PRACTICUM
S U M N I M A G H I M I R E
2 0 0 7 3 8
@ A R C H I T E R O N E D E S I G N & T R A I N I N G
C E N T E R P V T . L T D
2 0 2 4
ArchiteroneDesignStudio
Location: Dillibazar, Kathamandu
Contact: +977 985503991
E-mail: architerone.construct@gmail.com
Architect:
AR. Purna Bd. Shrestha
Field of Expertise:
• Design Consultation
• Replanning and Redesigning
• Site supervision
• Landscape Design
• Interior Designs
OFFICE HIERARCHY:
Chairman
AR. Purna Bd. Shrestha
Senior Engineer Architect Structural Engineer
ER. Ashim Shrestha AR. Purna Bd. shrestha ER. Satya S. Shrestha
IT Department
Mr. Arjun Shrestha
S u m n i m a G h i m i r e
2 0 2 4
Janakpur Residence
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
SANN Intl. College
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
Janakpur Hotel
● WORKING DRAWINGS
● ELECTRICAL AND SANITARY DRAWINGS
● MATERIAL INVENTORY
Marcopolo Rooftop Restaurant
● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS
● 3D VISUALISATION, SKETCHES, RENDERS
● PRESENTATION DRAWINGS
01
02
03
04
PRACTICUM
REPORT
CONTENTS
GKCC (GOPI KRISHNA COMMERCIAL COMPLEX)
● OPTIONS CREATING, HIT AND TRIAL
Satish Residence
● MUNICIPALITY DRAWING
Sheraton Hotel
● PREPARATION OF BILL
● MATERIAL INVENTORY
● RFI
05
06
07
PRACTICUM
REPORT
CONTENTS
Site Visit
● SITE LAYOUT
08
SANN
INTERNATIONAL
COLLEGE
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Chandragiri, Kathmandu
Client: Karna Bd. Shahi
Type of Project: Redesigning Former Design
Assigned Date: Asoj 15th, 2081
Total Area: 5076 sq. m.
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
Involvement:
• Floor plans - 2D Layouts
• 3D modelling in SketchUp
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
Previously Designed Building
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
Planning
 Trying few geometrical forms dividing high school and
primary block.
 A divider placed in between two blocks with half a story
height difference in plinth level of both the block. i.e 1.65m
FORM CONCEPTUAL DESIGN
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
Planning
 Trying few geometrical forms dividing high school and
primary block.
 A divider placed in between two blocks with half a story
height difference in plinth level of both the block. i.e 1.65m
FORM CONCEPTUAL DESIGN
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Ground Floor Plan 1134 SQ.M
1. Grand entrance with ample seating area-295
SQ.M
2. Office-1-64.3 SQ.M
3. Exam Centre Hall-365 SQ.M.
4. Teacher’s Room-58.6 SQ.M
5. General Infirmary-63.25 SQ.M
6. Server & IT room-63.25 SQ.M
WASHROOM 1:12 RATIO
2-CUBICLES FOR LADIES
2-CUBICLE FOR GENTS
6- URINALS
Grand entrance with
ample seating area
Office-1
Exam Centre Hall
Teacher’s
Room
General
Infirmary
Server &
IT room
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
First Floor Plan 1134 SQ.M
1. Meeting hall-125 SQ.M
2. Office-2&3-64.3 SQ.M
3. Chemistry Lab-365 SQ.M.
4. Chemical storage room-63.25 SQ.M
5. Teacher’s Room-58.6 SQ.M
6. Classrooms-63.25 SQ.M
WASHROOM 1:24 RATIO
Meeting hall
Office-2&3
Chemistry Lab.
Chemical
storage room
Teacher’s
Room
Classrooms
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Second Floor Plan 1134 SQ.M
1. Physics Lab-365 SQ.M.
2. Storage room-63.25 SQ.M
3. Teacher’s Room-58.6 SQ.M
4. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO Biology Lab
Storage
room
Teacher’s
Room
Classrooms
Classrooms
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
FloorPlans
Third Floor Plan 1134 SQ.M
1. Biology lab- 365 SQ.M.
2. Storage room-63.25 SQ.M
3. Teacher’s Room-58.6 SQ.M
4. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO
Biology lab
Teacher’s
Room
Classrooms
Classrooms
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Fourth Floor Plan 1134 SQ.M
1. Library-365 SQ.M.
2. Teacher’s Room-58.6 SQ.M
3. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO
Library
Teacher’s
Room
Classrooms
Classrooms
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Fifth Floor Plan 1134 SQ.M
1. Canteen-295 SQ.M.
2. Kitchen- 65 SQ.M
3. Computer Lab- 365 SQ.M.
4. Teacher’s Room-58.6 SQ.M
5. Classrooms-63.25 SQ.M
WASHROOM 1:70 RATIO Computer
Lab
Teacher’s
Room
Classrooms
Canteen
Kitchen
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4
FloorPlans
Sixth Floor Plan 1134 SQ.M
1. Auditorium-1340 SQ.M.
S u m n i m a G h i m i r e
S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e
2 0 2 4
• The Racing Track Infront Is Of 100 M.
• The road track surrounding the track is used for reversing the
busses or any other vehicle since buses are pickup and drop
FRONT FAÇADE OF THE BUILDING
BRICK CLADDING FAÇADE
• Brick cladding was done to match with the
bhaleswor mandir situated in Chandragiri height.
To show traditional touch and to blend with the
surrounding
JANAKPUR
RESIDENCE
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Janakpur
Client: Dilip Kumar Mahaseth
Type of Project: Residential
Assigned Date: Kartik 8th, 2081
Requirements:
• Client wanted a guest bedroom on top
• Two master bedrooms for his two sons
• One Master bedroom for himself.
• Slight look on VAASTU
Involvement:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
J A N A K P U R R E S I D E N C E 2 0 2 4 S u m n i m a G h i m i r e
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Planning
- Private backyard parking and entrance
- Executive Office room
- Reception with waiting area
- Working Hall
- Ladies & Gents Toilet
CORRECTED DRAWING BY OFFICE SUPERVISOR
• Other floors are created based on the ground floorplan
Entrance Gate
32’ ROAD
Entrance Gate
13’ ROAD
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Planning
NE
N
W E
S
NW
SW SE
VAASTU accordance:
- Working Area (G.F)/ Kitchen (F.F)
(SE)- Fire Zone/Active Energy
- Reception (N)- Abundance
- Office (NE)- Calm Energy
- Toilet (F.F, S.F, T.F) (NW)- Cancels out negative energy
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Layouts
F I R S T F L O O R P L A N
1 8 6 3 S Q . F T
- Master bedroom with walk in closet and att. Toilet bath
- Living room below.
- Entertainment area
- Kitchen & dining with outdoor breakfast area
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Layout
S E C O N D F L O O R P L A N
1 8 6 3 S Q , F T .
- Master bedroom with walk in closet and att. Toilet bath
- A void area that is open to living room below.
- Family room space
- Master bedroom with large bathroom and balcony
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Zoning
T H I R D F L O O R P L A N
7 2 0 S Q . F T .
- Guest bedroom
- Common Toilet / Bath
- Open Terrace
- Puja room
3DRender
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
Greeneries were
added to enhance the
looks of the building
A porch with steps outside an office area
serving as a welcoming entryway,
providing a functional transition between
the exterior and interior
Truss structure is built with roof to provide a
modern outdoor sitting and to minimize heat
for the immediate floor below.
Since it is a semi commercial building, Lower
Floor being the office.
Patio is created to access in to the main
reception area.
RCC cover is created over every window
1. For shading purpose
2. To shelter from the rain
Challenges
• The 3D design changes were asked rapidly at a space of 2
days and it was a very short time to change the demanded
design
• The design and choice of window greatly matters the outer
looks, but because of lack of knowledge of door and
window materials the design process got slower.
• Design was created with little to less knowledge about the
site condition as I haven’t visited the site yet.
J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
JANAKPUR
HOTEL
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Janakpur
Client: Kusheshwor Mahat
Type of Project: Hotel
Assigned Date: Kartik 21st, 2081
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• Electrical & Sanitary Drawing
• Section of Toilet
Involvement:
• Electrical & Sanitary Drawing
• Section of Toilet
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawing
• In this project, the electrical wiring and points are
highlighted which determines the exact position of light
fixtures to be placed as per the requirements stated by
the client.
• Some of the fixtures desired by clients for potential
placement are provided
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ectricalDrawing
Layout
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
ElectricalDrawingSection
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
WaterSupply and
SanitaryDrawing
Hot water pipes and cold-water
pipes are indispensable elements in
a building’s plumbing infrastructure,
serving key roles in comfort,
hygiene, safety, and the overall
functionality of the space. Pipeline
for the hot and cold-water pipe was
passed through the duct which was
constructed for them specifically.
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
Having said that, after recent visit to Janakpur. Client had asked to add the top two floors as the restaurant. To which our team had gone there to have a
look at the site again, so that we could have a clear visualization of the site and surrounding to create designs.
But unfortunately, the contractor client hired had not placed the placements as per the drawing. Which was an additional work to redesign as per the
current situation.
J A N A K P U R H O T E L S u m n i m a G h i m i r e
2 0 2 4
J A N A K P U R H O T E L 2 0 2 4
Bulge on the wall
S u m n i m a G h i m i r e
J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
Fixtures that are required in the project For e.g. in this case sanitary fixtures were required thus the marketing research people visits
the office and they present their products to our office including the client and they provide the necessary details required for the
drawing completion.
MATERIAL INVENTORY (SANITARY FIXTURES)
J A N A K P U R H O T E L 2 0 2 4
SanitaryDrawingSection
S u m n i m a G h i m i r e
J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
MARCOPOLOROOFTOP
RESTAURANT
S U M N I M A G H I M I R E
2 0 2 4
INTRODUCTION
Location: Kamalpokhari Chwok, Kathmandu
Client: Indreni Multipurpose Investment .Co
Type of Project: INTERIOR DESIGNING (Restaurant & Bar)
Assigned Date: Kartik 26th, 2081
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• BOQ
Involvement:
• Floor plans - 2D Layouts
• 3D modelling
• Render
S A N N I N T E R N A T I O N A L C O L L E G E S U M N I M A G H I M I R E
2 0 2 4
M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Planning
Raised deck to conceal the pipe
lines
Kitchen is proposed on existing
structure
GENERAL PLANNING
Proposals
Total seatings of 56 people,
taking 28 guest rooms times
two. Meeting the goal 60
people accommodation was
created as seen in the first
proposal.
FinalLayout
Following is the final plan
that was corrected by the
supervisor:
M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Branding Wall
Raised Deck Plat
Partition
with the
flower
beddings
Extra added pillar to
match other two duct
voids
Enhancin
g the
existing
trellis
Beer
Garden
Challenges
• Since the structure is 30 years+ old, the first issue was
to create a light weight structure while fully water
proof.
• Concealing the existing duct while maintaining the
aesthetics of restaurant.
M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E
2 0 2 4
Lessons
• Zoning is primarily important to ensure a smooth
transition in design.
• Loose furniture are easy to create a greater number of
seating abbreviations in design.
GOPI KRISHNA
COMMERCIAL
COMPLEX
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Gopi Krishna, Chabahil
Client: Owner of Gopi Krishna cinemas
Type of Project: mixed- used
Assigned Date: Mangsir 2nd, 2081
G K C C S u m n i m a G h i m i r e
2 0 2 4
CLIENT INTENTION: INVOLVEMENT
•100 Room + Hotel -Apartment
•Apartment -Penthouse
•Shopping mall
•Casino
•Theatre
•Conference Hall
•Swimming Pool / Fitness Centre
CURRENT SCENARIO OF PROJECT:
TOTAL LAND AREA: 4454 sq. m
 Adjoined By Existing Building from Project [ Gopi Krishna
Cinemas]
 Road in the middle So, We Are Trying to Perform Land pooling
Under the Guidance of KVDA
 A 66kv High Tension Line Is Going Through the Project.
 2 towers hotel tower - 12 storey
apartment tower – 15 storey
SITE PLAN
● The staircase is only to be dismantled and the remaining cinema hall gets renovated
Fig: PT WIRE BEAMLESS SLAB
FINALSITEPLAN
BYE LAWS:
Total Land Area: 4454.00 sq. m.
Road Plot: 125.00 sq. m.
GCR permissible: 50% (2227.00 sq. m.)
FAR permissible: 4.5 (20043.00 sq.m)
Apartment Tower:52.0 m Setback: 7.0 m
Hotel Tower: 42.0 m Setback: 6.0 m
COLUMN LAYOUT
OPTION-1
APARTMENT
OPTION-2
APARTMENT
CARPET AREA
● This option was refined by supervisor.
● Detailing was done by
OPTION-1
PENTHOUSE BASE
OPTION-2
PENTHOUSE BASE
OPTION-1
PENTHOUSE TOP
OPTION-2
PENTHOUSE TOP
SATISH
RESIDENCE
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Duwakot, Jhaukhel ChanguNarayan Municipality
Client: Satish Shrestha
Type of Project: Residence
Requirements:
• Floor plans - 2D Layouts
• 3D Modelling
• Render
• Municipal Drawing (ARCHITECTURAL, STRUCTURAL)
Involvement:
● Corrected the plans as per the change supervisor
suggested
● Architectural Municipal Drawing
S A T I S H R E S I D E N C E S u m n i m a G h i m i r e
2 0 2 4
S A T I S H R E S I D E N C E
SITEPLAN
Site area: 4074.00 sq.ft.
GCR: 60%
FAR: 1.75
R.O.W: 3.0m from Road Centre
General Setback: 1.5m
Setback for shutter: 2.5m
Setback from High tension line: 12’-0”
Since the land is above 8-aana, the permissible Ground coverage
ratio (GCR) is only 60%. Meanwhile FAR for this project is 1.75
The road is only 3m wide, and hence the R.O.W is 3m from centre of
the road. We have left another 8’-0” after the R.O.W just incase the
client would want to make temporary truss structure with rolling
shutter for shop purpose.
S A T I S H R E S I D E N C E
Involvement
● Slight angled wall of the western direction was changed to straight wall.
● The building placement was leaving 5m setback as previously it was attached to the wall with no openings.
● Openings were added
● Pillar size was differed
S A T I S H R E S I D E N C E
Architectural
Drawing
SHERATON
HOTEL
S u m n i m a G h i m i r e
2 0 2 4
INTRODUCTION
Location: Thamel, Kathmandu
Client: MIT Group Holdings Nepal PVT. LTD
Type of Project: 5-Star Hotel
Requirements:
● Checking and confirming IPC(Interim Payment Certificate),
VO(Variation Order), (which means if there is any change
from initial objective, and the work is changed)
● Confirming BOQ
● Consulting with project director and allied manpower or
domestic contractors, refining the shop drawing
Involvement:
● Helping to create RFI
● Assisting with Quantity verification of loose furniture
provided by the Interior firm based on Singapore
S H E R A T O N H O T E L S u m n i m a G h i m i r e
2 0 2 4
S H E R A T O N H O T E L
CrossCheckofQuantities&SpecifyingIDasper
specificationsanddrawingprovided
1. To check the quantities the
drawings are provided by the
designed company as given below.
S H E R A T O N H O T E L
2. The ID number specified by the company is placed on top right corner of the drawing like illustrated below
3. The catalogue provided by the company shall be tallied and their specified name and the number of quantities must be
counted by proxy method. (Proxy method in this case is separating the numbered layer and sorting them one by one.)
S H E R A T O N H O T E L
4. The naming of the specified id furniture or fixtures is confirmed by the catalogue also provided by the company and
its size, name and billing is done.
NAME OF THE PRODUCT
The sizes are also provided to jot down
the given sizes in the BOQ for further
billing.
S H E R A T O N H O T E L
BillofQuantities
S H E R A T O N H O T E L
SiteSupervision
Error in steel deck which is
later welded
Poly urathene foam is added to conceal
any gaps for 50 mm thick concrete to pour
into
Error in steel deck to be
covered
S H E R A T O N H O T E L
SiteSupervision
DRY WALL
• Pink for fire resistor wall
• Green for water resistor wall
FITTINGS IN DRY WALL INNER LAYER INSULATION
S H E R A T O N H O T E L
RequestForInfomation
Request for Information, is a formal request for clarification or additional information about a project.
RFIs are a common part of construction projects and are used to resolve ambiguities and gaps in
documentation.
Location: Gaushala,Kathmandu
Client: NA
Type of Project: Site Analysis and Measurement
The building is located at Gaushala Chowk, close to the main road,
offering easy accessibility and prominent visibility.
Involvement:
● Measurement of column spacing.
S u m n i m a G h i m i r e
2 0 2 4
GAUSHALASITE
S u m n i m a G h i m i r e
2 0 2 4
MEASUREMENTS
The interior design needs to be reconfigured and adapted to
meet the requirements of a commercial project, ensuring
functionality, aesthetics, and compliance with commercial
space standards and regulations.
Column Layout
SITEVISITAND
ANALYSIS
8.2.1 Problems at column:
Pipes running through columns create significant structural problems,
compromising the integrity of the building and potentially affecting safety and
stability.
8.2.2 Solution:
Retrofitting and jacketing are being applied to reinforce the structure, enhancing
its strength and stability by adding additional support and improving its load-
bearing capacity to address the existing deficiencies
G A U S H A L A S I T E
THANK YOU!
S u m n i m a G h i m i r e
2 0 2 4

More Related Content

PDF
160304- Design Portfolio
PPTX
Modular meet Passive
PDF
BUILDING REPORT- Nalagarh Salon(Shreya Arora).pdf
PDF
JessicaLaseak_Portfolio_F14
PDF
Building Science II
PDF
Jill Schroeter Portfolio
PPTX
AMORE PACIFIC (1)-1.pptx
PPSX
Ar. Bhumika Chudiwala portfolio
160304- Design Portfolio
Modular meet Passive
BUILDING REPORT- Nalagarh Salon(Shreya Arora).pdf
JessicaLaseak_Portfolio_F14
Building Science II
Jill Schroeter Portfolio
AMORE PACIFIC (1)-1.pptx
Ar. Bhumika Chudiwala portfolio

Similar to practicum Presentation Internship Architecture (20)

PPSX
Bhumika chudiwala portfolio
PDF
B11-Adapting+Richards+Medical+Research+Building.pdf
PPTX
Housing gr
PDF
Portfolio of Final semester ( Design Studio 3B )
PDF
[Group] building structure project
PDF
Gulshan Botnia
PDF
Gulshan Botnia
PPTX
150316 case studies
PPTX
NATIONAL & INTERNATIONAL GREEN BUILDING PPT.pptx
PDF
HCA Portfolio
PDF
Prestige Primrose_Brochure.pdf
PDF
Prestige Primrose_Brochure.pdf
PDF
Best Apartment in Gurgaon - Ganga Realty Anantam
PDF
PPTX
Presentations
PPTX
Presentations
PPTX
2224_GIDC_GIFT_PPT_00_R1.pptx
PDF
Ebrahim Bawany insdustrial training institute
PDF
Phase 7D Meeting 1 (4/10/14)
PPT
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Bhumika chudiwala portfolio
B11-Adapting+Richards+Medical+Research+Building.pdf
Housing gr
Portfolio of Final semester ( Design Studio 3B )
[Group] building structure project
Gulshan Botnia
Gulshan Botnia
150316 case studies
NATIONAL & INTERNATIONAL GREEN BUILDING PPT.pptx
HCA Portfolio
Prestige Primrose_Brochure.pdf
Prestige Primrose_Brochure.pdf
Best Apartment in Gurgaon - Ganga Realty Anantam
Presentations
Presentations
2224_GIDC_GIFT_PPT_00_R1.pptx
Ebrahim Bawany insdustrial training institute
Phase 7D Meeting 1 (4/10/14)
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Ad

Recently uploaded (20)

PDF
intro_to_rust.pptx_123456789012446789.pdf
PPTX
2. Competency Based Interviewing - September'16.pptx
PDF
Chalkpiece Annual Report from 2019 To 2025
PPT
WHY_R12 Uaafafafpgradeaffafafafaffff.ppt
PPTX
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
PDF
GSH-Vicky1-Complete-Plans on Housing.pdf
PPTX
UI UX Elective Course S1 Sistem Informasi RPS.pptx
PPT
EthicsNotesSTUDENTCOPYfghhnmncssssx sjsjsj
PDF
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
PPTX
Final Presentation of Reportttttttttttttttt
PPTX
VERNACULAR_DESIGN_PPT FINAL WITH PROPOSED PLAN.pptx
PPTX
22CDO02-IMGD-UNIT-I-MOBILE GAME DESIGN PROCESS
PPTX
22CDH01-V3-UNIT-I INTRODUCITON TO EXTENDED REALITY
PDF
How Animation is Used by Sports Teams and Leagues
PPTX
8086.pptx microprocessor and microcontroller
PDF
1 Introduction to Networking (06).pdfbsbsbsb
PDF
THEORY OF ID MODULE (Interior Design Subject)
PDF
The Basics of Presentation Design eBook by VerdanaBold
PDF
analisis snsistem etnga ahrfahfffffffffffffffffffff
PPTX
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx
intro_to_rust.pptx_123456789012446789.pdf
2. Competency Based Interviewing - September'16.pptx
Chalkpiece Annual Report from 2019 To 2025
WHY_R12 Uaafafafpgradeaffafafafaffff.ppt
Necrosgwjskdnbsjdmdndmkdndndnmdndndkdmdndkdkndmdmis.pptx
GSH-Vicky1-Complete-Plans on Housing.pdf
UI UX Elective Course S1 Sistem Informasi RPS.pptx
EthicsNotesSTUDENTCOPYfghhnmncssssx sjsjsj
The Complete Guide to Buying Verified Stripe Accounts 2025.pdf
Final Presentation of Reportttttttttttttttt
VERNACULAR_DESIGN_PPT FINAL WITH PROPOSED PLAN.pptx
22CDO02-IMGD-UNIT-I-MOBILE GAME DESIGN PROCESS
22CDH01-V3-UNIT-I INTRODUCITON TO EXTENDED REALITY
How Animation is Used by Sports Teams and Leagues
8086.pptx microprocessor and microcontroller
1 Introduction to Networking (06).pdfbsbsbsb
THEORY OF ID MODULE (Interior Design Subject)
The Basics of Presentation Design eBook by VerdanaBold
analisis snsistem etnga ahrfahfffffffffffffffffffff
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx
Ad

practicum Presentation Internship Architecture

  • 1. PRACTICUM S U M N I M A G H I M I R E 2 0 0 7 3 8 @ A R C H I T E R O N E D E S I G N & T R A I N I N G C E N T E R P V T . L T D 2 0 2 4
  • 2. ArchiteroneDesignStudio Location: Dillibazar, Kathamandu Contact: +977 985503991 E-mail: architerone.construct@gmail.com Architect: AR. Purna Bd. Shrestha Field of Expertise: • Design Consultation • Replanning and Redesigning • Site supervision • Landscape Design • Interior Designs OFFICE HIERARCHY: Chairman AR. Purna Bd. Shrestha Senior Engineer Architect Structural Engineer ER. Ashim Shrestha AR. Purna Bd. shrestha ER. Satya S. Shrestha IT Department Mr. Arjun Shrestha S u m n i m a G h i m i r e 2 0 2 4
  • 3. Janakpur Residence ● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS ● 3D VISUALISATION, SKETCHES, RENDERS SANN Intl. College ● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS ● 3D VISUALISATION, SKETCHES, RENDERS Janakpur Hotel ● WORKING DRAWINGS ● ELECTRICAL AND SANITARY DRAWINGS ● MATERIAL INVENTORY Marcopolo Rooftop Restaurant ● PRELIMINARY SKETCHES/CONCEPTUAL DRAWINGS ● 3D VISUALISATION, SKETCHES, RENDERS ● PRESENTATION DRAWINGS 01 02 03 04 PRACTICUM REPORT CONTENTS
  • 4. GKCC (GOPI KRISHNA COMMERCIAL COMPLEX) ● OPTIONS CREATING, HIT AND TRIAL Satish Residence ● MUNICIPALITY DRAWING Sheraton Hotel ● PREPARATION OF BILL ● MATERIAL INVENTORY ● RFI 05 06 07 PRACTICUM REPORT CONTENTS Site Visit ● SITE LAYOUT 08
  • 5. SANN INTERNATIONAL COLLEGE S u m n i m a G h i m i r e 2 0 2 4
  • 6. INTRODUCTION Location: Chandragiri, Kathmandu Client: Karna Bd. Shahi Type of Project: Redesigning Former Design Assigned Date: Asoj 15th, 2081 Total Area: 5076 sq. m. Requirements: • Floor plans - 2D Layouts • 3D Modelling • Render Involvement: • Floor plans - 2D Layouts • 3D modelling in SketchUp S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e 2 0 2 4
  • 7. Previously Designed Building S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e 2 0 2 4 Planning  Trying few geometrical forms dividing high school and primary block.  A divider placed in between two blocks with half a story height difference in plinth level of both the block. i.e 1.65m FORM CONCEPTUAL DESIGN
  • 8. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e 2 0 2 4 Planning  Trying few geometrical forms dividing high school and primary block.  A divider placed in between two blocks with half a story height difference in plinth level of both the block. i.e 1.65m FORM CONCEPTUAL DESIGN
  • 9. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans Ground Floor Plan 1134 SQ.M 1. Grand entrance with ample seating area-295 SQ.M 2. Office-1-64.3 SQ.M 3. Exam Centre Hall-365 SQ.M. 4. Teacher’s Room-58.6 SQ.M 5. General Infirmary-63.25 SQ.M 6. Server & IT room-63.25 SQ.M WASHROOM 1:12 RATIO 2-CUBICLES FOR LADIES 2-CUBICLE FOR GENTS 6- URINALS Grand entrance with ample seating area Office-1 Exam Centre Hall Teacher’s Room General Infirmary Server & IT room S u m n i m a G h i m i r e
  • 10. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans First Floor Plan 1134 SQ.M 1. Meeting hall-125 SQ.M 2. Office-2&3-64.3 SQ.M 3. Chemistry Lab-365 SQ.M. 4. Chemical storage room-63.25 SQ.M 5. Teacher’s Room-58.6 SQ.M 6. Classrooms-63.25 SQ.M WASHROOM 1:24 RATIO Meeting hall Office-2&3 Chemistry Lab. Chemical storage room Teacher’s Room Classrooms S u m n i m a G h i m i r e
  • 11. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans Second Floor Plan 1134 SQ.M 1. Physics Lab-365 SQ.M. 2. Storage room-63.25 SQ.M 3. Teacher’s Room-58.6 SQ.M 4. Classrooms-63.25 SQ.M WASHROOM 1:70 RATIO Biology Lab Storage room Teacher’s Room Classrooms Classrooms S u m n i m a G h i m i r e
  • 12. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e 2 0 2 4 FloorPlans Third Floor Plan 1134 SQ.M 1. Biology lab- 365 SQ.M. 2. Storage room-63.25 SQ.M 3. Teacher’s Room-58.6 SQ.M 4. Classrooms-63.25 SQ.M WASHROOM 1:70 RATIO Biology lab Teacher’s Room Classrooms Classrooms
  • 13. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans Fourth Floor Plan 1134 SQ.M 1. Library-365 SQ.M. 2. Teacher’s Room-58.6 SQ.M 3. Classrooms-63.25 SQ.M WASHROOM 1:70 RATIO Library Teacher’s Room Classrooms Classrooms S u m n i m a G h i m i r e
  • 14. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans Fifth Floor Plan 1134 SQ.M 1. Canteen-295 SQ.M. 2. Kitchen- 65 SQ.M 3. Computer Lab- 365 SQ.M. 4. Teacher’s Room-58.6 SQ.M 5. Classrooms-63.25 SQ.M WASHROOM 1:70 RATIO Computer Lab Teacher’s Room Classrooms Canteen Kitchen S u m n i m a G h i m i r e
  • 15. S A N N I N T E R N A T I O N A L C O L L E G E 2 0 2 4 FloorPlans Sixth Floor Plan 1134 SQ.M 1. Auditorium-1340 SQ.M. S u m n i m a G h i m i r e
  • 16. S A N N I N T E R N A T I O N A L C O L L E G E S u m n i m a G h i m i r e 2 0 2 4 • The Racing Track Infront Is Of 100 M. • The road track surrounding the track is used for reversing the busses or any other vehicle since buses are pickup and drop FRONT FAÇADE OF THE BUILDING BRICK CLADDING FAÇADE • Brick cladding was done to match with the bhaleswor mandir situated in Chandragiri height. To show traditional touch and to blend with the surrounding
  • 17. JANAKPUR RESIDENCE S u m n i m a G h i m i r e 2 0 2 4
  • 18. INTRODUCTION Location: Janakpur Client: Dilip Kumar Mahaseth Type of Project: Residential Assigned Date: Kartik 8th, 2081 Requirements: • Client wanted a guest bedroom on top • Two master bedrooms for his two sons • One Master bedroom for himself. • Slight look on VAASTU Involvement: • Floor plans - 2D Layouts • 3D Modelling • Render J A N A K P U R R E S I D E N C E 2 0 2 4 S u m n i m a G h i m i r e
  • 19. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Planning - Private backyard parking and entrance - Executive Office room - Reception with waiting area - Working Hall - Ladies & Gents Toilet CORRECTED DRAWING BY OFFICE SUPERVISOR • Other floors are created based on the ground floorplan
  • 20. Entrance Gate 32’ ROAD Entrance Gate 13’ ROAD J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Planning NE N W E S NW SW SE VAASTU accordance: - Working Area (G.F)/ Kitchen (F.F) (SE)- Fire Zone/Active Energy - Reception (N)- Abundance - Office (NE)- Calm Energy - Toilet (F.F, S.F, T.F) (NW)- Cancels out negative energy
  • 21. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Layouts F I R S T F L O O R P L A N 1 8 6 3 S Q . F T - Master bedroom with walk in closet and att. Toilet bath - Living room below. - Entertainment area - Kitchen & dining with outdoor breakfast area
  • 22. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Layout S E C O N D F L O O R P L A N 1 8 6 3 S Q , F T . - Master bedroom with walk in closet and att. Toilet bath - A void area that is open to living room below. - Family room space - Master bedroom with large bathroom and balcony
  • 23. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Zoning T H I R D F L O O R P L A N 7 2 0 S Q . F T . - Guest bedroom - Common Toilet / Bath - Open Terrace - Puja room
  • 24. 3DRender J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4 Greeneries were added to enhance the looks of the building A porch with steps outside an office area serving as a welcoming entryway, providing a functional transition between the exterior and interior Truss structure is built with roof to provide a modern outdoor sitting and to minimize heat for the immediate floor below. Since it is a semi commercial building, Lower Floor being the office. Patio is created to access in to the main reception area. RCC cover is created over every window 1. For shading purpose 2. To shelter from the rain
  • 25. Challenges • The 3D design changes were asked rapidly at a space of 2 days and it was a very short time to change the demanded design • The design and choice of window greatly matters the outer looks, but because of lack of knowledge of door and window materials the design process got slower. • Design was created with little to less knowledge about the site condition as I haven’t visited the site yet. J A N A K P U R R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4
  • 26. JANAKPUR HOTEL S u m n i m a G h i m i r e 2 0 2 4
  • 27. INTRODUCTION Location: Janakpur Client: Kusheshwor Mahat Type of Project: Hotel Assigned Date: Kartik 21st, 2081 Requirements: • Floor plans - 2D Layouts • 3D Modelling • Render • Electrical & Sanitary Drawing • Section of Toilet Involvement: • Electrical & Sanitary Drawing • Section of Toilet J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4
  • 28. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 ElectricalDrawing
  • 29. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 ElectricalDrawing
  • 30. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 ElectricalDrawing • In this project, the electrical wiring and points are highlighted which determines the exact position of light fixtures to be placed as per the requirements stated by the client. • Some of the fixtures desired by clients for potential placement are provided
  • 31. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 ectricalDrawing Layout
  • 32. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 ElectricalDrawingSection
  • 33. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4 WaterSupply and SanitaryDrawing Hot water pipes and cold-water pipes are indispensable elements in a building’s plumbing infrastructure, serving key roles in comfort, hygiene, safety, and the overall functionality of the space. Pipeline for the hot and cold-water pipe was passed through the duct which was constructed for them specifically.
  • 34. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4
  • 35. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
  • 36. Having said that, after recent visit to Janakpur. Client had asked to add the top two floors as the restaurant. To which our team had gone there to have a look at the site again, so that we could have a clear visualization of the site and surrounding to create designs. But unfortunately, the contractor client hired had not placed the placements as per the drawing. Which was an additional work to redesign as per the current situation. J A N A K P U R H O T E L S u m n i m a G h i m i r e 2 0 2 4
  • 37. J A N A K P U R H O T E L 2 0 2 4 Bulge on the wall S u m n i m a G h i m i r e
  • 38. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e Fixtures that are required in the project For e.g. in this case sanitary fixtures were required thus the marketing research people visits the office and they present their products to our office including the client and they provide the necessary details required for the drawing completion. MATERIAL INVENTORY (SANITARY FIXTURES)
  • 39. J A N A K P U R H O T E L 2 0 2 4 SanitaryDrawingSection S u m n i m a G h i m i r e
  • 40. J A N A K P U R H O T E L 2 0 2 4 S u m n i m a G h i m i r e
  • 41. MARCOPOLOROOFTOP RESTAURANT S U M N I M A G H I M I R E 2 0 2 4
  • 42. INTRODUCTION Location: Kamalpokhari Chwok, Kathmandu Client: Indreni Multipurpose Investment .Co Type of Project: INTERIOR DESIGNING (Restaurant & Bar) Assigned Date: Kartik 26th, 2081 Requirements: • Floor plans - 2D Layouts • 3D Modelling • Render • BOQ Involvement: • Floor plans - 2D Layouts • 3D modelling • Render S A N N I N T E R N A T I O N A L C O L L E G E S U M N I M A G H I M I R E 2 0 2 4
  • 43. M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E 2 0 2 4 Planning Raised deck to conceal the pipe lines Kitchen is proposed on existing structure GENERAL PLANNING
  • 44. Proposals Total seatings of 56 people, taking 28 guest rooms times two. Meeting the goal 60 people accommodation was created as seen in the first proposal.
  • 45. FinalLayout Following is the final plan that was corrected by the supervisor:
  • 46. M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E 2 0 2 4 Branding Wall Raised Deck Plat Partition with the flower beddings Extra added pillar to match other two duct voids Enhancin g the existing trellis Beer Garden
  • 47. Challenges • Since the structure is 30 years+ old, the first issue was to create a light weight structure while fully water proof. • Concealing the existing duct while maintaining the aesthetics of restaurant. M A R C O P O L O R O O F T O P R E S T A U R A N T S U M N I M A G H I M I R E 2 0 2 4 Lessons • Zoning is primarily important to ensure a smooth transition in design. • Loose furniture are easy to create a greater number of seating abbreviations in design.
  • 48. GOPI KRISHNA COMMERCIAL COMPLEX S u m n i m a G h i m i r e 2 0 2 4
  • 49. INTRODUCTION Location: Gopi Krishna, Chabahil Client: Owner of Gopi Krishna cinemas Type of Project: mixed- used Assigned Date: Mangsir 2nd, 2081 G K C C S u m n i m a G h i m i r e 2 0 2 4 CLIENT INTENTION: INVOLVEMENT •100 Room + Hotel -Apartment •Apartment -Penthouse •Shopping mall •Casino •Theatre •Conference Hall •Swimming Pool / Fitness Centre
  • 50. CURRENT SCENARIO OF PROJECT: TOTAL LAND AREA: 4454 sq. m  Adjoined By Existing Building from Project [ Gopi Krishna Cinemas]  Road in the middle So, We Are Trying to Perform Land pooling Under the Guidance of KVDA  A 66kv High Tension Line Is Going Through the Project.  2 towers hotel tower - 12 storey apartment tower – 15 storey SITE PLAN ● The staircase is only to be dismantled and the remaining cinema hall gets renovated Fig: PT WIRE BEAMLESS SLAB
  • 51. FINALSITEPLAN BYE LAWS: Total Land Area: 4454.00 sq. m. Road Plot: 125.00 sq. m. GCR permissible: 50% (2227.00 sq. m.) FAR permissible: 4.5 (20043.00 sq.m) Apartment Tower:52.0 m Setback: 7.0 m Hotel Tower: 42.0 m Setback: 6.0 m
  • 54. OPTION-2 APARTMENT CARPET AREA ● This option was refined by supervisor. ● Detailing was done by
  • 59. SATISH RESIDENCE S u m n i m a G h i m i r e 2 0 2 4
  • 60. INTRODUCTION Location: Duwakot, Jhaukhel ChanguNarayan Municipality Client: Satish Shrestha Type of Project: Residence Requirements: • Floor plans - 2D Layouts • 3D Modelling • Render • Municipal Drawing (ARCHITECTURAL, STRUCTURAL) Involvement: ● Corrected the plans as per the change supervisor suggested ● Architectural Municipal Drawing S A T I S H R E S I D E N C E S u m n i m a G h i m i r e 2 0 2 4
  • 61. S A T I S H R E S I D E N C E SITEPLAN Site area: 4074.00 sq.ft. GCR: 60% FAR: 1.75 R.O.W: 3.0m from Road Centre General Setback: 1.5m Setback for shutter: 2.5m Setback from High tension line: 12’-0” Since the land is above 8-aana, the permissible Ground coverage ratio (GCR) is only 60%. Meanwhile FAR for this project is 1.75 The road is only 3m wide, and hence the R.O.W is 3m from centre of the road. We have left another 8’-0” after the R.O.W just incase the client would want to make temporary truss structure with rolling shutter for shop purpose.
  • 62. S A T I S H R E S I D E N C E Involvement ● Slight angled wall of the western direction was changed to straight wall. ● The building placement was leaving 5m setback as previously it was attached to the wall with no openings. ● Openings were added ● Pillar size was differed
  • 63. S A T I S H R E S I D E N C E Architectural Drawing
  • 64. SHERATON HOTEL S u m n i m a G h i m i r e 2 0 2 4
  • 65. INTRODUCTION Location: Thamel, Kathmandu Client: MIT Group Holdings Nepal PVT. LTD Type of Project: 5-Star Hotel Requirements: ● Checking and confirming IPC(Interim Payment Certificate), VO(Variation Order), (which means if there is any change from initial objective, and the work is changed) ● Confirming BOQ ● Consulting with project director and allied manpower or domestic contractors, refining the shop drawing Involvement: ● Helping to create RFI ● Assisting with Quantity verification of loose furniture provided by the Interior firm based on Singapore S H E R A T O N H O T E L S u m n i m a G h i m i r e 2 0 2 4
  • 66. S H E R A T O N H O T E L CrossCheckofQuantities&SpecifyingIDasper specificationsanddrawingprovided 1. To check the quantities the drawings are provided by the designed company as given below.
  • 67. S H E R A T O N H O T E L 2. The ID number specified by the company is placed on top right corner of the drawing like illustrated below 3. The catalogue provided by the company shall be tallied and their specified name and the number of quantities must be counted by proxy method. (Proxy method in this case is separating the numbered layer and sorting them one by one.)
  • 68. S H E R A T O N H O T E L 4. The naming of the specified id furniture or fixtures is confirmed by the catalogue also provided by the company and its size, name and billing is done. NAME OF THE PRODUCT The sizes are also provided to jot down the given sizes in the BOQ for further billing.
  • 69. S H E R A T O N H O T E L BillofQuantities
  • 70. S H E R A T O N H O T E L SiteSupervision Error in steel deck which is later welded Poly urathene foam is added to conceal any gaps for 50 mm thick concrete to pour into Error in steel deck to be covered
  • 71. S H E R A T O N H O T E L SiteSupervision DRY WALL • Pink for fire resistor wall • Green for water resistor wall FITTINGS IN DRY WALL INNER LAYER INSULATION
  • 72. S H E R A T O N H O T E L RequestForInfomation Request for Information, is a formal request for clarification or additional information about a project. RFIs are a common part of construction projects and are used to resolve ambiguities and gaps in documentation.
  • 73. Location: Gaushala,Kathmandu Client: NA Type of Project: Site Analysis and Measurement The building is located at Gaushala Chowk, close to the main road, offering easy accessibility and prominent visibility. Involvement: ● Measurement of column spacing. S u m n i m a G h i m i r e 2 0 2 4 GAUSHALASITE
  • 74. S u m n i m a G h i m i r e 2 0 2 4 MEASUREMENTS The interior design needs to be reconfigured and adapted to meet the requirements of a commercial project, ensuring functionality, aesthetics, and compliance with commercial space standards and regulations. Column Layout
  • 75. SITEVISITAND ANALYSIS 8.2.1 Problems at column: Pipes running through columns create significant structural problems, compromising the integrity of the building and potentially affecting safety and stability. 8.2.2 Solution: Retrofitting and jacketing are being applied to reinforce the structure, enhancing its strength and stability by adding additional support and improving its load- bearing capacity to address the existing deficiencies G A U S H A L A S I T E
  • 76. THANK YOU! S u m n i m a G h i m i r e 2 0 2 4