SlideShare a Scribd company logo
1
Submitted by
Ishrat hashmi
1303531028
ECE 4th
year
1. Recent Scenario Of Electronic Media
2. Television In Day To Day Life
3. Glimpse Of Training Program at DDK Muzaffarpur
4. Introduction
5. A Short History
6. TV Studio
7. Vision mixer
8. Audio & video chain
9.MSR
10.Earth station
11.OB VAN & DSNG
2
3
Recent Scenario of Electronics
Entertainment Media
Interne
t
DTH
Personal
Computers/
Smartphones
Cinema
Hall
Radio
Television
4
5
Broadcasting:
Process of sending information to a
distant place is called Broadcasting.
Means of Broadcasting in India:
1.Terrestrial
2.Satellite
3.Internet
Both AIR & DD make use of both
Terrestrial & satellite.
6
1- Broadcasting started in India in the year 1923.
2- AIR was formed in the year 1936.
3- In 1947, AIR was covering 2.5% & about 11% of
land & population respectively.
4- 1st
T.V Station was established in Delhi in 1959
5- T.V was separated from AIR in 1976
6- DD has 1500 Transmitters and 70 Production
centers across the Country.
7
8
A television studio is an installation in
which television or video productions take
place by using several supporting
equipments.
Camera
Lighting
Microphones
Vision mixer and Audio consoles
MSR
VTR
Acoustics
Post production and video effects
Supporting services like AC, UPS
9
10
1. A vision mixer (also called video switcher, video
mixer or production
switcher) is a device used to select between several
different video sources and in some cases mix video
sources together and add special effects.
2. It has many input sources such as cameras,
VCR/ server, Graphics/Character
Generators,etc.
3. Out of these i/p, any source can be taken
as o/p.
4. Sources can be changed as cut to cut,
dissolve, wipe and other special effects.
11
1-Use PAL system (720*576) in 4:3 aspect ratio.
2-For TV Transmission It uses VSM .
3-It Uses C Band( DTH uses Ku band) and in the transmitter room it
has two 10 KW Transmitters for Broadcasting.
12
Distributor
Audio
Console
Analog to
AES
Converter
Earth station
through
Optical Fiber
STL Link
Sources
It is the heart of the studio.
Most of the switching
electronics is kept e.g.
camera base stations,
switcher main frame,
Satellite receivers, MW
link, DDA & most of the
patch panels.
Signal is routed through
MSR.
Signal can be Monitored at
various stages
13
14
Earth Station is a very important part of satellite
communication system for broadcasting of
signals.
It is an uplink center from which the signals are
fed to Satellite for distribution in a specified area
covered by the Satellite.
The signal is up-linked from the Earth Station
and received by many down link centers in TV
broad casting via PDA.
Two Types:
1) Analog
2) Digital
Digital Earth Stations are widely used because
of various advantages over analog.
15
• PDA (Parabolic Dish
Antenna)
• FEED
• Wave Guide / Low Loss
Cable
• Up converter
• Modulator
• Encoder
• Multiplexer
• IRD (Integrated Receiver
Decoder)
Outside broadcasting (OB) is the electronic field production (EFP) of
television or radio programmes (typically to cover television news and sports
television events) from a mobile remote broadcast television studio.
16
17
A typical OB Van is usually divided into 4 parts.
The first and largest part is the production area or sitting area
for all directors & producers.
The second part of a van is for the audio engineer.
The 3rd part of the van is video tape
The 4th part is transmission where the signal is monitored by
and engineered for quality control purposes and is
transmitted.
18
If there is a live program to be telecast following
options can be choosed.
Microwave link
DSNG (digital satellite news gathering)
19
 Audio and video signals are feed to micowave transmitter.
 Input video is processed and up converted to 12.25 & 12.30 GHz.
 Approx transmission power is 600 milli watts
 Transmit/ receive station is 1.1 m in diameter.
 Audio/ video input is
processed by an encoder as
per mpeg-2 standard.
 The audio and video along
with other data are
multiplied.
 Multiplied data forward error
corrected using a standard
technique.
 Error corrected codes are
QPSK modulated at 70 MHz.
 The modulated signal is up
converted to power
amplifiers.
20
21
Conclusion
1-Overall a very nice experience
2-Learn about Team work power.
3- Practically watched how studio
recording take place.
Thank you…
22
Any queries ?

More Related Content

PPTX
Final presentation of DDK
PPTX
summer training,doordarshan kendra lucknow
PPTX
Presentation on Industrial training
PPTX
SUMMER TRAINING ON DOORDARSHAN {PPT]
PPTX
Summer training at Doordarshan presentation
PPTX
Doordarshan Indore,Summer Training ppt
PPTX
Doordarhan kendra Delhi -Summer Training -by Raisaket
PPTX
Satellite Communication
Final presentation of DDK
summer training,doordarshan kendra lucknow
Presentation on Industrial training
SUMMER TRAINING ON DOORDARSHAN {PPT]
Summer training at Doordarshan presentation
Doordarshan Indore,Summer Training ppt
Doordarhan kendra Delhi -Summer Training -by Raisaket
Satellite Communication

What's hot (20)

PPT
Earth Station Subsystem
DOCX
SUMMER TRAINING REPORT ON DOORDARSHAN KENDRA SILCHER
PPTX
Doordarshan Industrial training
PPTX
Inplant training report doordarshan
PPT
Introduction to Digital Broadcast
PPTX
industrial training at doordarshan
PPTX
Ddk(niraj) ppt on summer training from ddk patna
PPTX
digital tv DTMB
DOCX
Report on Doordarshan indore
PPTX
Satellite Radio
PPTX
Doordarshan Summer Training at Lucknow.ppt
PDF
HH QUALCOMM ev-do - 1 x advanced - four-fold increase in voice capacity
PPT
The Digital Video Broadcast (DVB) Project
PPTX
Digital Video Broadcasting (DVB)
PDF
Hfc b headend of hfc
PPSX
Vsat Training
PPTX
DOORDARSHAN KENDRA SUMMER TRAINING REPORT
PPTX
Doordarshan Implant Training Report
PPTX
Doordarshan Presentation
Earth Station Subsystem
SUMMER TRAINING REPORT ON DOORDARSHAN KENDRA SILCHER
Doordarshan Industrial training
Inplant training report doordarshan
Introduction to Digital Broadcast
industrial training at doordarshan
Ddk(niraj) ppt on summer training from ddk patna
digital tv DTMB
Report on Doordarshan indore
Satellite Radio
Doordarshan Summer Training at Lucknow.ppt
HH QUALCOMM ev-do - 1 x advanced - four-fold increase in voice capacity
The Digital Video Broadcast (DVB) Project
Digital Video Broadcasting (DVB)
Hfc b headend of hfc
Vsat Training
DOORDARSHAN KENDRA SUMMER TRAINING REPORT
Doordarshan Implant Training Report
Doordarshan Presentation
Ad

Similar to Ppt ddk (20)

PPTX
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
PPTX
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
PPTX
DOORDARSHAN KENDRA BHOPAL
PPTX
Hina ppt(dd)
PPTX
television broadcasting
PPTX
Doorsdarshan and All India Radio Summer Training
PPTX
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
PDF
My training report (pdf)
PPTX
Summer Training At Doordarshan
DOCX
Doordarshan industrial training report
DOCX
Dynya news report
PPTX
Prasar barti "DD"
DOCX
DDK Delhi -Vocational training by Raisaket
DOCX
Vocational training at DDK Delhi by SAKET RAI
PPTX
Studio production
PDF
Industrial training report
PPTX
Doordarshan kendra raipur report ppt
DOC
108600389 dd-report
PDF
Global ereload services pvt ltd - dth tv
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA BHOPAL
Hina ppt(dd)
television broadcasting
Doorsdarshan and All India Radio Summer Training
DOORDARSHAN RAIPUR PROJECT PRESENTATION/REPORT PPT ppt
My training report (pdf)
Summer Training At Doordarshan
Doordarshan industrial training report
Dynya news report
Prasar barti "DD"
DDK Delhi -Vocational training by Raisaket
Vocational training at DDK Delhi by SAKET RAI
Studio production
Industrial training report
Doordarshan kendra raipur report ppt
108600389 dd-report
Global ereload services pvt ltd - dth tv
Ad

Recently uploaded (20)

PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
introduction to high performance computing
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Soil Improvement Techniques Note - Rabbi
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
introduction to high performance computing
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
UNIT 4 Total Quality Management .pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
R24 SURVEYING LAB MANUAL for civil enggi
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Fundamentals of safety and accident prevention -final (1).pptx

Ppt ddk

  • 2. 1. Recent Scenario Of Electronic Media 2. Television In Day To Day Life 3. Glimpse Of Training Program at DDK Muzaffarpur 4. Introduction 5. A Short History 6. TV Studio 7. Vision mixer 8. Audio & video chain 9.MSR 10.Earth station 11.OB VAN & DSNG 2
  • 3. 3 Recent Scenario of Electronics Entertainment Media Interne t DTH Personal Computers/ Smartphones Cinema Hall Radio Television
  • 4. 4
  • 5. 5
  • 6. Broadcasting: Process of sending information to a distant place is called Broadcasting. Means of Broadcasting in India: 1.Terrestrial 2.Satellite 3.Internet Both AIR & DD make use of both Terrestrial & satellite. 6
  • 7. 1- Broadcasting started in India in the year 1923. 2- AIR was formed in the year 1936. 3- In 1947, AIR was covering 2.5% & about 11% of land & population respectively. 4- 1st T.V Station was established in Delhi in 1959 5- T.V was separated from AIR in 1976 6- DD has 1500 Transmitters and 70 Production centers across the Country. 7
  • 8. 8 A television studio is an installation in which television or video productions take place by using several supporting equipments.
  • 9. Camera Lighting Microphones Vision mixer and Audio consoles MSR VTR Acoustics Post production and video effects Supporting services like AC, UPS 9
  • 10. 10 1. A vision mixer (also called video switcher, video mixer or production switcher) is a device used to select between several different video sources and in some cases mix video sources together and add special effects. 2. It has many input sources such as cameras, VCR/ server, Graphics/Character Generators,etc. 3. Out of these i/p, any source can be taken as o/p. 4. Sources can be changed as cut to cut, dissolve, wipe and other special effects.
  • 11. 11 1-Use PAL system (720*576) in 4:3 aspect ratio. 2-For TV Transmission It uses VSM . 3-It Uses C Band( DTH uses Ku band) and in the transmitter room it has two 10 KW Transmitters for Broadcasting.
  • 13. It is the heart of the studio. Most of the switching electronics is kept e.g. camera base stations, switcher main frame, Satellite receivers, MW link, DDA & most of the patch panels. Signal is routed through MSR. Signal can be Monitored at various stages 13
  • 14. 14 Earth Station is a very important part of satellite communication system for broadcasting of signals. It is an uplink center from which the signals are fed to Satellite for distribution in a specified area covered by the Satellite. The signal is up-linked from the Earth Station and received by many down link centers in TV broad casting via PDA. Two Types: 1) Analog 2) Digital Digital Earth Stations are widely used because of various advantages over analog.
  • 15. 15 • PDA (Parabolic Dish Antenna) • FEED • Wave Guide / Low Loss Cable • Up converter • Modulator • Encoder • Multiplexer • IRD (Integrated Receiver Decoder)
  • 16. Outside broadcasting (OB) is the electronic field production (EFP) of television or radio programmes (typically to cover television news and sports television events) from a mobile remote broadcast television studio. 16
  • 17. 17
  • 18. A typical OB Van is usually divided into 4 parts. The first and largest part is the production area or sitting area for all directors & producers. The second part of a van is for the audio engineer. The 3rd part of the van is video tape The 4th part is transmission where the signal is monitored by and engineered for quality control purposes and is transmitted. 18 If there is a live program to be telecast following options can be choosed. Microwave link DSNG (digital satellite news gathering)
  • 19. 19  Audio and video signals are feed to micowave transmitter.  Input video is processed and up converted to 12.25 & 12.30 GHz.  Approx transmission power is 600 milli watts  Transmit/ receive station is 1.1 m in diameter.
  • 20.  Audio/ video input is processed by an encoder as per mpeg-2 standard.  The audio and video along with other data are multiplied.  Multiplied data forward error corrected using a standard technique.  Error corrected codes are QPSK modulated at 70 MHz.  The modulated signal is up converted to power amplifiers. 20
  • 21. 21 Conclusion 1-Overall a very nice experience 2-Learn about Team work power. 3- Practically watched how studio recording take place.