© Canberra Institute of Technology Page 1 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
Observation/Practical Assessment
Student Name: CIT Number:
Name of Subject:
ConstructEaves
NAT ID:
CPCCCA3008
CRN:
Assessment Name Construct Timber Eaves
Assessment Date
Student Statement
This assignment is my own work, except where I have acknowledged the use of the works of other
people. I understand that by submitting this assessment electronically, I agree to this statement.
Student Signature: Date:
Privacy Disclaimer
CIT is collecting your personal information for assessment purposes. The information will only be used in
accordance with the CIT Privacy Policy.
Assessor Feedback
Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date:
Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date:
Assessor Signature: Date:
Note from Assessor (including any reasonable adjustment):
Student Information
Review the important information below in relation to this assessment task.
Instructions
© Canberra Institute of Technology Page 2 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
You are going to follow the given plans to plan, mark and cut roof members to accommodate a timber
fascia and barge board to meet the NCC and Australian Standards. You will install timber verge
gable eaves, timber box gable eaves and eaves. The constructions will have an apex on the barge
board, a junction between the barge board and the plumb fascia, a junction of the fascia and eave
lining at the valley and a junction of the fascia and eave lining at the hip.
Task Instructions
You willbe required to submit the following documents on completion to Ready Skills:
 JSA (Job Safety Analysis)andToolbox talk (Ready Skills)
 Calculateyou gable end dimensions
 Listthe required tools and equipment needed for this task
 Listthe required materials needed for this task
 Calculateyour cutting list
Calculate your gable end
You are required to calculate the ‘pitched roof component’ of the ‘Gable End’. Please complete
the calculations below.
Your teacher will provide you with a ‘Roof Pitch’ or you may need to do a site measure. The
correct calculation and construction of this component will be assessed by your teacher.
ROOFING TRIANGLE FOR GABLE ENDCOMPONENT OF EAVE PRACTICAL:
This is also on yourmain set of plans
© Canberra Institute of Technology Page 3 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
Rise
Half Span
(Round up allcalculations dealing withmeasurements to 3 decimal points)
Plan length or half span Rise Rafter line length
= = =
(Round up allcalculations dealing withdegrees to 1 decimal point)
OnThe wall Provided:
 Construct the eaves frame according to the plans
 Cut and install the timber fascia as per the plans
 Cut/shape and fit eave sheets
 Cut and install quad mouldings
Once the eavepractical has beendeemedsatisfactory:
 De-construct eave structure
 De-nail and restack timbers
 Any timber below 500mm gets put into adesignated bin
 Finalise this document and submit to your assessor
=
Angle of plumb cut
© Canberra Institute of Technology Page 4 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
Plans are separate to this document
Time Allowed
4 hours
Assessment Conditions
Assessmentwill bealways conducted in simulated work environment CIT Bruce under teacher
supervision. If at any stage the assessor deems the assessmentto be unsafeit will be stopped, and this
will count as your first attempt. Access toallresources, manual and standards is permitted. All mobile
phones are to be switchoff during the assessment.
Materials Provided by CIT
All plans, materials and tools required to complete the taskwill be provided.
Materials You Need
Personal protective equipment PPE and nail bag and a device to access Ready Skills.
Attempts
You may have at least two (2) attempts for this assessment.
 If your first attempt is not successful, your teacher will discuss your results with you and will arrange
a second attempt.
 If your second attempt is not successful, you may be required to re-enrol in this unit.
Please refer to the CIT Assessment Policy if you have any questions.
© Canberra Institute of Technology Page 5 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
Observation/Practical Checklist
You must successfully complete the following skills in the Observation/Practical checklist.
(Please Note: Students only need to complete grey boxes. Your teacher will provide you with feedback and
advise whether your work is Satisfactory or Not Yet Satisfactory).
Student Name: CIT Number:
During the task the following skills were demonstrated
satisfactorily:
Attempt 1 Attempt 2
Date
(Optional)
Date
(Optional)
Observation/Practical Checklist Items S* NYS* S* NYS*
1. Student activelyparticipated in a toolbox talk and
agreed to its content
☐ ☐ ☐ ☐
2. Student contributed to the development of a JSA and
its control rating, with consideration to environmental
requirements ☐ ☐ ☐ ☐
3. Student correctly selected and used PPE for giventasks
☐ ☐ ☐ ☐
4. Student carried out task in accordance with the JSA
and organisational policies and procedures. ☐ ☐ ☐ ☐
5. Student used written and verbal communication skills
during this topic, also completed the non-verbal
communication document ☐ ☐ ☐ ☐
6. Student worked with others in a team to achieve given
tasks ☐ ☐ ☐ ☐
7. Student was able to interpret and apply relevant work
instruction and complete all documentation given. ☐ ☐ ☐ ☐
8. Student was able to read and interpret plans, site
drawings and specifications ☐ ☐ ☐ ☐
9. Student listedand selected the correct materials for
the given tasks ☐ ☐ ☐ ☐
10. Student listed and selected the correct tools for the
given tasks ☐ ☐ ☐ ☐
11. Student created an accurate cutting list for the given
tasks ☐ ☐ ☐ ☐
12. Student checked tool and equipment for serviceability
and reported any faults to the appropriate person ☐ ☐ ☐ ☐
© Canberra Institute of Technology Page 6 of 6 Date created: 15/08/2022
CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022
13. The student communicated and coordinated to install
the facia and barge to AS1684 standards.
The task:
 Facia was selected and cut to length correctly
 Facia was installed according to working drawings
 Mitres and joints are within tolerance +/- 1mm
 Barge return is to correct pitch and mitre is within
tolerance +/- 1mm
☐ ☐ ☐ ☐
14.
The student communicated and coordinated to install
the Eaves framework to AS1684 standards.
The task:
Framework was set out to working drawings
Back ledger was level with fascia groove
Blocking and trimmers installedto working
drawings
Gable and barge rafters to correct pitch
 Distance from fascia to wall fits an uncut eave
sheet (455mm)
☐ ☐ ☐ ☐
15. The student communicated and coordinated to line
and clad eaves to AS1684 standards.
The task:
Eavesheets cut and shaped to suit task
Sheets joined and fixed inaccordance to drawings
and specifications
Moldings are fitted and fixed accurately and in
accordance with drawings and specs
 Sloping eaves (raked eaves) are fitted and fixed
according to drawings and specs
☐ ☐ ☐ ☐
16. Student had been assessed and uploaded photos of
task to Ready Skills before cleaning up commenced
☐ ☐ ☐ ☐
17. Student de-constructed the task in a safe and
methodical system
☐ ☐ ☐ ☐
18. All material was disposed of appropriately, reusing and
recycling materials when applicable
☐ ☐ ☐ ☐
*S –Satisfactory, NYS – Not Yet Satisfactory

More Related Content

DOCX
1. Practical assessment-Carry out levelling operations
PDF
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
DOCX
Trench Mesh Quantities Calculations
PDF
Dempolition notes Part 2.pdf
PDF
SmartJoist-Design-Guide-2021
PPTX
Identify Construction Work Hazards and Select Risk Control Part 1.pptx
PDF
Hansens Lodge for Plan and Organise
1. Practical assessment-Carry out levelling operations
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Trench Mesh Quantities Calculations
Dempolition notes Part 2.pdf
SmartJoist-Design-Guide-2021
Identify Construction Work Hazards and Select Risk Control Part 1.pptx
Hansens Lodge for Plan and Organise

What's hot (20)

PDF
Woodhouse installation guide for cladding boards
PPTX
Fixing mouldings Powerpoint
PPTX
Install lining, panelling and moulding - Linings presentation
PPTX
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
PDF
Bonner House - Set.pdf
PDF
ENDUROFLOOR Installation Manual
PDF
Axon Cladding Installation Guide
PDF
Gyprock-Wet Areas-installation-guide.pdf
PPTX
Cladding introduction class presentation
PPTX
Sealants - Engineering Sealant Joints by Design
PDF
Scope of work for concrete and steel reinforcement Rehabilitation
PPT
Vidrios 2016
XLS
Flood wall estimate
PPTX
Engineered Timber Products Glulam.pptx
PDF
Screw and Barrel Inspection
PPTX
Construction Presentation.pptx
PDF
Muscat scaffolding Cuplock System
PDF
Joint sealants with new Technologies
PDF
ICANZ Insulation installation handbook P:2 V:5
Woodhouse installation guide for cladding boards
Fixing mouldings Powerpoint
Install lining, panelling and moulding - Linings presentation
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Bonner House - Set.pdf
ENDUROFLOOR Installation Manual
Axon Cladding Installation Guide
Gyprock-Wet Areas-installation-guide.pdf
Cladding introduction class presentation
Sealants - Engineering Sealant Joints by Design
Scope of work for concrete and steel reinforcement Rehabilitation
Vidrios 2016
Flood wall estimate
Engineered Timber Products Glulam.pptx
Screw and Barrel Inspection
Construction Presentation.pptx
Muscat scaffolding Cuplock System
Joint sealants with new Technologies
ICANZ Insulation installation handbook P:2 V:5
Ad

Similar to Practical Assessment-Construct Eaves-Boxed eaves (20)

DOCX
Student Assessment_Eaves.docx
DOCX
Practical Assessment-Construct eaves-Raked eaves
DOCX
Practical Assessment-Construct eaves-Metal eaves
DOCX
Practical assessment Pitched Roof.docx
PDF
Oblique End_Student Assessment.pdf
DOCX
Student Assessment- Metal fascia with raked eaves.docx
PDF
Octagonal End_Student Assessment.pdf
DOCX
3. Practical Assessment Skillion roof.docx
DOCX
Subject Guide-Construct eaves
DOCX
Practical Assessment- Carry out setting out-T shape practical
DOCX
Practical assessment-Construct, assemble and install timber external stairs
DOCX
Subject Guide Eaves.docx
DOCX
Work Effectively and Sustainably_Student Practical Assessment.docx
DOCX
Practical Assessment_ Repair wall and floor tiling.docx
PDF
Practical Assessment_Full set of stairs with handrail.pdf
DOCX
Practical Assessment 1 - Install horizontal weatherboards
DOCX
Practical assessment - Moulding & Skirting.docx
DOCX
Practical Assessment Handle carpentry materials.docx
DOCX
Practical Assessment 1 - Reinforcement
DOCX
2. Practical Ass_Work effectively.docx
Student Assessment_Eaves.docx
Practical Assessment-Construct eaves-Raked eaves
Practical Assessment-Construct eaves-Metal eaves
Practical assessment Pitched Roof.docx
Oblique End_Student Assessment.pdf
Student Assessment- Metal fascia with raked eaves.docx
Octagonal End_Student Assessment.pdf
3. Practical Assessment Skillion roof.docx
Subject Guide-Construct eaves
Practical Assessment- Carry out setting out-T shape practical
Practical assessment-Construct, assemble and install timber external stairs
Subject Guide Eaves.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_Full set of stairs with handrail.pdf
Practical Assessment 1 - Install horizontal weatherboards
Practical assessment - Moulding & Skirting.docx
Practical Assessment Handle carpentry materials.docx
Practical Assessment 1 - Reinforcement
2. Practical Ass_Work effectively.docx
Ad

More from Canberra Institute of technology (18)

PPTX
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
PPTX
Demolition - 7 Process' of demolition Scenarios.pptx
PDF
Hansens Lodge Take-off.pdf
PDF
Small House Plans & Calculations.pdf
PDF
Deck and Screen plans & Calculations
DOCX
CIT Subject Guide EPT
PDF
Example Site Induction Map .pdf
DOCX
Optical Dumpy Enlarge staff reading.docx
DOC
Practical assessment 2 - Install horizontal weatherboards to internal corner
DOC
Practical assessment 3 - Install horizontal and vertical sheet panels
PDF
Makita cold cut manual
PDF
Small House Calculations
PDF
Form Release Agent SDS
DOCX
Practical Assessment 3 - Reinforcement
DOCX
Practical Assessment 2- Reinforcement
PDF
Code of practice - Construction work- Appendix C
PDF
MSDS- Fibreglass composite reinforcement bar
PDF
Truss Plan Timber.pdf
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Demolition - 7 Process' of demolition Scenarios.pptx
Hansens Lodge Take-off.pdf
Small House Plans & Calculations.pdf
Deck and Screen plans & Calculations
CIT Subject Guide EPT
Example Site Induction Map .pdf
Optical Dumpy Enlarge staff reading.docx
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 3 - Install horizontal and vertical sheet panels
Makita cold cut manual
Small House Calculations
Form Release Agent SDS
Practical Assessment 3 - Reinforcement
Practical Assessment 2- Reinforcement
Code of practice - Construction work- Appendix C
MSDS- Fibreglass composite reinforcement bar
Truss Plan Timber.pdf

Recently uploaded (20)

PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Yogi Goddess Pres Conference Studio Updates
PPTX
Cell Structure & Organelles in detailed.
PPTX
master seminar digital applications in india
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
Lesson notes of climatology university.
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
RMMM.pdf make it easy to upload and study
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
Cell Types and Its function , kingdom of life
PDF
Updated Idioms and Phrasal Verbs in English subject
PDF
Classroom Observation Tools for Teachers
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Yogi Goddess Pres Conference Studio Updates
Cell Structure & Organelles in detailed.
master seminar digital applications in india
Module 4: Burden of Disease Tutorial Slides S2 2025
Lesson notes of climatology university.
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
RMMM.pdf make it easy to upload and study
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Supply Chain Operations Speaking Notes -ICLT Program
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Chinmaya Tiranga quiz Grand Finale.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
Cell Types and Its function , kingdom of life
Updated Idioms and Phrasal Verbs in English subject
Classroom Observation Tools for Teachers

Practical Assessment-Construct Eaves-Boxed eaves

  • 1. © Canberra Institute of Technology Page 1 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 Observation/Practical Assessment Student Name: CIT Number: Name of Subject: ConstructEaves NAT ID: CPCCCA3008 CRN: Assessment Name Construct Timber Eaves Assessment Date Student Statement This assignment is my own work, except where I have acknowledged the use of the works of other people. I understand that by submitting this assessment electronically, I agree to this statement. Student Signature: Date: Privacy Disclaimer CIT is collecting your personal information for assessment purposes. The information will only be used in accordance with the CIT Privacy Policy. Assessor Feedback Attempt 1 ☐ Satisfactory ☐ Not Yet Satisfactory Date: Attempt 2 ☐ Satisfactory ☐ Not Yet Satisfactory Date: Assessor Signature: Date: Note from Assessor (including any reasonable adjustment): Student Information Review the important information below in relation to this assessment task. Instructions
  • 2. © Canberra Institute of Technology Page 2 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 You are going to follow the given plans to plan, mark and cut roof members to accommodate a timber fascia and barge board to meet the NCC and Australian Standards. You will install timber verge gable eaves, timber box gable eaves and eaves. The constructions will have an apex on the barge board, a junction between the barge board and the plumb fascia, a junction of the fascia and eave lining at the valley and a junction of the fascia and eave lining at the hip. Task Instructions You willbe required to submit the following documents on completion to Ready Skills:  JSA (Job Safety Analysis)andToolbox talk (Ready Skills)  Calculateyou gable end dimensions  Listthe required tools and equipment needed for this task  Listthe required materials needed for this task  Calculateyour cutting list Calculate your gable end You are required to calculate the ‘pitched roof component’ of the ‘Gable End’. Please complete the calculations below. Your teacher will provide you with a ‘Roof Pitch’ or you may need to do a site measure. The correct calculation and construction of this component will be assessed by your teacher. ROOFING TRIANGLE FOR GABLE ENDCOMPONENT OF EAVE PRACTICAL: This is also on yourmain set of plans
  • 3. © Canberra Institute of Technology Page 3 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 Rise Half Span (Round up allcalculations dealing withmeasurements to 3 decimal points) Plan length or half span Rise Rafter line length = = = (Round up allcalculations dealing withdegrees to 1 decimal point) OnThe wall Provided:  Construct the eaves frame according to the plans  Cut and install the timber fascia as per the plans  Cut/shape and fit eave sheets  Cut and install quad mouldings Once the eavepractical has beendeemedsatisfactory:  De-construct eave structure  De-nail and restack timbers  Any timber below 500mm gets put into adesignated bin  Finalise this document and submit to your assessor = Angle of plumb cut
  • 4. © Canberra Institute of Technology Page 4 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 Plans are separate to this document Time Allowed 4 hours Assessment Conditions Assessmentwill bealways conducted in simulated work environment CIT Bruce under teacher supervision. If at any stage the assessor deems the assessmentto be unsafeit will be stopped, and this will count as your first attempt. Access toallresources, manual and standards is permitted. All mobile phones are to be switchoff during the assessment. Materials Provided by CIT All plans, materials and tools required to complete the taskwill be provided. Materials You Need Personal protective equipment PPE and nail bag and a device to access Ready Skills. Attempts You may have at least two (2) attempts for this assessment.  If your first attempt is not successful, your teacher will discuss your results with you and will arrange a second attempt.  If your second attempt is not successful, you may be required to re-enrol in this unit. Please refer to the CIT Assessment Policy if you have any questions.
  • 5. © Canberra Institute of Technology Page 5 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 Observation/Practical Checklist You must successfully complete the following skills in the Observation/Practical checklist. (Please Note: Students only need to complete grey boxes. Your teacher will provide you with feedback and advise whether your work is Satisfactory or Not Yet Satisfactory). Student Name: CIT Number: During the task the following skills were demonstrated satisfactorily: Attempt 1 Attempt 2 Date (Optional) Date (Optional) Observation/Practical Checklist Items S* NYS* S* NYS* 1. Student activelyparticipated in a toolbox talk and agreed to its content ☐ ☐ ☐ ☐ 2. Student contributed to the development of a JSA and its control rating, with consideration to environmental requirements ☐ ☐ ☐ ☐ 3. Student correctly selected and used PPE for giventasks ☐ ☐ ☐ ☐ 4. Student carried out task in accordance with the JSA and organisational policies and procedures. ☐ ☐ ☐ ☐ 5. Student used written and verbal communication skills during this topic, also completed the non-verbal communication document ☐ ☐ ☐ ☐ 6. Student worked with others in a team to achieve given tasks ☐ ☐ ☐ ☐ 7. Student was able to interpret and apply relevant work instruction and complete all documentation given. ☐ ☐ ☐ ☐ 8. Student was able to read and interpret plans, site drawings and specifications ☐ ☐ ☐ ☐ 9. Student listedand selected the correct materials for the given tasks ☐ ☐ ☐ ☐ 10. Student listed and selected the correct tools for the given tasks ☐ ☐ ☐ ☐ 11. Student created an accurate cutting list for the given tasks ☐ ☐ ☐ ☐ 12. Student checked tool and equipment for serviceability and reported any faults to the appropriate person ☐ ☐ ☐ ☐
  • 6. © Canberra Institute of Technology Page 6 of 6 Date created: 15/08/2022 CRICOS No. 00001K | RTO Code 0101 Date updated: 17/08/2022 13. The student communicated and coordinated to install the facia and barge to AS1684 standards. The task:  Facia was selected and cut to length correctly  Facia was installed according to working drawings  Mitres and joints are within tolerance +/- 1mm  Barge return is to correct pitch and mitre is within tolerance +/- 1mm ☐ ☐ ☐ ☐ 14. The student communicated and coordinated to install the Eaves framework to AS1684 standards. The task: Framework was set out to working drawings Back ledger was level with fascia groove Blocking and trimmers installedto working drawings Gable and barge rafters to correct pitch  Distance from fascia to wall fits an uncut eave sheet (455mm) ☐ ☐ ☐ ☐ 15. The student communicated and coordinated to line and clad eaves to AS1684 standards. The task: Eavesheets cut and shaped to suit task Sheets joined and fixed inaccordance to drawings and specifications Moldings are fitted and fixed accurately and in accordance with drawings and specs  Sloping eaves (raked eaves) are fitted and fixed according to drawings and specs ☐ ☐ ☐ ☐ 16. Student had been assessed and uploaded photos of task to Ready Skills before cleaning up commenced ☐ ☐ ☐ ☐ 17. Student de-constructed the task in a safe and methodical system ☐ ☐ ☐ ☐ 18. All material was disposed of appropriately, reusing and recycling materials when applicable ☐ ☐ ☐ ☐ *S –Satisfactory, NYS – Not Yet Satisfactory