Introduction
• in project 1 we defined the problem in
Aldajani factory as accumulation of huge
amounts of waste, and we found that lean
manufacturing technique is a successful
way to solve this problem.
• The main objective of the project, is to
apply many techniques of lean
manufacturing techniques in Al-Dajani co.
to remove / or reduce waste resulting from
many sections that exist in the metal
furniture factory.
• So, we applied techniques
like 5s, value stream map and
cause-effect diagram)
Definition and frame work
• We will start with the project using the
methodology of “define, measure, analyze,
improve and control” (DMAIC).
Measure
• We measure some of the waste by the
engineering sense (qualitative form) and
some of them by specific tools like VSM
(quantitative form).
Qualitative form
• Motion waste.
• Transportation waste.
• Inventory waste.
• Waiting waste.
• Defects waste.
Type of waste Description Observed
Motion 1 Poor workstation layout Yes
2 Shared equipment and machines Yes
3 Poor production planning Yes
4 Poor process design Yes
Transportation 1 Poor layouts – large distance between operations Yes
2 Large Batch sizes No
3 Multiple storage facilities Yes
Inventory 1 Overproduction of goods Yes
2 Inventory defects Yes
3 Huge amount of raw material Yes
4 Delays in production Yes
Waiting 1 Unplanned downtime or Idle equipment Yes
2 Long or delayed set-up times No
3 Lack of process control No
4 Poor process communication Yes
Defects 1 Poor quality control at the production level No
2 Poor machine repair Yes
3 Lack of process standards Yes
4 Not understanding your customers’ needs No
Quantitative form
• Value stream map, is a technique to
describe the current flow of a specific
process
• In the project we have taken a two door
cabinet as a representative sample of the
information flows and materials that occur
in this factory, and we applied
a value stream map on it.
Flow processes
Product family
Current state drawing
Future state drawing
Work plan and
implementation
To assess the performance of the company by using the
VSM tool we collect these information:
The number of
working days
per month
26
One shift
lasts 8 hours
break Half an
hour
Raw material
requested Every six
months
ppt-project-final.ppt
Analysis of current state map
• We calculated the takt time, the process times, and waiting times
(inventory lead times) and add these to our VSM.
• Takt time = 24 min /unit
• Inventory lead time = Inventory level*Takt time
• The value-added activities in percentage of the processes = 6.77%
ppt-project-final.ppt
Analyze process capacity
• Achieving balance between the customer’s
demand and the capacity of the production
process so that there is a balance between the
time-specific operations for each process. Also,
there must be a balance in the arrangement and
sequencing of products so that we achieve a
stable and predictable production pace.
• There are two steps to achieve this
balance :
1. Compare the time it takes to make one
piece with the takt time.
2. Assess the balance of the production
processes, by comparing the time of each
process with respect to the others, this helps
to determine the potential bottlenecks for
this process,
ppt-project-final.ppt
ppt-project-final.ppt
• We studied the bottleneck in order to calculate the maximum
output.
• maximum output = 3.2 unit
• This means that the company can produce 3 pieces in
the one-way tour instead of producing one piece. So
they can produce 41 pieces.
• In comparison with the customer’s
request, it is possible to fulfill the
request within two days in addition
to the day of the paint.
Waiting
Transportation
Inventory
Motion
Over
production
Over
processing
Defects
TIM
WOOD
The future state map
1. Move towards continuous flow (Kanban)
“Flow where you can, pull where you must“
2. Rebalancing the process
3. Kaizen
(continuous
improvement)
After analyzing the current situation of the
company we set a specific steps for
improvement.
using our results, kaizen and kampan
methods we draw a template for the future
state map which shows the progress of the
process after applying all the changes to it.
ppt-project-final.ppt
Recommendations:
1. Commitment to safety instructions, and keep aisles clear
from obstacles Continuous cleaning for the workplace
through following programmed cleaning schedule.
2. Maintain the arrangement of tools used in manufacturing
operations.
3. Give workers standard operating procedures in order to
reduce defects and increase productivity.
4. The necessity of employing an industrial engineer to
follow up an application of lean system in order to
improve quality and reduce wastes.
5. Improve the factory lighting system.
6. Better production planning in order to reduce the
excessive amount of inventory.
7. Using CNC method to cut the metallic boards in order
to reduce waste.
8. making new products using the waste of material such
as producing second hand tables or cabinet.
9. Improve their marketing skills to build bridges to reach
customers’ needs and fulfill it.
10. Also there is no website showing their
products and that is considered something
important due to online purchasing.

More Related Content

PPT
Value stream mapping - Future State
PDF
Lean sytems lecture ayub jake salik 2012
PDF
Lesson 10 - Value stream mapping
PPT
460 operations - 4.20
PPTX
Fundamentals of Lean
PDF
Iss 9
PDF
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Value stream mapping - Future State
Lean sytems lecture ayub jake salik 2012
Lesson 10 - Value stream mapping
460 operations - 4.20
Fundamentals of Lean
Iss 9
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...

Similar to ppt-project-final.ppt (20)

PDF
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
PDF
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
PPT
Value Stream Analysis
PDF
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
PPT
Lean Transformation with Value stream mapping
PPT
The Complete Lean Enterprise
PDF
Increasing speed of service: basics of lean application
PPT
Hourly Lean Introduction
PDF
Production System optimization: Case Study of a Local Textile Company
PPT
Value stream mapping water manufacturer
PDF
Lean Management Mid-Term (1), Muda Mura Muri.pdf
PPTX
Application of value stream mapping for reduction of cycle time in machining ...
PPTX
Value Stream Mapping ( Lean manufacturing )
PPT
VSM (Méthode HOSHIN)
DOCX
Value stream mapping synopsis
PPTX
060 LEAN SUPPLY CHAIN VALUE STREAM MAPPING
PPTX
060 lean supply chain
PDF
Lean six sigma 3d
PPTX
Value stream mapping
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
A Case Study on Reducing in Lead Time by Using Value Stream Mapping
Value Stream Analysis
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
Lean Transformation with Value stream mapping
The Complete Lean Enterprise
Increasing speed of service: basics of lean application
Hourly Lean Introduction
Production System optimization: Case Study of a Local Textile Company
Value stream mapping water manufacturer
Lean Management Mid-Term (1), Muda Mura Muri.pdf
Application of value stream mapping for reduction of cycle time in machining ...
Value Stream Mapping ( Lean manufacturing )
VSM (Méthode HOSHIN)
Value stream mapping synopsis
060 LEAN SUPPLY CHAIN VALUE STREAM MAPPING
060 lean supply chain
Lean six sigma 3d
Value stream mapping

Recently uploaded (20)

PDF
Volvo EC290C NL EC290CNL excavator weight.pdf
PDF
How much horsepower does a Volvo EC210Cl have.pdf
PDF
Renesas R-Car_Cockpit_overview210214-Gen4.pdf
PDF
computer system to create, modify, analyse or optimize an engineering design.
PDF
EC290C NL EC290CNL Volvo excavator specs.pdf
PPT
Mettal aloys and it's application and theri composition
PDF
Physics class 12thstep down transformer project.pdf
PPTX
UNIT-2(B) Organisavtional Appraisal.pptx
PDF
MANDIBLE (1).pdffawffffffffffffffffffffffffffffffffffffffffff
PDF
Todays Technician Automotive Heating & Air Conditioning Classroom Manual and ...
PPTX
TOEFL ITP Grammar_ Clausessssssssssssssssss.pptx
PPTX
Fire Fighting Unit IV industrial safety.pptx
PDF
Volvo EC300D L EC300DL excavator weight Manuals.pdf
PPT
Kaizen for Beginners and how to implement Kaizen
PDF
Caterpillar Cat 315C Excavator (Prefix ANF) Service Repair Manual Instant Dow...
PPTX
Intro to ISO 9001 2015.pptx for awareness
PDF
higher edu open stores 12.5.24 (1).pdf forreal
PDF
Journal Meraj.pdfuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
PPT
ACCOMPLISHMENT REPOERTS AND FILE OF GRADE 12 2021.ppt
PDF
intrusion control for clean steel 123.pdf
Volvo EC290C NL EC290CNL excavator weight.pdf
How much horsepower does a Volvo EC210Cl have.pdf
Renesas R-Car_Cockpit_overview210214-Gen4.pdf
computer system to create, modify, analyse or optimize an engineering design.
EC290C NL EC290CNL Volvo excavator specs.pdf
Mettal aloys and it's application and theri composition
Physics class 12thstep down transformer project.pdf
UNIT-2(B) Organisavtional Appraisal.pptx
MANDIBLE (1).pdffawffffffffffffffffffffffffffffffffffffffffff
Todays Technician Automotive Heating & Air Conditioning Classroom Manual and ...
TOEFL ITP Grammar_ Clausessssssssssssssssss.pptx
Fire Fighting Unit IV industrial safety.pptx
Volvo EC300D L EC300DL excavator weight Manuals.pdf
Kaizen for Beginners and how to implement Kaizen
Caterpillar Cat 315C Excavator (Prefix ANF) Service Repair Manual Instant Dow...
Intro to ISO 9001 2015.pptx for awareness
higher edu open stores 12.5.24 (1).pdf forreal
Journal Meraj.pdfuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu
ACCOMPLISHMENT REPOERTS AND FILE OF GRADE 12 2021.ppt
intrusion control for clean steel 123.pdf

ppt-project-final.ppt

  • 1. Title Applying lean manufacturing concepts in furniture factory: case study-based project. Supervised by: Dr. Moawia Ramadan Prepared by: Dina Hijab Majeda Hussain Musab Nazzal Shahd Saye d
  • 2. Introduction • in project 1 we defined the problem in Aldajani factory as accumulation of huge amounts of waste, and we found that lean manufacturing technique is a successful way to solve this problem.
  • 3. • The main objective of the project, is to apply many techniques of lean manufacturing techniques in Al-Dajani co. to remove / or reduce waste resulting from many sections that exist in the metal furniture factory. • So, we applied techniques like 5s, value stream map and cause-effect diagram) Definition and frame work
  • 4. • We will start with the project using the methodology of “define, measure, analyze, improve and control” (DMAIC).
  • 5. Measure • We measure some of the waste by the engineering sense (qualitative form) and some of them by specific tools like VSM (quantitative form).
  • 6. Qualitative form • Motion waste. • Transportation waste. • Inventory waste. • Waiting waste. • Defects waste.
  • 7. Type of waste Description Observed Motion 1 Poor workstation layout Yes 2 Shared equipment and machines Yes 3 Poor production planning Yes 4 Poor process design Yes Transportation 1 Poor layouts – large distance between operations Yes 2 Large Batch sizes No 3 Multiple storage facilities Yes Inventory 1 Overproduction of goods Yes 2 Inventory defects Yes 3 Huge amount of raw material Yes 4 Delays in production Yes Waiting 1 Unplanned downtime or Idle equipment Yes 2 Long or delayed set-up times No 3 Lack of process control No 4 Poor process communication Yes Defects 1 Poor quality control at the production level No 2 Poor machine repair Yes 3 Lack of process standards Yes 4 Not understanding your customers’ needs No
  • 8. Quantitative form • Value stream map, is a technique to describe the current flow of a specific process • In the project we have taken a two door cabinet as a representative sample of the information flows and materials that occur in this factory, and we applied a value stream map on it.
  • 10. Product family Current state drawing Future state drawing Work plan and implementation
  • 11. To assess the performance of the company by using the VSM tool we collect these information: The number of working days per month 26 One shift lasts 8 hours break Half an hour Raw material requested Every six months
  • 13. Analysis of current state map • We calculated the takt time, the process times, and waiting times (inventory lead times) and add these to our VSM. • Takt time = 24 min /unit • Inventory lead time = Inventory level*Takt time • The value-added activities in percentage of the processes = 6.77%
  • 15. Analyze process capacity • Achieving balance between the customer’s demand and the capacity of the production process so that there is a balance between the time-specific operations for each process. Also, there must be a balance in the arrangement and sequencing of products so that we achieve a stable and predictable production pace.
  • 16. • There are two steps to achieve this balance : 1. Compare the time it takes to make one piece with the takt time. 2. Assess the balance of the production processes, by comparing the time of each process with respect to the others, this helps to determine the potential bottlenecks for this process,
  • 19. • We studied the bottleneck in order to calculate the maximum output. • maximum output = 3.2 unit • This means that the company can produce 3 pieces in the one-way tour instead of producing one piece. So they can produce 41 pieces. • In comparison with the customer’s request, it is possible to fulfill the request within two days in addition to the day of the paint.
  • 21. The future state map 1. Move towards continuous flow (Kanban) “Flow where you can, pull where you must“ 2. Rebalancing the process 3. Kaizen (continuous improvement)
  • 22. After analyzing the current situation of the company we set a specific steps for improvement. using our results, kaizen and kampan methods we draw a template for the future state map which shows the progress of the process after applying all the changes to it.
  • 24. Recommendations: 1. Commitment to safety instructions, and keep aisles clear from obstacles Continuous cleaning for the workplace through following programmed cleaning schedule. 2. Maintain the arrangement of tools used in manufacturing operations. 3. Give workers standard operating procedures in order to reduce defects and increase productivity. 4. The necessity of employing an industrial engineer to follow up an application of lean system in order to improve quality and reduce wastes. 5. Improve the factory lighting system.
  • 25. 6. Better production planning in order to reduce the excessive amount of inventory. 7. Using CNC method to cut the metallic boards in order to reduce waste. 8. making new products using the waste of material such as producing second hand tables or cabinet. 9. Improve their marketing skills to build bridges to reach customers’ needs and fulfill it. 10. Also there is no website showing their products and that is considered something important due to online purchasing.