank university
Masterclass Kwaliteitsnetwerk Bouw: "BIM in relatie tot kwaliteitsmanagement"
Presentatie Bouw Informatie Model (BIM)
 
Public Sector Life Cycle Costing for Asset Management
Application of life cycle analysis in the capital 07 17 14
3D and bim technology for construction safety morning section final version...
BIM and FM: Bridging the divide between AEC and owner
I Rmag Guide Sept09
Bio-IT for Core Facility Managers
BIM - Operational readiness
BIM in Project Management: Keynote Speech by Mr. Kevin POOLE
Bim and building life cycle
BIM for Health & Safety: Virtually Sorted
How Sweco creates operationally high performance buildings and reduce client...
The Expansive Hospital Game
Presentation to BIM Lancashire Conference 2013 @uclan
8. eBook #8 time theft
Ad

Similar to BIM for Lifecycle Asset Management (20)

PPTX
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
PPTX
Bim cafm presentation 23 june2014
PDF
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
PPTX
Possibilities of adding FM-specific data into BIM in early Design Phases
PPTX
BIM beyond the building
PPTX
Bim presentation km 21-10-2011
PDF
Paul Nunn v2
PDF
PDF
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...
PPTX
To BIM4fm or not to BIM4fm?
PDF
Building Information Modelling (BIM) for Handover and Facilities Management
PDF
lifecycle-bim-gis-user-group-april-2017
PDF
The FM Contribution to BIM
PDF
F-BIM - The argument for FM involvement in BIM
PDF
BIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM Corporation
PDF
ApplicationAreasandDataRequirementsforBIM-EnabledFacilitiesManagement (1).pdf
PDF
Richard Archer
PDF
Extend the Value of Your BIM Data with FME: Part 1
PDF
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
BIM For Free_28May2013_EdBartlett_BIM and lifecycle management
Bim cafm presentation 23 june2014
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Possibilities of adding FM-specific data into BIM in early Design Phases
BIM beyond the building
Bim presentation km 21-10-2011
Paul Nunn v2
Forge - DevCon 2016: Bringing BIM to Facility Management with Forge – Collabo...
To BIM4fm or not to BIM4fm?
Building Information Modelling (BIM) for Handover and Facilities Management
lifecycle-bim-gis-user-group-april-2017
The FM Contribution to BIM
F-BIM - The argument for FM involvement in BIM
BIM for Operations Mr. Wood Douglas, BIM Software Architect, IBM Corporation
ApplicationAreasandDataRequirementsforBIM-EnabledFacilitiesManagement (1).pdf
Richard Archer
Extend the Value of Your BIM Data with FME: Part 1
Design & Construction Presentation on the New Putnam Vocational Technical Aca...

Recently uploaded (20)

PPTX
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
PDF
Getting started with AI Agents and Multi-Agent Systems
PDF
Architecture types and enterprise applications.pdf
PDF
OpenACC and Open Hackathons Monthly Highlights July 2025
PDF
Credit Without Borders: AI and Financial Inclusion in Bangladesh
PPTX
Configure Apache Mutual Authentication
PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PDF
UiPath Agentic Automation session 1: RPA to Agents
PPTX
GROUP4NURSINGINFORMATICSREPORT-2 PRESENTATION
PDF
A proposed approach for plagiarism detection in Myanmar Unicode text
PDF
Enhancing plagiarism detection using data pre-processing and machine learning...
PDF
NewMind AI Weekly Chronicles – August ’25 Week III
PPT
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
PDF
1 - Historical Antecedents, Social Consideration.pdf
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
PPTX
Modernising the Digital Integration Hub
DOCX
search engine optimization ppt fir known well about this
AI IN MARKETING- PRESENTED BY ANWAR KABIR 1st June 2025.pptx
Getting started with AI Agents and Multi-Agent Systems
Architecture types and enterprise applications.pdf
OpenACC and Open Hackathons Monthly Highlights July 2025
Credit Without Borders: AI and Financial Inclusion in Bangladesh
Configure Apache Mutual Authentication
A contest of sentiment analysis: k-nearest neighbor versus neural network
UiPath Agentic Automation session 1: RPA to Agents
GROUP4NURSINGINFORMATICSREPORT-2 PRESENTATION
A proposed approach for plagiarism detection in Myanmar Unicode text
Enhancing plagiarism detection using data pre-processing and machine learning...
NewMind AI Weekly Chronicles – August ’25 Week III
Galois Field Theory of Risk: A Perspective, Protocol, and Mathematical Backgr...
1 - Historical Antecedents, Social Consideration.pdf
Benefits of Physical activity for teenagers.pptx
Taming the Chaos: How to Turn Unstructured Data into Decisions
Final SEM Unit 1 for mit wpu at pune .pptx
Produktkatalog für HOBO Datenlogger, Wetterstationen, Sensoren, Software und ...
Modernising the Digital Integration Hub
search engine optimization ppt fir known well about this

BIM for Lifecycle Asset Management

  • 1. BIM and lifecycle management BIM Academy Edwin Bartlett - Kykloud
  • 2. Why is Asset Management Relevant to BIM?
  • 3. 6 dimensions But also… 12 edges 8 corners Many teams of people beyond design & construction FM & Asset Management - a tough one to crack?
  • 5. What does Asset Management Require from BIM BIM FM Services Potential • Portfolio planning (buy, sell, rent etc.), rationalisation programmes/ management of surplus property, transaction services  in Part • Condition surveys, life-cycle costing, capex/opex balance and investment planning, procurement, performance monitoring, space optimisation Potential • Energy procurement, bill validation, legislation consultancy, workforce education, energy audit and advice  • Installation/ maintenance of BMS, equipment optimisation/ re-configuration, metering  • M&E (including HVAC), building fabric maintenance, grounds maintenance ? • Catering, cleaning, security FM delivery Energy services Management services Property strategy Asset / property management Energy management/ consultancy Energy services delivery Hard FM Soft FM  FM focus on managing rising FM and energy costs, carbon pressures, legislation, capital constraints, cost efficiency targets NOT the technology  BIM is lifecycle facility management supported by digital technology  BIM is not only 3D visualization tools: central data storage area/portals for extracting relevant FM information  “Make BIM useful to a wider community” http://www.wbdg.org/bim/nibs_bim.php  property managers, appraisers, brokers, mortgage bankers, facility assessors, facility managers, maintenance and operations engineers, safety and security personnel as incident responders, landscape architects, infrastructure engineers and operators etc Real demand for BIM in FM but only if its collaborative
  • 6. BIM into FM – proven early benefits • Intelligent lifecycle replacement planning – e.g. lifecycle capital replacement models and plans linked to design models (2D or 3D) • Reduced Energy & Carbon impacts – e.g. linking to real-time building submeter and sensor data on electricity and occupancy (Autodesk Project Dasher) • Affordable risk based preventive maintenance – e.g. linking maintenance to risks, criticality and quality of assets of specification • Delivering cost effective refurbishment – e.g. existing buildings surveyed using point cloud surveys, feed into condition surveys and new capital work cost planning • Efficient space management – e.g. people/HR data, utilisation and FF&E management • Integrated real time condition assessment – e.g. in-field condition surveys apps linking to asset database and lifecycle plans
  • 7. FM to BIM: A workable model • Focused activities at each stage of design: 1. Option Appraisal i.e. specification choice 2. Service Cost Analysis i.e. cleaning or maintenance by asset 3. Whole Buildings Cost analysis i.e. annual budget 4. Handover and commissioning i.e. operational efficiency and adequacy of O&M • Data requirements: which systems/assets/elements and what data properties from model • Data flow: from who and where to • Data drop timings: 2-3 required • How will the data be updated operationally?
  • 8. Title COBie Status IFC2x3 Purpose This spreadsheet supports the exchange of building, system and product information through the life of the project. Outline Individual worksheets are organized by project phase as shown below All Phases Sheet Contents kykloud "light" Contact People and Companies Contacts Early Design Worksheets Sheet Contents Site Facility Buildings Floor Vertical levels and exterior areas Floor Space Spaces Space Zone Sets of spaces sharing a specific attribute Zone Type Types of equipment, products, and materials Detailed Design Worksheets Sheet Contents Component Individually named or schedule items System Sets of components providing a service Assembly Constituents for Types, Components and others Connection Logical connections between components Impact Economic, Environmental and Social Impacts at various stages in the life cycle Operations and Maintenance Worksheets Sheet Contents Spare Onsite and replacement parts Resource Required materials, tools, and training Job PM, Safety, and other job plans All Phases Sheet Contents Document All applicable document references Attribute Properties of referenced item Coordinate Spatial locations in box, line, or point format Issue Other issues remaining at handover. Legend text required required text if specified as required Assets (hierarchy) Activities Client / Site
  • 9. Title COBie Status IFC2x3 Purpose This spreadsheet supports the exchange of building, system and product information through the life of the project. Outline Individual worksheets are organized by project phase as shown below All Phases Sheet Contents kykloud "light" Contact People and Companies Contacts Early Design Worksheets Sheet Contents Site Facility Buildings Floor Vertical levels and exterior areas Floor Space Spaces Space Zone Sets of spaces sharing a specific attribute Zone Type Types of equipment, products, and materials Detailed Design Worksheets Sheet Contents Component Individually named or schedule items System Sets of components providing a service Assembly Constituents for Types, Components and others Connection Logical connections between components Impact Economic, Environmental and Social Impacts at various stages in the life cycle Operations and Maintenance Worksheets Sheet Contents Spare Onsite and replacement parts Resource Required materials, tools, and training Job PM, Safety, and other job plans All Phases Sheet Contents Document All applicable document references Attribute Properties of referenced item Coordinate Spatial locations in box, line, or point format Issue Other issues remaining at handover. Legend text required required text if specified as required Assets (hierarchy) Activities Client / Site
  • 10. BB (before BIM) c.2000 Dimensions FM Documents Lifecycle model O&M Manuals Spec £ BoQ Life cycles Spaces & 2D Design Data input
  • 11. Emerging Data Flows – design stage BIM to FM Documents Lifecycle Model O&M Manuals £ Cost Spec BoQ Life cycles Spaces & Dimensions Quants Spec FM Model 3D Design Model Data Web Services API data structure filter e.g. IFC / COBie / own Portfolio & Site data Economic data e.g. inflation
  • 12. Emerging Data Flows – BIM in refurb Asset Register (Spec) Documents Activity Life cycles Condition Spec Spaces & Dimensions Quants FM Model 3D Design Model Field Data Collection Survey via Web Services API data structure filter e.g. IFC / COBie / own Portfolio & Site data Dimensions Photos data import e.g. IFC / COBie / own Refurb Design Model + Field Data Collection via Point Cloud Survey Point Cloud
  • 16. Revit - elemental or asset attribute data
  • 17. Example Component level WLC KyKloud
  • 21. COBie – A few observations from an FM • COBie is a spreadsheet: “we use asset management databases” • Doesn’t handle “portfolio” or multiple facility level asset data • Service life data fields exist but don’t get used at design stage • Asset Classifications - FM operators have their own asset codes and don’t use Uniclass, typically driven by client contract models • Latest version contains the concept of “impacts” to cover cost and carbon – Cost impacts are rarely in the 3D model so a COBie export from a model will not populate this data – Costs have to come from elsewhere! • Macro economic and risk assumptions missing – just as critical as asset data • FM and lifecycle standards not yet full bedded in
  • 22. FM will keep the data alive
  • 23. Conclusion • BIM = lifecycle management supported by digital technology – 3D visualisation design tools support & improve the process • FM BIM alive and kicking – Business benefits are visible and achievable – Push and support the supply chain • Asset owners more interested in: – Data and not just the design model – Real usable outputs e.g. lifecycle investment plans – FM will keep the model alive