1. PRACTICUM
S U M N I M A G H I M I R E
2 0 0 7 3 8
@ A R C H I T E R O N E D E S I G N & T R A I N I N G
C E N T E R P V T . L T D
2 0 2 4
2. ArchiteroneDesignStudio
Location: Dillibazar, Kathamandu
Contact: +977 985503991
E-mail: architerone.construct@gmail.com
Architect:
AR. Purna Bd. Shrestha
Field of Expertise:
• Design Consultation
• Replanning and Redesigning
• Site supervision
• Landscape Design
• Interior Designs
OFFICE HIERARCHY:
Chairman
AR. Purna Bd. Shrestha
Senior Engineer Architect Structural Engineer
ER. Ashim Shrestha AR. Purna Bd. shrestha ER. Satya S. Shrestha
IT Department
Mr. Arjun Shrestha
S u m n i m a G h i m i r e
2 0 2 4
3. Janakpur Residence
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
SANN Intl. College
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
Janakpur Hotel
● WORKING DRAWINGS
● ELECTRICAL AND SANITARY DRAWINGS
● MATERIAL INVENTORY
Marcopolo Rooftop Restaurant
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
● PRESENTATION DRAWINGS
01
02
03
04
PRACTICUM
REPORT
CONTENTS
4. GKCC (GOPI KRISHNA COMMERCIAL COMPLEX)
● OPTIONS CREATING, HIT AND TRIAL
Satish Residence
● MUNICIPALITY DRAWING
Sheraton Hotel
● PREPARATION OF BILL
● MATERIAL INVENTORY
● RFI
05
06
07
PRACTICUM
REPORT
CONTENTS
Site Visit
● SITE LAYOUT
08
6. INTRODUCTION
Location: Chandragiri, Kathmandu
Client: Karna Bd. Shahi
Type of Project: Redesigning Former Design
Assigned Date: Asoj 15th, 2081
Total Area: 5076 sq. m.
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
Involvement:
• Floor plans - 2D Layouts
• 3D modelling in SketchUp
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
7. Previously Designed Building
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
Planning
Trying few geometrical forms dividing high school and
primary block.
A divider placed in between two blocks with half a story
height difference in plinth level of both the block. i.e 1.65m
FORM CONCEPTUAL DESIGN
8. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
Planning
Trying few geometrical forms dividing high school and
primary block.
A divider placed in between two blocks with half a story
height difference in plinth level of both the block. i.e 1.65m
FORM CONCEPTUAL DESIGN
9. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Ground Floor Plan 1134 SQ.M
1. Grand entrance with ample seating area-295
SQ.M
2. Office-1-64.3 SQ.M
3. Exam Centre Hall-365 SQ.M.
4. Teacher’s Room-58.6 SQ.M
5. General Infirmary-63.25 SQ.M
6. Server & IT room-63.25 SQ.M
WASHROOM 1:12 RATIO
2-CUBICLES FOR LADIES
2-CUBICLE FOR GENTS
6- URINALS
Grand entrance with
ample seating area
Office-1
Exam Centre Hall
Teacher’s
Room
General
Infirmary
Server &
IT room
S u m n i m a G h i m i r e
10. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
First Floor Plan 1134 SQ.M
1. Meeting hall-125 SQ.M
2. Office-2&3-64.3 SQ.M
3. Chemistry Lab-365 SQ.M.
4. Chemical storage room-63.25 SQ.M
5. Teacher’s Room-58.6 SQ.M
6. Classrooms-63.25 SQ.M
WASHROOM 1:24 RATIO
Meeting hall
Office-2&3
Chemistry Lab.
Chemical
storage room
Teacher’s
Room
Classrooms
S u m n i m a G h i m i r e
11. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Second Floor Plan 1134 SQ.M
1. Physics Lab-365 SQ.M.
2. Storage room-63.25 SQ.M
3. Teacher’s Room-58.6 SQ.M
4. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO Biology Lab
Storage
room
Teacher’s
Room
Classrooms
Classrooms
S u m n i m a G h i m i r e
12. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
FloorPlans
Third Floor Plan 1134 SQ.M
1. Biology lab- 365 SQ.M.
2. Storage room-63.25 SQ.M
3. Teacher’s Room-58.6 SQ.M
4. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO
Biology lab
Teacher’s
Room
Classrooms
Classrooms
13. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Fourth Floor Plan 1134 SQ.M
1. Library-365 SQ.M.
2. Teacher’s Room-58.6 SQ.M
3. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO
Library
Teacher’s
Room
Classrooms
Classrooms
S u m n i m a G h i m i r e
14. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Fifth Floor Plan 1134 SQ.M
1. Canteen-295 SQ.M.
2. Kitchen- 65 SQ.M
3. Computer Lab- 365 SQ.M.
4. Teacher’s Room-58.6 SQ.M
5. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO Computer
Lab
Teacher’s
Room
Classrooms
Canteen
Kitchen
S u m n i m a G h i m i r e
15. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Sixth Floor Plan 1134 SQ.M
1. Auditorium-1340 SQ.M.
S u m n i m a G h i m i r e
16. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
• The Racing Track Infront Is Of 100 M.
• The road track surrounding the track is used for reversing the
busses or any other vehicle since buses are pickup and drop
FRONT FAÇADE OF THE BUILDING
BRICK CLADDING FAÇADE
• Brick cladding was done to match with the
bhaleswor mandir situated in Chandragiri height.
To show traditional touch and to blend with the
surrounding
18. INTRODUCTION
Location: Janakpur
Client: Dilip Kumar Mahaseth
Type of Project: Residential
Assigned Date: Kartik 8th, 2081
Requirements:
• Client wanted a guest bedroom on top
• Two master bedrooms for his two sons
• One Master bedroom for himself.
• Slight look on VAASTU
Involvement:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
J A N A K P U R R E S I D E N C E 2 0 2 4 S u m n i m a G h i m i r e
19. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Planning
- Private backyard parking and entrance
- Executive Office room
- Reception with waiting area
- Working Hall
- Ladies & Gents Toilet
CORRECTED DRAWING BY OFFICE SUPERVISOR
• Other floors are created based on the ground floorplan
20. Entrance Gate
32’ ROAD
Entrance Gate
13’ ROAD
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Planning
NE
N
W E
S
NW
SW SE
VAASTU accordance:
- Working Area (G.F)/ Kitchen (F.F)
(SE)- Fire Zone/Active Energy
- Reception (N)- Abundance
- Office (NE)- Calm Energy
- Toilet (F.F, S.F, T.F) (NW)- Cancels out negative energy
21. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Layouts
F I R S T F L O O R P L A N
1 8 6 3 S Q . F T
- Master bedroom with walk in closet and att. Toilet bath
- Living room below.
- Entertainment area
- Kitchen & dining with outdoor breakfast area
22. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Layout
S E C O N D F L O O R P L A N
1 8 6 3 S Q , F T .
- Master bedroom with walk in closet and att. Toilet bath
- A void area that is open to living room below.
- Family room space
- Master bedroom with large bathroom and balcony
23. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Zoning
T H I R D F L O O R P L A N
7 2 0 S Q . F T .
- Guest bedroom
- Common Toilet / Bath
- Open Terrace
- Puja room
24. 3DRender
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Greeneries were
added to enhance the
looks of the building
A porch with steps outside an office area
serving as a welcoming entryway,
providing a functional transition between
the exterior and interior
Truss structure is built with roof to provide a
modern outdoor sitting and to minimize heat
for the immediate floor below.
Since it is a semi commercial building, Lower
Floor being the office.
Patio is created to access in to the main
reception area.
RCC cover is created over every window
1. For shading purpose
2. To shelter from the rain
25. Challenges
• The 3D design changes were asked rapidly at a space of 2
days and it was a very short time to change the demanded
design
• The design and choice of window greatly matters the outer
looks, but because of lack of knowledge of door and
window materials the design process got slower.
• Design was created with little to less knowledge about the
site condition as I haven’t visited the site yet.
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
27. INTRODUCTION
Location: Janakpur
Client: Kusheshwor Mahat
Type of Project: Hotel
Assigned Date: Kartik 21st, 2081
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• Electrical & Sanitary Drawing
• Section of Toilet
Involvement:
• Electrical & Sanitary Drawing
• Section of Toilet
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
28. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
29. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
30. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
• In this project, the electrical wiring and points are
highlighted which determines the exact position of light
fixtures to be placed as per the requirements stated by
the client.
• Some of the fixtures desired by clients for potential
placement are provided
31. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ectricalDrawing
Layout
32. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawingSection
33. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
WaterSupply and
SanitaryDrawing
Hot water pipes and cold-water
pipes are indispensable elements in
a building’s plumbing infrastructure,
serving key roles in comfort,
hygiene, safety, and the overall
functionality of the space. Pipeline
for the hot and cold-water pipe was
passed through the duct which was
constructed for them specifically.
34. J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
35. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
36. Having said that, after recent visit to Janakpur. Client had asked to add the top two floors as the restaurant. To which our team had gone there to have a
look at the site again, so that we could have a clear visualization of the site and surrounding to create designs.
But unfortunately, the contractor client hired had not placed the placements as per the drawing. Which was an additional work to redesign as per the
current situation.
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
37. J A N A K P U R H O T E L 2 0 2 4
Bulge on the wall
S u m n i m a G h i m i r e
38. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
Fixtures that are required in the project For e.g. in this case sanitary fixtures were required thus the marketing research people visits
the office and they present their products to our office including the client and they provide the necessary details required for the
drawing completion.
MATERIAL INVENTORY (SANITARY FIXTURES)
39. J A N A K P U R H O T E L 2 0 2 4
SanitaryDrawingSection
S u m n i m a G h i m i r e
40. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
42. INTRODUCTION
Location: Kamalpokhari Chwok, Kathmandu
Client: Indreni Multipurpose Investment .Co
Type of Project: INTERIOR DESIGNING (Restaurant & Bar)
Assigned Date: Kartik 26th, 2081
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• BOQ
Involvement:
• Floor plans - 2D Layouts
• 3D modelling
• Render
S A N N I N T E R N A T I O N A L C O L L E G E S U M N I M A G H I M I R E
2 0 2 4
43. M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Planning
Raised deck to conceal the pipe
lines
Kitchen is proposed on existing
structure
GENERAL PLANNING
44. Proposals
Total seatings of 56 people,
taking 28 guest rooms times
two. Meeting the goal 60
people accommodation was
created as seen in the first
proposal.
46. M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Branding Wall
Raised Deck Plat
Partition
with the
flower
beddings
Extra added pillar to
match other two duct
voids
Enhancin
g the
existing
trellis
Beer
Garden
47. Challenges
• Since the structure is 30 years+ old, the first issue was
to create a light weight structure while fully water
proof.
• Concealing the existing duct while maintaining the
aesthetics of restaurant.
M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Lessons
• Zoning is primarily important to ensure a smooth
transition in design.
• Loose furniture are easy to create a greater number of
seating abbreviations in design.
49. INTRODUCTION
Location: Gopi Krishna, Chabahil
Client: Owner of Gopi Krishna cinemas
Type of Project: mixed- used
Assigned Date: Mangsir 2nd, 2081
G K C C S u m n i m a G h i m i r e
2 0 2 4
CLIENT INTENTION: INVOLVEMENT
•100 Room + Hotel -Apartment
•Apartment -Penthouse
•Shopping mall
•Casino
•Theatre
•Conference Hall
•Swimming Pool / Fitness Centre
50. CURRENT SCENARIO OF PROJECT:
TOTAL LAND AREA: 4454 sq. m
Adjoined By Existing Building from Project [ Gopi Krishna
Cinemas]
Road in the middle So, We Are Trying to Perform Land pooling
Under the Guidance of KVDA
A 66kv High Tension Line Is Going Through the Project.
2 towers hotel tower - 12 storey
apartment tower – 15 storey
SITE PLAN
● The staircase is only to be dismantled and the remaining cinema hall gets renovated
Fig: PT WIRE BEAMLESS SLAB
51. FINALSITEPLAN
BYE LAWS:
Total Land Area: 4454.00 sq. m.
Road Plot: 125.00 sq. m.
GCR permissible: 50% (2227.00 sq. m.)
FAR permissible: 4.5 (20043.00 sq.m)
Apartment Tower:52.0 m Setback: 7.0 m
Hotel Tower: 42.0 m Setback: 6.0 m
60. INTRODUCTION
Location: Duwakot, Jhaukhel ChanguNarayan Municipality
Client: Satish Shrestha
Type of Project: Residence
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• Municipal Drawing (ARCHITECTURAL, STRUCTURAL)
Involvement:
● Corrected the plans as per the change supervisor
suggested
● Architectural Municipal Drawing
S A T I S H R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
61. S A T I S H R E S I D E N C E
SITEPLAN
Site area: 4074.00 sq.ft.
GCR: 60%
FAR: 1.75
R.O.W: 3.0m from Road Centre
General Setback: 1.5m
Setback for shutter: 2.5m
Setback from High tension line: 12’-0”
Since the land is above 8-aana, the permissible Ground coverage
ratio (GCR) is only 60%. Meanwhile FAR for this project is 1.75
The road is only 3m wide, and hence the R.O.W is 3m from centre of
the road. We have left another 8’-0” after the R.O.W just incase the
client would want to make temporary truss structure with rolling
shutter for shop purpose.
62. S A T I S H R E S I D E N C E
Involvement
● Slight angled wall of the western direction was changed to straight wall.
● The building placement was leaving 5m setback as previously it was attached to the wall with no openings.
● Openings were added
● Pillar size was differed
63. S A T I S H R E S I D E N C E
Architectural
Drawing
65. INTRODUCTION
Location: Thamel, Kathmandu
Client: MIT Group Holdings Nepal PVT. LTD
Type of Project: 5-Star Hotel
Requirements:
● Checking and confirming IPC(Interim Payment Certificate),
VO(Variation Order), (which means if there is any change
from initial objective, and the work is changed)
● Confirming BOQ
● Consulting with project director and allied manpower or
domestic contractors, refining the shop drawing
Involvement:
● Helping to create RFI
● Assisting with Quantity verification of loose furniture
provided by the Interior firm based on Singapore
S H E R A T O N H O T E L S u m n i m a G h i m i r e
2 0 2 4
66. S H E R A T O N H O T E L
CrossCheckofQuantities&SpecifyingIDasper
specificationsanddrawingprovided
1. To check the quantities the
drawings are provided by the
designed company as given below.
67. S H E R A T O N H O T E L
2. The ID number specified by the company is placed on top right corner of the drawing like illustrated below
3. The catalogue provided by the company shall be tallied and their specified name and the number of quantities must be
counted by proxy method. (Proxy method in this case is separating the numbered layer and sorting them one by one.)
68. S H E R A T O N H O T E L
4. The naming of the specified id furniture or fixtures is confirmed by the catalogue also provided by the company and
its size, name and billing is done.
NAME OF THE PRODUCT
The sizes are also provided to jot down
the given sizes in the BOQ for further
billing.
70. S H E R A T O N H O T E L
SiteSupervision
Error in steel deck which is
later welded
Poly urathene foam is added to conceal
any gaps for 50 mm thick concrete to pour
into
Error in steel deck to be
covered
71. S H E R A T O N H O T E L
SiteSupervision
DRY WALL
• Pink for fire resistor wall
• Green for water resistor wall
FITTINGS IN DRY WALL INNER LAYER INSULATION
72. S H E R A T O N H O T E L
RequestForInfomation
Request for Information, is a formal request for clarification or additional information about a project.
RFIs are a common part of construction projects and are used to resolve ambiguities and gaps in
documentation.
73. Location: Gaushala,Kathmandu
Client: NA
Type of Project: Site Analysis and Measurement
The building is located at Gaushala Chowk, close to the main road,
offering easy accessibility and prominent visibility.
Involvement:
● Measurement of column spacing.
S u m n i m a G h i m i r e
2 0 2 4
GAUSHALASITE
74. S u m n i m a G h i m i r e
2 0 2 4
MEASUREMENTS
The interior design needs to be reconfigured and adapted to
meet the requirements of a commercial project, ensuring
functionality, aesthetics, and compliance with commercial
space standards and regulations.
Column Layout
75. SITEVISITAND
ANALYSIS
8.2.1 Problems at column:
Pipes running through columns create significant structural problems,
compromising the integrity of the building and potentially affecting safety and
stability.
8.2.2 Solution:
Retrofitting and jacketing are being applied to reinforce the structure, enhancing
its strength and stability by adding additional support and improving its load-
bearing capacity to address the existing deficiencies
G A U S H A L A S I T E